Loading...
20040109 (2).pdfa DATE JECE ED ERMIT EXPIRE Lp il) L� USE PERMIT ZONE ( CITY OF EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS 1 OWNER NAMENAME OF BUSINESS PLAT NAME/SUBDIVISION NO LOT NO, LID NO Cc MAILING ADDRESS LID FEE S uj z TESCII Ariproved E3 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Anquited 0 Stfoal Use Polmil Heq a CITY EXISTING — PROPOSED Inspectian Requifod ZIP TELEPHONE Sidewalk Required El REQUIRED DEDICATION— FT Undergiound C Wiring fe9tilrod '13 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES E] NO 13 z /Vf z I Z' I I Ir uj REMARKS z ADDRESS z OWNER/CONTRACIOR RESPONSIBLE FOR EROSION CONTROLYDRAINAGE 5 L) z Cc uj AJ, FEE, E_ CITY ZIP TELEPHONE VZ",V (WO o 7 NAME C 13 L 4 A4 t--- - tWGINEERING REVIEWED BY DAT ADDRESS 0 A BY DATE uj CITY ZIP TELEPHONE 0 L I ?t - (�, - , i h, /7 - j1Aj1,e,jI I I VARIANCE OR CU SHORELINE OR ADBN INSPECTION BOND STATE LICENSE NUMBER EXJIPWATION DATE CHECKED BY�.l RE(�o POSTED OYES TA- K D L 9 ._s lc� SERA REVIEW SIGN AREA HEIGHT PROPERTY TAX ACCOUNT PARCEL NO. COMPLETE EXEM ALLOWED , PROPOSED ALLOWED PROPOSED ul ou_� _j .bm EXP NEW RESIDENTIAL PLUMBING MECH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR S/ 2-1-`1 Z ADDITION F-1 COMMERCIAL COMPLIANCE OR -7 IV6� U�., � -7. 5 / 5: -, z CHANGE OF USE 3z;/g ' z PARKING LOT AREA PLANNING REVIEWED BYa DATE REMODEL MULTIFAMILY SIGN REO'D I PROVIDED G7 FENCE REPAIR t:?o Kil E CYDS X FT) REMARKS r_1 DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER z CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTI TY) EXP E CHECKED BY TYPE OF CONSTRUCTION COJ?E OCCUPANT iE — GROUP U f 'TtQ 9-7 in NUMBER OF gat, w NUMBER CRITICAL a DWELLING CRT( AREA OCCUPANT M OF _ TAREAS SPECIAL INSPECTION UNITS M I LOAD 0 STORIES N B REQUIRED)q I YES DES�RIBE WORK TO BE DONE A" REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D FS C (le &,L­Iea ki� 11, &01 L'�, j3V ff t�X222 f- I, I k*'( I I x2 VALUATION A--lLaz (C"p9aw T�- �jilel r--7,jr-t-1-7 6'_1iztAy:7Ctyr) Description FEE Description FEE r jr, Plan Check State Surcharge IV sr�) __L -jZ . 2 A+ Aq, el;z e�, HEAT SOURCE G11ZIN 91 LOT SLOPE % I Cv- I W C�l Building Permit City Surcharge 11, /1 -,, PLAN CHECK NO: VESTED DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: W BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading SEPARATE PERMISSION. Engr. Review PERMIT APPLICATION: 180DAYS PERMIT LIMIT., 1 YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review PlanChk.Deposit I f. IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF '3�X� 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # W 2— ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due -7 L 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION." Xi Recording Fee Receipt �j (Z.7 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S COMPENSATION INSURANCE AND RCW 18,27. nfATE OFFICIALS SIGVATURE 00r, SIGNATURE (OWN5R C,R GENT) DATE SIGNED (425) 1eAA:4f__) /A /) A�r /1) &�Tl ?11 1 W J / ; /L 771-0220 /RrT_9f D DATE ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL J14 - _C A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELL6W -I SPEC OR Ij S SSOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - *ASESSOR 04,,02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN ACCOUNTING I/ 0 4 0 M -n M C: M 0 ­10 0 C: M M Z cn 0 _n n M M 0 _cn 0 r- 0 M co U) M 0 Z X z --I M Cn z 0 ­1 0 M 41 PIZ I 6V A4 AV ,/-ZiPy X3t'j 0 "��l zx--. h /I O-e i -A 'iroptl4kc) (1A (H 4 W qcl lo .20 iii At n at 1),54 A % x V x I 15* !!RL-' "'ITIZ C� 5111, 51cmiswat rl;�- - Li (E i MAIN STREET 6-1.201 MAN 112 4.1VIO I It I., t, 4 *IW.II op.'s I I.I.W t.o. 111 0,01 *-Ito A IVItol. . I* V�, 14 " III. A., at, 94 31, Ito ".,b l."OlATIO Ift lb�l . 0 0,00t,'I't "It %Po " ,.I. '.. too 10, ONJI, tv,�""O 1, 4. . V.w 2 't II, 'o w 14 V,WI,oI ! s3% l6tycmm r#sma slencrNa A VAeCA -10 06' �,Oae t4/& a TeaAl- 3W3%4 litII PV y OL"d-rZ XA6045 oF boeOvAW P/571/06W 17VAIN6 6MV1416 Nlzg�;r: iriel5w" ra 6er1Wj1V,45 /.:� aaA(416 "10 e'aeys-N&C -7 IV Alo Z& 7A -ra ge- jl�re-,O 1,4W eX 1:71vlL I'vo .5 -roe MAIN STREET 6,RZ..AD11L)6 PtA10 02510 Ito, ELFIL FL:z9 IF elTE PLAN 95-12A MAIN 5TREUT d5rMNERAL NOT15et 9C.AL.r.I I" a r C*:VOI 'OkyglEvk Lw" In z l*d z 7. ci p U, 10-15-09 drOiI,,,tm k2yl Mpsil low, % vOttlelf, r", 1,-.1 014�11 rca,w wt0looj V0,114 ei'l ce'nMtl,�&. �ovmo,�a 11row lre� 014"10^01rolift w4o,-h rt"Ith Rho o,.�flf,Wtol � 11 ro mpr,�k.lvf , 0 L". t �orP C.? Jo L t,� �, 11# c4 lk, vlaoo Xv sj-q Vv ,ZSC i,, t itt ID�Oa ?Ew�, GCOVEDI-0) BY PLANNIN ADPRE55 b-72cl Mos%IN 5TREET LFCBoAL Pr=5CFPIFRTfONi LOT :2, TRACT 11, PLAT OF PINE RIDO SNOHOMI51-1 COUNTY V4A51-11NCERTON :05wit ROOD 9 15, 4 C 9 7,*-o oo,t�� 4�T AfTAI�olrrl, 017�y "ARA-4-ft I "o­ 09 Aav)?Opfv . J07,490' 0 0 tj ----- — too, VN I Plllo� r ; MAIN STREET ;*Wqp�ex W144"(p 51TV ARJ�Ai 12,664 �OUARE: FEET ejuam rwovcm k// Pi te XiC, PVC, PW� 10 ZQNIW�l P.5-8 ZONIN& �y,,Vjr "Jpj;O pvVRoeLl4To?d4,o` 25' 5TREET 0,501- mfl./me,5 - 1 490 as d(of 7-1/2' MIN. 5IDE B513L % oo� k . 0d; 15' REAR E355L. ot", i wU LOT COVERArSrEi (EXISTINO) R. E � I D E NC� F U525 5OUARE FEET TOTAL 1,525 SGUARE FEET ('10%) (PROPOSEP) RESIDENCE 2,225 9OUARE FEET RAJ NOO 5OFT OF THE TOTAL NEN C-ONSTRUCTION) POF7cH 100 5aUARE FEET DEC�Ks OVER, le) AE30VE (BYRAPE -10 GOLIARE FEET TOTAL 213LIZ3 150UARE FEET 5596 MAXIMUM LOT COVERAGE ,eIOLJ5 ARFA!�� (EXI!��TINW RESIMENCE 1,525 SOUARE FEET DRIVENAY5 1,730 SOUARE FEET r.ONC. 5LAD 552 5OUARE FEET TOTAL 5,635 5OUARF FEET (2f5.796) (r:,RoPo5Ep) RE5JDENC,E 2,225 5GUARE FEET DRIVEV4AYEp (NE�4) 1.5qE3 4EOUARH FEET ANP REr.ONFlC5rUR!zP) I:;)EC.,K (NEV4) -70 SrOUARF FEET PORCH (NEIN) 100 15OUARE FEET PNALKNA-T-g5 (NEVO 50 SOUARF FEET TOTAL 5OUARE FEET (NET CnrAIN 401 5aFT) LQ2-.�2LQ.fE EA!�)T-�00%!Eo5T 106.00, 1 I q2.00 14.00 100.00 LINEAR FEET 14% 5LOPE 1-4.00 VERTIC',AL FEET RJF lgr5fjl' ATIQN 9e4l/V/16r PLAe%J A= 10D ffl....AN 15TWIMT N1 00000,000 15120! MAN 101 00.00, Zo 00.00, 'SUE! oSENIMAL NOTIM5 S4rALr, to' .20'-0" IO'l 4121-1= 103.00, C�-,fZAME.