20030642.pdf)P01107/T "t'VElaf I LIC
V, 4 a 9 :DATE RECEIVED
PERM�T
EXPIRES
CITY OF EDMONDS
USE PERMIT
ZONE I�NUMBER
CONSTRUCTION PERMIT APPLICATION
JOB
ADDRESS
SUITE/APT#
OWNER NAMEINAME OF BUSINES1
es
sesf fg�f
—1
_Z1
mompisa &
PLAT NAME/SUBDIVISION NO, LOT
1 NO,%0119
MAILING ADDRESS
LID FEE S
114-1 NE� IA4--r'4 67-r- PM 15.
.PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
1. '.. , - bw��
EXISTING
TIESCP Approved
RW Permit Required
Street Us, Per"Ift Rsq-d
Inspection Required
CITY :� - PHONS,A,V
PROPIPSED
REQUIRED QgPICA-66 FT
sidewalk R* quired
Underground
Wiring required
NAME --m—pr
METER SIZE LINE SIfE NO. )F FIXTURES
0>/104oll 1 1 1?
PRV REQUIRED
A 13
r A.
1161,01, PL, 4-k
YES NO
1
ADDRESS
REMARKS
OWNER/CONTRACTOR RESPONSIBLE FOR E IOSION CONTROUDRAINAGE
(2T140
CITY ZIP jTfLEPHONE
�aoc;Ll &a5-%Q(0-5jC)3P
zeruwnw 54-snew, X15 W57_A_- Cz
NAME CBL#
SP;A&
MIC,14r,b Got4Q:M qoj(ot.4 05;8 9
REVIEWED BY
)bATE
ADDRESS
WINE�RINQ
II o o
FIRE REVIEWED BY
DATE
CITY ZIP TeLEPHONE
STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY
VARIANCE 0
IWV'D"O'
N BOND
POSTED
0 46 co Q& i D5
_'j[3YES
0 -
PROPERTY TAX ACCOUNT PARCEL NO.
02'
00 - 512-7?z - OL70 ..y �? - 00
SEPA REVIEW SIGN AREA
COMPL TE I EXEMPT ALLOWED PF OPOSED
;PM___1
H EIGHT
ALLOWED /I PROPOSED
NEW RESIDENTIAL PLUMBING MECH
LOT COVERAGE REQUIRED SETEACKS (Fr.)
ALLOWED PROPOSED FRONT- $10 EAR
PROPOSED SETBACKS (ft.)
FRONT URSIDE REAR
COMPLIANCE OR
ADDITION COMMERCIAL
0 CHANGE OF USE
�5
/5
REMODEL MULTIFAMILY SIGN
PARKING LOT AREA I PLAN NG'NEVIEWED BY DATE
REO'D PROVIDED.
FENCE
REPAIR K -CYDS 0 ( — X —FT)
jg�� rae
14
2a 1,9 15
DEMOLISH TANK OTHER
s.4bqc4r_ a?" 14cjr+
GARAGE RETAINING WALL F:RE SPRINKLER
CARPORT ROCKERY F RE ALARM
d A b�maf
?23
12
(TYPE OF USE, QUZINESS OR ACTIVITY) EXPLAIN:
BY
CHECKED TYP=VCTION C E
OCCUPANW
M* 77
GRO P
U�77
NUMBER 3U NUMBER OF CRITICAL .13
OF DWELLING AREAS
STORIES UNITS
1 SPECIAL INSP§CTION
%W
REQUIRED
CCUPA
LOAD
YES
DESCRIBE WORK TO BE DONE
6
REMARKS
PROGRESS INSPECTIONS PER UB FINAL INSPECTION REO'D
C2 N W
-:V1
74
e2-rz) L-,( Lo o o b - F= e, w r, t>
le w-L4 . r- _. � 1 . I
AVr 6 614 r,— D 6 At IZIA 6 Eo j
34 -Z
Descriptlon
FEE DiAscriptlein
rD
FEE
Plan Check
State Surcharge
HEAT SOURCE GLAZING % 0rSIOPF%
NLT-- 15. V)
Building Permit.
City Surcharge
PLAN CHEC NO: VES TED DATE _4_
Plumbing
PA
Mechanical -7dP
&!55
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THI PERMIT CdVERS WORK To
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
Gradi
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS; MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION - .
