20020820.pdfDATE RECE D
`7�9
PERMIT EXPIRES
USE PERMIT
CITY OF EDMONDS ZONE NUMBER'.�=
CONSTRUCTION PERMIT APPLICATION SUITEJAPT#
EW-
ADDRESS
-
Ams NAM�
N. E OF 'U
WIN NAM"� _P� � �, 0 N
PLAT 0.1�18U.Dlecl.N H LOT NO, I'D
MAILING ADDRESS LID FEE $
"d)(f:) " "A PUBLIC FIGHT OF WAY PER OFFICIAL STREET MAP
0 cq)
CITY ZIP TELEPHONE EXIST NG_ PROPOSED— In �Wrfoq.ilrd
IF
�
REOU:RED DEDICATION— FT — usens—re
IS11 —d
NAME METER SIZE
PAY REQUIRED
13
YES C3 No C3
t ADDRESS REMARKS
CITY ZIP ITELEPHONE
',2 "1 e- , ", ;
FIRE REVIEWED BY DATE
�21
CrTY ZIP TELEPHONE
0
x
-&a//, *I � C
STATE LICENSE NUMBER EXPIRATION
VARIANCE OR CU kjQR5UNE OR ADD# SPECTION BOND
INES
REC POSTED
P11 VON E3Y i6a,
'sz
S
PROPERTY TAX IAROIL NO,
BE V SIGN AREA HEIGHT
EXEMPT LLCANEO PROPOSED i ALLOWED PRO OSED
COMPLETE A
, I
rj NEW RESIDENTIAL M PLUMBING I MECH
T -RAGE I REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT)
LOT COVPrROPOSED
[ALLOWED FRONT SIDE FEAR FRONT UR SIDE REAR
rj ADDITION COMMERCIAL M C MPLIANCE OR
CHANGE OF USE
13
,I
REMODEL MULTIFAMILY rl SIGN
PARKING LOT AREA �NNING REVIEWED BY
RE ED
2� — , ow4X4
REPAIR E] GRADING QYGS M IENCE
X Fr)
REMARKS
DEMOLISH [3 TANK E3 077HE—R
GARAGE RETAININGWALL
[3 P RE SPRINKLER
0 [3
C A HT nocee
A PC RY FIREALARM
0
MPE OF USE, BUSINESS On ACTWITY) EXPLAIN
A.— k-,- et 0— 'K,
42
CHECKED BY TYPE Ot.CUN OCCUPANT-B
Gri Up
cq�
NUMBER NUMBER OF IVI ITIC L
14 1 CR
OF DWELLING AREAS
I
SPECIAL INSPECTION occu P NT
STORIES UNITS NUMBER
JAREA
REQUIRED LOAD
0 YES
DESCRIBE WORK TO BE DOWL
J
REMARKS
OGRESS INSPECTIONS PER USC 1OS/FINAL INSPECTION REOD
or
VALUATION
V A A 0
T'
Al,, 7� L, 9_
$
$ 19
Description FEE Description FEE
c
Plan Check
State Surcharge
GLAZING Is I OT SLOPE
Building Permit City Surcharge
PLAN CHECK NO: V18TEII DATE
Plumbing
THIS PERMIT AUTHOPINGES ONLY THE WORK NOTED. The PERMIT COVERS WORK TO
Mechanical
t 8 DOME ON PRIVATE PROPERTY ONLY ANY CONSTRUCTION ON THE PUBLIC
2
Grading
M DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETCL) WILL REQUIRE
t: SEPARATE PERMISSION.
PERMITAPPLICATION: IN DAYS
Engr. ReView
PERMIT UMM I YEAR�PRKDVIO 0 WORK IS STARTED WITHIN INDAYS
Engr. Inspection
SEE SACK OF PINK PERMIT FOR MORE INFORMATION
ON SERAL OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS
Fire Review Plan Chk. Deposit 1&2—
;APPLICANT,
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES. AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY
Fire Inspection Receipt It 4&7-13<�'
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT "'ALL NOT HE
DEEMED To MODIFY, WAIVE 01 RIDU E ANY REQUIREMENT 01 MY CITY G"DINAVC
Landscape Insp. Total Amt. Due
0 NOR LIMIT IN AM WAY THE CIWS ABILITY TO ENFORCE ANY ORDINANCE PROVISION,
Recording Fee Receipt #
ILL 2L
I HERESY ACKNOWLE BE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION
GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
APPLICATION APPROVAL
THE OWNER I ACRE TO COMPLY WITH CITY AND STATE LAWS REGULATING CON p`.TRUC_
This application Is not a permit unflaigned by me
CALL
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EM .
