Loading...
20040082.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS Is E a 1z ',i P, C. 0 VA C.-T 9, 0 C- MAILING ADDRESS r-.� E CITY ZIP TELEPHONE V� NAME �_ A, _r> ADDRESS 1"61-3 CITY ZIP .1TELEPHONE t-�Pka;-AS VAA. c)qfLq NAME CBL # I -4 .�) p. er% E' ADDRESS -740c)-3 CITY ZIP TELEPHONE y�Ig-vkjokv4D 11ON. I STATE LICENSE NU161BER EXPIRATION DATE CP�PCRTD70Y SE: qu. t4 C-t- LA PROPERTY TAX ACCOUNT PARCEL NO. 15 0407-71, `irqz30;P NEW RESIDENTIAL PLUMBING if MECH ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN GRADING FENCE 13 REPAIR CYDS I X FT) 91 DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER z 1:1 CARPORT ROCKERY FIRE ALARM I (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: CRITICAL 0 OF DWELLING AREAS M UNITS NUMBER 01 STORIES W uj NUMBER NUMBER OF PERMIT EXPIRES M 6 / I USE PERMIT ZONE NUMBER JOB ADDRESS PLAT NAME/SUBDIVISION NO. LOT NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING - PROPOSED REQUIRED DEDICATION� IFT METER AZE I LINE SIZE NO OF FIXTURES SUITEJAPT# LID NO. LID FEE $ TE—SCP Approved I RW po,Mlt Hequired street Use Portnit Roq'd inspection Required sidewalk Requited Undefrifoind Wiring triquit"d PRV REQUIRED YES 0 NO 11 REMARKS OWNER/CONIRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ENGINEERING REVIEWED BY DATE FIRE REVIEWED B OAT E 0 i`RE-1NSpr.cT10N REQUIRED VARIANCE OWCU -SI`1OHhL1r4t u" t%uc"` E N VAR AN ' 10 1 POSTED 00 -11 S,;StRuMU., C CU �I R AT 0 S1 Et SSWER MUS SEPA REVIE EA HEIGHT COMPLETE EXE;M�PT. ALLOWED PROPOSED ALLOWED PROPOSED 'as RMCINFED W MR1*70 Re ��z A 9 #V% ��A I I r2ft E p XP LOT COVERAGE0___T �_EdUIRED SETBACK (Fr.) PROPOSED SETBACKS (FT.) 11 ?ff NJ 110 Mf L*f EA R ALLOWED NOPq%jkjn Fj*NTAV#jhVMRD 0 .1�� - PARKING �01TKI'IS CARD 'J�r 'CKI'ls REO'D PRQVIDE I CC R INSPE TION REQUIREMENTS REMARKS "TYPET ON CHECKED BY �7r..DNST CYT CODE— OCCUPANT J 7 GROUP _jAiR6A OCCUPANT SPECIAL INSPECTI LOAD REQUIRED [] S 3 YE 0 z a z E z DESCRIBE WORK TO BE DONE a REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 5 irc-)e L i S H / (Z Z 2 S czc:� rr e (F�' C) (' (0 -4- S--'r is VALUATION til o k \Pj $ Description FEE Description FEE -V 1464. 1 f.7 (2-1 i'T"'�;, Air Plan Check State Surcharge HEAT SOURCE tLAZING % LOT SLOPE % Building Permi City Surcharge PLAN CHECK NO: VESTED DATE Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr, Review cr PERMIT APPLICATION: ISO DAYS PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit in "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF _j Receipt # 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND Fire inspection ALL CMMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY Oil INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE Landscapelnsp. Total Amt. Due 0 _j DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 7, 01 NOR LIM11 IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.4 x Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF This application is not a permit until signed by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building 011icial or his/tier Deputy: and Fees are paid, and TION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED FOR INSPECTION receipt is acknowledged in space provided. IN V�6LATION OF THE LA130B CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATIONA�SURANCE AND RCW IB.27. OFFIC17 Sl� AIURE DATE SIGNqURE J&NER 09 AbEND_'_.'