Loading...
20040094.pdfDo DATE ECEF J CITY OF EDIVIONDS� CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BUSINESS 7IT MAILING ADDRESS Lu 0 CITY ZIp7 NAME LU t: ADDRESS x U CITY ZIP P�4141- NAME TELEPHONE ;�'� 6 ­ -7.- - "� — TELEPHONE CBL 4 / 14 3 7 [PERMIT EXPIRES USE PERMIT ZONE L NUMBER i�qj' JOB SUITE/APT# ADDRESS '71 PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved RW Permit PlOqUired 0 13 SIrent Use Permit Roq'd [3 EXISTING — PROPOSED Inspection Required 13 Sidewalk Required 13 REQUIRED DEDICATION— FT Underground winng required u METER SIZE LINE SIZE NO. OF FIXTURES I PRV REQUIRED I YES 13 NO 13 ,ZIP I TELEPHONE L q&1262 STATE LICENSE NUMBER ff�Plw1_0_N Dear_-T d-PECIKED Bd PROPERTY TAX ACCOUNT PARCEL N 7 J f NEW RESIDENTIAL ADDITION COMMERCIAL REMODEL MULTIFAMILY REPAIR GRADING CYDS F� DEMOLISH TANK GARAGE CARPORT RETAINING WALL E] ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: G I MECH lwfea!�: OF USE I SIGN E:i FENCE X FT) OTIJER FIR SPRINKLER Ft ALARM ewt o I, L-�- NUMBER NUMBER OF CRITItAL OF DWELLING AREAS STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE k'r-�ek'7 al"d t�et—phqlw REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROWDRAINAGE ENGINEERING REVIEWED BY DATE C5 F cc UJI z z a z W FIRE REVIEWED BY DATE LU LL VARIANCE OR CU HORELINE OR ADIII INSPECTION BOND REO'D I POSTED E]YES ONO S SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP , LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (IT) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE REAR z Z z PARKIN�� LOT AREA PLANNING REVIEWED BY DAT REO'D I P�OVlt I /W-C oc-� A� o REMARIKS__�' CHECKED BY I TYPE F CWONTION E OCCUPANT '51M at q:i_7 G A3 SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] 'OrL LOAD YES REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D AA ­1 VALUATION $ FEE Plan Check HEAT SOURCE GLAZING % LOT SLOPE % DATE Building Permit Plumbing PLAN CHECK NO: VESTE) twir THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMI COVERS WORK TO Mechanical "i 7 - BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) SEPARATE PERMISSION. ON THE PUBLIC WILL REQUIRE 4 180 DAYS Grading Engr. Review Engr. Inspection Ir PERMIT APPLICATION: 180 DAYS UJI IL PERMIT LIMIT., I YEAR - PROVIDED WORK IS STARTED WITHI SEE BACK OF PINK PERMIT FOR MORE INFORMATION Description State Surcharge City Surcharge FEE *APPLICANI ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIG;S AND SUCCESORS Fire Review Plan Chk. Deposit IN INTERE�T. AGREES TO INDEMNIFY. DEFEND AND HOLD HAR 4LESS THE CITY OF MS 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND A FROM ANY AND Fire Inspection Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRE TLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PE MIT SHALL NOT BE Landscapelnsp. Total Amt. Due a DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF A _j Y CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CIlYS ABILITY TO ENFC NANCE PROVISION.4 x Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AU FHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY Willi CITY AND STATE LAWS REGJLATING CONSTRILIC- CALL I his application is not a permit until signed by the TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSOt WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S COM PEN SATIO N-INSU RANCE AND RCW 18.27. OFFIC�V SIGN DATE SIGNATURE (OWNER ORIAGENT) DATE S�GNED (425) 771-0220 PED BY DAT ATTENTION EXT 1333 /t/1 1_1(fl A /.,,�7 //11 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPRO�Al_ OR A CERTIFI. ORIGINAL - FILE YELLOW - INSPICTC CATE OF OCCUPANCY HAS BEEN GRANTED. UBC S CTION 109 PINK - OWNER GOLD - ASSESSOR 04!02 1 GREEN - ACCOUNTING PRESS HARD -YOU ARE MAKING 5 COPIES z 0 M --i -n X M C M 0 0 —i (-) 0 C: M M Z K) ­4 C _z 3: 0) 0 71 n x M ITI 0 0 M C/) (n M 0 Z X z 0) z 0 ITI N Project Info 0 9 2003 Project Address 9 9 -4L bo Date For Building Department Use Applicant Name: [Applicant Address: I-q 6 o 5­ m-M^� iz c I Applicant Phone: / cr , C? V S ffl�e�f beiliscription C] New Building [I Addition [F(Alteration Ea"'Plans included J If plans not included, refer to WSEC Section 1513 for controls and commissioning requirements. Compliance Option I rescriptive (D(Lighting Power Allowance 0 Systems Analysis (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces clearly on plans.) Alteration Exceptions (check appropriate box) 11:1 No changes are being made to the lighting I [51-ess than 60% of the fixtures are new, and installed lighting wattage Is not being increased Maximum owed Lighting Wattage (Interior) Location (floor/room no.) Occupancy Description Allowed Watts per ft2 Area in ft2 Allowed x Area _--t-0 / �"__ Z 106 P7XJ PxoLl / cz:%R&�Pox_ �/o �� -/c'/ 7-:3 610 IC;� W12P 4;— R45,e_�- Rob op 00 /� 8 C/4�_, ** From Table 15-1 (over) - document all exceptions on form LTG-LPA Total Allowed Watts / ?