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
Suit then Official or retire, DlplIy: and Fees are paid, and
FOR INSPECTION me.im Isrolmord.,19W trap ... p1oWd.d.
WORKMENS COMPENSATI=RANCE AND RCW 111.27.
as FFICI GNAT E DATE
LINE DAT F
(425)
=(p �Sl CN,
/ .
All
771-0220 DATE
ATTENTION
EXT 1333
9�ka,
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
i /z// ;��2
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
ORIGINAL -FILE YELLM-INSPECI(OR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
PINK - OWNER GO D - ASSESSOR
04102 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING
z
0
rp
ra -4
0 x
C
M
0
0
M
10 --;
C
0 _n
In
—1
x I
M M
0
0
0
ITI C)
Z
X
-4
3:
>
z
-4
(1)
z
0
IT
ENGINEERS, INC.
OR
P.O. Box 510 17270 Woodinville -Redmond Rd. NE - Woodinville, WA 98072 - (425) 488-4382 - Fax:(425) 488-2660
October 31, 2002
JanRosholt, PE
Garry Struthers Associates, Inc.
z
0
3150 Richards Road, Suite 100
0
Bellevue, WA 98005-4446
M
Reference: Bank of America- Mullion Replacement
ra
306 Main Street, Edmonds, Washington
0 m
C
In
0
Dear Jan:
0 C=
Peryour request, I visited the Bank of America building in Edmonds on 0 etcher 31, 2002 to
In
M
review the work being done and to discuss the construction approach with John Nielsen, the
construction supervisor.
This letter provides an opinion regarding the structural adequacy ofthe replacement window
0 -n
mullions at the Bank.
n�
The old mullions appeared to be 4xI6 timbers running vertically almost full height. The old
m Im
mullions have rotted out and are being replaced with new ones ofsimflar size. Thenewmullions
0
0
H
are held in place at the base by double 2x4 sill plates nailed to timber embedded in the concrete
C co
floor. These serve to wedge the mullions in place. In addition there are short lengths of 3 ft. high
TO
stud wall installed between the mullions which also add to the rigidity. The sill plates will be
further anchored to the floor by 5/8 inch diameter all -threads spaced at app roximately 4 ft.
into the concrete. The mullions will also be toe nailed from the sill plates.
centers and grouted
Hold-down bolts will be installed to anchor the end mullions to the floor; one at each end ofthe
z
window opening and one at each side ofthe door openings.
The top cormections for the mullions are similarly held in place by wedging action between the
z
double top plates which are nailed to the timber embedded in the concrete at the top ofthe
opening. Again the mullions are toe rigiled through the top plates.
0
Im
The approach taken for replacement ofthe mullions should provide secure connections at the top
and bottom and also provide lateral stability for the window systern, Please call ifyou have any
questions.
J. 8
Sincerely WAS,,
Z
em& ENGINEERS, INC.
RF—CFEIVED
... DEC 2 7 2002
Les J. Dakar, PE L
DEVELOPMENT SEFIVIC--
Cc: City ofEdmonds CITY OF
FOUNDATION:
Footing ......................
Wall ....................
Pier/Porch
Retaining Wall ...........
0
Stab Insulation .......... .
PLUMBING:
Underground .............
M
C
M a
0
Rough -in ...................
C
Commercial Final
M
HEATING: -
10-4
—
C z
a T.
a a,
Gas'Pipling ..........
Equipment
................
-4
Commercial Final
MITI
EXTERIOR SHEATHING
0
0
N AILING ..........................
FRAMING ........................
�MO
z
FIRST FLOOR FRAMING
;U
INSULATION
Floor Insulation
Z
_q
Wall Insulation ...........
x
Ceiling Insulation
z
SHEETROCK NAILING
M
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY
_07
..................
7f
tv\