20020881.pdfCITY OF EDMONDS N rS P='ZL CONSTRUCTION PERMIT APPLICATION jo EIAPT# ADDRESS 0 OF "S PLAT NAMSISUBDIWSION NO. 6T 140� LID NO. MAILING ADDRESS LID FEE I P BLIC RIGHT OF WAY PER OFFICIAL STREET MAP CITY EXISTING - PROPOSED il�� REQUIRED DEDICATION- FT ­­Lquu- NAME MliTla SIEE LINE NO, OF FIXTURES PAN REQUIRED SIZE �Al=_, C%wu a'A INC, � I f 4 YE.0 ADDRESS - REMARKS jWN-NTFACTDa 11.1IP.NW.L. FOR EROSION O.T..LKIRAINAAE lWeDrioNs ReVc) � 01 I-xos(Ot-1 (Q M-IL-W(Ori IS ZIP ITEL11 STATE LICENSE NUMBER PROPERTY -FAX ACCOUNT PARCEL NO. nQ49-3 - 4: -4) - n";Q ONE '7'1 Co FIRE REVIEWED BY DAT. VARIANCE C. SHORELINE OR ADS# INSPECTION �801`1 RED, OS 13 YES A NO I __ 15 SIGN AREA HEIGHT COMPLETE ALLOWED OSED ALLOWPO PROPOSED 1E.P ..... _ -VIEW 0-RESIDENTIAL PLUM NO MECH LOT COVERAGE REQUIRED SET IS (FF.) PROPOSED SETBACKS LPT. ALLOWED PROPOSED FRONT SIDBAC REAR FRONT UR SIDE REAR ADDITION COMMERCIAL 0 Me IAL CGARLLANCE OR HAN.E 0, Us. - 51 X -26X P 1 173 gAAr I -;- 5 ---------- [j REMODEL [0] APARTMENT [I SIGN T�4 IT AR PLANNING REVIEWED BY 4 PARKING 'DATE RECO PROVIDED ISRA ING REPAIR ING n FENCE ,p C,G z I CGE a X FT) REMARKS 'I DEMOLISH [0 TANK [j OTHER ARPO 0 RETAINING WALL ��NAGRT ROOKERY RENEWAL (TYPE OF USE. BUSINESS OR ACTIVITY) FXPLAINi CLUED ED BY TYPE OF CONITRUCTION OCCUPANT StNKAUE ]�� A I L�A 9��AOEW izie_, -va -va 11 NUMBER UMBER OF OF DWELL NO CRITICAL AREAS SPECIAtINSPECTOR NT STORIES UNITS NUMBER JAREAp REQU'.ED!AYEB E DESCRIBE WORK To BE DONE _��PU REMARKS PROGRESS INSPECTIONS PER USC 108/FINAL INSPECTION REaD 129211W 2EJ-)KA5 &7 :R� 1-1 S)NMLE EA"LIA d" �ft4C;;� - (2ppt�d 1 1. — - Firr �7Mj 551A Plan Check Ian I -4-U 3 /P FOR % Z, 5" Building ZOW f�m ��PE PLAN CHECK NO: 17ESTIDDATE Plumbing I/10- 0 Mechanical 0 THIS PERMIT AUTHOR�S ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: BE DOME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading 3 0 a OMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, FTC.) WILL SQUIRE WCheckl-I—IP3 Recording Fee SEPARATE PERMISSION. U PI MITAPPLICATION: 1NDAYS A. Emir. Review City Surcharge -//f; PERMIT LIMIT I YEAR - PROVID 0 WORK IS STARTED WITHIN 180 DAYS SEC BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection State Surcha Ige ON BEHALF 01 HIS OR HER IPOUIE, HEILS, A.IG.S AND SUCCESORS Plan Chk Deposit Traffic Mitigation 7�UT_ IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WAIHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT OF 0 MODIFYAWAIVE OR RE UCE ANY REQUIREMENT OF ANY CITY ORDINANCE F, . Cimn Fire Inspection Total Amount Due N=TTO IN ANY W T HE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- Landscapeltisp.1 I Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION� THAT THE INFORMA71ON GIVEN Is CORRECT, AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- T 1' .1 CALL gn�dbyLh TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VI N OF THE LA 11 CODE —THE STAT OF WASHINGTON RELATING To KID Offid.1 .1 KIM., D�put,: �,,d F...­ P.id, .d FOR INSPECTION N SATA INSU)MNCE AYD RCW 18.27� OFI`It�ALS SIGNATURE a ttt U I W A IATE SIGNED TH 'a (425) QA=ION 771-0220 kV\ D N //�TE EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL:FILO YELLOW, 1114eckri CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 I;AY PINK OWNER GOLD - ASSESSOR 10/01 z 0 am C M a 0 80 C m ITT z 0 n "n m m a- 0"0 0 M C U) 9 u) M 0 z z to z 0 m Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnicall I Civil Engineer RECEIVED KIP 1 1 2002 September 6, 2002 PERMIT COUNTER Mr. Rob Michel Michel Construction, Inc. CITy copy Z 7907 - 212th Street S.W. #102 Edmonds, Washington 98026 Subject: Geotechnical Evaluation "Soils Report�' Vi Om Proposed Single Family Residence ca In 0 7xx Spruce Street, Edmonds, Washington 80 This engineering report presents the results of a geotechnical evaluation of a M M Z new single family residence lot (Lot "A"), located at 7xx Spruce Street, Edmonds, C: Washington, with respect to the proposed single family residence project. This evaluation was required due to owner developer concerns, as well as City of Edmonds requirements. 