20030564.pdfI
DATE RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAMEINAME OFAIUSIN99S
MAILING ADDRESS
V I
a
CITY
ZIP TELEPHONE
7 79
NAME;
Aid
ADDRESS
,�: I z �- J�
(11TV _ _ /I I A
—,v-
ZIP ITELEPHONE
NAME f CBL#
0 /.1) 0 /) 1 1:5
ADDRESS
CITY ZIP
STATE LICENSE NUMBER
TAX
[PERMIT EXPIRES
USE PERMIT C;2
BER eoc
sUITEIAPTF
JOB
ADDRESs,0 211�A AL�
e
PLAT NAMEISUBDIVISION NO. - LOT NO. I
LID NO.
LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
IIESCIP APPI
W 44 R wed
Street use pgfmil R"'d
Inspoctio I;aquked
EXISTING — PROPOSED
sidewalk Rawk0d
REQUIRED DEDICATION— FT —
undww"Id
!t��
METER SIZE 40. OF FIXTURES
PRV REQUIRED
NO
-WEMARKS
OWNERMONTRACTOR RESPONSIBLE FOR EROSION CONTR21���
a
I
BY AZI
is
z
i
7� 4C
W-) DATE
FIRE REVIEWED BY
TELEPHONE r6
.& .1 -7 iL 4, BOND I
0 NEW
RESIDENTIAL
13 ADDITION
21 COMMERCIAL
REMODEL
MULTIFAMILY
13 REPAIR
GRADING CYDS
[3 DEMOLISH
0 TANK
GARAGE
0 CARPORT
RETAINING WALL
ROCKERY
(TYPE OF U ISINESS OR ACT" EXPLAIN:
NUMBER
OF
NUMBER OF
DWELLING
STORIES
UNITS
DESCRIBE WORK TO BE DONE
IONDATE CKEPDY
VARIANCE OR CU
tiHORELINEORAumm I IN ;�O'D POSTEO
. I
to . 0,:jWyEs
--------
13NO $
W,O,*P-
6V
MiFI&
-
SEPA REVIEW
COMPLETE EXEMPT
_nz�o.
SIGN AREA
ALLOWED PROPOSED
HEIGHT
ALLOWED PROPOSED
I -�<
PLUMBINGIMECH
EXP
LOT COVERAGE 8690iffE9,SETBACKS (FT.)
PROPOSED qp�WDI�pM.
PROPOSED SETBACKS (FT)
FRONT UR SIDE REAR
ALLOWED
0
COMPLIANCE OR
CHANGE OF USE
PARKING
AREA JIPL�NNIN? REVIEWED BY DATE
SIGN
REO'D PROVIDED
rLOT
FENCE
X FT)
REMARKS
7
0
OTHER
FIRE SPRINKLER
FIRE ALARM
CRITICAL
AREAS
NUMBER
LOT SLOPE %
T SOURCE GLAZING %
— F __,j VESTED DATE
P CHEC��
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBUC
DOMAIN (CURBS, SIDEWALKS. DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PER= APPLICATION: 100 DAYS
PERMIT UMM I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS
IN INTEREiT, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON. ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION."
I HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMENS COMPENSATION INSURANCE AND RCW 18.27.
I DATEPIGNED
SIGPIRE rNEWO? ENT) / 77
C CHECKED BY TYPE OF I hul.; I lull GROUP
HE D B VA
CKE Y TYPE OF
SPECIAL INSPECTION AREA --- UPANT
LOAD
C
REQUIRED YES
ERS4
lU
EMARK
PROGRESS INSPECTnIONS PEER UBC lialli/FINAL INSPECTION
AA
—
$
z
- I
lk I -
Description FEE Description FEE
Plan Check
state Surcharge !1.6-eq
Building Permit
City Surcharge IIJ5.140
-
Plumbing 'low
IIIIAl
Mechanical
Grading
Engr. Review
Engr. Inspection qL
Fire Review
Plan Chk. Deposit
Fire Inspection
Receipt #
Landscapelnsp.
Total Amt. Due L, 14 L4
Recording Fee
Receipt # Id
1,CATION APPROVAL
P! Th! plj� Ion Is not a permit until signed by the
CALL
Building oincial or his/her Deputy: and Fees are paid. and
FOR INSPECTION
receipt Is acknowledged in space provided.
OFFI S IGN E DATE
VIA05)
91) --j
714
771-0220
REL BY DATE
PVT I AfA
ATTENTION STRUCTURE UNTIL 4&eZ1,11 -y
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR AL OR A CERTIFI- ORIGINAL -FILE YELLOW-IN6PECTOR/
A FINAL INSPECTION HAS BEEN MADE AND APPROV PINK -OWNER GOLD -ASSESSOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 GREEN ACCOUNTING
04102 PRESS HARD -YOU ARE MAKING 5 COPIES
Z
0
171
M
C
M
0
0 C
M
0 _n
.n
M M
0
C.)
C
Ic
0
z
CO)
z
0
M
. ff�
4
I
ENGINEERING TWOf PS9
AnDOVErA&SMUCIVIMS 128214P DR SE
CIVIL A VrXM U&M ENGJNEMW EIVMW, WA 020M21
MICRAELAMCCANN SE OFFIMPO: (425) JW075
BENJAWNIJeA"AAfAr riall't &MWI. kc�OOOLC=
1416�.
G of Edmonds
ity
I r I I I mI 4 1 1
I
If f If 4
I If 4 4
IS b ects Oagnpbell Nelson Nissan
I f
1 4 1 1 1 1 1. 1 1 1
I I I f I d 0 1 1 1 1 1 t I I I I
I.I� I I I I I Bvildj*nv Remodel
If �,�i k I I I :r I I'
,,I P Comm*% Defta Strengt1i Change
'I k I I: I. 1 1 .4 1 1 rL� 1 0 1 1 L I. I I
I f '-I I r I I
I, It
I I I I t I I fI I I
1 0 r I
of the 30M psi
It is structurally acceptable to use 2500 psi concrete instead
I I I I I I I 1 4
Hence *e concMe
I F II in
I Ign strengt1i specified the structm! calculations.
des'
V T I
I I I I I
1 r % I I
4 t I I I I I -I' r.' f:1 0.' 1 1 1 d 4 P wo�k is unin
I
I I fI -k lz d I I I'I FI 01 1 1 f', I I I I I I I I I I I I.
I r.11 - I I I - I' � -r I'
1 .0 ,7 ; I.- f.% , .
I I I I I I 1 1 4 1 1 1 . . I I I I I IV I
I
I IIJIt I I V I I I I I I t
:Z, -., I I' j I I
Iv� I A . r . I I I I I 'I , I I '; . I I. . I I I Lr I I 1 4 1
711 A If' I I I 'r, I I I I I I I I I I
f I I-,—. off.. I� I �j C� If IN 1 1, .1 O.r I II I 1 0 1 1 1
I I k I� I I I I I I I I
7 f I f I L I I I
If YOU have any qwWoons, please, call. Tbank you.
If
'ell
S in 4
^5
Ir -d I ...I
1 .1 �
PI
14
If I I
11114.
k a Ott
I I I r�. L I
If 'p. q -, If
I I If f
If If I, Id ,I
fj
I wr . fI.
