20020771.pdf/c,
tv�
ACCEPTABLE TIGHTLINE 15o CITY COPY
MATERIAL
SDR 35
s 40
12 FIRE AND AID AUDHESS SIUMI REQUIRED
Is RE n1w
FOR
EROsi N Ui� i"HoL,
W
to'urtL ir
N,
--APPROVED
AS NOTED
BY EN INEERING
jq
4e
Date�,
"T
fV
907.
Tal&u: 422.6 "r"j
m
I.L WATER &
SEWER
INSPECTIONS REQD
CALL 425-771-0220 EXT, 1326
ALL EXPOSED SURFACE9 TO
BE COVERED WITHIN 2 DAYS
L-_ BUILDING DEPT,
-- J
c ITY Qopy
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE
IT IS DUE TO THE QUALITY OF THE DOCUMENT.
IN.
LOT *F SHOAT FL^T
e__ C6r*i air
smo—, "it" P-o" W& CITY COPY
IJ
174.0
j; Ju.
to urmt-r- t5*.z-PAT
)Pl
E -iGi4T CALC5
A iv!�f
So 7
LNi17 .7
EL
A 0 P q r ED
rAT'U#4 Pt.;m4T
Ew� SSW. m
roe e, It 5.31
Height Calculation Worksheet
C ALx- ry
Address.
Date:
hispector(s): W
1. Datum Point: h,*-�
Z-
2. Datum Point Elevation:
0'
In
3
4
3. Average Grade: r)5 I
4. Maximum Elevation Allowed: _LOI>.-'?.(averagegrade)+25'-
0 m
m
C
5. Referenc e Point Elevation Shot to House:
(datum elevation) (grade to transit level line shot to house)= 1 o'7- 1, -FF-
Inz
':
, ,
6. Measurements from line shot onto house to roof ridge:
c� L
m In"
C)
0
S
z
Total 3 A
In
7. Actual Elevation, (reference voint elevation) (measurements
from #6)
io
conclus 'n:
(actual) is gre 0, (allowed); therefore the'house is/
is not over the height requirement- per ECDC 16.20.30 requirements
EM
FINAL PROJECT APPROVAL FORM
TO:
DATE:
MEM0 TO: PERMT COORDINATOR, BUILDING DIVISION
FROM: DEPARThiMT DATI�-
-D- 6(Lgq2E1 DIVISIONDATE_ALI/0
r --- 7--
NJNGDIVISIONDAIE�-
sns ADDRESS 6�k A)
PM;Mff ��00 9 62� DATE 9 INSPECTED—:fj 2, 0 3
DESCRIPTION OF WORK To BE JNSPECTED_jELLA��.�.
A field inspection was conducted to determine fmal compliance with approved plans. Final approval
denotes that th e o objections from the above signed Department to the release of
er aSnand the granting of
PERFORMANCE B
---�ZGRANT FINAL PROJECT APPROVAL
GRANT PROJECT "PROVAL YM CONDM- ONS NOTED
t3 Copy ofCONDMONS given to owner/contractorby inspector
FAMED FINAL INSPECTION - OUTSTANDING ISSUES
a Copy of CORRECTION NOTICE given to owner/contractor by inspector
2.
3.
RE INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Sign,
--I. d— A -t� !hldv!fh� I ft/n 1
z
M
MO
0
C
M
M z
jo
3.:
0 -n
n �
3:9
M M
C, -M
C rj)
9 (j) i
M 0
Z
M
>
z
z
3
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
�z cp—
SETBACKS ...................
FOUNDATION:
Footing _ ....................
Wall. .......................
Pier/Porch ..................
Retaining Wall ...........
Stab Insulation ..........
PLUMBING:
3:
Underground
ITI
Rough -in ..........
-10
0
Commercial Final
C
M Mz
HEATING;
ms
jo
Gas Test ................
7- O's
-4
Gas Piping
Equipment .............
-4
x
Commercial Final
m
EXTERIOR SHEATHING
NAILING k6s
0
0
.........................
ITI
FRAMING ..................
FIRST FLOOR FOAMING.
0:
Z
0-3
INSULATION ................
Floor Insulation
z
Wall Insulation ...........
C/)
Ceiling Insulation
z
SHEETROCK NAILING...
I'D
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
5
S desewer#_aG
DdePurchased 771.,000"