Loading...
20020944.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION 7"E" 0 r MA'Ll G ADDRESS CITY ZIP G t NAME N r- o N -- L' -S t" AD RESS i 61-:1, 11 T1 I PERMIT EXPIRES u PERM T —b NUMIBER JOB ADDRESS SUITEfAPT# PLAT NAME/SUBDIVISION NO, I LOT NO. 11 0. LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP 111111:111-z"Ied IF EXISTING ___ PROPOSED REQUIRED DEDICATION yarears"a". MIFTER SIZE I LINE SIZE I No. PAY REQUIRED as L4 YESa� J.EMARKS 11 Cry 3 OWNER/CeNTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAIN be . - . - a C ADDRESS 'P� (�) - 1% ITY zip jj A TELEPHONE EXW11 &14 1 CHE_QKED BY PROPERTY TAX ACCOUNT PARCEL NO. !1 6 OG I q Ll 6 1 ej on 16^ NEW D9 RESIDENTIAL 5j71'N )IMECH ADDITION COMMERCIAL 'A A, C 13 CHANGE OFEIO�E CHANGE " REMODEL MULTIFAMILY SIGN REPAIR FENCE 4W GYGS I X_ FT) 0 DEMOLISH 13 TANK OTHER o GARAGE q CA PORT IN Ei RETAIN NO WALL ROOKERY FIRESPAINKLER L-4 FIREALARM (TYPE OF USE, BUSINESS OR ACTIVr It ")L NUMBER ..a- OF CRITICAL as as OF WELLING AREA 0 STORIES UNITS NUMBSE. DESCRIBE WORK TO BE DON'Sk/0 _S8 A00 F r VC % - t� t4 )1J,',S 'P- A K r FIRE REVIEWED BY DATE COMPLETE EXE�PT ALLOWED I PROPOSED I '�O_w j I t"4".06"I _XP X I 5EO LOT C VERAGE REQUIRED SETBACKS IFT ROPOSED SETBACKS (FT ALLOWED PROPOSED FRONT SIDE REAWI FpR.NT L' lc� PARKING I LOT AREA I PYNN.ING REVIEWED BY DAf 17 ' IQ 5 R D PRO ID REMARKS CHECKED" ITYPEOFCONMION GROUP NTg,3 0 OU SPECIAL INSPECTION 4X OCCUPANT C, JA9aUDC REQUIRE _4Z,,. !" LOAD [] YES j&I lid REMARKS or PROGRESS INSPECTIONS PER USC 1081FINAL INSPECTION REaD -.1- 77-- -- 11 1.- -- if 1—N - Ar) IVILULI I M4 'k,"EfIL QUM- t46M 16-11, it Description Description FEE Description FEE - C Plan Check I n h-k rn State Surcharge L Permit Building Permit B " U "' City Surchang! g 0—MO: VESTED DATE IS 'umbmg Plumbing Mechanical I THIS PERMIT AUTHORIZES ONLY THE ORKNOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERTY ONLY. AW CONSTRUCTION ON THE PUBUC Grading 3 a OMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review PERMITAPPLICATION: INDAYS PERMIT LIMIT, I YEAR - PROVIDED WORK IS STAITTED WITHIN 1 80 DAYS Engr. Inspection SEE 13ACK OF PINK PERMIT FOR MORE INFORMATION -PLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chit. Deposit A IN INTEREST, AGREES TO INDEMNIFX DEFEND AND HOLD HARMLESS THE CITY OF EDMOND WASHINGTON. ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND L CLAIMS' FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Fire Inspection Receipt # IK�q FROM THE ISSUANCE OF THIS PERMIT. SSUANCE OF THIS PERMIT $HALL NOT BE 9 DEEMED TO MODIFY, OR RED CE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp, Total Amt. Due 4 3? W�WAIVE 0 YT NOR LIMIT IN ANY HE CITYS ABILITY TO ENFORCE ANY CKIMNANCE PSOVISION, Recording Fee Receipt # I HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNEk OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO C�COMPIY WIT011'CITTY REGULATING CONITFUSG� CALL This application is not a permit mall Signed by me �E. NO TION; AND IN DOIN N PERSON WILL BE EMPLOYED .7 'Z IN VIOLATION LAS a .. OF N F WASHINGTON RELATING TO U CEAN \WOAKMEr cc NSAT190444U CEAN .27, Building Castel rc his/her osprey: and Face .1. Paid, add FOR INSPECTION . receipt Is acke-tedged in space pmid,d. ME SIGNED Slht[Aril E (OIIVN�ft:!