If
If I I I, P
I I d
r- 4 1 ; I I ��j
If I
I L
f
, 4 1 1
If ;f'' =%XPIAF 3
I I r I I 1 .1 1 1 1 1 1 1
Michael McCann, SE
C Y:
City of Edmonds, Building Division
Attention:
Mr. Mike Snook
Fax No.:
425-771-0221
Phone No.:
425-771-0220
Numberof Pages: 2 (including cover sheet)
ORIGINAL TO FOLLOW BY MAIL Yes No
EO
Permit #2003-0564, Campbell Nelson VW Remodel w
special Inspection Reports
Dear Mr. Snook:
Attached is the 28 day compressive strength test result on the grout (OK).
R
Z�,
It is my understanding from Drico Con struction that there are no further inspections required on
this For your reference, you should have received a total of five field reports
project.
FR-001 to FR-005, in addition to the attached grout tes t report. Please call me
0.4
n umbered
should have any additional requirements for this project.
you
�4'
Best Regards,
Richard McKinley
HWA GeoSciences
J.
(425)774 -0106 office
(206)794 -3316 cell
W
llie information in this rax messilge is confidential and intended only for the use orlhe rocipiLtit named above. If you
.......
receive this rax ill crwr, you are hemby notified that any dissemination, distribution, or copying of this communication Geotechnical Engineering
H drogeology
is $is icily plollihited. ir you lxxcive this llicssage ill crwr, plwsc notify us by (clullhon a immedlatcly wid return tile y
Geoenvironmentat Services
1
41rigilull Illessage to us at the above address via tile U.S. Postal Scrvicc. Testing It Inspection
S,
A 0.
OCT-08-2003 WED 02:32 PM HWA GEOSCIENCES
FIELD AND LABORATORY GROUT TEST REPORT
(2*x 2" Cubes - ASTM C 1091109M)
(2x 2'Cubes - UBC 21-14)
(3"x3'x6"SpccImons - UBC 211-118)
FAX NO. 42b (4 2 (14 r, ue
ffir *z
WIM14
V
HWAGEOSCIENCES INC
CLIENT: Campbell Nelson Volkswagon c/b Drico Construction TESTISET # 1 A
PROJECT: Campb�h Nelson Volkswagqp.ReTp�el
A
PROJECT NO: 2003-118-23 DATF- GAS]: 917UIXUUJ UA It KtU'U: 911212OU3
DECRIPTION OF GROUT PLACEMENT REPRESENTED BY THIS TEST:
Solid grouting of cells of CMU block wall along the north side of the remodel area, of the CMU infill of the former
door in the east wall, and of the short sections of CMU shear wall located at either end of the west wall. Also,
grouting of the cells containing the anchor bolts for the ledger board on the east wall of the remodel area.
COMPRESSIVE
STRENGTH
TEST DATA
SAMPLE
I.D.
NUMBER
AGE)
(days
TEST
DATE
(mrrdddlyy)
TIME
TESTED
(24 hr clock)
1ST
DIMENSION
(inches)
2ND
DIMENSION
(inches)
X-SECT.
AREA
(sq. in.)
MAX.
LOAD
(lbs)
COMPR.
STRENGTH
(psi)
TECH.
2003-118-17
7
9117103
16:20
5.93
3.10
18.38
37523
2040
EJB
2003-118-IB
28
1018103
13:30
6.33
3.10
19.62
46256
2360
BPM
2003-118-IC
28
1018103
13:45
6.10
3.10
18.91
47485
2510
BPM
Specified- Minimum Compressive Strength:1
200 psi
SITE MIXED GROUT
Product Manufacturer
Proportions: Sand:
Product Code:
Portland Cement:
Mixer Type;
Masonry Cement:
Time Batched:
Water.
Mixing Time:'-
Other:
16-
PLANT PRODUCED GROUT
Supplier Name: Glacier Northwaost
Max: Agg. Size:.3/8"
Time Batched: 9:59
Plant Number: 260
Cement Type:—
ArrivalTime: 110:i�'-
Mix Code/ No.:'39-60(7��-3/8-Gr.)
Load Volume (yd 3): 7.5
StartUnloading: 10A.1-'.
Truck Number 32
Cum. Volume (yd 3): 7..5..
End Unloading:.
Ticket Number, 442945
Admixtures:
FIELD TEST DATA
Slump: 9 112"
Time Sampled: 1,0:55
Mix Temp. (F):. 7 ' 5,
Time Cast: 11:00
Air Temp fl: 75
Cast By: HWAIP.J.P
Mold Type: CMU Blocks
MISCELLANEOUS INFORMATION I COMMENTS
Contractor / SubContractor Drico Construction lEverson Masoi7ry
Field test results reported to
(Contractor Representative an Site)
Field test results reported to
(Client/Owners Rep. on Site)
Comments:
Reviewed By:
This report applies only to the ilcms tested, and may be reproduced In full, with written approval of FIWA GEOSCIENCES INC.
r. ui/uj
Attached are field reports FRO01 (inspections Thursday on epox y anchors) and FRO02
yesterday for welding).
Please call me should you have any additional requ irements.
Best. Regards,
Richard McKinley
HWA GeoSciences
(426) 774-0106 office
(206)794 -3316 cell
RECEIVED,
SEP
PERMIT COUNTEH
i od abo
11io inkinivition in this Nix message is confidential and intcadod only for the use of the TcciPicut nit n ve. If you GeotechnicaL Engineering
gof this conimuni i
recciw Ilik (ax in crior, you atu hctvby notified that any disscinjnrition, distribution, or copyin cation Hydrogeology
jivirictlyprolsibitcd. I r you receive this tricssago in error, please notify us by telcrihorte inutiodiately and rclum the Geoenvironmental. Services
orintinal illessa"c to us at the above oddi-css via the US. Postal Service. Testing Et Inspection
Uelui
Shp-M-21JUJ TUE 11:bb HN HWH UhU6IU1hN1Jhb tHA NU. 4Zb ((4 e(14 r.
119730-64th Avenue Wast, Suite 200 Field Report No.: FR-001
Lynnwood, WA 98036 Date (mmIddlyft 91412003
Tel. 425-774-0105 HWA Project No.: 2003-118-23
HWAGEOSCIENCES I NC. Fax. 425-774-2714 HWA Task No.: 1100
Project Name
Location or Address of Project
Permitt4o.
Carriebell Nelson Remodel
Edmonds, WA
200-0564
Client
Client Representative
weather
Campbell Nelson VW do Dr1co Constr.
Galen Dries of Drico Construction
CloudyLCool
Design Authority (engineer or architect of record)
Design Authority Representative
A ProjW Manager
M2 Engineering Inc.
Mike NcCann
Richard McKinley
General Contmclor
General Contractor Representative
HWA Field Representative
Drico Construction
Dwight (site foreman)
Pat Pierce, Richard McKinley
FIELD REPORT
SUMMARY OF TIME SPENT ON PROJECT TODAY:
rt ra I
First Site Visit: Start Travel: 1100 krived at Site: 1110 Depa edSite:11 0 EndT ve:1200
Second MsIt Stail Travel: 1430 Arrived at Site: WO Departed Site: 1520 End Travel: 1530
ITEM BEING INSPECTED: installation of Epoxy Anchors
DETAILED LOCATION: Anchors for the future CMU block shear wall at the north end of the new west wall.
TYPE OF INSPECTION: Periodic
STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL At the time of our inspection, horizontal anchor hole 9 had been drilled Into the east
end of the north wall and vertical anchor holes had been drilled Into the concrete foundation at the north end of the east wall.
irm that the anchor holes
HWA INSPECTION ACTIVITIES RELATED TOTIHIS ITEM: HWA ca rried out visual observaUon and measurements to conr
were drilled to the required depth (6"' per phone call to Design Authority Representative), that the holes were thoroughly cleaned out prior to
placement of epoxy, and that the full co ntact was obtained during epoxy placement.