= 10�3.00' ACIUAL E30ILPINCvo HFIC�14T= HAXit-itit-1 DUII.17,11W�o HIL-IOHT= 1;2b,00' N to ul Z2 Z z Z 0 'd z z z j) ILI Z <o w (I ILI %3 00-00-00 cirajo,,im 1�1 I I HRNJ ahcoaka IVY Ion of 4 TERRA ASSOCIATES, Inc. C011SUIM111S hi Geotecliiiical Digineerkig, Geology alld Divit-oniiietital Eaali Scieiices RIECEIVEE) DEC 10 2003 PERMIT COUNTER Mr. Scott Catton 736 Dayton Street Edmonds, Washington 98020 Subject: Geotechnical Evaluation Catton Residence Addition 8729 Main Street Edmonds, Washington Dear Mr. Catton: !7 December 5, 2003 Project No. T-5480 As requested, we evaluated geotechnical conditions at the subject property. The purpose of our study was to address City of Edmonds Permit Submittal Requirements, specifically, classification of the site soils and determination of soil bearing capacity. The proposed project will consist of constructing an addition to the northern side of the existing residence. Based on our conversation with you, we understand that the addition will be a wood -frame garage with a concrete slab -on -grade floor. The upper level of the addition will be living area. SITE CONDITIONS Surface The site is a residential lot in Edmonds, Washington. The location of the site is shown on the attached Vicinity Map, Figure 1. Site grades in the area of the addition are relatively flat with a gentle grade down to the east- northeast. Topographic information provided by you indicates grades in the area of the addition are about 6 to 7 percent. Vegetation in the area of the proposed addition consists predominantly of grass. We observed a concrete slab in the northern portion of the lot, near the northern margin of the addition. It appeared that the slab might have been the floor of a previous garage. 12525 Willows [�Oad, SUite 101, Kirkland, Washington 98034 Phone (425) 821-7777 a Fax (425) 821-4334 z 9 0 M -n M C M 0 0 0 0 C M M z C o -n n M M 0 0 0 M C Cn 9 (n M 0 Z z (n z 0 1 0 M 0 Mr. Scott Catton December 5, 2003 Subsurface We investigated subsurface conditions in the area of the addition by excavating two backhoc test pits to maximum depths of approximately eight and ten feet below the ground surface. A geological engineer from our office conducted the field exploration, maintained a log of each test pit, classified the soils encountered, collected representative soil samples, and observed pertinent site features. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS) described on Figure 3. In general, the soils we observed in the test pits consist of ten to 12 inches of topsoil overlying loo se to medium 0 dense silty sand with gravel to depths of about three to 4.5 feet. These upper soils are underlain by glacial till 0 consisting of dense to very dense sand with silt and gravel to silty sand with gravel to the test pit termination depths. The Geologic Allap of the Edmonds East and part of the Edmonds TVest Quadrangles, Washington, by James P. M M 0 Minard (1983), shows soils in the area of the subject site mapped as Vashon glacial till. This is consistent with 0 0 0 the soils we observed at depth in the test pits. C We did not observe groundwater seepage in the test pits. However, we expect that a seasonal perched water table :z M M z develops on the relatively impermeable glacial till at times during the wet winter season. Perched groundwater C _Z levels and flow rates will fluctuate seasona Ily and typically reach their highest levels during the wet winter months (October through May). 