20030376A.pdfDATE RECEIVED
6-)
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAMEINAME OF BUSINESS
414 o5111_1395MT
MAILING ADDRESS
23W5 TfMD0PjAV0
CITY - ZIP ITELEPHONE
9::?Jp
f0020 4-W-11 7/
NAME
ADDRESS NIA
ZIP TELEPHONE
NAME
CBLN
45;/f-50)Vr (rdON51- Ace,
ADDRESS
a-3w/5 -r1maox4-+A10
x
CITY ZIP
TELEPHONE
j -cl - 7 t t
STATE LICENSE NUMBER
PROPERTY TAX ACCOUNT PARCEL NO.
004
[3 NEW �j;7RESIDENTIAL PLUMBING MECH
ADDITION COMMERCIAL COMPLIANCE OR
CHANGE OF USE
muLnFAmiLy
REMODEL SIGN
GRADING FENCE
REPAIR CYDS ( FT)
X
120SEMOLISH TANK [] OTHER
.V11___ —
oGARAGE RETAININGWALL 0 FIRE SPRINKLER
CARPORT ROCKERY FIRE ALARM
(TYPE OF USE. BUSINESS OR ACTIV" EXPLAIN:
NUMBER
OF
ER OF
LING
CRITICA�&
AREAS
q
NUMBEZ&j
-STORIES
DESCRIBE WORK TO BE DONE
jaw
in I) I fA ()S g:
HEAT SOURCE GLAZING % LOT SLOPE %
!C221
PLM CHECK NO: VESTED DATE
THis PERMIT AUTHOR= ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
tz BE DOME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURDS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMITAPPLICATION: 180 DAYS
ILIMM I YEAR - PROVIDED WORK IS STARTED WITHIN 160 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
APPLICANIT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS. WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.*
I HERE13Y ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE M COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
TION: AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18,27.
R A DATE SIGNED
1 4, — 2. 17
f 40 1 1 PERMIT EXPIRES
USEE,O, PERMIT
ZON ......
JOB
ADDRESS
PLAT NAME/SUBDIVISION NO.
LOT NO.
LID NO,
I
LID FEE$
4j
7ESCP Approved
PUBLIC RIG%T OF WAY PER OFFICIAL
MEET MAP
MY ParrNt Required
EXISTING 'PROPOSED
. , I I
� a "'Reced
lam,
Sidevratk Required
REQUIRED 4§EDla&jj9N_,.FT
=%jd d
METER SIZE JQWI�349 N'40. OF FIXTURES PRV REQUIRED 63
NO C3 Ll
]FtZ -rn RE RRIVI&M99im
REMARKS
OWNERICONTRA(YOORS16SP8USlBNY�TAt 140VA NAMAGE
Dump AT APPROVED DUMP SrM ONLT
SEP, D'EMOLITION INSPEcrm
G!IEeR1=if;'F 8?4 BAelE eF 4eB GARB
FOR INSPECTION REQUIREMENTS
ENGINEERING REVIEWED BY DATE
FIRE REVIEWED BY
DATE I
VARIANCE OR CU SHORELINE OR ADBN I INSPECTION 1$ BOND
REQ'D POSTED
13YEs 13NO
SEPA REVIEW SIGN AREA HEIGHT
COMPLETE . EXEMPT ALLOWED . PROPOSED 1. ALLOWED . PROPOSED
LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (Fr.)
ALLOWED PROPOSED FRONT SIDE REAR FRO NT L/R SIDE REAR
z
PARKING LOT AREA rPLAl;NING REVIEWED BY DATE
REO'D I PROVIDED I
REMARKS
CHECKED BY ITYP&OF CONSTRUCInON CODE OCCUPANT
1 �X7 GROUP
SPECIAL INSPECTION JAREA OCCUPANT
REQUIRED [3 YES LOAD
REMARKS
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D
11?7r �5054.00,1�1 n5oni
Description
FEE
Description
FEE
Plan Check
State Surcharge
Building Permit
City Surcharge
Plumbing
Mechanical
Grading
Engr. Review
Engr. Inspection
Fire Review
Plan Chk. Deposit
Fire Inspection
Receipt #
Landscapeinsp.
Total Amt. Due
I
Recording Fee
Receipt #
Mldo
CALL
FOR INSPECTION
771-0220
EXT 1333
APPLICATION APPROVAL
This application is not a permit until signed by the
Building Offlcial or his/her Deputy: and Fees are paid, and
receipt Is acknoWedged In space provided.
OF LS SI URE DATE
kLiArSf[f BY
.....
f,WUNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - ASSESSOR
04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING
Agency Case o.