Engr. Review
AOMMY
PERMIT APPILICATION: 180DAYS ���
PERMIT ILIMM I YEAR - PROVIDED WORK IS STARTP-WITHIN 180 DI.WS
Engr. Inspection
SEE BACK OF PINV;Rn TR MORYWORMATION
E`R;;OUSE,jrVEIRS SSIGNSAND C9
'APPLICANT, ON BEHALF OF HI/S OR` Ho' A
WEE
�EDMONDS.
Ire Review,,
Plan Chk. Deposit 74-
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AN—LD HAI CITY OF
WASHINGTON, ITS OFFICIALS, EMPLOYEES4, %H&NOITIS—FROM ANY AND
Fire Inspection
Receipt #
ALL CLAIMS FOR DAMAGE&OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
Landscape Insp.
Total, Amt. Due
0 NOR LIMIT IN ANY WAY THE C17YS ABILITY TO ENFORCE ANY ORDINANCE PROVISION."
x
Recording Fee
Receipt #
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION
AP LICATION APPROVAL
GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
CALL
This ap cation Is not a permit until signed by the
;CI
TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
Building 0 al or his/her Deputy., and Fees are paid, and
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION
rac I Is acknowledged In space provided.
Ip
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
OFF RE 1 DATE
BIG E EQ* tjEff) DATE Sf3NED
(425)
9 -2
1
771-0220
9
RE EDEY DATE
ATTENTIONI 0
!USE eOR 40C§Y &L
Off 1333
IT IS UNLAWFUL I 0 A I ILDINWOR STRZT&
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
RIGINAL - Fit E - YELLOW ."INSPECAR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
PINK -OWNER GOLD -ASSESSOR
04/02 gmi=qq wainn vni i AR;: mAwlimr. z; r. nPjF=Q GREEN - ACCOUNTING
ul
19
If
At:."
11111C
z
0
f:
rn
C:
C
ITIM
0 -n
"n
M M
Fri
C
CO)
M 0
CO)
z
0
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS ..................... _MS
FOUNDATION:
Footing......................
Wall..........................
Pier/Porch .................
Retaining Wall ...........
Slab insulation ..........
PLUMBING:
Underground .............
4.
Rough -in ...................
Commercial Final ......
HEATING:
GasTest ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING ..........................
b_0 f�
FRAMING ........................
FIRST FLOOR FRAMING ... MS
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation � .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
&!g -2?15- Recelpt#
AmoutFW_
Daftlaued
Af A WaftrMeterfte
Amount �Wd. It
ROW#
Amount Paid $....Receipt
Date
SCIENCES INC.
e Hydrogeology Geoenvironmental Services Inspection Testing
tichnical Engineering
November 4, 2004
HWA Project No. 2003-106-21
RECEIVED
City of Edmonds
NOV 0 8 2004
Development Services Department
Building -Engineering -Planning
PERMIT COUNTEn
"d
121 5h Avenue North, 2 Floor
Edmonds, WA 98020
Attention: Ms. Jeanine L. G raf, Building Official
Subject: ADDENDUM To GEOTECHNICAL MONITORING SUMMARY LETTER
Hillman Residence — Permit No. 2003-0642
New Single Family Residence
th
15915 — 74 Place West
Edmonds, Washington
Reference: Geotechnical Monitoring Summary Letter, by HWA GeoSciences Inc.,
dated October 18, 2004.
Dear Ms. Graf -
Further to our observations, conclusions, and recommendations included in the Erosion
and Sedimentation Control section of the above -referenced letter, we are of the opinion
that, from the geotechnical perspective, currently, exposed slopes on the project site can
be permanently protected against erosion using beauty bark in lieu of sod placement* or
hydroseeding. However, sufficient amounts of beauty bark should be used and care
should be exercised during placement of the mat erial to ensure that no -significant spots
of bare soil on the slopes are exposed.
0-0
i9730 '64.th'Aill";
November Lvvff
HWAP 'ectNo.2003406�21
r0i
I 1 4
r r 4
1 4
I
Please do not hesitate to call us if you have any questions regarding this letter or our I,
I I J. It I I I �A
sery
ices on this project.
"Id
I
Sincerely,
%,'0 t 0 'd I L L I I I I I
HWA GEOSCIENCES INC.
