Loading...
20020706.pdfHeight Calculation/Grading Verirication Worksheet Address: Permit#: 9c>-:0-O-?OG Date: A. Datum Point: B. Datum Point Elevation: C. Average Grade: (21 3. Maximum Elevation Allowed: 9 (average grade) + 25' 4. Reference Point Elevation Shot to House: to house) (datum elevation; + '�31D (grade to transit level line shot 2sf, 6. Measurements from line shot onto house to Toof ridge: 13,0 Total: D ITS 7. Actual Elevation: (reference point elevation) +?2.-51(measurements from 46) Conclusion: eater /0:.:s:s: 7th� (allowed); therefore the house isi (actual) is gr is not over the height requirement per ECDC 16.20.30 requirements L:\T.EMP\BUILDING\MISC\Height4CalculationGrading Verification Worksheet.doc Z! 0 m C m 00 0 C M: M Z CE O-n ,n r", m m 0 0 0 R� co ma z Z: z m y— k �,7 F--7 cl -70 11.-115 0 J�T.o 'et 9i; rn R, &vv m o +97 -r' al Eq Cp 77 L�07 PT, b�-,v t-0 7 Tt� OVED BY PLANNWL�,_ rr L9-- 01 FINAL PROJECT APPROVAL FORM TO: DATE:—:� MEMOTO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ME DEPARTMENT DATE,�.. -----ENGINEE GDIVISIONDATE-X361.93- DIVISION DATE PROJECT SITEADDRESS (4&-4 clo-lk Am. W, PERM oo;t - 07 PL—ADB#—_DATE INSPECTED 0 DESCRIPTION OF WORK TO BE INSPECTED 13A L- A field inspection was conducted to determine final compliance with approved plani. Final approval denotes that there are no objections from the above signed Department to the release of P_ERFORMANCE BONDS and the granting of: �--�GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED a Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign_ ocaprvl.doc.l:temp:bldg:fomisIO/OI z M M 0 0 80 C --i C , I X M M Z 0-4 0 n M M 0 0 M a co K W Q 0 Z .q� M --I 3: > z co z M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED nns SET13ACKS ................... FOUNDATION: Footing.............. wall ........... z Pier/Porch ................. Retaining Wall ........... Slab Insulation PLUMBING: x U IT C ............. MUnderground 0 0 Rough -In ... ................ ....... . . Commercial Final IT, M HEATING: > Gas Test .......... Gas Piping ........... 0 'n Equipment ................. A Commercial Final 0 EXTERIOR SHEATHING d 0 H NAILING ................ -3 ­7 M 0 FRAMING ................ Z 74 FIRST FLOOR FRAMIN G INSULATION .................. Floor Insulation z Wall Insulation co z Calling Insulation 0 SHEETROCK NAILING M SPECIAL INSPECTION MISCELLANEOUS FINAL APPROVAL FOR 0-03 OCCUPANCY ...............