��l (425) _?,F M�SMGNAIURE - DATE q 771-0220 '- ail H ED GA ATTENTION' Off 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN IAACIE AND AIPPRIDIAL It A CEFITIII. ORIGINAL - FILE - YELLOW NSPECTdR CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 PINK -OWNER - GOLD -ASSESSOR 04/02 PRESS HARD -YOU ARE MAKINQ 5 COPIES GREEK - ACCOUNTING FA z am C M 0 80 C 3: M ITT Z 0 -1 C 2 0 -n In -4 3: rn in U o) 0, 0 M fj) (j) ITT C) Z I" ;I) -i z z 9 0 In 5u *49 cl4x-s 44-9 0115T :31113� RECEIVED W" 9' .02D IqSWAy 1-1-9, -(V.M.O. APPROVED AS NOTED NOV 1, 3 2002 wo-t'�' BY,�W'INEERI PERMIT COUNTER Date: ------ -S- ASO& ISUNVAPA --J� ru? SEWER oenoA m- ew'3T' liew "m m4+ S44w -CTIONS REal). INSP� u5: CALL 425-771-0220 EXT. 1328 nsm Fxr lzz; -.'fw'r-eRll4r V-60 ----- ---- 77 �e&�qla7r J Mo Xr, LIP. VM LVPEL; -M,5. (wi 'T'2=2� La c I -Ty Copy 4 ftiff CALCZ. SPOW OdWTIm. 1401(a. NER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DAMAGE p - Yz%r 11/22/2002 13:07 2067232221 NO�)-22-2002 11433 WESTHILL INC OTTO ROSENAU ASSOCSS PAGE 01/03 425 487 9444 P.01/03 CITY OF EDMONDS IMCIAL INSPECTION AND TESTING AGREEMENT The project $9 8th Avenue s., Ediao dsA A 802 issued under building _ �JAJAz_ __L— permit riumv sped inspection ar uires 'a] id/or testing a, s,702, The jer UBC Chapter 17 to 1702. The comp, ete list of special inspeGtious is attach to this document BEFORE A P,�RNIIT CAN BE ISSUED: The ownes and co"tcK and special ixWeotor sliall complete ent and the attached structural test(s) and inspections schedule iricluding the gments. APPROVAL OF SPECIAL INSPECTORS: Each special impactor sluill, beAproved by the Building 0 paribtininin duties or imez0ons. Ek% special msp or shall submit d Statement 2tv tons to the ui ding Official for reviaw. Spe-dal inspectors shall display tliol identification w perfom ocial inspections an site. Special. inspection and testing shall meet the mininium*qUirtimentam Chapter 17 and thalbIlowlig: 1. Oboam Work The "is) inspector shell observe the site work fbr conformance with the approved p I * d d 1 14 a TJBC. ans an wfi 8" us cab e or Mviii %o 9 ec on. t ft Special cial 8 Pemiodic En"m rev alto me '�:,*d2hRw ?b 7 tk hon' to n I coo untie 4- d-4 a a - *a we on t.cparat� V is 7 'pi i L 7 tten plan S ara Ins on t 11 rose if Y. W have J.or -P rem by the tyin-ed arc .1 ctof ord d V=m by t. D Iding . W and th� crig ., or 2. Repoin Non -conforming Ittras The special inspector sliall bring nonconforming items to the, immediate ammflon of the contiracter and note all such Item in the daily field report Any item not resolved in a timely Mamar dWI be Imiliedifite C1111110 of The Special inspector to notify the Buildin& Official of the plan deviation, error, change or emission. It shall also be the duty of the special inspector to promptly notify the enginoir or architect, 3. Complete Daily Reports Each Special inspector shall complete and sign both the special inspection record and the daily report form for each day's i4spection. These records shall remain at the jobsite with the contractor for review by the Cit� Building Inspector. 4. Furabb Weekly Reports The special inspector or inspection agency shall fumish the City with weekly reports of tests and lippections. The * t ' architect and others as designated shall also be :rjeo engineer or � copied on orts. W y reports must include the ?011owing: Be=l tion of d1loy inspections and tats made with aliplicable locations at, 0 at 0 all nonco hrming items • Rapprz on status of nonconforming items (resolved or unresolved) • Itfinized changes authorized by the Archite4 Engineer and City if not included in nonconformance item 5.'Fu mid Final ConKtruction Ikepart Ile %-,!