I I I I I I tc,. I t 1 4
I P 11 1 1
I k I
I ' I L 14 Ce I r
1 0 1 k L �L I
I I I, r I 'L
I I I r
I 1 4 1 1 t. I I I I I L I I I
0
+
L I 1 14
1/0 Vex
I I e I I L 4 1. r
%I L
I, I. r :0. '1- 1 1
TI I.,; Z' �II, L I t I I?%, I L I I I
I I I I
Vq � .4 'Y' t' -4 w A 1 L� �'I, I IV 'L I I 1 11 L . I
r I I III I . I i It I I I I . I . . .
It 1 4
It JEMPES 12LUC
Kii
tt I'v I
Les C. Banas, P.E.
.0of)'. 1 4took 4 1 1 1 1
Senior Geotechnical Engineer
Ifk V 1'4- 'e4-
i;:�' jy�wr I '4� . I
v: Vi
I 4v� +I It
III� 4p��ILNI 1 -1 1 1 1"1. 1 11, k' L '1" 1
I I. I J, I - + I , I - "
I L I
It
I
14 cce Mr. and Mm. Hillman
I I k"
It 0 . . . . I .
ILL
I L' tl. It . I I . . I. I
I
LA I L I
It,
I
I ILI 1, 4 1 "L L
':.t
k1; L
U �041"B 1cb
I L I 1 11 1 1 -d 1 10, 1 1 1 1 1
L I I I V It 1 9
-L L L L L L L L It I I I
5L
I . " I I I I ' I - J I
tL
1 11
I
L k-
I r
1 4 1 1
I L
I'LL
A SCIENCES INC.
'icW Engineering - Hydrogeology - Geoenvironinental Services - Inspection Testing
RECEIVED
OCT 2 o:, 2004
October 18 2004
.............
. . . . . . . . . . .
HWA Project No. 2003-106-21 DEVELOPMENT SERVICES
CTiL
CITY OF EDMOAIDS
City of Edmonds
Development Services Department
Building -Engineering -Planning
121 5h Avenue North, 2 d Floor
Edmonds, WA 98020
Attention: Ms. Jeanine L. Graf, Building Official
Subject: GEOTECHNICAL MONITORING SummARY LETTER
Hillman Residence — Permit No. 2003-0642
New Single Family Residence
15915-74 th Place West
Edmonds, Washington
Dear Ms. Graf -
In accordance with the requirements of the City of Edmonds Special Inspection and
Testing Agreement, HWA GeoSciences Inc. (HWA) has provided periodical special
inspection services on the referenced project since the commencement of construction
activities in August 2003. Copies of our field reports have been mailed to your office
along with weekly inspection reports.
The purpose of this letter is to provide a statement that geotechnical aspects of the
construction were performed in accordance with the project plans and specifications,
and that the new development did not increase the potential for slope instability that
existed prior to construction.
Prior to construction, we reviewed the project plans and specification, including the
geotechnical report that had been prepared by others, and design of a proposed
Keystone wall. We also performed an additional subsurface exploration to aid in
installation of foundation pin piles. During construction we provided monitoring and
testing of the following:
& Foundation pin pile installation;
Foundation subgrade preparation;
Gradation and Proctor testing of structural fill;
October 18, 2004
HWA Project No. 2003-106-21
0 Structural fill placement and compaction;
0 Installation of underground utilities;
0 Construction of rockeries;
0 Construction of a Keystone retaining wall; and
0 Erosion and sedimentation control.
Foundation Pin Pile InstaUation
A total of 63, 4-inch nominal diameter, pin piles were installed to provide foundation
support for the house. A pile load test was performed on the first installed pile to
verify the pile design capacity and to develop driving refusal criteria. The pile
Contractor, McDowell NW Pile King, used a Bobcat 337 rubber -tired loader with a
mounted BTI TB425X harnmer to drive 51 vertical and 12 battered (lH:5V) piles to refusal.
The refusal was set as 12 inch of penetration in 48 seconds or longer and it was met at depths
ranging from 31 to 53.5 feet below grade. We verified that all installed pin piles met or
exceeded the specified design vertical capacity of 12.5 kips per pile.
Foundation Subgrade Preparation
Exposed subgrade at the depth of shallow footings, floor slabs, grade beams, retaining
wall foundations, underside of utility pipes and conduits, and access driveway was
inspected to ensure its firm and unyielding state. Amy soft spots and areas, as well as
concentrations of organics were removed under supervision of HWA field personnel
and replaced with compacted structural fill.
