20020998.pdfDATE RECEIVED
PERMIT EXPIRES / I /,
USE PERMIT
CITY OF EDMONDS
ZONE
. . .. ............ _NUMBER�
CATION/
CONSTRUCTION PERMIT APPLICATION
JOB
ADDRESS
S ITEIAPT#
g� �RN�11�71AE 01 BUSINESS
1 L__;r0__
FLAT NAMEISUBDIVISION NO� Or
LID NO.
MAILING ADDRESS
60-2 is C_
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
Lt. FEE I
Us
CITY
EXISTING — PROPOSED—
� A=.n."
13
a
op
REQUIRED DEDICATION— FT
a
NAME
METER SIZE LINE SIZE No, OF FIXTURES
�RV REQUIRED
E3
YES NO,0"
ADDRESS
Re
�.S.13115 I.. EROSION ... I-O...INA.E
mil
I
' FAIi Ci I �>Iper c,i Ao:�j 5�,`45
I-C - 1 /41
ENGINEERING REVIEWED By
OAT
I=,
W
ADDRESS
IRE REVIEWED BY
DATE
CITY
Iq
5TATPZ1EtVU,M8ER EXPIRATION
VARIANCE OR CU S OR�ELINE OR ADS# NleETION BOND
0 0
BAT Go POSTED
E]YES ONO k
SERA REVIEW SIGN AREA
HEIGHT
pR Ty Te COO PARCEL NO.
com PLETE EXEMPT A ED PFPO D
A�p , PROPOSED
Z-2 6
Is
170 V�
E.p
_"qm,
NEW RESIDENTIAL
LUMBtNGIMECH
LOT COVERAGE REQUIRED SETBACKS (Fr.)
ALLOWE OPO E �p SIDE, REAR
PROPOSED SETBACKS (Fr
FRONT L
�P/IDE A
COMPLIANCE OR
0 ADDITION n COMMERCIAL
CHANGE OF USE
E] REMODEL MULTIFAMILY
SIGN
A KING LOT AREA P1 No R 1111111
BEE PROVIDED
z_
REPAIR GRADINO CYOR
FENCE
(
-
FT) REMARKS
DEMOLISH rl TANK
Ei OTHER
'GAFIA.ET "TAININ.—
;AF 0, 0 ROCKERY
E] FIRE SPRINKLER
FIRS ALARM
g
OWE OF USE, OR ACTIVITY) EXPL.M.N.
CHECKED By PE
_r [ON C7-/
Do URA
ORCOUP NT
NUMSE� UMBER OF
OF IN
EIWELL NG
CRITICAL
ARE
SPECIAL.1,NSPECTION JAREA
OCCUPANI
LOAD
STORIE 2 UNITS
NU
I
REQUIR 0 YES I
DESCRIBE WORK TO BE DONE
REMARKS
INSPECTIONS PER UBC IOSIFINAL
INSPECTION RECVE
,A
o5v,4 5�n
'I
-
7W
Ili,, k _�2' - VA
5r 371
Desciliption
FEE
DescriptIOB,
FEE
3:�j"�L I') t1kf
(.-
Check
Plan Check
1
P a
J7J . ....
State Surcharge
Z/ _1�0
L_
T_
P.- %
RCE OWING % Lai SLOPE %
IkaATA S ___t I
Building Permit
u I d"'gpenmit
City Surcharge
ED DAT
PLAN CHECK IN IEITID DATE
g..W..KT.
IG
P'
Plumbing
"pro'n.
7
"Ch."'ca,
Mechanical—
EST IT mV
�.I. P UTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
PUBLIC
F
ON PRNAT. PROPERTY ONLY AM CONST UCTICIN-141111- U-LC
..=A
Grading
"adin.
- , WLL.E.UmE
R 'ETC, WILL REQUIRE
DOMAIN JCURBS,610�A�S.ORIVEWAYS,MAROUREES,UCI I
ICU
3 SEPAMTE PERMISSION.
g, -V'SW
Engr. Review
ER
5 PER ITAPILMATON: ISODAYS
5
IN 'e.
L PERMITILIMMIYENItt-PROVID D WORK IS STARTED WITHIN —DAYS
p ."'T L"" Y "T. CA
n gr� I pacron
Engr, Inspection
E n
BACK OF MATO.
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
BE.
ON BEHALF 01 "IS OR HER SPOUSE, NEAR, ASSIGNS AND SUCCESORS
-Al'"CAN" ON EHAL'G'
r'A'
Fire Review
Fire Rev'SW
IN INTERE T. AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
IN INTEREST. A. FEES T - "
EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES. AND AGENTS FROM ANY AND
a, WASN' Nor N
Fire Inspection
Receipt #
ELL11.11
LAIMS FOR DAMAGES F HATIEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
C , I G BE 0 ,
0
FROM THE ISSUANCE OF T HIS PERMIT ISSUANCE OF THIS PERMIT SHALL NET BE
Landscapeinsp.
Total And, Due
CITY DR.,
S�MEG To .B', X WAVE G NANCE
DEEMED TO MODIFY, WANE OR REDUCE ANY REQUIREMENT 01 ANY CITY OR 'NAN E
D NOR LIMIT IN ANY WAY THE CIWS ABIU ry TO ENFORCE ANY ORDINANCE PROV
NOR LIMIT,. ANY W Y .E "o.
X
Scolding Fee
Recording Fe e
Receipt #
I HEREBY ACKNOWLEDGE THAT HAVE READ THIS APPLICATION; THAT THE INFORMATION
APPLICATION AP PROVAL
GIVEN IS CORRECT. AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
I
RES LA C a C
THE OWNER. I AG TO CO PLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
MK
L
CALL
T rippInation Is nm a permit In signed by In.