0 -n BACKGROUND: Mai This engineer conducted a preliminary geotechnical evaluation of the property 0 0 rn Cm on September 6, 2002. It is understood that the property is "12' shaped, and consists of C co MO approximately 8,138 square feet. This engineer understands that the property consists The Z - r of approximately 101.7 frontage feet along the south side of Spruce Street. adjoining properties, as well as the neighborhood, consist of single family residences X on similar size lots. Z The property has recently been subdivided, with an existing house to the southwest (718 Spruce Street, Lot "B"). The subject property contains mature trees, 65 Z shrubs and lawn areas. the property is gently sloped (less than 5%), and drains northwesterly to the existing City of Edmonds storm system. I rn EVALUATION: Visual assessment of the property at 7xx Spruce Street revealed no evidence of any geotechnical distress. No slides, no settlements, no creep, nor any significant erosional degradation were observed. This engineer has considerable experience in the immediate vicinity and Understands the foundation subgrade conditions. Experience has proven that the subgrade soils are fully capable of properly supporting the proposed single family residence project. SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT LEGAL P.O. Box 55502 Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 Michel Construction, Inc. 7xx Spruce Street -Page two In order to augment the existing site geotechnical information, soil test pits were dug under this engineer's observation in September, 2002. A total of two (2) backhoe soil test pits were dug. Both soil test pits revealed similar subgrade conditions, namely: 011 to 81, Lawn, roots, and organic silt 8" to approx. 9' Relatively clean sands, with occasional gravels, dense to very dense No ground water was observed in any of the test pits. All test pit walls remained vertical and stable. No sloughing or caving occurred. CONCLUSIONS / RECOMMENDATIONS-. Based on the findings of this investigation, and experience with similar sites in the area, the property at 7xx Spruce Street is geotechnically approved for the proposed Michel Construction single family residence project, subject to the following: - Standard reinforced continuous and spread footings. Allowable bearing pressure: 2,000 p.s.f. - Equivalent fluid pressure of 35 p.c.f, is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. -For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have mini widths of eighteen (18) and twenty- four (24) inches, respectively, and should be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. Depending on the final site grades, some overexcavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over excavated hole, the width of the overexcavation at the bottom must be at least as wide as the sum of two times the depth of the overexcavation and the footing width. For example, an overexcavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Michel Construction, Inc. 7xx Spruce Street Page three Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, z native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between Vi the foundations and the bearing soils, or by passive earth pressure acting on the 0 m vertical, embedded portions of the foundations. For the latter condition, the C: M 0 foundations must either be poured directly against undisturbed soil or the backfill -40 0 C: placed around the outside of the foundation must be level structural fill. We :0 M recommend the following design values be used for the foundation's resistance to M rn lateral loading: C _Z Paramete Design Value 0 Coefficient of Friction 0.55 Passive Earth Pressure 350 p.c.f. Where: Vi 0 0 Fn C (1) p.c.f. is pounds per cubic foot. rn 0 (2) Passive earth pressure is computed using the equivalent fluid density. A safety factor of at least 1.5 is recommended for design of the foundation's resistance to lateral loading. z SLABS -ON -GRADE: z Slab -on -grade floors may be supported on undisturbed, competent native soils 0 or on str uctural fill. The slabs may be supported on the existing soils provided these M soils can be recompacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral Michel Construction, Inc. 7xx Spruce Street Page four earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height which restrain level backfill: Paramete Desion Value Z� 0 Active Earth Pressure* 35 p.c.f. M Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. 