20020802.pdf— —
"I I I
'D—ATEREC""
I
I I _L_
LAVI, t
,IV
PERMIT EXPIRES
CITY OF Elii�ONDS
ZONE PERMIT
NUMBER
CONSTRUCTION PERMIT APPLICATION
JOB SUITE/APT#
—H NAMEINAME OF CUISINE S
-rogL :Zl1fAL-t-_. _)�' I
mA -,
PLAT NAME/SUBDIVaION NO. LOT NO.
a��s A cL?.f-q LO',A
Lt. FEE $
MAI L I NO AD DRE Be M 9 1 "fST" 4A "�4_'_T , I�nrll
CITY
B.0 D G ,IT, WAY PER OFFICIAL STREET MAP
EXISTING
.1 no,
o"..' L.. 1-11 -sod
I —so
ZIP
P�LEPIIONE
— PROPOSED —
REQUIRED DEDICATION— FT
METER SIZE LINE SIZE NO. OF FIXTURES
REQUIRED
J 1, A
I
I
YEPROV NO 13
EU
13-x 3351U
CITY ZIP TEL PHONE
:5kA'rrLr-- CfOj_�� 07'?l 1.) - 007 1
STATE LICENSE NUMBER EXPRIjAT(DATE
FIZ05r-1 ml� 0 -7 IL44
I (Mt
PROPERTY TAX ACCOUNT PARCEL NO.
004f.100ol clo) 01
0 NEW PLUMBINGIMECH
ADDITION COMPLIA CE OR
CHANGE OF USE
REMODEL SIGN
rj F NCE
REPAIR GRADING CYDS X_Fh
DEMOLISH TANK r-1 OTHER
0 RETAININGWALL
GARAGE F HE SPRINKLER
Pm_ ROCKERY FIRE ALARM
----..-CA
--- —
(TYPE OF USE. BUSINESS OR ACTIVITY) EXPLJJN;
NUMBER
OF
STORIES
sI0
DESCRIBE WORK TO BE DONE
9 F_
ISE REVIEWED By DATE
J\VARIANCEORCU I SHORELINEORADBN tN_6P_ECT1_0N_r__7BOND
LOT COVERAGE I REQUIRED SETBACKS (FT.) I PROPOSE SETBA
I, PARKING I LOT AREA I P� IEWEDP BAT
D I PROVIDED
CHECKED BY ITYPE
SPECI LINSPECTION
REQUIRED 0 YES
0 CUPANT
GROUP
Description
FEE
Description
FEE
Plan Check
State Surcharge
HEAT SOURCE LOT SLOPE %
Building Permit
City Surcharge
PLAN CHECK NO: TED DATE
Plumbing
ch.m..'
THIS PERMIT AUTHORIZES ONLYTHE IN RKNOTED, THIS PERMIT COVERS WORK TO
t: BE DOME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
a
Grading
DOMAIN ACURVIS, SIDEWALKS, DRIVEWAYS MAR UEES, ETC) WILL REQUIRE
3
SEPARATE PERM;SSIO'N'.
Eng, Review
PER ITAPPLICATION: HSODAYS
PERMIT LIMIT I VE AR-PROVID 0 WORK IS STARTED WITHIN IGODAYS
Engr, Inspection
SEE a OF PINK PERMIT FDA MORE INFORMATION
____ACK
'APPUCANt' ON BEHALF OF HIS OR HER SPOUSE , "EIRS, ASSIGNS AND SUCCESORS
Fire ReView
Plan Chk. Deposit
IN INTEREST' AGREES TO INDEMNIFY, DEFEND AND HOLD 14ARMLESS THE GIN OF
EMPLOYEES, FRO AND
EDMOND ITS OFFICIALS. AND AGENTS ANY
INDIRECTLY
L C-MS'WA'R"D`AGMTA0RS 01 WHATEVER NATURE, 411SING DIRECTLY ORM
Fire Inspection
Receipt #
PROM THE "SUANG, OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY' WAIVE OR REDUCE ANY REOUIREMENT OF My C Ty ORDINANCE
LandscapeInsp.
I
Total Ana, Due
NOR LIMIT IN ANY WAY THE CITYS ASILRY TO ENFORCE ANY ORDINANCE PROVISION..
Recording Fee
IHEREUY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION
0
GIVEN IS CORRECT, AND THA M-1 IWN" R THE D UY AUTHORIZED AGENT OF
APPLICATION APPROVAL
try AN6
PLY WRtE0.1
THE OWNER. I AGREE TO 4 S'A'S LAWS REGULATING CONSTRUC.