CONFORMANCE OF THIS ITEM: To the best of the inspector's knowledge, the Item Inspected was to und to be in conformance with approved
plans,,specificafions and RFIs. with the exception of the following Items.
Item I Several of the anchor holes were found to be too shallow. The contractor redrilled the holes deeper, which resolved the Issue.
OTHER MISCELLANEOUS ACTIVITIES, OBSERVATIONS ANWOR COMMENTS:
SIgnod: ReViewed'
Pro I Engineer Reviewer
HWA Field Aepresentativ0000' HWA a
SUMMARY OF ISSUES REQUIRING FU TURE RESOLUTION
Report# Item# Status
na na No non -conforming Items at this time.
This repoit shoLld only be reproduced In its entirely. Report is not final until signed by HWA field representative ard HWA reviewer. Page I of I
SEP-09-2003 TUE 11:56 AM HWA GEOSCIENCES FIX NU. 4?-b (4 114 r. UJ/UJ
19730-64th Avenue West, Sulle 200 Field Report No.: FR-002
Lynnwood. WA 98036 Date (mmiddlyy): 91812003
ff -774-0106 HWA Project No.: 2003-118-23
Tel. 42S
HWAGEOSCIENCES INC. Fax. 425-774-2714 HWA Task No.: 1100
Proled Name
Location or Address of Project
Permit No.
Campbell Nelson Remodel
Edmonds, WA
2003-0564
Client
Client Representative
Weather
Campbell Nelson VW C/o Drico Constr.
Galen Dries of Drico Construction
CloudylCool
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
M2 Engineering Inc.
Mike NcGann
Richard McKinley
_G�nerai Contractor
General Contractor Representative
HWA Field Representative
ITony
Drico Cons1ruction
I Dwight (site foreman)
Martin
FIELD REPORT
SUMMARY OF TIME SPENT ON PROJECT TOD":
Site Visit Start Travel: 1430 Arrived at Site: 1445 Dep anted Site: 1600 End Travel: 1630
MATERIAL BEING INSPECTED/TESTED: Fillet Welding
ITEM BEING CONSTRUCTED: Structural Steel
DETAILED LOCATION: Fillet welding of 11Z'studs to W14, fillet welding of #4 rebar to 112"x6*x10" plate, and fillet welding of base plate to 4 0 TS
column.
TYPE OF INSPECTION: Periodic
-STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL: At the timeof our inspection, filletwelding fortheabovewas complete.
HWA INSPECTION ACTIVITIES RELATED TO THIS ITEM: HWA carried out visual observation and measurements to confirm fillet weld sizes, and
correct placement per Detail 2 on Drawing 1 B (stud welding) and per Drawing '19 (#4 rebar welding to plates). The welders WABO Certification was
confirmed by reviewing his wa0et card and identificafion.
CONFORMANCE OF THIS ITEM: To the best of the Inspector's knowledge. ft item Inspected was found to be in conformance with approved
plans, specifications and RFIs. With the exception of the followIng items.
Item 11 - The fillet welds for the 1/20 studs to the W14 beam were found to be undersize relative to requirements In the AWS D1.1 Code, This was
brought to Uie attention of the welder and the oonVactor. The fillet welds were increased In size to meet the requirements of AWS. which resolved
this Issue.
Item 2 - A base plate had been fillet welded to a 4"x4' TS column with no drawing requirements.
OTHER MISCELLANEOUS ACTIVITIES, OBSERVATIONS AND/OR COMMENTS:
SIGNATURES:
12_;� R
Signed: -V" eviewed-
ve Pr Review&
HWA FieldfRepresentati HWA eject EW�Ineer oi'T
SUMMARY OF ISSUES REQUIRING FUTURE RESOLUTION
Report# Item# Status
2 Unresolved. The contractor Is to contact the structural engineer and request a drawing showing the required detail for
the fillet welding of the 4"x4" TS column and base plate.
This repoil should only be reproduced in its entirety. Report Is riot final until signed by HWA field representative and HWA revie w6r. Page 1 of 1
SEP-09-2003 TUE IU:4'( AM HWA ULUSUIENUEb
FAXHITTAL
Date:
September 9, 2003
From:
Richard McKinley, Manager, M
Pr,QJect
2003-118-23
Sent To....
Company:
City of Edmonds, Building Dii
Attention:
Mr. Mike Snook
Fax No.:
425-771-0221
Phone No.:
1 425-771-0220
Number of Pages: I (including cover sheet)
PHA NU, 4eb f14 e114
r. ui
Uff LT a", I
HWAGEOSCIENCES lf�
19730-64th AVE W STE 200
Lynnwood, WA 98036-5904
Tel. 425-774-0106
Fax. 425-774-2714
aterials and Construction Services Group
I ORIGINAL TO FOLLOW BY MAIL [:] Yes El No I
Permit #2003-0564, Campbell Nelson VW Remodel
Special Inspection
Dear Mr. Snook:
We have been requested by Drico Construction to provide special inspection for this project
per your list of inspections written an the plans at the site. At the time of contact, the new CMU
block walls and door Infills were already in place and the new footing was already poured
along the east side of the building, so we have not inspected these parts of.the project, but I
understand from Dwight (foreman) that you have inspected these. Per your list, we will be
inspecting...
Concrete — None. No more concrete expected to be placed.
Welding — Visual Inspection of fillet welds for Nelson studs and anchor plates.
Bolts in Concrete — None. No more concrete to be placed.
Epoxy Anchors — Visual inspection to confirm depth of embeddment, cleanliness of hole, etc
Masonry Reinforcement — Visual inspection to confirm bar size, quantity, placement.
Grout — Visual Inspection of cell cleanout and grout consolidation, and take compressive
strength samples
Please call me should you have any modifications or additional requirements.
We will fax you inspection reports weekly as requested
Best Regards,
Richard McKinley
HWA GeoSclences
(425) 774-0106 office
(206) 794-3316 cell
The inrortualion in this rux message is conlidenlial and inteMed ottly for the use of (he recipient named above. tryou
mccivc thiq Cix In cmir, you are hereby nulified that any dissemination, distribution, or copying of this communication
i9strictiyProi,ibi(eci. i r ytiu receive this mcssngc in a rm r, plea ge notify us by idephane immcd i8tely and retu M the
orighud owisnLw to its ai ilia nluive addivss via the U.S. Postal Scrvicc.
GeotechnicaL Engineering
Hydrogeology
Geoenvironmentat Sery1ces
Testing ri inspection
Company: _
Attention:
City of Edmonds, Building Division
Mr. Mike Snook
'Fax No.:
425-771-0221
Phone
No.:
425-771-0220
Number of Pages: 2 (including cover sheet)
Permit #2003-0564, Campbell Nelson VW Remodel
Special Inspection Reports
Dear Mr. Snook:
ated with W14 beam).
Attached is field report FRO05 (inspections on welding associ
b
Please call me should you have any additional requirements.
Best Regards
q
Richard McKinley
HWA GeaSciences
(425) 774-0106.office
-3316 cell
(206)794
'11%c inromialkin in jbis fax m%*suge is confidentU and ItilciultA only forthe use orthe recipient narned above. If you
Geotechnicat Engineering
or copying orails communication
receive this Nx in cirur, you are lierd)y m9ificd that any dissemination, dishibution,
-n Hydrogeology
is sirictly prohibited. If you receive this inessage in emr. Please notify us by tcicplione imnicdialcly and rvtui (lie
Geoenvironmentat Services
ariginal wessape to ui at (lie above address via die U.S. Postal Scivice.