0 -n Detailed descriptions of the subsurface conditions encountered are presented on the attached Test Pit Logs, 3: Figure 4. The approximate locations of the test pits are shown on Figure 2. M M 0 0 M C W C Cn DISCUSSION AND RECOMMENDATIONS Q 0 Z In our opinion, the native, medium dense to very dense soils observed beneath the surficial topsoil layer are suitable for supporting the residential building loads. W e observed loose soils between approximately 1 and 3 feet in Test Pit TP-2. Because of lateral variations in the relative density of the native soil in the area of the > z proposed addition, exposed subgrades that will provide support for foundations.or floor slabs should be examined X to verify a relatively firm condition. If loose subgrade soils are observed, they should be mechanically 55 - : z compacted in -place to provide a uniform bearing surface. 0 The native soils contain a sufficient amount of fines that will make them difficult to compact when wet. The 0 M ability to adequately compact the site soils will depend on the soil's moisture content and the prevailing weather conditions at the time of construction. If foundation subgrade soils can -not be compacted in -place to a relatively firm condition due to excessive moisture, the wet soils should be removed to a firm bearing surface. Alternatively, overexcavated footing areas may be returned to grade with structural fill. Structural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of I 95 percent of th e soil's maximum dry density, as determined by American Society for Testing and Materials (ASTM) Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction should be within two percent of its optimum, as determined by this ASTM standard. Project No. T-5480 Page No. 2 Mr. Scott Catton December 5, 2003 Foundations The proposed addition may be supported on conventional spread footifig foundations bearing on an adequately prepared subgrade of firm native soil or structural fill. Perimeter foundations exposed to the weather should bear at a minimum depth of 1.5 feet below final exterior grades for frost protection. Interior foundations can be constructed at any convenient depth. We recommend designing foundations for a net allowable bearing capacity of 2,000 pounds per square foot (pso. For short-term loads, such as wind and seismic, a one-third increase in this allowable capacity can be used, With the anticipated loads and this bearing stress applied, building settlements should be less than one-half inch. For designing foundations to resist lateral loads, a base friction coefficient of 0.35 can be used. Passive earth pressures acting on the sides of the footings can also be considered. We recommend calculating this lateral resistance using an equivalent fluid weight of 350 pounds per cubic foot (pcf). We recommend not including the upper 12 inches of soil in this computation because it can be affected by weather or disturbed by future grading activity. This value assumes the foundation will be constructed neat against competent soil or backfilled with structural fill. The friction and passive values recommended include a safety factor of 1.5. Drainage Surface