� inspector or Inspection agency shell submit a final si ed re aty statin Rp -port to the z ec that I Items requirin ecial inspection and testing were Wfi ed and re -ported. And� to the er gon best of hisib w�cg the pr ed is in conformance with the a _pprovad plans and specifications approved ahange = and the applicable workman --hip provisions of the UBC. liams'not In conformamce or unresolved items or any discrepancies in inspection cOvem9r, (i.e., missed I _ 'ons; iriodic inspection when continuous inspqfflq& , pL required. etc.) shall be sp:Vcafly itemized in this report. W 19 2002 Z 0 0 C M MO 0 80 C: X M M Z Z --I 0 -n n -4 M M � 0) 0 0 a Kca M 0 Z Z --I x (D Z 9 0 M I I / 23,/�2 �q.02 13:0711. 2067232221 OTTO ROSENAU ASSOCSS PAGE 02/03 WE5THILL INC 425 487 9444 P.02/03 1. N edallampector It of the contractor to'sio* the special inspector when work is ready for 1pecial in NM the item fisted on the stuiched schedule wd as noted on the approved P) el ifiction. are required to have special inspections. Adequate notice shall be 171,09, by the contractor so that the special inspector has time to become femiliarwith the 2. Prtiv*�Adcess to Approved Plans MIM r is responsible for providing the special inspector acceu W approved plans at th*1=110 3. Retio: as raillionsible to retain at the lobsite all special Inspection records submitted I lid al Inspector. 17hese records an to'be provided to the City building inspector upon City offiasands Ikulldlogj),spartment Rap2malliffillgis A� arlal inspecton or inspection agenda f a bun g department shall approve all special inspectors and special inspection requirements. 1. Moubw special inspection and approve weddy reports M11ZWrin ocial ' alim and *e ormance of special inspectors shell be by UpCitly B=g Inspector, Wi6sNer approval must be obLtined prior to placement of concrete or other sUnilar ktivifies in addition to that ofthe, special inspector. 3. Isiva�C,gritificate of0ccapancy 7he Official me in . =1 issue a Certificate of occupancy after all weekly special inspection repo ^!SCN ing the report have been submittecl and accepted. 111ris to am. I t�hii engineer or architect of record acting m the owner's agent "I fund an special an services. 'if ."CiIhM — or ambilect ofr000rd shall include special inspection requirements on the plans and Spocificadmis. ACKNOWLEDGMENTS ' read and agree to cqmpk*h the gems and condifiagig of this agreement, 1— 2—?-- 01SUCTal Connector RECEIVED City Building Official--.—. /I T38te Nov 19 1002 WSSTHILL, INC. z 0 i 0 M C: M 0 80 C --I M X M M Z z ch 0 -n n mm 0 65 0 r- 0 M C: C/) E CD M 0 Z z -1 3: 0) z 9 0 m 11/22 13:07� 2067232221 OTTO ROSENAU ASSOCSS PAGE 03/03 �,21102 WFSTHILL INC 42S 487 9444 P.03/03 Or"MLMMLMON AND TF4"MG SMOULE CMMI GUMTE, GROUT AND MORTAR, UcnotAL STSIVWILDING. h"It MdTtal Ohl mpdfle omwft,� bl..) A TOM Ten mix TWISSIMP-60 OSb* QF.W ul-ric Imp--j- Olhop Dried DAM z cm A400 ON OX 13F 0 -4 Mal Dock WIWIRI kdpMdM JPRICAST44=TREsm coNCUTL. %ldi" A c 0 Tto c Mbzkd m R INSIXATING CONCRETE; co cogs I" 0 -n li MW Sm — Uxk *wow FML MATERIAL: m m 0 $Wjd IMPROM %am Und F*M DmSky c M —ftd,!