/ DATE SIGNED (425) 1 771-0220 "1 DATE 0-k. .4 - ­� I RELEASED BY mon� EXT 1333 A*ENTIO_ N ------------ IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INS13ECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - ASSESSOR 09!03 PRESS HARD -YOU ARE MAKING 4 COPIES z 0 M 7, =fi 0 M 1c: M 0 0 C.) 0 C: -1 K a: M M Z x Cn 0 -n n -4 M M 0 —0) 0 r- M Cn 90 M 0 Z z z 0 M LEGEND FNO MCN IN CASE 0 —SANITARY SEWER Mi POWER TRA1,FFORIER CA13LE RISER E3 CAOLE -Ur UON 1ELEFfCNE RISER -0- UTILI tY PCLE E-- _GUY At 01M 1H _WATER METER FIRE HYERANT WAI ER VALVE TIB 11 RAIL BOX 0 CATCH BASIN — Ss— SANITARY SEWER — So-- TL 3-KU SIMI MAIN — W — WATER L INE PAINT ft" — T — I ELEPt TO! JE PAINT MARK —G T p C --JOINT UTLITY PAW tIARK G,GAS. T-1ELEPfcvE. P,PCWER. C,CAELE WOM FENCE OVER EAU PO1qER LINE EDGE OF GRAVEL 10615 IL 3-M t� I:At. TL 3-0� )TO ITTP.LIr LIL 11 6. E 112, ZO FT ACGE55 r- _ "I ?m rw� ?1. 114, Sw 1/4 0 UNDER AF NO. 1 82637 H ITT IS V E. Ir MY, I or. t4 fftf"lax w lot 0 It TL 3-099 wltAcly. EX I c;)*F I NG c:F F. R 2,173 '50.FT, CAFTMT —rum �rt 490 c2f-- Fur LPE G N Lu. PAV113, IS 0 20 H Or FWP LVE 7— LIJ PAVM IS MUM 2ff V1 OF PROP Lfr z LL 0 w lf� lot= w PICO 01 AP 0 AE Olt I 6 0 Or lc� r a 0 ei,FjVA PAVO G CROSSES PROP LOC TL 3-100 0 10605 0 Im" 0 o Ac o-r"c IV lotm 0 N ctw SCALE: 1' 20' 1u. 0 20 110 CONTOUR15 2 FT INTERVAL ---------- ------------ ITi- 10 6 2 -4 AM— I GANr 5EF D-IA G0f,r-.7TRUGT 11 ON 60. L—A... IM 3! 1070(5 7003 117TH Ft -AGE f\1c— yjAr K I FZMANG', .111 q8033 ff -, 11/27/2042 18:21 425B286326 Mec Is 03 04:22a Page I of 6 D"231215 Pecen&" 15, 2003 SERENA CONSTRUCTION PAGE 01 425-489-4040 P.2 A-T ASRESTO-TEST, INC. ASBESTOS SURVEY 106-11226"' St. SW. Edmonds, WA 98020 Semen Construction 7003 117"' Pl. M KirklwW,'WA 98023 Atta- Erika Ph! 42&928-"76 fam 425-82W26 On December 9, 2003, Asbesto--Tcst personnel conducted an Asbestos survey (per U.S.E.P.AJAJLE.RJL guidelines as designated and specified by Puget Sownd Clean Air Agemey ajid WaAkingwx State) Qf the hooveAJ0611 22e SL SW, Ed'mnd% SWAPA*h Coug& y*khQtpM WM This survey purpose is to identify any Asbestos Containing Nfiterials that may be present and will require professional rewvalpior to denwiftionlrenovadon. IVY Of F_,fNDEVGS RASIC CONSTRUCTION: The house is one story wood frarne� The cxtcrior siding is wood. There was no suspect ACM located bamth the wood siding exterior. The torch down roofing and silvcr seal sur&cing materials were ssmpled. INTMOR CONSTRUCTION, FINISHES, AND FLOORINGS: The interior is drywall and wood. The drywall/taping materials were uniformly sampled. Tile flooring materials with relating backingr. and mastics were sampled per each located homogenous area. The masonry splash tile and mastics were sampled from the kitchen and bathroom areas. The "loose lay"piece of sheet vinyl was sampled from beneath the kitchen sink area. ELECTRICAL SYSTEM: The electrical wiring insulation is not of the kind to be ACM and was not sampled. Any .11ttpect electrical wiring in.tulation or on), yuspect 7NI (Thermal System ,insulation).found in, arountA or behind any localedfiuse or breaker boxes should be consfdered to bg ACM (Asbestos Containing Material), unless driermined otherwise hy laboralory analysis. ATTIC/WALL INSULATION: The insulation was sampled. CONTINUF rO PAGE I 1429 Avt. D. FMB #IV, Smobeinish. WA 98296 ph: 296-914-SPO (as; 360-M-240 poKc: 206-50-2491 z 0 i 0 M 11/27/2042 18:21 425B286326 Doc 16 03 04:22a SERENA CONSTRUCTION 425-489-4040 Page 2 