Final exterior grades should promote free and positive drainage away from the building areas. We recommend providing a gradient of at least three percent for a minimum distance of ten feet from the building perimeter, except in paved locations. In paved locations, a minimum gradient of one percent should be provided, unless provisions are included for collection and disposal of surface water adjacent to the structure. Subsurface We recommend installing continuous drains along the outside lower edge of the perimeter building foundations. The foundation drains should be tightlined to an approved point of controlled discharge independent of the roof drain system. Subsurface drains must be laid with a gradient sufficient to promote positive flow to the point of discharge. All drains should be provided with cleanouts at easily accessible locations. These cleanouts should be serviced at least once every year, LUNUTATIONS -inical engineering practices. No oth r We prepared this report in accordance with generally accepted geotecl e warranty, expressed or implied, is made. This report is the copyrighted property of Terra Associates, Inc., and is intended for specific application to the Westfield project in Snohomish County, Washington. This report is for the exclusive use of Stafford Homes and their authorized representatives. Project No. T-5480 Page No. 3 Z 0 i 0 M U 0 0 C M MZ r') --I C -Z C/) 0 -n M M 055 0 r- 0 M C cl) 9 Cl) Q 0 Z M Z --i 3: Z 0 1 0 M _1 Mr. Scott Catton December 5, 2003 The analyses and preliminary recommendations presented in this report are based on data obtained from the on - site test pits. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, Terra Associates, Inc. should be requested to re-evaluate the recommendations in this report prior to proceeding with construction. We trust this information is sufficient for your current needs. If you have any questions or require additional information, please call. Sincerely yours, Z 0 TERRA ASSOCIATES, INC. 0 Jo Fj G.. 0 M Projp M __10 0 0 2, 3: M Th i E M z Prin 742 141 JCS J 151 05 0 -n 7_17icin—iiMap n En 1 '----TtgM —e7--=xp to n Location Plan M M Figure 3 —Unified Soil Classification System 0 r- Figure 4 — Test Pit Logs 0 M C Cn C Cl) Q 0 Z > 0 0- w ST SW A 00 —j 198TH LN 1-000 A PL SW co DR L 198TH ST 199TH '0 PL SW _H V) SW ST SW 70- H CY -M eo 00 C=) ?T1S1 9 91, T H ST ST SW Cn 00 pt S'� co 20oTH VIEWOR PL 00 WY ST- Sw I -, --- =C I I 200TH �All VISTA 8300 1 200TH ST SW Zc LN -LA_SCADE LN --- 201ST ST SW 201ST DR ...J 202ND LT CASCADE 201ST PL Rj 00 V) ORC llz� 2 :�� 202ND HARD CAROL wr SIERRA DR Sw 202ND :c 00 "A 202NO PL SW F- 202ND FL co PL q1ol TJST ST SW GLEN ST 0 PL SIERRA, ST Sw 2DLRD_ 203RD ST ;W �W_ 203RD ST Sw *�' I- . SW PL SY 203RD PL I _j i CL S PARK :C I CO & RIDE 204TH ST i-2 3i cO 204T1 204 204T/i 10QQ A I- :.. "�. "'C' �t < ST ST SW V) P7sw 1-4 _j __j C3) 205TVI 4�P 205TH ST CL JNE fj1MMrqiGBjrRD "E, ST SW HUMMINGBIRD LUPL SW 206TH FE < 206TH LL PK ST ST Sv ST SW ST BELL, EM RALD /lit S 206TH j 207T7 Dp I TL Sw ST 20�TH PL. I ST SW 207TH 208TIr PL SW CD 20 ST co PL SW W� "* ".