Loading...
20040003.pdfDATE RECEIV.ED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BUSINESS RL�( Hc'�"(,e-2 MAILING ADDRESS (� -3 (, CITY TELEPHONE -,7 -7 C. -7 q1 NAME ADDRESS CITY ZIP I TELEPHONE NAME 0 (_ (j ADDRESS 2 <2 - 0 I LPERMIT EXPIRES USE PERMIT ZONE I�C NUMBER ()00 JOB SUITE/APT# ADDRESS PLAT NAMEISUBDIVISION NO. LOT N 0 LID NO. jK ?I LID FEE $ I ESCP Approved 13 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Required 11 Street Lisa Permit Redd 0 EXISTING - PROPOSED Inspection Raqwrad 0 Sidawalk Requited 13 REQUIRED DEDICATION- F1 Undrugiound wiring required METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED ,_�7 1 1 11�7 YES NO REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ?� M-1 I) - ''11) ­Z, ) I I h t� I L iI N (---. i,'_ 5 _) CBL 0 14�-%IIIKN-VgUc� ENGINEERING REVIEWED BY FIRE REVIEWED BY CITY ZIP TELEPHONE 1 2 oc, STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY PROPERTY TAX ACCOUNT PARCEL NO. tq 3q 2- -- 0(c Lj — 0 J) -- C) V 2 11 NEW 191�RESIDENTIAL EWPLUMBIN�� MECH Eik-ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE Z"'REMODEL El MULTIFAMILY SIGN F-1 REPAIR 2RAPI.NG CYDS GO FENCE x El DEMOLISH 11 TANK D OTHER GARAGE RETAINING WALL 1:1 FIRE SPRINKLER CARPORT POCKERY FIRE ALARM (TYPE OF USE, BUSINESS PR.,ACTIVITY) EXPLAIN: M NU NUMBER OF CRITICAL 0 DWELLING AREAS 0 UNITS NUMBER DESCRIBE WORK TO BE DONE A 4 -(e ef IFt -j e 01 <e. f �rv" 4C^_j HEAT SOURCE GLAZING % LOT S, OPE % PLAN CHECK -NO: VESTED DATE FT) - 4jL:2 I THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS PERMIT LIMIT., 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRLIC- TION; AND IN DOING THE WORK AUTHORIZED TIIEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. DATE SIGNED/, F10 uj Cr a: VARIANCE OR CU HORELINE OR ADB# I INSPECTION BOND POSTED IREO'D OYES ONO is SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT EXP I ALLOWED PROPOSED ALLOWED, , PROPOSED a�5 I &.� LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRON SIDE REAR FROYT Uv,.PIDE HEAR z PARKING REQ'D �PROVIDED PC5 P1 LOT AREA (0 t �<�L I PLAf4NING REVIEWED BY DATE I � / � (:_ -. � - rV -) , C) 0 y (9 REMARKS CHECKED BY TYPE 0 TRUCTJON C GROUP SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] YES LOAD REMARKS PROGRESS INSPECTIONS PER UBC 108/1FINAL INSPECTION REQ'D Ei M C, hlrl>1501�_�",_�'D I D VALUATION $P ML Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee CALL FOR I�Ns ECTI (425) 7 1.0 1-0220 FEE Description FEE State Surcharge City Surcharge Plan Chk. Deposit 4-- Receipt # 3z;l Total Amt. Due Receipt # N FAPPLICATION APPROVAL his application is not a perinit until signed by the ng Official or his/her Deputy: and roes are paid, and -receipt is acknowledged in space provided. ATTENTION XT 1333(� IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 OFF4AI_S/P6t4AV*? DATE 04!02 PRESS HARD -YOU ARE MAKING 5 COPIES BY I , i, r(c, 1, ut �, I ; ( ORIGINAL - FILE - YELL0J INSPICTC PINK - OWNER - GOLD - ASSESSOR GREEN - ACCOUNTING q z 0 1 0 1711 --I -n 0 M I= M 0 0 -40 0 C: -1 K X M M Z 0-1 _z 3: W o -n n M M 0 _U) 0 r- 0 M C W 91:1) M 0 Z 7-1 X z z 0 ITI .. 1111111 PPIROVED AS 'No"-') F -IRING j4WEF D ate-. Li's L V r c.,,r.,e ee ;v% o 4 7 -fwp iv� C�t6.lc-ftsi 161do --C De.VeVA.11 110 I/CONWTRA I P IS RE - I r8% I 081014 TROL AND D1, .1 C' �N Dl- 0 dv 114 ACCEPTABLE TIGHTLINE �-'\ ��N 07, �;"� — MATERIAL 'SDR 35p--t .. I SCH 40 ex N-12 �F810 HANCOR Argo, kt 12, +101 pouls GUMBO Ns 1 Aqo LOCKS I +toz.16 E w Lm4 -c—pe CN I T Y 0 P Y, E C E'"A V E 13 JUL 14 5 2003 q x E qfjl ff rt OUN —1 E R z 0 i 0 m -n M m 0 0 0 c 3: rn rn z ID co o -n n 3:9 m fn 0 —cn 0 r- 0 m C cn K co fn 0 Z 71 z CD z 0 i 0 m v JA St -L r I I rAl, t' ro.fdm � gfm� is ,17 lot% re RE NOV 2 4 2W BUILDING DEPTI I I Lois Itt, M. black-loq 64� � f'4jAW^dS &S #41, e lit lrccurje4# i I'% Vol - Z pl.k% P3. 