Loading...
20040106.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/ NAME OF BUSINESS 1-1 Ggr(-qr,Y L Li <" h) E7K MAILINU ADDRESS 7-4 118 t\10rn4 Aloric 11d,,t A.& CITY ZIP TELE ONE (001JR0E 805 ?sio tu 7RESS R L) CITY ZIP NAME An'Too( Se&jcF ADDRESS 2.7 CITY ZIP KwLfiAjt*-) 7,q 0 17Z- STATE LlUtNtit NUM13ER AAATASC066NA/ "ROPER11TAX ACCOUNT PARCEL NO'. NEW RESID L 19 L RC IN ADDITION COMMERC REMODEL EE] LT REPAIR G I NAG E] DEMOLISH\ GARAGE FR ETA I WALL ip CATPORT OC .US _ KERY B T (TYPE OF USE, BUSINESS, VI I Y) EXPLAIN: NUMBE OF NIJ DY STORIE 0 LIN DESCRIBE WORK TO BE DONE HEAT SOURCE PLAN CHECK NO: GLAZING % TELEPIIONE TELEPHONE qz!5 1% 18 CBL# =-OR USE U SIGN FENCE I X 1:1 OTHER A CR AR RE ALARM LOT SLOPE % VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180DAYS PERMIT LIMIT., I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HIS OR HE SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST. AGREES TO INDEMNIFY. DEFEND AND HOLD HARMi FSS THE CITY OF EDMONDS. WASHINGTON. ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY Oil INDIREC TLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT HE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION., 1 HEREBY ACKNOWLEDGE TIIAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR TIIE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF T14E LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATIot�J�SU_QrAWE AND RCW 18 27. DATE F S 16)41 I PERMIT EXPIRES Usf ZONE PERMIT thdif JOB ADDRE 5 X SUITE/APT# PLAT NAME/SUBDIVISION NO LOT NO. I LID NO. LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Appioveo RW Permit Required EXISTING � PROPOSED Street Use Permit Roq'd Inspection Required REOUIRED DEDICATION� FT Siclowak Required underground I ''I I I Wiring required METER SIZE OF FIXTURES PAV REQUIRED REMARKS OWNER/CONTRAClOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ORCU SEPA REVIEW COMPLETE EXEI IExp Aft RKS REQUIRED FRONT ING LOT PROVIDED TYPE YES z DATE -OWI INSPECTION B P�OND REO'D STED E]YES ONO S HEIGHT D PR PROPOSED —FA�LLOWED PROPOSED AREA z Fr Lu z z W W PROPOSED S ETBACKS (FE) FRONT L/R SIDE REAR z E D BY DATE 0. OCCUPANT GROUP OCCUPANT' LOAD S INSPECTIONS PER UBC 108/FINAL INSPECTI�0111`4 REQ'D VALUATION Description_ Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection LandscapeInsp. Recording Fee CALL FOR INSPECTION (425) 771-0220 FEE Description State Surcharge City Surcharge FEE Plan Chk. Deposit Receipt # Total Amt. Due Receipt # APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid, and receipt is acknowledged it, space provided. �kIA�.S.Sl�iNAJURF � DATE AT3ENTION f I MMONEWN� IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL EXT 1333 CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI E 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES 91 TE ORIGINAL -FILE YELLOW- INSPECTOR PINK -OWNER GOLD -ASSESSOR GREEN - ACCOUNTING z 0 4 0 -n Fn 0 rn C: rn 0 0 ­10 0 C rn rn z 0 C 2 > 0 -n n 3: m rn 0 co 0 r- 0 M C Cn K Cn M 0 z 17, --I rn --I r z W z 0 I 0 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In .... ............... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment .................. Commercial Final EXTERIOR SHEATHING NAILING ....................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z 0 4 0 M -4 -n M C M 0 C-) 0 C: 3: M M Z C —Z 0) 0 -n n M M 06 0 r- 0 M C C/) 9 Cf) Q 0 Z ;U z 0) z 0 M