-C. , _-, TH P1 Sw 205TH PL SW I— rz 268TH PL ST CL TSW KAPLE WY t; "209TH PL --YOST. iiE SW ST 210TIA 2 TH ST Sw 210TH L pt Sw p Aa* C _j 12 WAL 7 ST CEDAR PL P K. Sw S7R5UCE WY 0 Co Ln 0 col cd 21: w .01 SPRUCE tn ST 214TH PL Sw 9000 21 H PL EDAIONDS - 2 0 1-11 1 215TH ST 215TH ST SW h(00WA Y >— Sw I C� Sw > 215TH—ST P �SW >- 215T" HS SW < 21 PL '215TH ca ST SW E F_ PL SW 216TH Cn sw, 216TH, T t . < :3: 216 PL 92GO P1900 Z CO SW 217TH ST Sw FC, 217-n ST w 217TH PL SW C% '0 co 218TH ST SW 21 218TH S Sw 84011 8800 87TH�PL =C w 9TH E ' 219TH 1-1 3: _j 219TH ST cc ST SW iE — LO . I M ED Sw --=12 2 0 T H co 2 F2bO THH ST st Sw 9000 PL in 1821)0 4 Sw CvD 3i 3i 8600 220TH 3— Cx '�_j - _ji:�' co 22 ST 221ST 221ST PL pi, I � �E 3C .0- PL SW us PL SW Sw C:� 00 REFERENCE: Thomas Guide, CD-ROM , King/Pierce/Snohomish Counties, 2003 NOT TO SCALE Terra VICINITY MAP CATTON RESIDENCE ADDITION Associates, Inc. EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Proj. No. T-5480 Date DEC 2003 Figure Environmental Earth Sciences I 1 1 z 0 A 0 M -A -n U5 —1 3: 0 M C M 0 0 0 0 C M M Z jo --i _Z C/) 0 -n n ;U > Mm 0 0 0 M C Cn 9 Cf) Q Z z Cn z 0 1 0 M i 0 z 0 4 0 M --I -n M C M 0 —40 0 C --I K :r M M z CD o -n n MM 0 0 0 M C co K Cn M 0 Z z --I z 0 1 0 M MAIN STREET 0 30 60 -------------- REFERENCE:SITE PLAN PROVIDED BY CLIENT APPROXIMATE SCALE IN FEET Terra EXPLORATION LOCATION PLAN CATTON RESIDENCE ADDITION Associates, Inc. EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Proj. No. T-5480 I Date DEC 2003 Figure 2 Environmental Earth Sciences MAJOR DIVISIONS LETTER SYMBOL TYPICAL DESCRIPTION Clean G% W Well -graded gravels, gravel -sand mixtures, little or no C GRAVELS Gravels T(' fines. C/) a) 2 (less than F GP Poorly -graded gravels, gravel -sand mixtures, little or =� (D �O r 4 fine More than 5% s) jj�� no fines. W 50% of coarse GM Silty gravels, gravel -sand -silt mixtures, non -plastic a) > fraction is Gravels larger than No. with fines fines. co .2 z (n 4 sieve GC Clayey gravels, gravel -sand-clay mixtures, plastic fines. E C) W 'a CD 0 (D ` N Clean SW Well -graded sands, gravelly sands, little or no fines. U-) 6 SANDS Sands W a Z Cj) M (less than SP Poorly -graded sands or gravelly sands, little or no W More than 5% fines) fines. 0 50% of coarse fraction is SM Silty sands, sand -silt mixtures, non -plastic fines. 0 smaller than Sands —1 — No. 4 sieve with fines SIC Clayey sands, sand -clay mixtures, plastic fines. ML Inorganic silts, rock flour, clayey silts with slight W _j C: 0 SILTS AND CLAY S plasticity. PI stic 0) C) C-4 CL Inorganic clays of low to medium plasticity, (lean clay). E Liquid limit is less than 50% 0 Z.N OL Organic- silts and organic clays of low plasticity. W Cn _d :;z C: 4- CD > a) EMEH]E Inorganic silts, elastic. ainic co W a) (n SILTS AND CLAYS (D = M CH Inorganic clays of high plasticity, fat clays. E z 0 Cn Liquid limit is greater than 50% U_ OH Organic clays of high plasticity. HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS AND SYMBOLS U) Standard Penetration 2" OUTSIDE DIAMETER SPLIT U) W t Density Resistance in Blows/Foot T] SPOON SAMPLER _j z Very loose 0-4 -R 2.4" INSIDE DIAMETER RING SAMPLER 0 Loose 4-10 , L OR SHELBY TUBE SAMPLER U) W X Medium