-jA C) om.pwd Wahl") STRUCTURAL WOOD. M ADIDITIONALIPWRUCnONS OR OTIalt TF ST'S IMP-10 Ofl-mu Join Fab. z AND INSPIt.noNS: cf) z m ----------- Daw - - RECEIVSD TOTAL P.03 FROM DCUE701L STRUCTURES PHONE NO. 206 742 0661 Dec. 27 2002 05:2-2- M ENGINEERING INC., P S. dba DOVETAIL STRUCTURES 12,?21-49 DR. S. F. C11.7i, & SrRJJC7*1JR.4L ENUVILZRING EVLREY1� W.4. 98208-9621 lylcmAEL A MCCANN SE 0FT'1CL/r.4,Y,- (425)337-5075 ftFXJAXf1JV.J MCCANN E. 7. F­Mail: m2engineeringinc@,2101,cum December 27, 2002 Building Official Z� City of Edmonds Building Department M, Subject: Gard Residence Addition A -n 1114 - e Ave. So. M C Edmonds, WA IR 0 Permit # 2002-0944 C On December 26, 2002,MLichael P. McCann of M2 Engineering performed M Z. C: - an on -site inspection of the addition at the above listed address to ascertain if the construction to date is in conformance with the approved plan set. Also present was Mr. Wayne Pippin of Westhill Inc., the contractor for the 0 -n. 'n project. An approved plan set was furnished by Mr. Pippin for review on 3� site. M M 0 6 Fn' Mr. McCann is a registered civil and structural engineer in the state of c: W Washington and nine other states in the continental United States. He is not 0 the engineer of record, but was asked by the contractor to provide inspection services for this project As installed in the ground, the strip and spreadfooting sizes and reinforcing Z 31 are in con/brmance with the approvedplan set No deficiencies were noted. ca If you have any questions, please call me at the above listed phone number Z 0 M Thank you. P. RF-CE:IVED A Sincerely, DEC 3 0 2002 pgV401? ENT SERVICES CTR. Y OF EDMONDS 133 Ar Michael P. Mccaim, #18311 RECF-IVED EIE __111 —ri Fy- DEC 2 8 WES-TV41LL, INC- 12/17/2002 11:53 FAX 425 821 4334 TERRA ASSOCIATES (6002 TERRA ASSOCIATES, Inc. R\\ M Geotechnical Consultants 401,17N Q�j 12525 Willows Road, Suite 101, Kirkland, Washington 98034 Phone (425) 821-7777 - Fax (425) 821-4334 FOOTING EXCAVATION EXAMINATION REPORT zi DATE FOOTING$ EXAMINED 14.1 Zoo PROJECTNO. 0 PROJECT NAME: C" Ae- PROJECT LOCATION: ;11 ca n5 REPRESENTATIVE: CONTRACTOR: ew f! M C DESCRIPTION OFFOOTINOSCOVEREO SYTHISREPORT: M 0 —10 0 C FOOTING EXCAVATION FIELD CONDITIONS NOTED Fir "PV 4-i n onao,�io Y\ c,,-eck rp.ct -N-,cP— &e IvED DEVELOPMENT SCFty'CES CTt" Oily of EDMONDS :0 r M IT1 0 � 0 g IT! IT Ca 0 0 co M 0 ;a z z 0 IT NOTES: .50il-9 5illke-& 000022� �00.+ I na 2-Q,0QR,5'L All /M —AA a Ouf representative has examined only the fooling excavations listed above. The results of this examination am only valid for a period Of 48 hours. It any change in the subgrade conditions Occurs, we should be promptly notified. Any loosened soils observed In foundatp*n are due to construction activity., Nih,f. should be removed prior to concrete plaCORIO Mr=OEIVED P- P'4&=Y� �UGRATUREX_ COPYTO; j'q.;Pjt)G_ Lf eA4_0 TERRA ASSOCIATES REPRESENTATIVE WESTHILL, INC. @r--'R% CASCADE TESTING LABORATORY, INC. TESTING 8, INSPECTION I INOINEERS 12911 N.E. 126TH PLACE .EVIous — REPORT N.. N.. 108780 KIRKLAND WASHINGTON 98D34 (425) 823-9800 EVER— (42S) 259-0817 FIELD REPORT DATE o/-(g 'ERT' .0. Z�z / Z_ PM� as xn��X:ie �_D/72'6/j Tot LOCATION 244 eMeq zz- WEATH� V AT AM TEMP. AT PM END rR L7 RECEIVED ARCHITECT ATTN: 22',IQ.3 COAL \/- e-4 (2) PERMi:F ef) N-TEEM INSPECTION PERFORMED -k,./RESTEEIJCONCRETE RESTEEL ONLY (3) 1��IONOSTPJECTED F NGS — FOUNDATIONS — SLAB — — AESTEELIMASONRY STRSTfWELDING — AUGER CAST PILES — COLUMNS -ZOTHER — DRILLED PIERS — WALLS -1, BEAMS (4) Ic LOCATIO(AR 9)ONCRETEIMASON By DESIGN STRENGTH (ft) 5Qm:w' SUPPLIER TZI TOTAL CU. YD. PLACED /10 4 S SLUMP (INCHES) SPECIMENS CAST AIR CONTENT (%) SEE CYLINDER REPORT NO. _ZYES —NO —ITEMS INSPECTEDV�� CONFORMANCEWITH BLDG. DEPT, APPROVED PLANS — REMARKS: Tlel� i1,t'Xfee)f_ "4,6 �,g 11000f PL,22�2, TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED, THIS REPORT SHALL NOT INSPECTOR( . NAME(S) Pm "*4"a BE REPRODUCED EXCEPT lt� FULL,=� OUT THE "ITTEN APPROVALOrCA TESTING LABORATOW, INC. INSPECTOR SIGNATURE REVISED SM SIGNED BY COPIES TO z I -n IT, '0 00 MT >Z.. 0 _n M m 0 0 0 M 0 Z rl .-I �: z z 9 0 m ENGINEERING INC., P.S. dba DOVETAIL STRUCTURES 12821-49"H DR. S.E, CIVIL & STRUCTURAL ENGINEERING EVERETT, WA. 98208-9621 MICHAEL P. MCCANIV S.E. OFFICEIFAX: (425)337-5075 BENJAMINJ MCCANN EJ T E-Mail: m2engineeringinc@aol,rom ip, February 14, 2003 z 0' Building Official F, City of Edmonds Building Department M Subject: Gard Residence Addition 1114 — 8"' Ave. So. C M Edmonds, WA 0 -0944 Permit # 202 M Z. jo On February 13, 2003, Michael P. McCann of M2 Engineering, Inc., C: C4 performed an on site inspection of the addition at the above listed address to ascertain if the construction to date is in conformance with the approved '0 plan set. Also present was Mr. Wayne Pippin of Westhill Inc., the contractor M a 0 0 C: for the project. An approved plan set was furnished by Mr. Pippin for review at the jobsite. 0 Fn Mr. McCann is a registered civil and structural engineer in the state of 0 Washington and nine other states in the continental United States. He is not the engineer of record, but was asked by the contractor to provide certain 3 structural inspection services for this project, z As stipulated in the plan set, the floor and roof diaphragms, plus the associated framing and connections, have been installed according to the z approved requirements of the plan set. No deficiencies were noted. 0 M If you have any questions or concerns, please call me at the above listed phone number. Thank you. RFC:FIVF-D e, �"V' Sincerely FEB J 9 2003 SERVICES CTR' DEV O"MEN, EDMONDS ILI", OF Michael P. McCann, SE 83J OTTO ROSENAUA ASSOCIATES, INC. Gootechnical Engineering, Construction Inspection & Materials Testing 6747 M. L King Way South, Seattle, Washington 98118-3216 USA Tel: (206) 7254600 - Toll Free'. (888) OTT04-US Fayr, (206) 723-2221 WBE W2F59136B4 - WABO Registered Agency - Welosite: www.ottorosenau.com CONSTRUCTION INSPECTION REPORT Report Number: 001 Inspection(s) Performed: Structural Steel Fabrication Project Gard Residence Permit Number: 03-004 0 Address: 1114 e AvP S, Edmonds Job Number -4 Client Westhill Inc. Architect. M M Contractor Westhill Inc Engineer: Inspector Remarks and Date i:: t to Totem Steel Inc, Woodinville. I have visually welds to pieces listed: 1 C) m 1-6-03 CoIumnsW8x21 IVIK 1A IS, IC. O� Beams W8x2l MIK 2A, 2B, 2C, 2D. Appearance of welds is acce ptable per AWS. Inspector not present during welding of CJP and multi pass 00 C � zl� welds. Work is by WABO certified welders. M, M C 0 M M 0 0 Fn C 0), 0; F-� z 'ONI Z OF z In Copies to: X client .ponsitillity: Technical R 4 Architect F-1- engineer.. I