0 rn C ) Where: M 0 80 C M (1) p.c.f. is pounds per cubic foot M z (2) Active and passive earth pressures are computed using equivalent fluid C densities. For restrained walls which cannot deflect at least 0.002 times the wall -0" height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). MM 0 The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. M The above design values do not include the effects of any hydrostatic pressures k behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will z need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. 0 M Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls Michel Construction, Inc. 7xx Spruce Street Page five should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. the purpose of these backfill, requirements is to assure that the design criteria for the retaining wall as not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind. retaining and foundation walls. EXCAVATION AND SLOPES: In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet -deep in unsaturated soils may be vertical. For temporary cuts having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 1:1 (H:V). It is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system, No groundwater was observed in any of the test pits during the field work. Z 0 :j 0 M CO M 0 80 a : E OM %; M rn M a 0 0 9 CO Q 0 Z ca Z 0 j 0 M Michel Construction, Inc. 7xx Spruce Street Page six Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, and if encountered, should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector tenches at the bottom of the excavation. The excavation and site should be graded so that surface water is directed off Z the site and away from the tops of slopes. Water should not be allowed to stand in any 0 area where foundations, slabs, or pavements are to be constructed. Any exposed m slopes to be covered with plastic to minimize erosion. Final site grading in areas �A adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. 0 M GENERAL EARTHWORK AND STRUCTURAL FILL: C' M 0 -q 0 0 C The proposed building and pavement areas should be stripped and cleared of rn M Z all surface vegetation, all organic matter, and other deleterious material. The stripped Z or removed materials should not be mixed with any materials to be used as structural fill. NOTE: specific clearing limits to be established atpre-construction meeting with City 0 _n "n of Edmonds building officials and inspectors. rn M Structural fill is defined as any fill placed under the building, behind permanent 0 0 retaining or foundation walls, or in other areas where the underlying soils needs to C support loads. This engineer should observe site conditions during and after M 0 excavation prior to placement of any structural fill. All structural fill should be placed in horizontal lifts with a moisture content at or nearthe moisture content. The optimum moisture content is that moisture optimum Z content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and Z' compaction process. The allowable thickness of the fill lift will depend on the material type, 0 M compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: Location of Fill Placement Minimum Relative Compaction Beneath footings, slabs or walkways 95% Michel Construction, Inc. 7xx Spruce Street Page seven Location of Fill Placement Minimum Relative Combaction z 0 Behind retaining walls �90% 0 M Beneath pavements 95% for upper 12 inches of — -4 -n subgrade, 90% below that level Vi m C Where: Minimum relative compaction is the ratio, expressed in percentages, of M 0 0 the compacted dry density to the maximum dry density, as