Loading...
20020708.pdfV PERMITEXPIRES CITY OF ZO HE AQ PERMIT ) EDMONDS - NUMBER 0 CONSTRUCTION PERMIT APPUCATION joassrs ADD SUITEIAPT# - OW Be NAMENAME OF BUSINESS - - - - - - I 0:�0,4�w-��, FLAT NAMEISU13DIVISI.N 1111. LOT NO. LI NO. MAI ING ADDRESS LID F E IT PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP Trisco 4­­ as. — Pa., paaa� C" Z ITILEP10116, ­Y)b - w I EXISTING - PROPOSED - I.p­ RM REQUIRED DEDICATION- FT - w.fte".1- 13 NAME METER SIZE LINE SIZE 110� .1 FIXTURES PRY REQUIRED I YES 0 NO C3 I ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDITAINAGE CITY TELEPHONE I * 1 1 STATE LICENSE NUMBER EXPIRA CHIE[KED BY J�Vng I Obt Cx) j A-% V, V,4 11 [j NEW [] RESIDENTIAL 0 PLUMBING I MECH E] ADDITION COMMERCIAL `34 1 C MPLIANCE OR CHANGE OF USE ol REMODEL 0 APARTMENT 0 SIGN [3 REPAIR 0 "'ING CYDS FENCE 1:1 X Fn 0 DEMOLISH TANK E3 GARAGE 0 RETAINING WALL CARPORT ROOKERY RENEWAL (ME Of� N Meet OF STORIE DESCRIBE WORK TO BE DONE FIRE REVIEWED BY DATE 0 z- VARIANCE OR CU SHORELINE OR ADB# INSPEC!ION O%DC RE . . I PIT GET E3YES E3NO SEPA REVIEW SIGN AREA HEIGHT C EXEMPT ALLOWED PROPOSED AILOW10 PROPOSED �:MPLETE I I , LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR I FRONT LIRSIDE REAR PARKING LOT AREA I PLANNING REVIEWED BY DATE REOLD I PROVIDED I CHECKED By ITYM C79TElUCTION Go UPA ROUP INSPECT079 4no_ 177 I'D :� IT [AREA OCCU NT REQUIRE [3 YES LOAD RENA KIT PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION ack Plan Check HEAT SOURCE GLAZING % T LOT SLOPE % C g PLAN C VPlanh Plumbing Fthshb,n�__ Mechanical Mochanical , THIS PERMIT AUTHORIZES ONLY THE ORKNOTED.1006 PERMIT COVERS WORKTO t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading Grading Recording Fee 2 3 DOMAIN ICURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE 1: SEPARATE PERMISSIOM PERNIff"PUCATION: 160DAYS, PARMETUMMIYEAR, 'PROV"' 0 WORK IS STARTED WITHIN IWDAVS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Cngr. Inspection State Surcharge 'APPLICANT ON BEHALF 011111 OR HER SPOUSE, HEIRI, ASSIGNS AND IUCCEE.Ha Traffic Mitigation Plan Chk Deposit IN INTEREST AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND Fire Review Receipt III ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT HE D EMED TO MODIFY, WAIVE OR RE UCE ANY AEOUIREMENT OF ANY City ORDINANCE 0 Fire Inspection A Total Amount Due 15- _9 0 NOR LIMIT IN ANY WAY THE DRYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. Landscapol-ol Receipt III 1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CO RECT, AND THAT I AM THE OWNER, OR T14 DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC 11— s P-11 1.11 liaa.d by 'be CALL Tjo N; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF TI �ODE 01 THE STATE 0 WASHINGTON RELATING TO 'VaTbilappi dato FOR INSPECTION Ofifidia., Depely. weal F .. ... paid, ad _WpAls,ack ... lodged In space p,mldad, J��RKMEN's C.MPSN ars�N%AND RCVY 18.27. F SIGNED r 1 . BIG 0 (425) I 771-0220 -4-ELFASS 111 q)1,?' DATE 7RtATION EXT 1333 / b, IT IS UN LAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL >21 771-02 , A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 1,001GINAL - FILE YELLO . INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR rotor 01 z 9 0 M 0 M C In 0 0 80 C � C 111 ITT 0 � z " 9n � r hrim z 171 Ad" q > Arm MA�.�q Liiiiij >1 v A T 7 r A 133WSE30th -le", WA 9M- 4 -641-2127 25 Fm, 425-562-6662 440-go .74 VSrAEUMER* NO.9328111SO ---------- 8 i/2'Xll" iSOMETRIC V FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION DATE� FROM: ---YIRE DEPARTMENT �1� �-— GINEERING DIVISION DATE PLANNING DIVISION DATE — PROJECT SITEADDRESS 55 -4 ox C: M PERMIT ADBk —DATE INSPECTED rn 0 80 DESCRIPTION OF WORK TO BE IN SPECTED MM z '0 4 A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of -n PE RFORMANCE BONDS and the granting of: 0 n � M M GRANT FINAL PROJECT APPROVAL 0 V5 0 � 0 M M 0 Z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED > a Copy of CONDITIONS given to owner/contractor by inspector z z FAILED FINAL INSPECTION - OUTSTANDING ISSUES 3 M o Copy of CORRECTION NOTICE given to owner/contractorby inspector 2. 3. RE-INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvl.doc.l:temp:bldg:fomisIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ............. FOUNDATION: Footing _ ................... Wall.......................... PierlPorch ............... z it: Retaining Wall, Slab Insulation .......... ITI PLUMBING: Underground ............. M i` M Rough -in ................... Commercial Final. HEATING: M Z Gas Test ............. C Gas Piping ................. 84 Equipment .......... 0 -n Commercial Final M M EXTERIOR SHEATHING NAILING ................... 0 0 Fn C (a FRAMING .......... ­ ........... ca 0, FIRST FLOOR FRAMING.... INSULATION .................. Floor Insulation z Wall Insulation Ceiling Insulation z SHEETROCK NAILING 0 SPECIAL INSPECTION IT MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................