20030521.pdfFINAL PROJECT APPROVAL FORM
TO:—
DATE: —
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE-
Cn ( L&e(ZT ENGINEERING DIVISION DATE.11
PLANNING DIVISION DATE —
SITE ADDRESS VJ
PERMIT �?q ADB#________pATE INSpECTED�
DESCRIPTION OF WORK TO BE INSPECTED-13 VJa 3
rmine nuai compliance with approved plans. Final approval
A field inspection was conducted to dete
d enotes that there are no objections from the above signed Department to thei release, of
pERFORL�CE BONDS and the granting of
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
u Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES actor by inspector
0 Copy of CORRECTION NOTICE given to Owner/cOntr
2.
3.
RE-INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date. Sign,
ocaprvl.doc.l:tenip.-bldg:fomisIO/O1
z
0
i
0
M
Zi
M
MO
—1 0
0 0
C
MM
Mz
o'n
'n
—i
3:9
M M
0
0
0
C
?. co
rn 0
z
z
z
0
0
M
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
CO
1B -
SETBACKS ............ ......
FOUNDATION:
Footing ...................
Wall ....................
Pier/Porch ................
RetainlngWall ............
.
Slab Insulation ............
PLUMBING:
Underground .............
Rough -in .........
CorrunerclelFinal ........
HEATING:
GasTest .................
Gas Piping. � ..............
Equipment .................
Commercial Final .........
EXTERIOR SHEATHING
NAILING ....................
FR AMINO ....................
INSULATION:
Floor Insulation ...
Wall Insulation ........
Calling Insulation.
4r
S-d
3
SHEETROCK NAILING ......
SPECIAL INSPECTION ......
MISCELLANEOUS
FINAL APPROVAL
FOR OCCUPANCY ..........
i4k 1 23
AIt
z
0
0 M1
C: I I
IT! 0
—1 C,
0 C=
I _ !.
171 ITI
Z
0 -n
M M
0
0
M 0
Z
-4
z
CAI
z
171