Gradation and Proctor Testing of Structural Fill
Representative samples of imported materials that were to be used as structural fill
were obtained from on -site stockpiles or from the supplier, and tested in our laboratory
for gradation conformance with the project plans and specifications, and for their
compaction characteristics. Two gradation and two Proctor tests were performed on
the collected samples of structural fill materials in accordance with testing methods
ASTM D 422 and ASTM D 1557, respectively.
Structural Fill Placement and Compaction
HWA field personnel monitored placement and compaction of approved structural -fills
under the garage floor slab, behind the Keystone retaining wall, and under the
C
10.15.04.rinal report
2 RWA GEOSCIENCES INC.
Eli
M
(W
1A.
N
izP,
October 18, 2004
HWA Project No. 2003-106-21
driveway. The fills were placed in lifts not exceeding 8 inches in thickness, and were
compacted using equipment ranging from a jumping jack, through plate tampers, to a
vibratory drum roller. An HWA inspector performed on -site compaction testing using
a nuclear density gauge. All placed structural fill was 'Verified to be compacted to at
least 95% of the material's maximum dry density.
Installation of Underaround Utilities
We observed installation of the storm drainage and sanitary sewage drainage systems
carried out by the earthwork subcontractor. The storm drainage system consisted of
swales, house perimeter footing drains, retaining wall drainage pipes, catch basins and
connectors to the municipal storm sewer system. Generally, both storm and sanitary
sewer pipes were laid on imported bedding fill. The pipe trenches were backfilled with
approved well -draining granular soils. The trench backfill above the pipes was well
compacted; however, density tests were not performed due the variability of the
backfill materials. Compaction was approved based on the number of passes of the
compaction equipment and probing of the compacted fill.
In our opinion,all underground utilities installed on site were performed in accordance
with geotechnical recommendations, and the project plans and specifications.
Construction of Rockeries
Two rockery walls were-i ' nstalled on the project by a rockery subcontractor, Kirk
Rockeries. The first rockery was about 72 feet long, did not exceed 4 feet in firiished
height, and was installed along the eastern side of the house. Up to 2 feet of
overexcavation of foundation subgrade was required under the rockery due to the
presence of soft and organic soils., The second rockery was constructed in the
northwestern part of the site, near the existing roadway (74 1h Place West). In the
northwest comer of the property, construction of a hammerhead turnaround for
emergency vehicles required a substantial cut in the existing slope. The cut was
supported by a system of two rockery retaining walls. The upper wall was about 50
feet long and between I and 5 feet high. The lower rockery was located 5 to 6 feet in
front of the upper wall, and down a 2H: IV slope. The lower wall was about 62 lineal
feet long and between I and 5 feet high in the area of the hammerhead. The lower wall
was then extended by about 52 lineal feet farther south, parallel to 74h Place West and
at a setbAck of 10 feet from the western property line. The finished height of that
section of the rockery was also between I and 5 feet. Placement of additional grading
fill in front of the wall toe was required in order not to exceed the maximum specified
finished wall height of 5 feet.
10.15.04.rinal report
M
HWA GEOSCIENCES INC.
....
......
...
L
October 18, 2004
HWA Project No. 2003-106-21
We verified that the rockeries were constructed using hard, durable, two- and three-
man rocks and were stacked in general accordance with standard rockery installation
guidelines. Smaller rocks were placed to fill voids and spaces between larger rocks
and quarry spalls were placed as backfill behind the walls. Drainage behind the walls
was provided by installing 6-inch diameter perforated drainage pipes connected to the
storm sewer system. Vertical clean -out pipes were connected to the wall drains as
specified in the project plans.
Construction of Keystone Retaining WaU
A 120-foot long Keystone wall was constructed by KeyWall NW, the wall
subcontractor, in the southwest part of the property. The wall ranged in height from I
to 9.5 feet and supported the access driveway embankment. Its foundation support
consisted of a continuous reinforced concrete shallow footing.
We verified that the wall was constructed in general accordance with the design by the
structural engineer and with the project plans and specifications.