determined in C accordance with ASTM Test Designation D-1557-78 (Modified Proctor). M M 10 Use of On -Site Soils C z If grading activities take place during wet weather, or when on -site soils are wet, Vj: site preparation costs may be higher because of delays due to rains and the potential 09 need to import granular fill. The on -site soils are generally sandy and thug are not E� C I moisture sensitive. Grading operations will be difficult when the moisture content of M M these soils exceeds the optimum moisture content, Vi 0 or- C M Moisture sensitive soils will also be susceptible to excessive softening and K Ch �To "pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill which is to be placed in wet weather should consist of a z granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. z The use of "some" on -site soils for fill material may be acceptable if the upper 0 M organic materials is segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident at 7xx Spruce Street. Surface runoff flows generally northwesterly. This engineer recommends compliance with the City of Edmonds standard storm water drainage controls within the existing city of Edmonds storm water system. Michel Construction, Inc. 7xx Spruce Street Page eight CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. INSPECTION: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: - Foundation subgrade verification - Retaining wall, or rockery placement - Any fill placement SUMMARY: The proposed Michel Construction single family residence project at 7xx Spruce Street, Is geotechnically viable when constructed in accordance with the. recommendations herein, compliance with City of Edmonds approved plans and requirements. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. g- 4,- /YZ' Dennis M. Bruce, P.E. Geotechnical Civil Engineer '77. �' �i it 0119ono W611' NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 63 Umbaugh, Theresa J, From: Palmatier, Lara Sent: Tuesday, October 08, 2002 11:26 AM To: Waite, Jim Cc: DST; Chrisman, Lyle Subject: 7141716 Spruce Street With Rob Michel's Short plat 01-196, the existing house, 718, is being changed to 714. The new house built on the newly created lot is 716. The existing water meter and sewer will serve the NEW house so the EXISTING house has to pay new fees to connect to water and sewer. When the new house (716) is issued, they will only have to reconnect to existing so the fee will be $35 and they will call you to reconnect water. You will be O� getting water and sewer permits for 714, full fees paid but it is an existing house so I wanted you to know what is going on. If you have any questions, you should ask Lyle since he is the one that informed us of how to handle this. Thank you! Lara Palmatier, LMP V, Development Services Coordinator m 01 City of Edmonds 0 0 Phone 425.771.0220.1703 C Fax 425.771.0221 re C 0 n m M 0 fn -;41 Vi z m C ma 0 -10 0 C m ra C— z 3. Maximum Elevation Allowed: e.ge grade) + 25'= !It `(av 3! On 4. Reference Point Elevation Shot to House: m M VS qdaturn elevation)+ CV6 1 (grade to transit level lineshotto house)= 0 0 Fn C cc 6. Measurements from line shot onto house toroof ridge: 0! i z —71 )Z W z 0 m Total 7. ActVYIevation: 9� U6 �reference point elevation) 4-��O —f(I(measurements from 13-7 #6) C 0 UTI u sin: (actual) is greater /resi t6ji (allowed); therefore the house is/ is not over the height requiremehtwACDC 16.20.30 requirements BTENIPWILDINGWISOHeight CalculationGrading Verification Worksheet.doc 05/17/2004 15: 05 4257789086 MICHEL CONST PAGE 03 IvEb MAY 1 7 2004 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. May 7, 2004 MAY 1 �7 2004 4 0 0 City of Edmonds EVELOPMENT l,' c/o Michel Construction, Inc. CITY OF 6,o,C,,-S CTR. 7907 212"' St. SK #102 Edmonds, WA 98026 Subject: finglikeport - Geotechnical inspections U M C M CO), 0 716 Spruce St., Edmonds, Washington -4 0' c: City of Edmonds Permit No. 20020881 m This engineering report presents the final results of ongoing geotechnical P Z 3 inspections for the new residence at 716 Spruce St., Edmonds, Washington. These 6i inspections were required by City of Edmonds permit stipulations. 