of 6 Dcrtmkr IS, 2003 13#231215 Asbesta-TA14 Iffr— (206) 914-5500 E&w am', r —ACO u m 020 HEATINO A" VENTILAItION STSTSK: There is a P4 forced air fijmace in the crawl space accessed fi-om behind the fireplace. There is ACM TSI taping on misc. ducting and also ticked above the ducting in rnise. arms. Note: It wv..r not possible to dismantle the fiffnace and ducting to locate anWor evaluate any additional suspect A CM which may be comealed, iatide the unit, or atweiated in hidden areay. It is our opinion anyfurther jecl manager andlor handling qf thefurnace system should be coordinated by the pro abatement contractor if any additional relating suspect materials are located prior to andlor during any demolition or renovation, any and all additional related suspect materials should be considered to be ACM (Asbesfos Containing Material), unless determined to be o(her%ise by laboratory analysis. THERE MAY BE ADDITJONAL ACM TSI PRESENT ASSOCIATED WITH THE FURNACE AND DUCTING SYSTEM THAT IS NOT LISTED IN THIS SURVEY. TEE HEATING SYSTEM SHOULD AGAIN BE THOROUGHLY INSPECTED BY THE ASBESTOS ABATEMENT PERSONNEL. AS THERE MAY BE ACM PRESENT THAT IS CONCEALED FROM VIEW. Any wMiflOnal located TS1 inside or outside the fianace an&or ducting system including but not UP*W to all gaskets, joint cornpound% seakuts, stWor ifnaladons, am FACM unless tested otberwrlse by labor2tory suWyxis. There was no suspect ACM located a-siociated with the fireplace system. Misc.: The, window glazing was sampled, Addition" SUVetures on site included in sumy: Now- # of sirswimm included in survey; one Requesied by-, Erfan @ Seirna Construction certified A.tLE.FLA. #CLAY 5327 (Expires 19/12/04) A-T eftfieft to P*&j 3 PAGE 02 F.3 I Z 0 4 0 M =i :fi M C M 0 --10 0 C M M Z 10 C X W 0 M n M M 065 0 r- 0 M C Cn 9 Cn Q 0 Z X Z Z 0 i 0 M 11/27/2042 18:21 4258286326 -Doc 16 03 04:22a SERENA WNSTRUCTION 425-48S-4040 Page 3 of 6 December 15, .2003 111#231215 Inc. (296) 914-5500 1"I Any &VA EU materials as ACM or PACM is this report (210WOr Vidditi"d mAtcrimb aamigted Witb the s"r-twe tbat may be diacovered and later Watirlmd as ACM or I`ACM� Must be profmdonany stuatcd prior to deMeNtIM ASSESSMENT AND QUANTWWA'"ON OF ACM yon ASAIEMENlr pUmOSES AND/OR PRIM(; FOR REMOVAL S130VW BE I)rMRMMW By ON SM EVALIJATTOK AS L4STED QUANUrM ARE NOT GUARANTEED AND ARE AN APPROMM �TION �ONLY' �� ,U & M M L-$ A I t E � 98E _570S C 01 MA It, 1 NQ MA r g MA A & eweo *@ maWAF gyd Md= L4dft MOM* as ASBESTOS/iTypF ANALYSIS. ID — J/QUANnTY OTHERX&URIAL 1.0) ACM TST TAMG yes // chrfwvtik // 65-70% Don -fibrous materials FRL48LE ACM Taping Is on misc. beat ducting JointL The fumam h xcceswd Amm the crawl spom behind the fireplace. 1.1) ACM TSI yes it th"ffle // 65-70% noD-fibraw materials FRIABLE ACM ACM is twJW above the beat dading in xvisc. areas in (be crawl space between the ducting and floor joists. NOTE- THE INSPECTOR WAS N[OT ARIx. To 0FTXRMM QUANTITIES OF ACM TS1 THAT IS pRESENT AS ADDITIONAL MATERIALS MAY BE CONCEALED WI 1,HIN THE WALLS, CEILINGS, AN7DJOR FLOORS. QUANTITZ5 OF ASBESTOS yoR ABATEMENT ASSESSMENT AND/OR PRICINC FOR REMOVAL SUOULD HE T)ETERMINED BY ON SITE EVALUATION. ALL TSI ASSOCIATED wrm Tm FvRNAmoucmG sysTEN THAT is NOT VISIBLY FIBERGLASS MATERIAL IS FRESUMED ASBESTOS CONTAWNG- ANY FLUE MORTAR FACJQNG MATERIAL THAT MAY BE LOCATED IS ALSO FRESUMD ASBESTOS CONTAINING UNLESS TESTED OTHERWISE BY LABORATORY ANALYSIS. 