Loading...
20030428.pdfDATE CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMMEINNAMME 0 BUSINESS b^ LCIMPO( sdgtk~l� MAILING ADDRESS 0 if '�w-4 CITY ZIP TELEPHONE .1 NAME ADDRESS CITY I / &IP 'j ITELEPHONE [PERMITEXPIRES USE PERMIT ZONE #;#a NUMBEROL� JOB SUITE/APT# ADDRESS PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved RW Permit R6qu:rod EXISTING — PROPOSED Street Use Perm I R&q'd inspection Required Sidewalk Required REQUIRED DEDICATION— FT Undertirourid g required 13 METER SIZE LINE SIZE NO. OF FIXTURES PRV R EOUIRED I YES13 NO 13 z REMARKS I OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE I NAME N SFATRT 7AA14 r ... 'IRI�: MARSHAL ENGINEERINGRK$W9SE tPRESENT FOR DATE ADDRW %ANK FILL, REMOVAL, OR CAP —fna —FIRE CITY ZIP TELEPHONE I REVIEWED BY DATE us CK Se fe . df 006-:9�-zqp-o -- 0 STATE LICENSE NUMBER EXPIRAT19N DAT H BY VARIANCE OR Cu SHORELINE OR AMIN INSPECTION BOND c-dir-A77Tral2aq 101AIZ REO'D POSTED I 13YEs 13NO 1$ ; IROPERTY TAX ACCO EL NO. BEIRA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED 0 :2PARC tnlj// Iola , I EXP 0 NEW RESIDENTIAL PLUMBING MECH LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE REAR COMPLIANCE OR ADDITION COMMERCIAL 0 CHANGE OF USE z . REMODEL MULTI FAMILY [] SIGN PARKINGI LOT AREA PLANNING REVIEWED BY DATE REOD I PROVIDED REPAIR GRADING FENCE CYDS ( _ X _FT) REMARKS DEMOLISH TANK OTHER GARAGE RETAINING WALL F RE SPRINKLER CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACT CHECKED BY OCCUPANT, 7PIPT, G 4�1',A jTY!P%=N Fp— NUMBER, NUMBER OF CRITICAL -- If \-f—j OF DWELLING AREAS SPECIAL INSPECTION AREA OCCUPANT IIES UNITS NUMBER REQUIRED [] YE LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REG-0 c9AC IJ,5T- killlwi,7-4 f-fxt+ t— "141M -(-W'e*/VQ VALUATION RAj9 $ 'YvS -.P?r — Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE GLAZING % LOT SLOPE % Building Permit City Surcharge PLAN CHECK VESTED DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 Grading 3 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review PERMITAPPUCATION: ISO DAYS IL PERMIT UMM I YEM - PROVIDED WORK IS STARTED WITHIN I So DAYS Engr. Inspection SEE 13ACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFX DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY; WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* — Recording Fee Receipt # I HERE13Y ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH C17Y AND STATE LAWS REGULATING CONSTRUC- CALL This application Is not a permit until signed by the TION; AND IN DOING THE WORKAUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt Is acknowledged in space provided. WORKMEN'S COMPENSATI!INURANCE AND RCW 18.27. S INNER E DATE S9NED 25) OFFICIA�SPIGOATURE DATE- 771-0220 PO RE—LEAM" I D*E A'17TENTION Off 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL -FILE YELLOW- INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK -OWNER GOLD -ASSESSOR 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING L z 0 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION z m =i 9 m m 0 0 0 C -4 r. X M M4 10 Z co) o -n n m M a 0 0 M C (j) c 0) M 0 Z z z 0 m 2. 3. RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date Si ocaprvi.doc.l:temp:bldg:formsIO/OI