dense 10-30 30-50 7- WATER LEVEL (DATE) 0 L) Dense Very dense >50 Tr TORVANE READINGS, tsf Standard Penetration Pp PENETROMETER READING, tsf Consistency Resistance in Blows/Foot DD DRY DENSITY, pounds per cubic foot W > Very soft 0-2 LL LIQUID LIMIT, percent U) W X: Soft 2-4 Medium stiff 4-8 pi PLASTIC INDEX 0 0 stiff 8-16 N STANDARD PENETRATION, blows per foot Very stiff 16-32 Hard >32 Terra UNIFIED SOIL CLASSIFICATION SYSTEM E ADDI N CATTON RESIDENCE ADDITION DEN I C TIOJF Associates, Inc. ;H NG ON EDMONDS, WASHINGTON S WA ;DateDEC Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences igu 2003 ure 3 Proj. No. T-5480 � t C 00 z 0 i 0 M —i -n C M M 0 0 0 0 rn rn z C _Z o -n n --I 3:9 M M 060 0 r- I 0 rn C C/) 9 Cn M 0 Z ;U > z X C/) z 0 q 0 M Test Pit No. TP-1 Logged by: JV Date: 12/1/03 Depth Approximate Elev. 100 Moisture Content (ft.) Soil Description N 0 TOPSOIL with debris (trash and roof shingles) Reddish -brown silty SAND with gravel, medium dense, moist. (SM) With roots. Gray silty SAND with gravel, dense to very dense, moist. (SIVI) (GI cial Till) 10 Test pit terminated at 10 feet. No groundwater seepage observed. 15 Test Pit No. TP-2 Logged by: JV Approximate Elev. 102 Date: 12/1/03 Moisture Depth Content (ft.) Soil Description N 0 1 10 inches TOPSOIL. Reddish -brown silty SAND with gravel, loose, moist. (SIVI) Gra SAND with gra fl, fine grained, dense, moist. (SP) 5 acial Till) Gray SI, Gray silty SAND with gravel, dense to very dense, moist. (SM) (GI 10 j Test pit terminated at 8 feet. to groundwater seepage observed. 15 Terra TEST PIT LOGS CATTON RESIDENCE ADDITION E Associates, Inc. EDMONDS, WASHINGTON Consultants in Geotechnical Engineering Geology and Environmental Earth Sciences Proj, No. T-5480T&te DEC 2003 Figure 4 z 0 M --i -n 0 M C PH 0 0 C 3: M M z 0 -n 3:9 rn M 0 0 0 M C cl) 9 C/) M 0 Z > z 0 z 0 i 0 M 9 02/23,12004 16:52 FAX 425 821 4334 ASSOCIA'I'FS Inc. TERRA ASSOCIATESo Geote(liflic"li Consultants 9V34 �,%,i 1,.2ws Road, 5�.Jjte 10,, Kirkland, WAs (4i', 7,� C -4-134 Mom '42S/ tj2l -7/7 77 * Fax , I - — FOOT114G EXCAVATION EXAMINATION REPORT DKiEFOCOTINGSEXAMINED PROJEcTmo. PROJECTNAIAE: PROJEC-rk-OCX'1014: RF-PRESENTATIVE: Roy CONTRACT09: MSCRIPTION OF Fjc.Tj%4Gs COVERED BY 7H*S REPORT' r9m -jit,; ol this pxprj,rat;cn am only valIQ icr a our reptesentativ8 I-r-1 OxarninGd 0,)Iy �V, Icct,.-Ig exuam�ations Itated above. Trio ros Li AT/ loosened s,,-:.IS ObServee. )qraca condl,.Ions accu-5. \qo should be profni)4' -*Wie period of 48 hours. 14 arv/ change in the sut 6 prior to om-:,rote placement. ct* t vity or rpinfall &CLId be iemove nT,0L.nc3aI:or*. amas die tOc strL vac 7A (1-C!" TO: RF-C-EIVED TEnpi�'�S�OC::ATFS RE,-r-ESENTArIVE FELI 2 7 2004 DEVELOPMEN1 SERVICES C'FPN' CITY OF EN30NDS z 0 4 0 m -n F) --I 0 M C MID 0 --1 0 0 C:: —i K = M M Z 0-4 C2 cn 0 -n n m M 0 0 0 M C: Cn 9 Cn M 0 Z 3: z Cn z 0 4 6 m Inc. 1 8W3 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 9W2O - (425) 771-0220 - FAX (425) 771-0221 Website: wwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering May 20, 2004 Scott Catton 736 Dayton St. Edmonds, WA 98020 Re: Building Permit: 2004-0109 Site Address: 8729 Main