Testing Et Inspection
SEP-Ib-20M MON U1:b( FM HWA ULUSUIENUEb �HA NU. Ub ((4 e114 Ue
19730-641h Avenue West, Sulte 200 Field Report No., FR-005
IFWA Lynnwood, WA 90036 Date (mmIddlyft 911212003
Tel. 425-774-0106 HWA Project No.: 2003-118-23
HWAGEOSCIENCES INC. Fax. 425-774-2714 HWA Tasic No.. 1100
Project Name
Location or Address of Project
Permit No.
Campbell Nelson Remodel
Edmonds, WA
2003-0564
C I i e nt
Client Representative
Weather
Campbell Nelson VW c/o Drico Constr.
Galen Dreis of DrIco Construction
Cloudy/Warm
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
M2 Engineering Inc.
Mike McCann
Richard McKinlev
Goncral Contractor
General Convector Representative
HWA Field Representative
ITony
Drico Construction - -
I DmAght (site foreman)
Matin
FIELD REPORT
SUMMARY OF TIME SPENT ON PROJECT TODAY:
el t: Start Travel: 1530 Arrived at Site. 11600 Departed Site: 1615 EndTravel:1630
Site Vi
MATERIAL BEING INSPECTED/TESTED: Fillet Welding
ITEM BEING CONSTRUCTED: W14 beam and 4"0"TIS Column
DETAILED LOCATION, W14 beam welds to the embed 1/2" plates grouted Into the CMU wall packets at each end. The 4"x 4"TIS Column weldeds
to the bottom flange of the W14 beam.
4
TYPE OF INSPECTION: Periodic
STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL, At the time of our Inspection, welding was complete.
HWA carried out visual welding Inspection irm weld quality and that fillet weld sizes
INSPECTION ACTIVITIES RELATED TO THIS ITEM. to confi
conform to drawing requirements.
CONFORMANCE OF THIS ITEM: To the best of the Inspectoes knowledge, the item inspected was found to be in conformance with approved
..plans, specifications and RFIs.
OTHER MISCEIAANEOUS ACTIVITIES, OBSERVATIONS AND/OR COMMENTS: The drawing showing the required detail for the fillet welding of
the 4";kil' TS column and base plate is now available. resolving the outstanding issue from field report FR002..
�ZNATdiiE��.
k'y"
-A-7 RBvle ed,4
Signed.
W pro
. ..... HWA Fiiel?/fiep�e �enta 7e' H A Engineeror e�vler
A
SUMMARY OF ISSUES REQUIRING FUTURE RESOLUTION
Reportft Iternh! Status
U1 t a drawing showing the required detail for
FRO03 I nresolved. The contractor Is to contact the structural engineer and reques
the ledger board anchor system.
A�.
SEP-18-2003 THU 04:55 PM HWA GEOSCIENCES
FAX NO. 425 774 2714 F. 02
FIELD AND LABORATORY GROUT TEST REPORT WE
AM
U a,
Irk 2" Cu"s - ASTM C 1091109M) 11WAGEoSci ENCES INC
1210'Cubami-1.18C21-14)
(3'4741 SPOCIalons - U13C 21-18)
CLIENT- C"pbeff Nelson Volkswa TESTISET # 1...
goo c/o Drico COnstruction
PROJECT- Cam all Nelson Volkswanon Romodel
.. . Pm. . . .. . -
PROJ15.CT NO: WW,2.44A_21 DATE CAST: 911012003 IjAtE REC'E):_jijj��j
DECRU-MON OF GROUT PD%C_E_MENT REPRERNTED BY THIS TEST*
Solid Urouting of cells of CMU block wall along the noith side of the remodel area, of the CMU infill of tho formef
door In (he east wall, and of the short sections of CMU shear wall located at eN)er end of the wesf wall. Also,
gmuting of the cells containing the anchor bolts for the ledger board on the east wall of tho mmodel area.
COMPRESSIVE
STRENG T
H TEST DATA
SAMPLE
I.D.
NUMSFR
AGE
(days)
TEST
DATE
(2!M!ggW)
TIME
TESTED
(24 hr datk)
-T
IS
;MENSION
DIMENSION
(inches)
(I es)
2ND
DIMENSION
(ff whe5)
-SEC
X-SECT.
T.
ARE
AREA
in.)
(sq. In.)
A]
MAX.
LOAD
t 31
COMPR.
STRENGTH
(O&A
TECH.
2003-1 18-IA
7
W1 7103
16:20
5.9;
5.93
3.10
18.38
37523
2040
EJ8
2003-118-IB
28
IaW3
2003-118-IC
28
1WM3
V rinimum CZ;;;p7R_sr'4e Strenqth:L'.L0.00
psi,
SITE MIXED GROUT
Product Manufacturer
Proportions- Sand:
Product Code:
Portland Cement:
Mixer Type:
Masonry Cement:
'Time Balched:.
Water.—
Mixing Tone:
Other
PLANT PRODUCED GROUT
SuppliorName: ofacierNorffivnicst
Mnx, Agg. Size: 318"
Time Belched: 9,59
Plan! Number. 2clo
Cement Type:
Arrival Time: 10:30
Mix Code I No.: 3960 (7 SK Or.)
Truck Number 32
Load Volume (yd): 7.5
Cum. Volume (yd): 7.5'
Start Unloading: I OA I
End Unloading:
Ticket Number. ti�;ii)4!i
Admixtures. -
FIELD TEST DATA
slump. 9 14,11
Time Sampled: 10:55
Mix Temp. (F). 75
Time Cast* I 1:oo
Air Temp (F): 75
Cast By:
mow YIPO: ka
Bloc
MISCELLANEOUS INFORMATION I COMMENTS
Contractor I SubContraclon Ddoo Construction lEverson Masonry
Field lost rosults reported to
(Contractor Representative an Site)
Field test resulls reported to
(Client/OwnersRcp.on Silo)
Cnniments-
Reviewed By: Af
ThIll r*W4j4ik-4 only 10 ft Ildnis $M100. 0ek! May ba mptodo"d Ift (ulL wilh wrillen aWavrol of I IWA GEOSCIENCES INC.
SAN,
..CV
21.
SEP-18-2003 THU 05:00 PM HWA GEOSCIENCES M NU. 4?b (14 �(14
r, uelue-
FIELD AND LABORATORY GROUT TEST REPORT
-ASIM C 1001100M) UL
(2% 2" Culics. - UGC 21-14) 11WAGFOSCIENCES INC
(1-4-ov Spovirnuns - UBC 21 -`19)
CLIENT: Campbell Nelson Volkswagpq.S�q prico Construction TEST/SET I
PROJFCT: Campp�!l Nelson Volk w. gon Remodel
:s. a
ROjEOF NO: 2003-118-23 LJA I t .917 VIZUUJ UA It KtL;-U: 911212003
5ECRIPTION 5P GROUT PLACEMENT REPRESENTED BY THIS TEST:
�olid grouting of cells of CMU block wall along the norlh sldc of the remodel area, of the CMU infill of the fomier
foor in iho oast wall, and of the shott sections of CMU shear wall located at either end of the west wall. Also,
youting of the cells containing the anchor bolts for the ledger board on tho east wall or tho remodel area.