0 _n _n REFERE C rn m . City of Edmonds approved Project Plans 0 r 0 o Geotechnical Report by D. Bruce, P.E. dated September 6, 2002 C * Construction photographs mo� INSPEC This engineer performed on -site gootec hnical inspections for the following aspects of the new residence: Excavation: Soil cuts encountered dense, native sub -grade soils consisting of Z' relatively clean sands with occasional gravels as anticipated by the Geotechnical Report. Soil cuts greater than 4 feet required localized placement of Eco-Block 0 In shoring (see photographs), Excavation cuts remained stable throughout the foundation and stem wall installation phase of the project. All excavation is geotechnically approved. Soil Bearing: This engineer verified dense, native, sub -grade soils easily capable of providing 2,000 p.s,f. bearing capacity. "OK" to proceed with foundation formwork, reinforcing steel and concrete placement in accordance with City of Edmonds approved Plans and inspections. SOILS FOUNDATIONS SITE DEVELOPMENT INSPECTION DRAINAGE DESIGN A PERMIT - LEGAL P,0. Box 55502 Shoreline, Washington 98155 (206) 546-9217 FAX 546-8442 05/17/2004 15:05 4257789086 MICHEL CONST PAGE 02 City of Edmonds c/o Michel Construction, Inc. May 7, 2004 k, Page 2 Structural Fill: No significant quantities of structural fill was required due to the presence of dense, native sub -grade soils. Localized rains and seepage into the foundation zone allowed for effective use of gravel in some portions of the formwork. This gravel was used as a co, nstruction expedient and improved g-, overall foundation integrity. Z ,0 -4 r�� Retaining Wall, Rockery: this engineer verified proper installation of the west 0. property line Eco-Blo ck stabilization wall (adjacent the joint parking area, as well as the stabilization rockeries on both sides of the new residence). Base rocks were properly embedded in dense, native sub -grade soils. Rock M linkage, batter, drainage zone and overall "blending in" to the site contours was M 0 R successfully completed and is geotechnically approvAA. C, M M SUMM All special geotechnical inspection aspects have been properly co mpleted and C: Z > are ap proved. If there are any questions, do not hesitate to call. M M 6 Fn C (fi C M 0: 417406 Z U Dennis M, Bruce, P.E. Z Ueotechnical Civil Engineer 04 M DMB:abJ RECEIVED MAY 11 2004 DEVELOPMENT SERVICES CTR, CITY OF EDMONDS FINAL EROJECT APPROVAL, FORM TO DATE* MIEMOTO: PMUM COORDINATOR. BUIM19G DPASION FROM —FIRE DEPAR770W DA TE �N'GINEERING DIVISION DATE z DIVISION DATE�— q 5i M SiTEADDRES M 0 80 t PMwr #" 2 W______--PATE,INSPE C M M M z DESCRIPTIONOF:WORKTOBE z -4 A field inspection was conducted to determine final compliance with.approved Plans. Final approval from the above signed Department to the release of 0 n n� denotes that. there are no objections BONDS and the grouting of: -4 =9 MM _PERFQ�RMANCE GRANT FINAL PROJECT APPROVAL 9 co M 0 Z PROJECT APPROVA� WIM CONDITIONS NOTEI) > z GRAM a C4pyofCONDrnONSgiVentDOWU-/WnftCtOrbyinsp-tor CD z FAHM FINAL INSPEMON - OUTSTAMING ISSUES M a Cbpy of -COMMON NOTICE given to owner/conttactor by inspector 2. 3. RE-INSpECM OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL, Datq—� 0CNPr4Ld=l:".b1ft:f0MW10/01, RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... _0Z FOUNDATION: I H, Footing .................... Wall MS. z ........... Pier/Porch Retaining Wall ........... Slab Insulation .......... \(V\S PLUMBING: ITI C R., 0 Underground ............. Rough -in ............. -4 C x Commercial Final M to -4 HEATING: C GasTest .................... Gas Piping A U-1-0 0 -n Equipment ............. M fn Commercial Final 0 0 EXTERIOR SHEATHING 03- 09 C ca C 0) NAILING ................... L2 M 0 z FRAMING ........................ 74 FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation Wall Insulation co z Ceiling Insulation PAS 0 ITI SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ............. Side sewer V__L� All-out Dctepure:1-11