_ Notes: 1. Use manufacturer's listed maximum input wattage. For hard -wired ballasts only, the default table in the NREC Technical Reference Manual may also be used 2, Include exit lights unless less than 5 watts per fixture. V�^��nnAl T ;"16"-nd3r WnifnerA, 1Tnf-Dv4rJAist all fixtures. For exempt lighting, not exception and leave Watts/Fixture blank. Location (floor/room no.) Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed W T-1vo0__<Ceo-F � V-12-0 & CCe H �- /0 / t? ca ii de- 5ce� t4 4- 12- 1 ?' 9_� Total Proposed Wafts may not exceed Total Allowed Watts for Interior Total Proposed Watts L/6 o 0 Maximum Allowed Lighting Wattage (Fixterior) Location Description Allowed Wafts per ft2 or per If Area in ft2 (or If for perimeter) Allowed Watts Xft2 (or x IQ Covered Parking (standard paint) Xf Ik 0.2 Wlfe Covered Parking (reflective paint) RM7 0.3 WIfe Open Parking 0.2 W/ft2 Outdoor Areas .1(f4& A- 0.2 W/ft2 Bldg. (by facade) Af /v� 0.25 W/ft' Bldg. (by perim) /i 1A 1 7.5 W/If Note: for building exterior, choose either the facade area or the perimeter method, but not both) Total Allowed Watts Use mfgr listed maximum input wattage. For fixtures with hard -wired ballasts only, Proposed Lighting Wattage (F.Xterior) the default table in the INIKEL; i ecnnicai Keterence manuai may aiso be used. Location Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed ,&61f_ X141 IVIA Total Proposed Watts may not exceed Total Allowed Watts for Exterior Total Proposed Watts I z 0 11 0 M =1 =55 Cl) ­4 0 M C IT11 0 0 ­10 0 C: -i K X rn M Z 10--i C a: W o -n n --I 3:9 M M 0 0 0 M C W 9 w M 0 Z 71 ;0 _11 X z --i 3: Cl) z 0 i 3 M .k' 7 At: 22618 H Occupancy established by this ce A3 Maximum Occul Owner of Building _ The Pho-Noodl, of the Uniform Building occupancy Is classified. : :t DEPARTMENT OF BUILDINGS IVER UNIFORM BUILDING CODE SECTION 4Y 99 # 101 Load molty slos, I L"T"'V'ZL, . I . uWIFF" . , � Dat The d* has beelllWed by f4 as adopted by fc Issued this 2? ling Units: **N/A*** of d& Imlon: I 0 ,ermit # 2004-0094 sto as: I Basement: U13C ie4 PW' remain i0tosted at times. the 9 requirements of the 1997 Edition cy and the use for which the proposed rc 2004 CHIEF BUILDING OFFICIAL BY: - This coMficate shall be Posted In a conspicuous public area and shall not be removed, mullIsted or obscured and shall be maintained In legible condition at all times, Any change of occupancy or use requires a building permit and a now Certificate of Occupancy Issued by the My of Edmonds Building Offlclal. FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUELDING DIVISION 0 FROM: DEPARTMENT DATE- PLEASESIGN ENGINEERING DIVISION DATE pLeASESION PLANNING DIVISION DATE pLWESIGN PROJECT SITE ADDRESS_L�_- PERMIT # '2, ct INSPECTED — DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of : X GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:fbrn1S 10/0 1 z 0 4 0 M :q =n- U5 --I 3: M 0 0 __10 0 C: M M Z C/) 0 -n n ;d _4 > 3:9 M M 0 &5 0 r- 0 M C U) 9 co Q Z z --I 3: z 0 M MEMO TO: I FROM: PROJECT, FINAL PROJECT APPROVAL FORM TO: DATE: PERMIT COORDINATOR, BUILDING DIVISION <: FIRE DEPARTMENT DATE KEASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE - PLEASE SIGN d SITE ADDRESS 2- 1 L�_� Z 2 ' 0/ PERMIT B# DATE INSPECTED 3 DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of : X GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED a Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inspector RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date ocaprv1.doc.1:temp:b1dg:f6mis1 0/0 1 Sign, z 0 M n 0 M C M 0 0 0 C: -A K M M M Z 0 --1 C —Z C/) 0 _n n m > M M 0 0 0 M C: C/) K U) M Z r z Cl) z 0 i 0 M 0 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Z� Retaining Wall ........... M Slab Insulation .......... PLUMBING: 3: Underground ............. 0 M C M 0 0 Rough -In . ................... __40 Commercial Final ...... 3: M M Z HEATING: C z Gas Test ................... > Gas Piping ................. Cn 0 -n Equipment ................. _n ------------------- Commercial Final ....... M M 0 EXTERIOR SHEATHING 0 0 M NAILING ........................ C cn FRAMING ........................ 9 C/) Q 0 Z FIRST FLOOR FRAMING ... INSULATION ................... __4 Floor Insulation ......... > z Wall Insulation ........... 0) Ceiling Insulation ........ ---------------- z SHEETROCK NAILING ... 0 M SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR Oq OCCUPANCY .................. 00 avix Of(