COMPRESSIVE
STRENGTH
TEST DATA
SAMPLE
I.D.
NUMr:,r--:R
AGE
(days)
TEST
DATE
(rnrn/ddtyy)
TIME
TESTED
(24hrclock)
1ST
DIMENSION
(inches)
2NO
DIMIENSION
(inches)
X-SECT.
AREA
(sq. in.)
MAX.
LOAD
(lbs)
COMPR.
STRCNGTH
(.Dsi)
TECH.
2003-116- 1A
7
9117103
16:20
5.93
3.10
18.38
37523
2040
EJB
2003-118-18
28
1018103
1
2003-118-lC
26
1016103
Specified Minimum Compress iveS trength:
2000
SITE MIXED GROUT
Product ManUfActurer......
Proportions: Sand:
Product Codo
Portland Cement:
Mixer Type:
Masonry Cement;
Time Batchod:
Water:
Mixing Time:
Other:
PLANT PRODUCED GROUT
Supplinr Name: Glacier Northwoest.
Max: Agg. Size: 3/8"
Time Batchcd:.9.:5..9..
Plont Number. 260
Cement Type:
Arrival Time: 10:30
Mix Code i No., P960 (7 SK.318 Or.)
Load Volume (yd*)- i.s
Start Unloading: 10:41
Truck Number. 32
Cum. Volume (yd3)-. 7.5
End Unloading:
Ticket Numbor: 4
4
Admixtures:
FIELD TEST DATA
Slump: 9 1/2"
Time Sampled: 10:55
MixTomp (F): 7.5
Time Cast: 11:00
AirTemp(F):
Cast By:.HWA�P.J.�*
Mold Type: &U, Blocks
MISCELLANEOUS INFORMATION COMMENTS
Cuntractor / SubContractor: Ofico Consiructfon Everson Mssonr
Firld test results reported to
(Contriactor Representative on Site)
Field lest results relported to
(ClienVOwners Rep. on Site)
Comments:
Reviewed By:
I Mr. ropurtappliescnlylo Me How leslod, and mny Iv rcproduced In hill, will imiltan appmwil of HWAGEOSCIENCES INC.
0f
4 s
J: 0�
Z,
a!ly- C i
Comp tv of Ednionds, Building Division
on: Mr. Mike Snook
Attcnti
F 25-771-0221
ax No.: 4
-771-0220
Plionc No.: 425
Number of Pages: 4 (including cover sheet)
Permit #2003-0564, Campbell Nelson VW Remodel
S ecial Inspection Reports
p
Dear Mr. Snook:
hor bolts for ledger board) and FR004.
Attached are field reports FRO03 (inspections on anc
""A ing and for CMU grouting).
(inspections yesterday for masonry reinforc
Please call me should you have any additional requirements.
Best Regards
Richard McKinley
H
... .... WA GeoSciences
(425) 774-0106'office
(206) 794-3316 cell
The inl1ormation in Ill is fax wessagi: is conl idential and intended only for (lie use. of the recipient nained above. Ifyou ering
reopying of this willillu llical loll Geotechnical Engine
-ccivc Illis fox ill Ullor, you'lli; hereby notified that nny disseininalicin, distribution, o
Hydrogeotogy
issilidlytillibillilet]. 11' you it-ecive this 111css;joe in el-mr, please notif� us by telephone immediately and return the
0 GeoenvironmentaL Services
original Inessneg tti is lit the above addre.is via tile U.S. Postal Sci ice. Testing a Inspection
. . . . . . . . . . .
SEP-12-2UU3 �Nl U2:23 PH HWA UEUSUIENGES M NU. 42b ((4 2(14 P. U2
-64th Avenue West, Suite 200 -003
151730 Field Report No.: FR
Lyniwood, WA 9BD36 Date (mm/cIdlyry): 91812003
Tel. 425-774-0106 HWA Project No.: 2003-118-23\/
HWAGEOSUENCES INC. Fax. 425-774-2714 HWA Task No.: 1100
Project Name
Location or Address of Project
Permit No.
Campbell Nelson Remodel
Edmonds, WA
2003-0564
Client
Client Representative
Weather
Campbell Nelson VW c/o Drico Constr.
Galen Dries of Drico Construction
Mostly Sunny / 65*
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
M2 Engineering Inc.
Mike McCann
Richard McKinley
General Contractor
General Contractor Representative
FMA Field Representative
Drico Construction
Dwight (site foreman)
Pat Pierce
FIELD REPORT
SUMMARY OF TIME SPENT ON PROJECT TODAY:
Site Visit: Start Travel: 1010 Arrived at Site; 1020 Departed Site: 1030 End Travel: 1040
MATERIAL BEING INSPECTEDITESTED. Anchor Bolts
ITEM BEING CONSTRUCTED: Anchor Bolts for, Root Ledger Board
DETAILED LOCATION: Interior or East Wall
TYPE OF INSPECTION: Periodic
STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL: At the time of our inspection, knock -outs for J-Bolts in ungrouted cells and drilled
holes forwedge,type bolts in grouted cells were completed. Anchor bolts were not in place at the time of our visit.
HWA INSPECTION ACTIVITIES RELATED TO THIS ITEM: HWA carried out visual observation and measurements to confirm adequate cover.
CONFORMANCE OF THIS ITEM: To the best of the Inspector's knovAedge, the item Inspected was found to be In conformance with approved
plans. specifications and RF19. with the exception of the following non -conformance issues. These issues were brought to the attention of the
general contractor.
Item I - Structural details showing bolt location, number, and sizes of anchor bolts was not provided in the plans.
OTHER MISCELLANEOUS ACTIVITIES, OBSERVATIONS AND/OR COMMENTS:
SIGNATURES:
Signed: Reviewed:
HWA Project Engiii er r ReAAer"
HWA Fie 3ineer r Re we
I/e
preseni�ii�4_/__
TI
SSUES REQUIRING FUTURE RESOLUTION
Report# Item# Status
It
FR002 2 Unresolved. The contractor Is to contact the structural engineer and request a drawing showing the required detail for
the fillet welding of the 4"xil" TS column and base plate.
FRO03 i Unresolved. The contractor is to contact the structural engineer and request a drawing showing the required detail for
the ledger board anchor system.
This report should only be (eproduced in its entirely. Reporl Is not final until signed by HWA field representative and HWA reviewer. Page 1 of I
TI
I
btr-le-ZULIJ M UZ;Z4 ri'l HWH U11UbUItNlJl1b
19730-64111 Avenue West, Suite 200
Lynnwood, WA 98036
Tel. 425-774-0106
HWAG'r-.oSC1ENCES INC. Fax. 425-714-2714
Project Name Location or Address of Project
CarriDbell Nelson Remodel Edmonds WA
a
r HA 11U. i4e_0 f (4 e- 1 14
Field Report No.:
Date (mm/dclilyft
HWA Project No.:
HWA Task No.:
r. ui
FR-004
9110/2003
2003-118-23
1100
Permit No.
2003-0564
Clien!
Client Representative
Weather
Carnp�ell Nelson VW c/o Drico Constr.
Galen Dreis of Drico Construction
Mostly Sunny / 65*
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
M2 Engineering Inc.