2.4) FLOOR TILE yes // chrysotile // 2-,'--'% nowfibrous materials ldtcbco 9"x 9" Poor file -color. white streak ACA1 2.1) BLACK MASTIC yt* It cbry3WIt H 2-5% adbv&t, celluluse MASTIC AND TILE IS NON -FRIABLE ACM AFMOX 200 SQ. FT. ON WOOD A-T confiame to Mge 4 PAGE 03 p. 4 z 0 4 0 M =i 9 M C M 0 0 —40 0 C M M z 0­1 C _Z 3: Cl) o -n MM 0 0 0 M C Cn 9 Cn Q 0 Z z z 0 4 0 M 11/27/2042 18:21 4258286326 SERENA CONSTRUCTION PAGE 04 bee IS 03 04122a 425-489-4040 P.5 pecemb" is, 2003 Page 4 of 6 AsbWo-TeS4 life- (206) 914-5500 13#231215 LftU-Vd*,YA,TW, ko ANALYSIS 10 FSTO—S] - E/1MANTFU 0 R NA _AL 3.0) FLOOR TELE yes // cbrysotile H 2-5% non-Abrous maftrialS z 0 east md 9,,x 9" Boor tile-volor. black intermixed -1 0 ACM 3.1) FLOOR TILE yes It chry3ot0e 2-5% nowfibrous Materials M east aid 9"IL 9" floor filo-color- wbkc inttrWixell ACM 3.2) BLACK MASTIC yes H cbrywARe //2-5% adhesive, ccftlme M MASTIC AND TELE IS NON-FRUMV, ACM C M AFMOX 650 SQ, FT. ON wOOD 0 0 0 co) FLOOR TELE yes I/ cb*wtk Z-5% --I K side entry -color: red brick ACM X M M z TELE IS NON-FWA13LE ID APMOX 40 SQ. FT. ON WOOD C 4.1) MASTIC NAP adhesive, cellnWe E: -4 3: Cl) NOTE- Any additional colors or Idadi; ol owr tile and/or umstics, baditaga that Were not 0 -n dimmered in this swvcy and may later be located in this stmdure art Also Prmtmed tO n contain asbcstos naless tested othowix by labor2torY R=IYsb af 9 M M 5.0) ROOVINC. SURFACE yes /I chryootfle // 2-5% non -fibrous nmterlals� 0 0 r- "silver sul" Material on surface of tomb down roof cellujose 0 M ROORNG AREA AppROX. 7 ACM .920 SQ. Fr. -SILVER SEAL M&TERIAL IS FRL4JaL)E C Cn K Cn Q 0 5.1) tomb down mofing NAD cellulose, ter, fiberglass, Z r- T , , underlying waterimb-beacath silver scal non -fibrous matecials . , W TEM WAS NO ASAESTOS DZI�ECTEID U4 ANY OF THE MLG SAWLES > z 6.9) drywall NAD nun -fibrous materials cellulose, fiberglass, 0) paint, (gypsum) z 6.1) dryvvA tapiog compounds NAD nori-fibrous materials, 0 i I SAMPLED PER AHERA PROTOCOL cellulose, fiberglass 0 6.2) surface paint (bomagcouas throngbout) 74AD paint cellulose M A.r C"finve to pay 5 11/27/2042 18:21 4258286326 SERENA CONSTRUCTION PAGE 05 bec IS 03 04:22a 425-469-4040 F-6 Omemb& 15, 2003 NI 5 of 6 Inc. (206) 914-5500 ZmWl215 10611220— a Nw. MEAN!& 98 0 C _4 l) 3: M: c M 0, 0 0 C� 3: m m Z� > 0 -n xvv m M 0 F 0 m c Cf) Cl) m 0 z Z� 3: co: z 0 m FINAL PAOJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE GINEERING DIVISION DATE- 7// PLANNING DIVISIONDATE_� PIXASE SIGN PROJECT SITE ADDRESS PERMIT #_..Z 00q- (JJ2:�:___ADB#_________PATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED L A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of -GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES Copy of CORRECTION NOTICE given to owner/contractor by inpector 1 . PA 0 RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbm1s:ocaprv1 3/25/04 z 0 M M M 0 0 --I (-) 0 C --A K M M M Z UTZ) 0 _n n;U > M M 0 0 0 M C U) 9: U) M C-) Z r- M X z __4 3: U) z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ................. 'Wall ........................... Pier/Porch ................. Retaining Wall: ........... Slab Insulation .......... PLUMBING: Underground ............. :Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING.......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 4?00vw z 0 4 0 171 —i -n 171 M 0 0 0 C: M M Z (:) --I I I C Cf) o -n n 17111TI 055 0 r- 0 M C Cn 90) M 0 Z z 0) z 0 171