This report applies only to the items tested or reported 3 nd Is the exclusive property of Otto Rosenau & Associates, Inc. Reprod uctl Of this it R O!"VE115 C except In full, w0out written permission from our 11rin is strictly prohibited. —) Page I Of 1 FEB 19 2003 Form No.: T-104 Revi"d: owl DEVELOPMENT SERVICES CTFI. CITY OF EDMONDS Foci 0 6 Certified Inspection Services, Inc. C13AI3038 1069 S.W. 328th court, Federal Way, WA 98M Phone (253) 91-7-0626 Fax (253) 661-2984 Ultrasonic Weld Inspection Report AWS D1.1 Customer: Otto Rosenau &Associates Date: 1/6fO3 Z 0- P.O. No.: mi Prqject: Gard Residence Job No 03-004 Report No.: 21747 Specification: AWSDIA-20022 Table: JobDescription: Ulftasonic inspection of. complete penemition welds, as listed. am Remarks: Work was performed at Totem Steel -40 C m m z Profedure 10-4 Procedure No.: I x Weld joint: TC-U4a C > E: Base Metal Type: x Weld Process: FCAW 0 Surface condition: as welded In m Joint Details: 0 0 Fn, C (a 01 TC-U4a z Z: Ulft-awnic Equipment In Instrument. Nffg.. Kraudommer Branson Model: USK 7 Serial Noz 15% RFECEIVED Transducers: Mg.: KB Aerotech Frequency: 7-25N*ft FEB 19 2003 Dinnendown.75x.75' Angle: 70* DEVELOPMENT SERVICES CTR. Dimensions: l"dia. Angle: Straight Beam CITY OF EDMONDS Level. Insppected By, E. Appro BY: OTTO ROSENAU & ASSOCIATES, INC. Gootachnical Engineering, Conitruction Inspection & Materials Testing 6747 M. L King Way South, Seattle, Washington 98118-3216 USA Tel: (206) 7254600 - Toll Free: (888) OTTO-4-US - Fax: (206) 723-2221 WEE W2FS913684 # WABO Registered Agency . Website: vrmvottorosenau.corn ULTRASONIC WELD TESTING REPORT Job Number: 03-004 Report Number: 001 P rmit Number: 2002-0944 i Project: Gard Residence Archit t: Address: 1114 8" Ave S, Edmonds, Edmonds Client: Westhill Inc. Contractor WeSthill Inc.. Date., 1-15-03 Technician: D Graham ITEMINSIPECTED (Weld Location and Identification) 'X H Z ap 0-1 0 Moment frame 1 " level north, south and center frame, top Bottom ilanges 8welds. 54 X 2" level north, south and center frame, top &4- Bottorn flanges 8 welc 1 54 X Governing Code: xAWSOI.1 I I Other instrument Mfg.: Krautkrarner Procedure No.: 0 NDT-OP-03-01 I I Other M.cei 4 USN60 ORA0116 Serial #* 00K18F transducer Mfg.: Krautkramer Serial #* 61111-18 Deg, Size Frequency Single I Dual X Straight 0 1.000 2.26. 0 She r 70 .626x75 2.25. Calibration Bieck Type: 0 IlW x OSC CouplantType: 0 Water eased 13 Oil R ..d ri Oths6\, ... . ........ Qc I Coates to: a WAAM I x I owner I I contractor I Erchit:: I Building Capt. I Technicai Responsibility: T! in 8 a report applies only to the hems tested or reported and Is the exclusive prop" of Otto Rosenati & Associates, Itge d oil f this report. .Acept in full, wHhout written permission from our firm is strictly prohibited. r?2003 Page I of I DEVELOPMENT SERVICES CTR CITY OF EDMONDS Rwvised: 01103 z M ca C; M C a M 0 80 C In m z 0 M In a 0 0 rn C 0 CO. C*) z 5.1 55 z z 9 0 M Job Number. �Rport Number. -Pennit no' 'r Project: f74,1 Architectj Address: Client: Eo-ntractdr. We: U3 Technician: I —79771E] z M MO 0 MIM z 9) -1 �z Cn O"n A � 9 1 M m C: 0 C (j) M 0 Z r- > z X z 0 i 0 M 07TO ROSENAU& ASSOCIATES, INC. CONSTRUCTION INSPECTION REPORT Report Number: rmit Number: Architect: Address: .4 Engineer: Client: Contractor: Date: inspector: 'D, (7 rA A44A E *AA,inI,rrci,WngS1e—el" Shear