Mike McCann
Richard McKinley
General Cotilractor
lGeneral Contractor Representative
HWA Field Representative
Drico Construction
I Dwight (site foreman)
Pat Pierce. R. McKinley
FIELD REPORT
SUMMARY OF TIME SPENT ON PROJECT TODAY:
Site Visit: Start Travel: 930 Arrived at Site: 940 Departed Site: 1120 End Travel: 1130
MATERIAL. BEING INSPECTED/TESTED: Reinforcing Steel - placement
ITEM BEING CONSTRUCTED: CMU block walls
DETAILED LOCATION, New CMU block %vall along the north side of the remodel area, and the short sections of CMU shear wall located at either
end of (lie west wall.
TYPE OF INSPECTION: Periodic
STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL: At the time of our Inspection, the rebar placement was complete.
HWA INSPECTION ACTIVITIES RELATED TO THIS ITEM: HWA carried out visual observation and measurements to confirrii bar sizes, number of
bars, correct placement, and adequate cover. Since the walls and reinforcing were already in place, inspection was limited to what could be
observed by looking down into the wall from the top of wall using a flashlight.
CONFORMANCE OF THIS ITEM: To the best of the inspectors knowledge, the item inspected was found to be in conformance with approved
plans, speci9cations and RFIs. with the exception of the following non-conformance Issues.
Item I - There were no bar positioners In place to support the tops of the vertical bars, consequently numerous bars were noted to be touching the
sides of the coils at the top of the wall (UBC requires a minimum of 1/2" separation of bar and block to allow pea gravel grout to flow around and
encapsulate the rebar. The subcontractor and contractor were nobfied. No bar positioners were available on site, however, the. subcontractor
indicated that lie would center the top of each bar by hand during the grouting process.
i�Aiii�liC�iIW6'T��PE�E�EDITESTED: Grout
ITEM BEING CONSTRUCTED: CMU block walls
DETAILED LOCATION: Solid grouting of cells of CMU block wall along the north side of the remodel area, of the CMU infill of the former door in the
e3st wall. and of the short sections of CMU shear wall located at either end of the west wall. Also, groufing of the cells containing the anchor bolts
for the ledger board on the east wall of the remodel area.
TYPE OF INSPECTION: Periodic
STATUS AND DETAILS OF PLACEMENT OF THIS MATERIAL: At the time of our Inspection, all CMU block had been placed, the reinforcing steel
was In place, and all anchor bolts were in place. Grouting of the north wall and of the shear wall an the north end of the west wall was carried out
durinq our site visit.
HWA INSPECTION ACTIVITIES RELATED TO THIS ITEM: HWA carried out visual observation and measurements to confirm that cells are
unobstructed, to confirm the presence and use of adequate cleanouts, and to confirm proper placement and consolidation techniques. Field testing
included measuring the slump of the grout, and casting of grout compressive strength specimens. Test results are summarized on HWNs 'Field and
Laboratory Concrete Test Report' for Set 1.
CONFORMANCE OF THIS ITEM: To the best of the inspectors knowledge, the Item Inspected was found to be in conformance with approved
plans, specifications and RFIs, with the exception of the following non-conformance issues.
Item 2 - No cleanouls were present for the reinforced cells of the new CMU wall. The subcontractor was informed and created cleanouts and
removed an debris present at the bottom of the cells, which resolved the issue.
Item 3 - The subcontractors qrout vibrator was not long enough to penetrate the full height of the wall. A full length vibrator was provided by the
contractor for the subcontractor's use , which resolved the issue.
i5fiiEh 1�666C[KqE66S ACTI ITIES. OBSERVATIONS AND/OR COMMENTS:
SIGNW - _S:
Signed:_._.
HWA Fiel epr �i� nlal'�e
(continued on Page 2)
Reviewed: , 1
HWA ProjectVAY16'eer or Reviewer
This relicul should only be reproduced In its entirely. Rwil is not final until signed by HWA field representaWe and HWA reviewer. Page 1 of 2
A
loll'
�T
X
�4-
p
P
SEP-12-2UU3 HI 024 FM HWA GEUSUIENGES HX NU.
4?b
(14 2114
19730-64th Avenue West, Suite 206
Field
Report No.:
FR-004
T"
Lynnwood, WA 98036
Date
(mm/ddlyy):
911012003
HWAGEOSCIENCES INC.
Tel. 425-774-0106
HWA
Project No.:
2003-118-23
Fax. 425-774-2714
HWA
Task No.:
1100
Project Name
Location or Address of Project
Permit No.
CarnpAi�11_Nclson Remodel
Edmonds, WA
2003-0564
Client
Client Representative
Weather
Carripbel Nelson VW c/o Drico Constr.
Galen Drois of Drica Construction
Mostly Sunny / 65"
Otasign Aui,%orfly (engineer or architect of record)
Design Authority Representative
HWA Pf0ject Manager
Engineering Inc.
Mike McCann
Richard McKinley
IM2
General Contractor
General Contract or Representative
HWA Field Representallve
Drico Construction
Dwight (site foreman)
Pat Pierce, R. McKinley
SUMMARY OF ISSUES REQUIRING FUTURE RESOLUTION
Reportg Iterng Status
.. ... ....... FRO02 2 Unresolved. The contractor is to contact the structural engineer and request a drawing showing the required detail for
the fillet welding of the 4"x4" TS column and base plate.
FRO03 1 Unresolved. The contractor Is to contact the structural engineer and request a drawing showing the required detail for
the ledger board anchor system,
2
.... ......
JI
U.
i-271
......... . . .....
-z"
Tnis rcpod should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer.
Page 2 of 2
FINAL ROJECT APPROVAL FO*k.-ol
TO:
z
9
0
m
=i 9
m
c
ma
0
80
c
�c
m
mz
10
co
o -n
n
m M
055
0 r-
0 M
C m
c co
M 0
Z
7-4
M
z
z
9
0
m
'AT; 1. 1 A I',
V'I '' I A A A A
IT I I A L
A 1 1 1 1 1 1 1
A
I A
A
A TV A
I I I I A A A
LT I I
Lt
I A
'IT I A I I I
It A , L A -
L 0 1 A - A
I T A A I A I I I I L I I I I VL
A A A I L A
IT A I L L
A CCA//t/l, L A L. I I''.I I'll A
A A I'�'l t' It " I" j L.