Fees
TION; AND IN DOING THE NOR AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
" �,F
CODE OF THE STATE OF WASHINGTON RELATING TO
are Prild.
Dr.11,11higs end
notfidal of histhef D.P11y: I'd
FOR INSPECTION celPH'.anewle
IN VIOLATION OF THE LABOR
WORKMEN'S COMPENSATION AND RCW 18,27
— _dg.dIm.mrm.1d.d.
0 S GNATURE DATE
FH.ANCE
(425
771-0220
EASED BY B
ATTENTION
EXT 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
ORIGINAL -FILE/- YELLOW- INSPECTOR
OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109
PINK -OWNER - GOUD4,SSESSOR
CATE
04/02 PRESS HARD -YOU ARE MAKING 5 COPIES
GREEN - ACCOUNTING
z
Om
C
rn 0
0
80
C:
-4 r.
X M
ITI
0
z
0 -n
n
-4
3:9
ITIM
0 V5
0 r-
0 rn
C ED
M 0)
M 0
Z
z
z
M
ONE
Sm
x-A
so
ol
0
MEN
so
on
NOW
C-b
�11 Dic
1
J�
�R
�t;LH
1-T
1 1
L t
I L i
L
I I
t
it
Li
J-1
LL
IL
_1
I
I
777
I
GARY.HAAKENSON
CITY OF EDMONDS
121 STHAVENUENORTH- EDMONDS.WAM20- (425)771.0210-FAX(425)?710221 MAYOR
Websire* wmv.d.admondsmaus
DEVELOPMENT SERVICES DEPARTMENT
Planning Building - Engineering
Geir Straume
October 29, 2002
603 Olympic Avenue
Edmonds, Washington 98020
RE: Carport
Dear Mr. & Mrs. Straume,
In response to a citizen's complaint, the City investigated the i I cons uction of a garage and
egal tr
deck structure on your property on 10/04/02. The City Building Inspector verified that no permit
was issued for such construction and issued a Notice to Stop Work. In response to the Stop
Work order on October 14, 2002, the City received a permit application signed by Mr. Straume
that described the work as; to enclose an existing carport with partition walls and install a garage
door, also to repair/replace an existing deck surface and railings. The Building Division
completed the initial review ofthe application and plans on October 23d and several plan review,
corrections were,noted.
A most critical issue was to determine common wall windows or doors between the proposed
garage and dwelling. We have since been notified that there is a window on the common wall
that serves a sleeping room. Be advised, the Uniform Building Code expressly prohibits a
sleeping room window to open into a garage. It has been explained to us that there is no other
alternative to relocate this window for code compliance. Therefore, it appears that you have two
options to resolve this matter: 1) revert the garage back into a carport (carports must be
completely open on two or more sides), The Uniform Building Code allows a sleeping room
window to open into a carport) or, 2) submit a change of use permit to remove the closet and
convert the sleeping room into a mechanical room, storage room, or other non -inhabitable room
that does not require minimum light and ventilation. The change of use permit requires an
existing and proposed floor plan,
Since this is considered a life -safety violation I must insist that you inform my office in writing
within 10 days with your plan of action to resolve this matter. It is not the City's intent to cause
you undue hardship however, once my office is aware of a life -safety violation I am obligated to
gain code compliance. If you have any additional code questions please feel free to contact
Tricia Bennon, Plans Examiner at 771-0220. If you have questions regarding this letter or the
time frame given for your plan of action please contact me directly at the same number.
Sincerely,.
Jeannine L. GraT
Building Official
Incorporated August 11, 1890
Sister Citv - H�W J.—
;e
0
0
C a m
0
80
C
mm
Z
0-4
0 -n,
in M
C)
0
6 Fn
'co)
M 0,
Z
Z
0
in
FINAL PROJECT APPROVAL FORM
TO: -
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE -
ENGINEERING DIVISION DATE 3L
PLANNING DIVISION DATE -
PRO
0161rA4v;(-1 AVLQ
SITE ADDRESS--LEc-�-'
PERMIT # ADB#________--DATE]NSPECTED
DESCRIPTION OF WORK TO BE INSPECTED- ELL A L-
A field inspection was conducted to determine final compliance with approved plans. FInal approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
L�,�GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
a Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
u Copy of CORRECTION NOTICE given to owner/contractor by inspector
I
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Sign
ocaprvl.doc.l:tenip:bldg:formsIO/OI
z
0
M
C
M
0
-10
0 C
M
M Z
,0-4
57, Z
C
0 -n
-n
M ni
065
0 r-
M
0)
C Cn
Q 0
z
z
rn
z
M
.... .. .......
RECORD OF INSPECTIONS
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall.........................
Pier/Porch ..............
Retaining Wall ...........
Stab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...............
Commercial Final
HEATING:
Gas Test ....................
Gas Piping .................
Equipment ...... . .........
Commercial Final
EXTERIOR SHEATHING
NAILING ........... ..........
—,D 3
FRAMING ..................
FIRST FLOOR FRAMING
INSULATION ............... tl_
Floor Insulation
I
I
Wall Insulation ...........
Ceiling Insulation ....... ---
SHEETROCK NAILING
_�3
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
MS
OCCUPANCY .................
Ahl) 0.. 41,933939.z
C1
C:
M_
0
C
AM
z
C_
"n
IT1 M
0
0
H
K v)
171 0
21
z
ca
z
ITI