Agency Use Only
!—A—�o ect �4
B. Property
Owner:
Property owner',
M.0inc, Address:
Asbestos
PUGET SOUND CLEAN AIR
AGENCY
treet, Suite 500
110 Union S
Seattle, WA 98101-2038
www.pscicnair.org
NOTICE OF INTENT
n -1 2. rT Asbe
val stos Removal & Demolition 3. [1 De
puget Sound Clean Air Agency Fom No.: 66-160 (Revised 9/02) TS
State:
Date
�gency Use Only
No Asbestos Rei
The Puget Sound Clean Air Agency requires advance notification before any person commences a friable asbestos project
invq1ving materials equal to or greater in size than 10 linear feet or 48 square feet and for all demolition projects (regardless of
asbestos content) i nvolving structures with a projected roof area greater than 120 square feet (Regulation III, Article 4). All
asbestos removal and demolition notifications must be submitted to the Agency on current Agency forms. Asbestos removal
and demolition Rrojects involving materials and structures below the notification threshold are still subject to all other
reguirements of Regglation 111, Article 4.
The Agency notification form must be used to submit a notification for an asbestos project, a combined asbestos and demolition
project and a demolition project where no asbestos is required prior to demolition. After receiving a complete notification with
the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by
mail. The returned copy will be your validated notification.
J. Demolition PLEAMPAWCLAQUE THIS KUM r"JU'WM"LML01EL
Contractor:
Owner/CEO:
Contractor's
Mailing Address:
Phone:
Job #:
d
I city:
State:
ZiE:
Fax:_
GUIDELINES FOR SUBMITTING AN ASBESTOSIDEMOLITION NOTIFICATION
Step 1. Check the appropriate project type in Box A.
Step 2. Enter property owner information in Box B.
Step 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single-family residential
prcjec� in Box C. Print clearly this is your return mailing label.
Step 4. Enter the site address for all notifications in Box D. For multiple -structure projects, attach supplemental sheet with a site map
(include an address for each site) and a list of the type and amount of fiiable asbestos to be removed from each structure.
Step 5. Check either asbestos survey or material presumed in Box E. All demolitions require an Asbestos Hazard Emergency
Response Act (AHERA) asbestos survey be conducted by an AHERA certified building Inspector. Attach a c2p-y of the MM Ue results
to the notification submittal for projects where nonfriable asbestos is identified and proiects where no asbestos was identified on the
smelt
Step 6. Enter the project information in Box F. and check the mining fire or ordered demolition if appropriate (a copy of the official
order must be attached) if appropriate. All asbestos must be removed prior to conducting a mining fire. Additional training fire
requirements are contained in Regulation 1, Section 8.08. If any nonfriable asbestos materials win be left in place during demolition,
check yes and list the type and quantity of material.
Step 7. Enter asbestos project information in Box G.
Step 8. For Single -Family Residential projects; check BOX H1A for renovation projects, BOX HlB for demolition projects with or
without asbestos removal. Asbestos removal may be conducted after a complete notification is received, but demolition activities can
only begin on the 10' day after the notification is received.
For Commercial asbestos projects; check the project category H2 - 6 that matches the amount of friable asbestos that will be
removed. If a demolition is involved, include the appropriate surcharge (additional fee) in your payment. To file for an emergency
asbestos or demolition project, check the appropriate box I - 6 and the applicable emergency box in H7. All emergency requests must
be accompanied by a letter ftom the pEggpM owner demonstrating the need to conduct the 1proiect immediately in accordance with the
requirements in Rezulation III, Section 4.03 (c).
Step 9. Please cer* the accuracy and completeness of the information provided by signing the notification in Box 1.
Mandatory amendments to the notification are required for changes that increase the project category, change the types of asbestos
materials to be removed and work schedule changes. No fee is required for work schedule changes if the contractor is participating in
the Agency work schedule fax program. A $25 processing fee is required for all amendments.
Puget Sound Clean Air Agency asbestos regulations and forms can dovniload from die Agency web page at www.pscleanair.org, For
technical assistance contact (206) 6894058 and for administrative inquiries contact (206) 6894090.
Puget Sound Clean Air Agency Fonn No.: 66-160 (Revised 9/02) TS
C)!
M,
R
0
M
10
Z
"41
Is
FINAL PROJECT APPROVAL FORM
z
9
0
m
am
c
ma
0
80
c
� r.
m m
10 �
z
0 -n
n
M m
0
0
0 M
C 0)
c co
M C)
Z
X
z
co)
z
9
0
m
3.
RE_INSpECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL
Date— Si
ocaprvl.doc.l:temp:bldg:formsIO/OI
A t 1, �-
An
I
Fina
mm arcial .......
m
HEATING:
Gas Test,,..
................... .
G Pi Ind
as p ... ..............
"n
47'.
Equipment .................
m
Comr�erclal' Final-.,
EXTERIOR SHEATHING
NAILING� .....................
FRAMING .
.......
. ......... ..........
FLOOR FRAMING..;
JL.
,FIRST
INSULATION, .................
A
C�DATE RECEIVED_
Cirl OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAME/NAME OF BUSINESS
'�:J-
o 0 N Cj, I t- r3 r.:7 rZ I
MAILING ADDRESS
23A-11,S TfM8)FV-i14Nj:-
CITY ZIP ELEPHONE
o 6 -7 / 7
NAME
ADDRESS
1231011
USE
PERMIT EXPIRES
PERMIT AL , A
0;
JOB SUITE/Aiq#
ADDRESS
PLAT NAME/SUBDIV161ON NO. LOT NO. LIO NO.