I, I T L' A At. A A
LT 13 1 1 1 ' I 1 1, -L.� It.,
I I L, T LI., T4 IT LIAL
If L L 4j L A A I "I 1" 1: A A L A (I 1 .0 "1 1. to A 1, 1
L:' I I A I I A I I I A I I L I Lt It, I
I A I I A L I I I I , Lt A I I L 4
I z I I 'L I i 1 1. L I I L I I Jd A I, I L 4 1 1 1 1 1. 1 1 1 1 1 1 L A 1 1 4 4 1 A Lt A .1 Lt LL 4 Lt L
ALL I A I A At I I 1 0 AT A A
I AL
A A A I
I A A I A I A A
I I A A I I A .1 A A
, I V A A t A I I ,
ii �'VLL; A t L A A 1 11 1
A 4, , A , I I , A I I I ! : t
I I A 1 0 A L AT
A, . . , I , " ,
I "TV' :A I A Ar IT A, I I . I
A A I ; - A At IL LT
-V A re
LT AT IT I I L A I L 1 L I A L A A A I LL
I A
L IF I A
I , A 1 ;0, It A A A A A t A A I A
; I I A "' . A , , I A It
A A A A A
ILA A 1 4 L I I... L I I L A A I
A A I A A :A A L L I r r, A I IT I IT
TV A A L I L A I L r I
AIL A L I TV I I I t A_
A- TV I" I I AT A r. A, I I
r A
A F
A A 1 4
LT A AT A 4 L IV, A I A 7L TV L
r r I I I r I I A A A L r L I : I r I LT I -
A r I r L A TV AT A ,k*r A A
TI ...1 .0 6 A r
I L L 1 A A A I
A 1 1 4 1 L 1 0 A A I A I A I IT I A I f A A I
TV AL, I,_ -I I A I A A I I A I L L A r A I I A L
I I At A A
IA I I I A I L A r IT L
A . - I I T 1 1, A Lt A A A L A L At A, I r I I r I r A r L A A I I I AT Lt
L A A A I A A I Lt I L L IT r I L
L A
L L r A r I I A L tL I r I I I
L I, I , L ' I A I L I I I I I I I I - - I LA I I r I 1 11 1 1 r I L A I L I A I . ,
I A, A I k- r IT L A I -L A L A I r LT A, _I L r L A 1 4 1 L A 4 A L L I 1 4 A L It Al r r 11 L I
to A ' r A L 0 A A L r AT , , I
1 4 A I L r I I r A A, Lt r, L r 1 11 'L A r L r A A ALL A A
I'.. T 4 L I L I L A LT A A r L A - A
A 4 A I A 4 A A I
IV I I A I A A IT tt� L A 0 A Lt I LT A- t A 1, r , I L r
I I A I L A A A .,I I It I A 4 A I A L I
A
I �'. I t r AT T
I I IT 1 4 1 A r I A A I I I A L A r 00 1 It
1 A A I A r L I I I I L I A L r I IT I , A L
I L A I It L z , A I A I I r L A r I I I . 1 0 : A
A A I A A I I I I A A I It I I I I L , r A L : I A I I 1 1
9 If A A A r I A A A A 1. r I A I L I A A I A A L r I L AT TL - 1 1 . I A
A If I I L
I I A IT
1, , A , f r A I I L I r A I ! I I A L I A
I I I A I I . r r' AT I, I I L r I L . I r r
A A A -I A A 1 4 A I I I . L I . . I I A I I r
A A I I I L r L I A r I A I L I L I A A I LT A At
A: 11
A
Aft! A It r I A A_
L L "'L, A LT A r I A I I A I A I 1 5 . L I I I I 1 0 A
"V I A I t I A' 1 1 41 A L L L r r LT L I I , I I r I
I L T. r I I LT A A A A .1 1 A -I' I A I r L A I A 4 A A I A A I L It L
L r I A LT I A L I AT ALI A A L A I r r I A A A I I A r A A I LL I ' I r A A r L I A r I A I A A I I A r A At' I I
A A 4 1 A A I I A I A A I I A r A L A I I A I A A I
L L I' A A TV It r ' I k
r I I IT I I A It I I A I A I A r r A I V A
I A A I r L I A
I A V I A . PIT I A I I A A I A A r r fr I A I I A A r I AT I . I I
A 'JIVAI� VA I I ALL J I IT' ' A r A , 5 1 1 L I I I I r I I I- A A A L r I I AT A I I I% I A I A A A, 1 A A A L I A A I, L
IT A LV I A A VAL I A, 4 A LT A A TV A A I, L L r I I I A A r' r I r L 4p I
A A IV
IT A V A r L I A L I I I I A A A A I A
A: 1 4 "k L r I r I L A AT I I L A r A L L r A r A A 6 r L r I IT. 4 r r A
I A AIAA 4
ITVI VAT A tttALTITAVIA4 AtIItAA1 4 III At4 I LT A I tA 1A AIIIA I A I L I I I A A ITV4 1A LT IT IIAILTtIII ITK I, I I A LtITAI t4; , A - co) IAAr'
T1I I A k I tIT 4 ItAAtI I TI I I I A I A AAAP, LT I I1 4 A A r A - I , A ( I , A I AI I A ; L . 6 L I A .1 1 r Lt IL A v 4 r rg I I
AII tA A AII A TAA AAAI A IttI I N II L It L L IIJ ItTo tIITIIr % 4 TT1 l rl' A A07, T , I If41 1 1 1 A , I I, I t Lt6 .4 ItItf TLt If t A I v
I r r I .' I TTI I I A I r A L r A I A
TVAL f 0 I It r A I I I I tI4, S., I �L'. ITAtIk, f_ Z� nL, Ltrn
I 14 A A AA A11 I I IAA I 0 ItAI14 1 IIIAI IIt I1. LAVA 1, ]tL IF I I
I r & I TVIITIIA I1 A- AAIdI L I L I 1I'qq I 1'. Ir A r A A4 I IVVIIAATIAtAIt1I I I A II, A Itt 1% % It ItTI1I A
II r ITII11I0 AITAtA, I I I "A" If AtITI'AN C k 4 .1 Lt A I % I A L TVITVL L ILL L �Tp
TTIt ITIITAfAtALL IT ITI4 L AAftT r I L A L L r II VIA I t I A ? I L r L ITItAAt4'. 4 1 .4
I A I. L i, owl
TVIt 11 % r IIII r tIIAI I I I I A I . I A I I AIII tA I I LL
TJ4 L A r I L I A I I A I I 1 1 4 A A I IT I, I I r I A II I1 A L I AtTLTtrT tA4 AIT I ATIIAIr 4 I IT A4 1 k, AI11 AIA I I I A. I144 l rj "t,. A. I I r I I L A I L r r k AAI % IL4 I . I I A 4 1 AI .4 1
ItA I
'r r L4: I A� I A. T'L L
AT A I I I I AIf LtItITVrjjA�r F '.4 IJA Tf VITVATIkr 0 r 4 r L L L r 1 T It, I I II., A 4 TV; V; tI r . I . A I . . I r I I A ItI 4 1 I t AT AIt I IIITAI A I4 ITVItr 1AA 11 IT I ItIAII I1IITtAI I I It I I I I I I r I I L I I k IfTI I At I I I A I I A 4 1 IP� r I p A4 -L ' 'L r L I I r L I IV I IL L 'r r ITr AI t4 A A , L I I
I VA, A 4 r I ;pf L r L 1. A LT ATA 4 TI II -1 1 A L L f I AIAITVTI r. L I tA 4 TI TItAtA. I I A Ik II4 I'�tL TI P, A1. 1 1 A I tIT, ItItTVITL t
ITLTTAII Ad L A I I r I L I L', A6. . A
4 4 I I 14 r
)Lt + I I I r 4 rk
41, 1 I 4k T I A I AA 4 AI I L A 'I ITIAIIt, 1, I TAtATI A 4 4 1 I A I + IA A r I A I r; I 1 4 I I4 1 I
IIV A I I 41, I + % ttTAIdd
A I A ATVL , L. I I I TII AAI I I A L IIA I Lorp-N I I 4 I
IAITAIr AtI A .1 A A A A I A I I : I A L I I L II I I TTk
LT4 IL I L I
TIITAI A I
II
tItII I ITTf tLtI 4 L IT ILt 1 I I IIT% AII# I 4
LTtAZ L� VI A LTAI TL ttLTItIAII tr IT I I I .4 4 Lt TI Tk I 4 1A% + A I I I 4 I tIt II 4 tTV1tAA IAk 1AITVI I A Akl
TAIA It II 4 % L rp
I L 1I ATTTVAII5 AA I LTA AII I
ItI4 AAI ILt 4 r r 4 1
A
A
z
0
A
0
m
=i 9
m
c
m 43
0
80
c
Ic
MM
MZ
C) -4
0 -n
n
m M
0 V;
0
o Fn
C: co
c CO)
M 0
Z
z
-4
3:
V5
z
9
0
m
z
0
A
0
m
rTi
m
0
0
c
M
M Z
m m
0 M
M 0
z
0)
z
0
m
.. .. ......