31 comb. Co. '�.4cAtfw W144 IA�i 120f;#b% 0+ V&Cqitd 41,07 '4't kfw#lof *##&CA .f low. 1?(&\, Hro V415 Cuwt%kv% 107,01 + luSAMILf-162010— q20012 42o-i-L —�* ioes.cill � 6vem3e 6rawe Pt /20 1), 1 4, C �cr Hisk *A ley Wc.>o oft %low, 2 U40 � 40 <1r Z010� Z'2�6330 Wk 44/j 44? Amel "sit Paul and Cheryl Hawley 936 Daley St. Edmonds WA. 98020 9/8/03 To: Jeannine Graf Building Official, City of Edmonds RE: Plan check #03-292 Hawley addition and remodel. Dear Ms. Graf. RECEIVED BUILDING DEPT. On July 15 we applied for a permit for an addition and remodel for our house. We received a pleasantly quick response from Ann BuIlis on July 29. We responded to the comments and resubmitted around the 13'h of August. On Sept 4, 1 received another plan review notice from Star Campbell stating that we would be exceeding the building coverage with this plan and we would need to revise. Although we are very disappointed with not being able to expand our kitchen by a measly 100 square feet, the reason I am writing is to voice my �concern about the process. It would seem to me that the first step in the city review process would be for Planning to make sure that things like set backs, lot coverage etc. were in line. If the plan didn't conform to Planning guidelines, the process would stop. In this case the plan review bypassed the planner and went on to building review. We in turn wasted weeks of time planning on a kitchen that we weren't going to be able to have in the first place. We wasted time and money to hire an architect to do some additional sheer calculations on walls that we were never going to be able to remove. Your staff wasted their time reviewing something that couldn't be built. We both wasted my $582 plan review fee. I am not an Architect so I relied on the information that was available in your handouts to figure the building coverage questions. The information on total impervious area says to include all patios, concrete, driveways, sheds and building, which I did. The information on the building coverage says nothing of including shed square footage, overhangs if they are over 2'6", wood porches over 40" tall. These items all together pushed us over the 35% limit. I don't feel that you should have to hire an architect to apply for a building permit especially on non -technical issues like this.' I have had conversations with:both Ms. Campbell, and one of the other Planners (sorry I forgot the name) and I found them both �courteous and sympathetic. As I said, although we are very upset about not being to go ahead with this kitchen plan, I am really angry z 0 i 0 M :q 9 M C rn 0 __10 0 C rn M Z 0­4 C Cl) 0 -n n M M 07) 0 r- 0 M C cl) ?. co M 0 Z X z -4 :C co z 0 i F5 M 0 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwxi.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT C. 18 9 13 Planning - Building - Engineering September 15, 2003 Paul & Cheryl Hawley 936 Daley Street Edmonds, Washington 98020 RE: Plan Check #03-292 Dear Mr. & Mrs. Hawley: GARY HAAKENSON MAYOR Thank you for your letter of September 8, 2003. We appreciate feedback as it allows us to consider improvements to our processes here at City Hall. I have researched the history of your permit application and the following is our explanation of the process of plan check #03-292: Our Permit Coordinator who accepted your application was Marie Harrison. Mrs. Harrison distinctly remembers the issue of lot coverage was brought to'your attention on the day of submittal (July 15, 2003). In fact she specifically asked you the lot coverage and you responded 36%, then when she informed you that the maximum was 35% you responded "it is calculated wrong" and then you changed it to 35%. She said 'I hope so because 35% is the maximum'; she then warned you that the City review would verify the number. From our perspective you were duly warned and notified of a potential lot coverage problem as of July 15, 2003. Regarding your statement that planning was by-passed in the review process this is incorrect. As Mrs. Harrison explained to you on July 15 1h the City performs a concurrent review of all applications —meaning all reviewing divisions review during the same time period —it is not a linear review system which would greatly lengthen the overall review process of all applications. The Planner assigned to your project, Star Campbell did review the application on 8/5/03 but chose to defer written comments because lot coverage was already written up as a building division comment on 7/29/03. As you are aware, Building Division plan review comment number #2 states, "to verify lot coverage" provide fully dimensioned floor plans of the existing house, garage and carport. Your response on August 13, 2003 states, "a new page A2 has been added that is a larger scale and fully dimensioned to determine lot coverage." Please note your submittal of A2 does not show a recalculation of lot coverage, which you still indicate oil Al as 35%. Incorporated August 11, 1890 Sister City - Hekinan, Japan z 0 4 0 M Mr. & Mrs. Hawley Page Two September 15, 2003 From this information I must conclude that staff properly brought the issue of lot coverage to your attention from the beginning of the process. Furtheimore, I disagree that your engineering and plan review fee has been wasted. I concur that you will have to alter your project to conforin to lot coverage but there is no reason that the entire project has to be withdrawn. Staff is willing to work with you to explore possible alternatives, I suggest that you meet with Star Campbell to research other possible alternatives to resolve this issue. if it is your intention to withdraw the application please provide a written note to Mrs. Harrison and she will promptly return your plans and other materials. Sincerely, Jeannine Graf Building Official 0 -n 0 M C M 0 0 0 ff M M z 10 C z 3: o -n n M M 0-0) 0 0 M C 0) 9 Cn Q 0 3: z 0 0 M FINA1 PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLWESIGN ENGINEERING DIVISION DATE_*Za1je4-),�—' PLANNING DIVISION DATE PLEASESIGN PROJECT ':M.UUAJ31/x/V SITE ADDRESS V PERMIT #2 ADB# DATE INSPECTED Z20 /0 -1-- DESCRIPTION OF WORK TO BE INSPECTED �2,�- A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE given to owner/contractor by inspector 1 . 01 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:fbmis 10/0 1 z 0 M M M 0 --i C) 0 C: M M Z -Z C/) o -n Ti M > M M 0 0 0 M C C/) � (f) M C-) Z r- M r z z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... s<' 0 INSULATION ................... Floor Ins blation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 0005 z 0 11 0 M —4 -n M C M 0 0 C M M z 3: Cl) o -n n M M 0 0 M C C/) F. Cn M 0 Z 7-1 r > z —4 x 0) z 0 i 0 M