LID FEE $
7EGFP App—d
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP Rw ParrrA flacriked
8"M Uss, Pormk Rsqd
EXISTING 0 12' -PROPOSED 1,7^.,T fll�r%yvfnn ir"sceon rlsqhred
SIZE
LINE SIZE NO. OF FIXTURES PRV REQUIRED
DE SEWE [j MUST BE CAPPIM-MM NO 13 Z
npF-RTV tjE
A 01
WkftHoftftWy&
CITY ZIP TELEPHONE HOSE BIB WITH AVU INSTAIJM
Dump AT APPROVED DUMP Sf= OW
NAME SEE D.r.MOLITION INS
PEM011
1-787/ 26 ENGINEERliSRE03%Xt'S' UM ISACY% Ur MODEM
IADDRESS FOR INSPECTION REQUIREMENIS
,;2.9 -r11nj2r-'R 4,4&h5 1011
FIRE REVIEWED BY DATE MA
CITY ZIP ;1TELEPHONE -7/
-o e z o & 15�fa
Jb. Vovo 71
STATE LICENSE NUMBER
DATE
CKED B
VARIANCE OR CU
1
SHuRELINE OR ADS#
I
INSPECTION
REO'D
I
BOND
OSTED
L 8 r-ee776 AD .1 ?. -;?I -o 5
I
---
13YES 13NO $
SEPA REVIEW -0
SIGN AREA
HEIGHT
PROPERTY TAX ACCOUNT PARCEL NO
COMPLETE EY4EMPT
ALLOWED PROPOSED
ALLOWED
PROPOSED
4
/.2_ 0 7 3 -0 //
-0a
,
--FeFESIDENTIAL
EXP
NEW
[:] PLUMBING/MECH
LOT COVERAGE
REQUIRED SETBACKS (FT.)
PROPOSED
SETBACKS (FT.)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT
LIRSIDE REAR
ADDITION
COMMERCIAL
ci COMPLIANCE OR
CHANGE OF USE
PARKING
LOT AREA
PLANNING REVIEWED BY
DATE
Lj nrMUUML
L-I MUDIFNAILT
L —j SIGN REOD
i PROVIDED
REPAIR
GRADING
cyos
FENCE
X F-1) REMARKS
1;2-VEMOUSH
TANK
OTHER
o GARAGS
o RETAININGWALL
FIRE SPRINKLER
CARPORT
ROCKERY
----FIREALARM
(ME OF USE. BUSINESS OR ACTIVTM EXPLAIN:
CHECKED BY TV �01` CONSTRUCTION
OCCUPANT
-7
IV
GROUP
NUMBER
V
NUMBER OF CRITICAW,.fli
OF
13WELLING AREAS
I I
SPECIAL INSPECTION JAREA
OCCUPANT
jTORIES
UNITS NUMBE
REQUIRED [] YES
LOAD
DESCRIBE WORK TO BE DONE
REMARKS
E:
LIA
PROGRj9SS INSPECTIONS PER UBC 108/FINAL INSPECTION RECV10
AwsE -7ed
lo
$ 0V
Description FEE
Doscriptlon FEE
Plan Check
State Surcharge
HEAT SOURCE
GLAZING %
LOT 8 OPE %
!0.-
Building Permit
City Surcharge
VESTED DATE
Plumbing
CHECK 140:
Mechanical
THIS PERMIT AUTHORMED ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLX ANY CONSTRUCTION ON THE PUBLIC
Grading
DOMAIN (CURB% SIDEWA WAYS. MARQUEES, ETC.) WILL REQUIRE
3 16=2PERMISSION.
Engr. Review
PERMIT APPLICATION. 160DAYS
PER.ITUMM, YEAR- PROVIDED WORK IS STAITTED WITHIN 180DAYS
Engr. Inspection
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
*APPLICAK ON BER41F OF HIS OR HER SPOUSE. HEIRS.ASSIGNS AND SUCCESOR6
Fire Review
Plan Chk. Deposit
IN INTEREST. AGREES TO INDEMNIFY: DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND
Fire Inspection
Receipt #
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
Landscapelnsp.
Total Amt. Due
A.
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
I
4.Vno
NOR LIMIT IN ANY WAY THE C17YS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.,
Recording Fee
I
Receipt #
wiem
I HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
APPLICATION
APPROVAL
GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGuLAnNG CONSTRUC-
CALL
This application Is not a partnit until signed by the
TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
1N OF THE OF THE STATE OF WASHINGTON RELATING TO
INSPECTION
Building Offlclal or histher Deputy: and Foos are paid, and
receipt Is acknowledged Inspaco
VIOLATION LABOR CODE
WORMEICS COMPENSATION INSURANCE AND RCW 18.27.
F6R
provicind.
0 S SI()NAjURE ATE
SKINATU R AgIhM
DATE SIGNED
TAW
771-0220
A '!' ION
M. 1333,
NLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
PINAL
F L IN�
INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
CATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109
04102
PRESS HARD -YOU ARE MAKI
........ ......