1 16
It
Ic
I K 1 4 1 1
I I I d I I I I I
i
omm
Q ercial Final
E 4
I I
.1 1 It I I I d I
III I HEATING6 4 P
.,.tk 41�
t A f
. I P ,
P k
I k k I k
Gas Test,
I d I
1 4' -O'Le d 4 1. It- 1 1 1 1 0 k d
I I . I I , . , I I I
�L , I I I ! III,
1 11 1 1 1
k k 4 �Ij,, .;Gas Piping
4 '41 L" "'I t I I t I .
I I
I I
rq t j.;. oc Equipment I
o
t I 1 0 It t I - I I I :It. . I k
I I , . I . t P I I L I
I P I I 1 1 1
1 .1 P I I . I I I & ,
0 .1 d
'Commerc
ial Final
L t I I d I'. I
P,
I L I I I . I , I. I It 't
. tC
1. It.
j' P
A ,
EXTERIOR SHEATHING
v I I I I . . I I
I f I I I . .
c
I t r I
1 4 1,
f,lw
P
�4.
t d
NAILING
fIt I I . I I I
1 4 1 t 4 k j . d 1 4
d I P I
It,
I t I
4RAMING .......
VA
I 'd 1 4 k L
I I I 1 0 . I I
I k I I I
I IN I t . .4 1 1 '1 jy�! 't r
. , . 'r � .- . . - I ' : * ' I I I I 1 '4
I, 'j: It 1� r 1.
I , . I I I I I t, I I I k It
t tc I L'k
I
d P 4 11 1 1- \1 d I I I
I k I
t I I t I I
FIRST FLOOR FRAMING
age
pj
j, I tL I
k
48*800
It .
NSULATION
- . f i
LI It I
f
II I I- It I- .
ATE RECEIVED
PERMIT EXPIRES
CITY OF EDMONDS
USE PERMIT
ZONE NUMBER 4eV,:� /y/
CONSTRUCTION PERMIT APPLICATION
JOB SUITE/APT#
ADDRESS
OWNER NAME/NAME OF93USINE
0�
1�4_11W'Ivtd Xial
PLAT NAME/SUBDIVISION NO.
LOT NO.
LID NO.
MAILING ADDRESS
LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCP Approved
AW PermA Required
CITY ZIP TELEPHONE
-
EXISTING — PROPOSED
Sum Use Permit RoWd
InspactionRequired
Sidewalk Required
eygold
L9_2 -2: M :ZZ :2
REQUIRED DEDICATION— FT
Underground
13
NAME
METER SIZE
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
YES13 No
ADDRESS
REMARKS
OWNERICONTRACTOn RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
zip
zA,4, Olt, 4L4 z r=
A`rr:5tEFIRONE
IAI� el�& 1,a'jq ItA "56 111 VV)+ W CZ2:4
NAME JCB
L N
;�'— / q -
(4
ENGINEERING REVIEWED BY 9ATE
ADDRESS
Z
0
FIRE REVIEWED BY
CITY ZIP
TELEPHONE
W
Ir
--2 Q_9_4W�
0
STATE LICENSE NUMBER EXPIRATION DATE
CKED Y,
VARIANCE OR CU
SHORELINEORADB#
INSPE71ON
REQD
BOND
POSTED
M
_u —1t c
XY�S 13NOj$
e=;"
SEPA REVIEW
SIGN AREA
HEIGHT
PROPERTY TAX ACCOUNT PARCIFLNO.
-71
COMPLETE
EXEMPT
ALLOWED
PROPOSED
ALLOWED
PROP
M
0 000
EXP
x
C:
M
1:3 NEW
1:1 RESIDEN�A
PLUMBING MECH
LOT COVERAGE
ALLOWED PROPOSED
WIREf SETBACKS (FT.) PROPOSED
R T_�
r,4P,'.-.'�LDF,,,A.EA,`L
SETBACKS (k)
FRONT LIR SIDE REAR
0
0
ADDITION
COMMERCIAL
COMPLIANCE OR
1:1 CHANGE OF USE
NMI --- -
-
_:Z� (P 5 1
-*t
20
REMODEL
TIFAMILY
MUL
1:1 SIGN
PARKING
REO'D PROVIDED
�=Ih,�J�
AlIED By
�L�NNING REVIEWED BY DATE
M
10
1
GRADING 0 FENCE X
ReFdR CYDS FT)
I
-
REMARKS
71
0 OTHER
DEMOLISH 0 TANK
An 11
W
In!
[AA111101 ED
GARAGE RETAININGWALL o FIRE SPRINKLER
CARPORT El ROCKERY FIRE ALARM
0 "n 11"�'
%F%Ml 7 - ft I Map
x 1
I BUSINESS OR ACTI'Viry) EXPLAIN:
N T
qw- n"
CHECKED BY
ITYPMRUCTION
cook—
02 C2 cu F& T_Zx
GROUP _5
M M
NUMBER
.OF
=":&I
NUMBER OF
DWELLING
j
CRrIlCAL,,,,"
AREAS
q /
0
SPECIAL INSPECTION JAREA
OCCUPANT
LOAD
STORIES
UNITS
NUMBE R -If
REQUIRED ES
DESCRIBE WORK TO BE DONE
K CA
REIRKS
I GRESS INSPECTIONS.EER UBC 108/FINAL INSPECT16N RECVD
I
fTI 0
ALI
&AJ
92
VALUATION
Z
$
&_
N A
g: V I
DescrIption
Descriptlon
FEE
Z
Plan Check
State Surcharge
46,49
0
0
RCE
J
%
LOT SLOPE %
Building Permit
City Surcharge
M
It
A CHECKNO:
VESTED DATE
Plumbing
1--J
lc2 !2 5b� / ...
. Mechanical
t:
THIS PERMIT AUTHORIZES ONLY THE WOR9 NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY OULM ANY CONSTRUCTION ON THE PU11ILJC
DOMN (CURBS, SIDEWALKS, DRIVEWAYS, MAMUEES, ETC.) W LL REQUIRE
Grading
t:
SEPA!!WERMISSION.
Review
31
PERMIT APPLjcX7i69-. 111iig
2gr.
PERMIT LIMM I YEAR - PROVIDED WORK Is �111THIN 180 DAYS
Engr. Inspection
SEE VACK OF PINK PERMIT FOR MORE INFORMATION
Fire Review
Plan Chk. Deposit
0APPLICANT, ON BEHALF OF HIS On HER UPOL15c, HEIRU, P% IGNS MCI SUMESORS
IN INTEREST, AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
Fire Inspection
Receipt #
1-
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
---
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
Landscapelnsp.
Total Amt. Due
DEEMCD TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
fM L13AIT IN ANY WAY THE CITVS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.*
Recording Fee
Receipt
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
APPLICATION
APPROVAL
GIVEN 18 CORREC71 AND THAT I AM THE OWNER, ORTHE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
CALL
This application Is not a permit until Signed by the
TIGN; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
Building Official or his/her Deputy: and roes are paid, and
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION
receipt Is acknowledged In space provided.
WORKMEFtS COMPENSATION INSURANCE AND RCW 18.27.
0 DATE
FFVIIG
SIG ER 0 ENT),
NED
1425)
ME(
771-0220
ra
/DATE
L E'At VO B Y
ATTENTION
M 1333
rRE
-7
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-