Erosion and Sedimentation Control
During our periodical visits, we observed implementation and performance of erosion
and sedimentation control measures. The temporary measures included installation of
silt fences downslope of areas of potential disturbance, placement of straw bales, and
protection of exposed slopes and stockpiles. Protection of exposed soils against
erosion was achieved using visqueen sheet covers and sandbags. After an initial period
of maintenance, the property Owner retained a subcontractor specializing in erosion
control work. The subcontractor, Northwest Erosion Control, Inc., provided inspection
of Best Management Practices, and the implemented measures on a weekly basis.
Repairs and upgrades were provided as required.
Stabilization of the project site has been achieved by hydroseeding and establishing
native vegetation, including shrubs and trees, on the majority of exposed slopes. In
addition, all above -ground storm water drainage system elements have been installed.
The remaining exposed slopes have recently been regraded to gradients not exceeding
2H: IV, and are scheduled to receive sod the week of October 25, 2004, thus,
completing the permanent protection of the slopes.
In conclusion, we are of the opinion that the earthwork on the project was performed ih
general accordance with the geotechnical recommendations, and the project plans and
specifications. We observed and verify that all disturbed areas and slopes on the
project site have been, or will soon be, adequately protected and stabilized. In our
Ij.
. .
. . . . . . . . . .
10
Z�
10. 15.04.fmal rqmrt 4 HWA GEOSCIENCES INC.
M
Sincerely,
HWA GEoSciENcEs INc..
LWO11
JEMRES 1211&OS
Les C. Banas, P.E.
Senior Geotechnical En gmeer
10.15.04.fuW rcport 5 HWA GEOSCIENCES INC.
L
05/06/2004 09:54 4257789a0c
Sent By: HP LaserJet 3100;
7�.
MICHEL CONST PAGE 02
4256727998; May-e-04 7:S7AM; Pagn 2/2
May 8, 2004
File No. 4663-0-04
Edmonds Building Department
250 r Avenue N.
Edm . onds, Washington 98020
re; Hillman Residence 15915 701 Place W.. Edmonds, Washingwrl
Dear Slrs.
At the request of Rob Michel. the project contractor, we have dispatched a survey crew to
the above refarence property to ascertain the elevation of the roof peak of the now
residence currently under construction. Toestablish the height of Me residence we used
the Invert of CBS 42A as depicted on the Road and Drainage propered by John Mellor,
datedAuquat 30,2001 and established the elevation of the sanitary sower manhole at the
northwest corner of the property. We find the elevation of the north rim of the manhole to
be 98.96. This elevation is indicated to 99.0 on the plan.
From this bench mark we have determined the elevation of the roof shooting at the peak
to be 140.35.
Should you require any additional information, please, call me at 425-775-1591.
Sincerely,
I
qft4oft�
Jeffrey Treiber P.L.S.
President
RECEIVED
MAY 2 4 2004
PERMIT COUNTER
I,qvcll - i;iu"llnd & Aswclulil- fitc-
1940n .11(d AYC- VV-- S141C 200. ty,MVgj, WA 9A0j* 47S.77S.IS91 425-6n YY98 rp,
0
"A
I
ZONEGMMM�
I
APPROVED BY PLANNINrl
Let
noar 'Nir or mactam:
The City of Edmonds hereby authorizes the release $50 000 from the above referenced
Restoration Frozen Fund. All interested City departments have approved the release of
the Restoration Frozen Fund.
:0.
Sincere ly,
Mafta son
Senior Permit Coordinator
Cc: Applicant
File
Uremp/DST's/MasterLetters/ReleasePerformanceO2/01
Incorporated August 11, 1890
Sister Citv - Hekinan. Janan
. fix
A
VINAL PROJECT APPROVAL FORM
too
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
"ASE SIGN
I- $At�m ENGINEERING DIVISION DATE
I12ASE SIGN
-PLANNING DIVISION DATE
FLIMSE SIGN
PROJECT —
SITE ADDRESS
PERMIT #-2Ad -ZWf
_ADB# DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED_!��
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of
I Y GRANT FINAL PROJECT APPROVAI
GR ANT PROJECT APPROVAL WITH CONDITIONS NOTED
,., 0 Ir d"fim"Irlirirflive : �/_ + +_ t, :
E, VR_,11, LU VW111-. U&I LW, I Y LtDPVALVL
jr,
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
I .
PA
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fonPs:ocaprv1 3/25/04