20020706.pdfHeight Calculation/Grading Verirication Worksheet
Address: Permit#: 9c>-:0-O-?OG
Date:
A. Datum Point:
B. Datum Point Elevation:
C. Average Grade: (21
3. Maximum Elevation Allowed: 9 (average grade) + 25'
4. Reference Point Elevation Shot to House:
to house)
(datum elevation; + '�31D (grade to transit level line shot 2sf,
6. Measurements from line shot onto house to Toof ridge:
13,0
Total: D ITS
7. Actual Elevation: (reference point elevation) +?2.-51(measurements from
46)
Conclusion:
eater /0:.:s:s: 7th� (allowed); therefore the house isi
(actual) is gr
is not over the height requirement per ECDC 16.20.30 requirements
L:\T.EMP\BUILDING\MISC\Height4CalculationGrading Verification Worksheet.doc
Z!
0
m
C
m 00
0 C
M:
M Z
CE
O-n
,n
r",
m m
0
0
0 R�
co
ma
z
Z:
z
m
y— k �,7
F--7
cl
-70
11.-115 0 J�T.o
'et 9i;
rn R,
&vv
m o
+97
-r' al
Eq
Cp
77
L�07
PT,
b�-,v
t-0 7
Tt�
OVED BY PLANNWL�,_
rr L9--
01
FINAL PROJECT APPROVAL FORM
TO:
DATE:—:�
MEMOTO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: ME DEPARTMENT DATE,�..
-----ENGINEE GDIVISIONDATE-X361.93-
DIVISION DATE
PROJECT
SITEADDRESS (4&-4 clo-lk Am. W,
PERM oo;t - 07
PL—ADB#—_DATE INSPECTED 0
DESCRIPTION OF WORK TO BE INSPECTED 13A L-
A field inspection was conducted to determine final compliance with approved plani. Final approval
denotes that there are no objections from the above signed Department to the release of
P_ERFORMANCE BONDS and the granting of:
�--�GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
a Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
a Copy of CORRECTION NOTICE given to owner/contractor by inspector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date_ Sign_
ocaprvl.doc.l:temp:bldg:fomisIO/OI
z
M
M 0
0
80
C
--i C , I
X M
M Z
0-4
0 n
M M
0
0 M
a co
K W
Q 0
Z
.q�
M
--I
3:
>
z
co
z
M
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
nns
SET13ACKS ...................
FOUNDATION:
Footing..............
wall ...........
z
Pier/Porch .................
Retaining Wall ...........
Slab Insulation
PLUMBING:
x
U IT
C
.............
MUnderground 0
0
Rough -In ... ................
....... . .
Commercial Final
IT,
M
HEATING:
>
Gas Test ..........
Gas Piping ...........
0 'n
Equipment .................
A
Commercial Final
0
EXTERIOR SHEATHING
d
0
H
NAILING ................
-3 7
M 0
FRAMING ................
Z
74
FIRST FLOOR FRAMIN G
INSULATION
..................
Floor Insulation
z
Wall Insulation
co
z
Calling Insulation
0
SHEETROCK NAILING
M
SPECIAL INSPECTION
MISCELLANEOUS
FINAL APPROVAL FOR
0-03
OCCUPANCY ...............