Wall Nailing �abncolion Epoxy Grouting 0 1 Diaphragm Nailing I of.,. S.., Eoclon ncho I Installation r "Of Spray -Applied Fireproofing Nondestructive Testing I Installation of Holdown System steel LACKing I Other (specify) -F - OA 5 C-elf, 2 14 per ^J5 Q 5 7, ,,P. Vfri F;r,.,A No, - 61.4 CA k(k /V 0., - 5 1,, k (7�n, ;7 5 A?TAA f#0:7 '-9 A� ( InA SAIA 5. A Yg^,V-�4 61 ze, A. (,4L ke 'i Z� . wo-6, -IMMEMM z 0 C M M a 0 0 M P o -n - n M M 0 V5 0 r- M, Cc 9 v) M 0 Z z -4 z 0 M FIELD CASCADE TESTING LABORATORY, INrj. REPORT No. lee 2M NO.44632 TESTING & INSPECTION / ENGINEERS 12919 N.E� 1261" PLACE KIRKLANO. WASHINOTON 96034 1425) 023-9800 EVERETT A25) 259-0817 COMPRESSION REPORT T.:—VIessAl, P 0o lm(h \,ha 4?)4027- ATTN: THE FOLLOWING WAS NOTED: "I-ATF—, , , 1 01-,07-0-3 1 :;2� 7 _ 429- P CT LO ON 7 BLDG. PERMI, — TTE u MER � W MR AT AM Lluelc-d— AT Pm ENGINEER ARC CONTRACTOR,,'/), C TRUCK SAMPLED TRUCKTICKETNO. 710.36 MIX NO/2 MT —AMR =4gg DESIGN WEIGHTS K— M IST. — Ar35ijff—ED — WEIGHTS TIME ASSTLMUCM-P143 % AIR UNIT WEIGHT ASTM C.138 YIELD CEMENT FACTOR TEMP. ASTM -1064 .... Al. UtIVItN I b4yr, 44e -7 541: A -0�* IA. — AIRTESTMETHOD: OPRESSUREASTM C-231 OR OVOLUMEASTM C-173 FINEAGG. EQUIPMENT USED LD, E [WATELI SLUMPCON CSLCOO�— THERMOMETER CCOTHO T.T�A 112-4 TYPE OF BREAK: (A) Cone (C) Cons and Shear (b) Cone and Split (d) Shear (a) Columnar COMPRESSIVE STRENGTH 90 =1 1-1— - - 1-1 ....... EIASTMC-1231 SAMPLE PIIJ DATE El ASTM C-617 SAMPLING IN ACCORDANCE WITH TEST METHOD APPLICABLE CODES & SPECS. SUPPLIER CrNIENTTYPE �11-- CU.YAROSPLACED AEA ADMIX, CAC1 % DESIGN STRENGTH PLACEMSNTAREA& NOTES e��J' TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED, THIS REPORT SHALL NOT ECTOR(S), NAME(S) PRINTE BE REPRODUCED EXCEPT IN FULL. WITH- OUTTHE WRITTEN AP—OF—CADE �N Llil� TESTING LABORATORY INC. NSPECTOR SIGNATURE REVISED SM SIGNED BY COPIESTo&yLjc'jw !14'?b FINAL PROJ ZXT APPROVAL FORM TO:_ DATE:_ MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE 77 3 4 *^J�21��ENGINEERING DIVISION DATE O� PLANNING DMSION DATE - z PROJECT G A 0, h SITE ADDRESS 814 6'-Ava S INSPECTED M MO 0 80 C PERMIT DESCRIPTION OF WORY- To BE INSPECTED---4����� 3: M M z C 5; A field i nspection was conducted to determine final compliance with approved plans. Final approval signed Department to the release of CD denotes that there are no objections from the above of: 0 -n "n PERFORMANCE BONDS and the granting GRAN FINAL PROJECT APPROVAL T M M 0 M C 0 9 co M 0 z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED > z 0 Copy of CONDI TIONS given to owner/contractor bY inspector z FAILED FINAL INSPECTION - OUTSTANDING ISSUES M 0 Copy of CORRECTION NOTICE given to owner/contractor by inspector. I 2. 3. RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date--� Sign ------ ocaprvl.doc.l:temp:bldg:formsIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED 30 SETB�CKS ..................... FOUNDATION: af Footing...................... wall .................... Pier/Porch .............. Retaining Wall Stab Insulation PLUMBING: Underground Rough -in ........... vv,)s Commercial Final HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING ........................ FRAMING ................ FIRST FLOOR FRAMING... INSULATION .................. Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR X OCCUPANCY .................. 00