..r
CALL
nook, Ion Is nd a ponnit,nit olgo.d by on,
TION; AND IN DOING THE WdS'n.71LZTE..E1..A.TE-b.. IEFIS N WILL GE EMPLOYED
Co. 9 ,
IN VIOLATION OF THWBOF , T F WASHINGTON RELATING TO
FOR INSPECTION
Suillhis
ding Offid.1 hDInd ospoly; ond F - Pon, no v
gU�A F
WORK�EY'S C . OMPEYSATION INSU�A E AN? RCW 18.27�
IrA ENT) DATE I NED
(425)
AL
0'70 N 10 JDAT
2-
771-0220
�7y'j
-RELEAM)BY DATE
ENTION
Off 1333
OR 0111 IPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL 08 A CERTIFI-
ORIGINAL -FILE - YELLOV" INSPECTOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
PINK -OWNER - GOLD -ASSESSOR
04102 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING
z
0
d
0
C IT
M 0
0
80
C
1711 ITT
z
0
.71
:C
M M
0
0 M
C 0)
K to
1110
z
7"1
z
0)
z
9
0
1711
CITY OF EDMONDS
DEVELOPME NT SERVICES DEPARTMENT
121 5th Avenue North, Edmonds, WA 98020
(425)771 -0220
"RDER TO CORRECT VIOLATION
z
Location of Violation (Address and Tax Account Parcel No 21616 76"' Avenue West, Suite 212
0
M
Edmonds, WA.98026 Tax Account Parcel No. 00461-0001-001-01
9i
MM �z
Issued To: _3tevens Professional Center/Morris Piha Manaizement Group
M0
Address Of Person This Order Is Issued To. Post Office Box 53290, Bellevue, WA 98015
M rn
z
Code Section Violated:. Uniform Mechanical Code Section 112. 1.
0
Description of Violation: On behalf of the building owner, Pro -Staff Mechanical obtained a
M M
mechanical nennit (A2002-0802) to rolace an existing 10 ton heat pump with a. new 10 ton heat ourny.
0 5i
The QV Senior Building Inspector contacted Pro -Staff and determined that a duct detector is required
0
C
for this unit d an alarm detector test must be Rerformed and passed in order for the City to want
C
Q 0
mechanical ai3proval, As of this date the work has not been Performed and the mechanical permit work
z
cannot be gpProved. Also, the mechanical pennit enired on Avril 11, 2003.
Corrective Action Required: Install duct detector as required and recall for insRection. If the work is
z
Rerformed and approved by the deadline the permit shall be extended to MU 30, 2003. Failure to meet
the deadline shall reguire that a new Rennit be obtained to complete the w rk.
2
z
Correction is Required no later than: 5:00pm tim May 30,2003 ate)
e) (d
If correction is not made by the date and time specified in the Order, a Notice of
M
Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of
LI 09.00 Der daL or portion of a day, during which the violation continues.
Date Posted:— Date Mailed: May 15, 2003 Date Served
Issuing Party. Jeannine L. Graf Title Building Official
Sig.at.re
Cc: Pro -Staff echanical, P013 33370. Seattle. WA 98133
9
FINAt, PROJECT APPROVAL IoR—k
TO.
DATE.
mEmo To: PERmrr COORDINATOI?, BUILDING DIVISION
FROM. ME DEPARTMENT DATEA
ENGINEERING DIVISION DATE—.
PLANNING DIVISION DATE—,
PROJECT
SITEADDRESS
PERMIT #
-2 INSPECTED
a ?0 —Z— ADB#
DESCRIPTION OF WORK TO BE INSPKTEDA—V&��;—�k-Ag O"Vr.
7—'e
A field Inspection was conducted to determine final compliance with approved phms� Final approval
denotes that there are no objections from the above signed Department to the release of
P_ERFORMANCE BO—NDS and the granting of:
--�X—GRAINIT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
a Copy of CONDITIONS given to owner/contractor by inspector
1.
FAMED FINAL INSPECTION - OUTSTANDING ISSUES
ci Copy of CORRECTION NOTICE given to owner/conftctor bY inspector
I
2.
3.
RE_INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date. Sign__
ocaprvi.doc.l:temp-.bldg:fonnsIO/OI
z
OM
M
0
0
M
M Z
z
-4
�;EC/)
O"n
-"nq
M M
0 Y)
0 r-
M
0)
M 0) 1
z 0
z
-4
3:
Cn
z
0
1
0
M
t-UUNUAI IVN:
Fooling . .....................
Wall............. .............
z
Pier/Porch .................
Retaining Wall
SIa4 Insulation
PLUMBING:
am
Underground .............
m
Roo gh-In ................. I
Commercial Final
M
m
HEATING;
jo
C
>
Gas Test ..........
Gas' Piping
0 r,
-n
Equipment ..............
-q
Commercial Final
EXTERIOR SHEATHING
0
0 Fn
C co
NAILING . .............
FRAMING ........................
To
FIRST FLOOR FRAMING
X
INSULATION ..................
Floor Insulation
Wall Insulation ...........
0)
Ceiling Insulation
z
SHEET ROCK NAILING
m
SPECI AL INSPECTION
MISCELLANEOUS ..........
FINALAPPROVAL FOR
OCCUPANCY