Loading...
20040087.pdf9 0 e!!5- 6 (C-�67 TELEPHONE 16111M. TELEPHONE =&Ac7Oj? W0 55!�; 60VO STATE LICENSE NUMBER EXPIRATION DATE r CHEC PROPERTY TAX AC(;OUNT PARCEL NO. 0;77 0 ;2� -L- -:�; 0 0 e+ Ol (::5) 0 0 1:1 NEW 1:1 RESIDENTIAL ADDITION 10 COMMERCIAL REMODEL 1:1 MULTIFAMILY REPAIR 11 GRADING CYDS DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: PLUMBING / MECH COMPLIANCE OR CHANGE OF USE SIGN FENCE I X FT) OTHER FIRE SPRINKLER FIRE ALARM ul I PERMITEXPIRES LWif�r USE PERMIT ZONE 54�� ' M -117 NUMBER 008 JOB SUITEJAPT# ADDRESS Ve, !�;P. PLAT NAMEISUBDIVISION NO, LOT NO. I LID NO� LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP ILSCP Approved 11 RW Prifind Floquired 13 EXISTING - PROPOSED Surial Use Parinit Roq'd 13 Inspection Required 13 sidewalk l4equired 13 REQUIRED DEDICATION� FT Undargratiod Wiring required 13 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 13 NO cc W REMARKS z OWNER/CONTRACIOR RESPONSIBLE FOR EROSION CONTROLYDRAINAGE z F3 z w ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DATE VARIANCE OR CU SEPA REVIEW COMPLETE EXEMPT EXP I LOT COVERAGE ALLOWED PROPOSED N . PARKING REO'D I PROVIDED 'Af L, I REMARKS W cc a: SHORELINEORADB# I INSPECTION BOND IREQ*D EIYES 13NOIS POSTED — SIGN AREA HEIGHT ALLOWED PROPOSED ALLOWED PROPOSED 7-,A 0 2,73P I /\/c, , REOMED SET13ACKS (Fr) PROPOSED SETBACKS (FT) FRONT SIDE REAR FRONT L/R SIDE REAR N (1, IV6 z E z LOT AREA PLANNING REVIEWED BY DATE I I 17,117,of CHECKED BY ITYPE OF ­POP NUMBER NUMBER OF CRITICAL OF G M DWELLIN AREAS SPECIAL INSPECTION JAREA 0 STORIES NITS NUMBER t�� ­04 REQUIRED [] YES DESCRIBE WORK TO BE DONE I h-4 5-T-1z L-1— HEAT SOURCE GLAZING % LOT SLOPE % PLAN CHECK NO: VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Etc Lu PERMIT APPLICATION: 100DAYS IL PERMIT LIMIT 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECT LY FROM THE ISSUANCE OF rHIS PERMIT ' ISSUANCE OF THIS PERMIT SHALL NOT 13E -j DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LA13OR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. iii;Q NATURE IWNER96AGENV DA7TE ,IGN7E0, e il-ic. I / 0 0 DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNE� NAME/NAME OF BUSINESS 4�;7 e:�,2 1,e-, A Lz� MAILING ADDRESS 706 CITY ZIP TELEPHONE 7A 'ME uj L- ADOR SS x 0 CITY ZIP NAME ADDRESS 682,1� CITY ZIP OCCUPANT GROUP OCCUPANT LOAD REMARKS a z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D S VALUATION Description Plan Check Building Permit_ Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee FEE Description ii;? 0 State Surcharge /00 City Surcharge Base Fee ,,� CALL OR INSPECTION (425) 771-0229,---.,, ATTENTION " r E)a 13 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE TIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL Oil A CE R I- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 09/03 PRESS HARD -YOU ARE MAKING 4 CC FEE Plan Chk. Deposit Receipt # Total Amt. Due Receipt # I I ��- APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid, and receipt is acknowledged in space providud. F ALS SIGNATURE DATE j ES BY ^ - I' DA ORIGINAL - FILE YELLOW - INSPL&TC PINK - OWNER GOLD - ASSESSOR z 0 4 0 ITI =i =55 zii --j 3: 0 M C M 0 0 ­10 0 C —4 K X M M Z 10 —4 c x Cn 0 -n n --I x m rn 0 0 0 rn C Cn K Cn 111 0 Z 7' r z cn z 0 1 0 M r FINAL PROJECT APPROVAL FORM TO: Pt DATE-_�//a MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PIX.ASE SIGN ENGINEERING DIVISION DATE— PLZASF SIGN PLANNING DIVISION DATE �25 PLEASKSiGN PROJECT SITE ADDRESS-J PERMIT itpuo- �Oo�v� ADB# DATEINSPECTED 4121of DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED C3 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES c3 Copy of CORRECTION NOTICE given to owner/contractor by inspector. 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvi.doc.l:temp:bldg:fomisIO/OI z 0 i 0 M --I -n V5 --i 3: 0 M C M 0 0 --1 0 0 C: --i K 7- M MZ 0-4 C: —Z Cn 0 -n n X > M M 0 U5 0 0 M C U) ?. Cn Q Z 71 M 3: z U) z 0 M 'I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. z Retaining Wall ........... 0 --I Slab Insulation .......... 0 M PLUMBING: -n Underground ............. Rough -in ................... M M 0 0 Commercial Final ...... 0 0 C HEATING: M M z Gas Test .................... ID C Gas Piping ................. > z Equipment ................. o -n Commercial Final ....... -n EXTERIOR SHEATHING M M NAILING.......................... 0 0 r FRAMING ........................ M C: CD FIRST FLOOR FRAMING ... K Zn M 0 Z INSULATION ................... Floor Insulation ......... Wall Insulation ........... > z Ceiling Insulation ....... Cn SHEETROCK NAILING ... z 0 SPECIAL INSPECTION ... --i 0 M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................