Loading...
20020771.pdf/c, tv� ACCEPTABLE TIGHTLINE 15o CITY COPY MATERIAL SDR 35 s 40 12 FIRE AND AID AUDHESS SIUMI REQUIRED Is RE n1w FOR EROsi N Ui� i"HoL, W to'urtL ir N, --APPROVED AS NOTED BY EN INEERING jq 4e Date�, "T fV 907. Tal&u: 422.6 "r"j m I.L WATER & SEWER INSPECTIONS REQD CALL 425-771-0220 EXT, 1326 ALL EXPOSED SURFACE9 TO BE COVERED WITHIN 2 DAYS L-_ BUILDING DEPT, -- J c ITY Qopy NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. IN. LOT *F SHOAT FL^T e__ C6r*i air smo—, "it" P-o" W& CITY COPY IJ 174.0 j; Ju. to urmt-r- t5*.z-PAT )Pl E -iGi4T CALC5 A iv!�f So 7 LNi17 .7 EL A 0 P q r ED rAT'U#4 Pt.;m4T Ew� SSW. m roe e, It 5.31 Height Calculation Worksheet C ALx- ry Address. Date: hispector(s): W 1. Datum Point: h,*-� Z- 2. Datum Point Elevation: 0' In 3 4 3. Average Grade: r)5 I 4. Maximum Elevation Allowed: _LOI>.-'?.(averagegrade)+25'- 0 m m C 5. Referenc e Point Elevation Shot to House: (datum elevation) (grade to transit level line shot to house)= 1 o'7- 1, -FF- Inz ': , , 6. Measurements from line shot onto house to roof ridge: c� L m In" C) 0 S z Total 3 A In 7. Actual Elevation, (reference voint elevation) (measurements from #6) io conclus 'n: (actual) is gre 0, (allowed); therefore the'house is/ is not over the height requirement- per ECDC 16.20.30 requirements EM FINAL PROJECT APPROVAL FORM TO: DATE: MEM0 TO: PERMT COORDINATOR, BUILDING DIVISION FROM: DEPARThiMT DATI�- -D- 6(Lgq2E1 DIVISIONDATE_ALI/0 r --- 7-- NJNGDIVISIONDAIE�- sns ADDRESS 6�k A) PM;Mff ��00 9 62� DATE 9 INSPECTED—:fj 2, 0 3 DESCRIPTION OF WORK To BE JNSPECTED_jELLA��.�. A field inspection was conducted to determine fmal compliance with approved plans. Final approval denotes that th e o objections from the above signed Department to the release of er aSnand the granting of PERFORMANCE B ---�ZGRANT FINAL PROJECT APPROVAL GRANT PROJECT "PROVAL YM CONDM- ONS NOTED t3 Copy ofCONDMONS given to owner/contractorby inspector FAMED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Sign, --I. d— A -t� !hldv!fh� I ft/n 1 z M MO 0 C M M z jo 3.: 0 -n n � 3:9 M M C, -M C rj) 9 (j) i M 0 Z M > z z 3 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED �z cp— SETBACKS ................... FOUNDATION: Footing _ .................... Wall. ....................... Pier/Porch .................. Retaining Wall ........... Stab Insulation .......... PLUMBING: 3: Underground ITI Rough -in .......... -10 0 Commercial Final C M Mz HEATING; ms jo Gas Test ................ 7- O's -4 Gas Piping Equipment ............. -4 x Commercial Final m EXTERIOR SHEATHING NAILING k6s 0 0 ......................... ITI FRAMING .................. FIRST FLOOR FOAMING. 0: Z 0-3 INSULATION ................ Floor Insulation z Wall Insulation ........... C/) Ceiling Insulation z SHEETROCK NAILING... I'D SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 5 S desewer#_aG DdePurchased 771.,000"