Loading...
20020845.pdf11111M DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ER N�ME17,9.0,F BUSINESS IN ADDRESS QA4 �l TBIEP��C 'I CITY IIIP Ur t ITr STATE UCENSE NUMBER gun- ?7P4791 1 WCKCW�W [:] NEW RESIDENTIAL PLUMBING I MECH rl ADINTION COMMERCIAL L[03MULTIFAMILY COMPUANCEOR 13 CHANGEOFUSE n REMODEL M SIGN REPAIR [3 GRADING CYDE o HE CS FT) I _x— rl DEMOLISH 0 TANK 0 OTHER GARAGE A PORT C R E3 RETAININGWALL ROOKERY FIFIES RINKLER L-J FIRE ALARM ITYPE OF USE. BUSINESS OR =N� — NUMBER OF STORIES NUMBER OF DWELLING NIT U 8 CRITICAL 13EAS NUMBER DESCRIBE WORK TO BE DONE PERMIT EXPIRES PERMIT US�E Zo NUMBER_��' Z'!�' 'Be UIT.1T1 ADDRESS ILL PLAT NAME/SUBDIVISION NO. ta6T NO, 1�1) NO, I L D FEE S P SLIC RIGHT OF WAY PER OFFICIAL STREET MAP 1eacF sPes .... aW "', "'tt's' but—I.P.. 'Wd EXISTING — PROPOSED— kare.e.-Neou". a a..w .. ... s. REQUIRED DEDICATION— FT — urunccuu! Worp.'­ IiT__[7� PRV REQUIRED YES 0 No E3 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE ENGINEERING REVIEWED By DATE z F11 REVIEWED BY DATE 0 VARIANCE 08 CLI SHORILINE OR A1151 INSPECTION HE 'D I POSTED 1. BONO m t3 YES 13NO SERA REVIEW SIGN AREA HEIGHT C COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED INOICI.E. , , , �Xp in LO COVERAGE REQUIRED SETSA KS (FT) C PROPOSED SETBACKS (Fr.) C: M ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE HEAR 0 0 PARKING LOT AREA REVIEWED BY DATE Rea PROVIDED PLANNING m M REMARKS 0 -n CHIECKEDBY JTY��TR'Tl C& COOL PA�e3 3: C P in M SP TION PANT FE=SaC YES JAREA 0 r 0 M C OD 4EMARKS or PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D m V) M 0 Z � .1 I , ;Ig _q VALUATION m > $ z t6fl-11') AIIIA&Z'm 6"11 Description FEE Description FEE U , z HEAT SOURCE LOT SLOPE Plan Check State Surcharge Building Permit City Surcharge PLAN CHECK NO: I VESTED DATE Plumbing THIS PERMITAUTHORIZESONLYTICE WORK .... THIS PERMIT COVERS WORK TO Mechanical 11 DONE I P111 1"OP11 ONLY, ANY CONSTRUCTION ON THE PUBIJ DOMAIN SKIEWALKS, Grading (CURBS. DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRCE it: SEPARATE PERMISSION. Engr. Review PERMITAPPLICIATI N: ISODAYS A. PERMIT tusi I YEAR - PROVIDED WORK IS STARTED WITHIN 18a DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION *APPLICANT. ON BEHALF OF HIS OR HER S"OUSE, HEIRS. ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND H to HARMLESS THE CITY 01 EDMONDS* WASHINGTON, ITS OFFICIAL% EMPLOYEES, AND AGENTS FROM ANY AND Fire InsDection Receipt It ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF MIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- . Recording Fee Receipt # I HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION By TH GIVEN Is CORRECT; AND THAT I AM E OWNER. OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER, I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application Is not a pencil until started by the Tjoal� AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMENS COMPEN:=RANCE AND RCW 18,27, FOR INSPECTION Building Official., his/her Deputy: and Foos are paid,, receipt 1, acknowledged happen pro,ided. OFFICII S SI ATURE DATE ;�ENII OATE SIGNED (425) �612 /1' "�l /�R'011 771-0220 (RELEASED BY ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 ORIGINAL - FILE YELLOW - INSPECTOR PINK OWNER GOLD -ASSESSOR 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN ACCOUNTING RECORD OF INSPECTIONS' INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ..................... Wall ...................... Pier/Porch ................ Retaining Wall ........... Slab Insulation PLUMBING: Underground . ............ Rough -in ................... Commercial Final HEATING: Gas Test Gas Piping .............. Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING .......................... FRAMING ...................... FIRST FLOOR FRAMING... INSULATION ........... Floor Insulation Wall Insulation .......... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY .................. so a M M z 10 C E4 M ITI 0 0 CN Q 0 > z z ITI