St. Expiration Date: February 6, 2005 GARY HAAKENSON MAYOR The purpose of this letter is to inform you that the last remaining inspection on your project is a final inspection(s). The final inspection(s) determines that there are no outstanding life -safety issues and approval allows the City to close your permit file. The City considers the final inspection to be one of the most important inspections conducted on a project. In order to grant final approval the following must be complete: smoke detectors, house numbers, guardrails, handrails, self -close doors between garage and residence, egress from sleeping rooms, safety glazing, weather-stripping, any Engineering department requirements etc. Of course not all of these things may specifically apply to your project but it does give you an idea about the kinds of things that must be complete as well as some items that do not need to be installed such as: paint, carpet, moldings, wallpaper, etc. Please be advised permits expire one year from the date of issuance. If you will need more time to complete the work, permits can be renewed prior to expiration for one half fees. If the permit expires without a final approval granted by the Building Inspector, full fees are required in order to renew the permit. This can be very costly to you and we strongly encourage you to check your permit expiration date and call for the required final inspection(s). Note: If more than one department is required to final your project, this is noted on your Job Card. Please feel free to contact me at 425-771-0220 if you have any questions. incerely, y Readwin e rmlt Coo rmit Coor=dinator L\TeaT\DST's\Master Letters\SRwaamLtrSFR Incorporated August 11, 1890 Sister Citv - Hekinan. Jaoan Z 0 1 0 P M C M 0 0 C --I K X M M Z K) --I C —Z 0) 0 -n n M M 0 0 0 M C Cn 9 a) Q 0 Z Z CD Z 0 i 0 M SCADE TESTING LABORATORY, INC. TESTING & INSPECTION / ENGINEERS 12919 N.E. 126TH PLACE KIRKLAND. WASHINGTON 98034 (425) 823-9800 0=2�joj EVERETT (425) 259-0817 FIELD REPORT TO: PREVIOUS No. 119869 - I DATF_ =� ERT. NO. 4 QrI30 PROJEr LOCATION 9-7 2-4? ffiaur,� 4_=A BLDG. PERMIT NO. 'q ryuj- CIO A X 0 J ILLL�,I-f - 6A It-, U-&4-4— ENGIN RECEI gL V :0 ARCHI ATTN: MAY 2 1 2004 CONTI (2) INSPECTION PERFORMED RESTEEL/CONCRETE — RESTEEL ONLY R EUMASONRY — STR.ST[WELDING OTHER — STR.STIBOLTING (4) - I— D LOCATION (AREAS) A, A 0 L.0 r\' TEMP. AT AM AT PM V., e. q (3) ITEMS INSPECTED — FOUNDATIONS FOOTINGS — SLAB — AUGER CAST PILES — COLUMNS DRILLED PIERS — WALLS — BEAMS (5) CONCRETE/MASONRY MIX NO. DESIGN STRENGTH (f'c) SUPPLIER TOTAL CU. YD. PLACED SLUMP (INCHES) SPECIMENS CAST AIR CO SEE CYLINDER REPORT NO. YES _No ITEMS INSPECTED WERE IN CONFORMANCE WITH BLDG. DEPT. APPROVED PLANS N\44% enk ct C LA -,.- REMARKS: D TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S). NAME(S) PRINTED BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY. INC. INSPECTOR SIGNATURE REVISED 8/00 SIGNED BY COPIES TO:-=_t� z 0 i 0 m -i -n M m 0 --lo 0 c: M M Z nL c M cl) 0 -n n m M 0 0 0 M cn cn M 0 Z z cl) z 0 m RECEIVED SEP 12 2004 DEVELOFIAENT SERVICES CTR. CITY OF EDMONDS 11644N.E,80thSt, Kirkland, WA 98033 (425)828-4117 FAX(425)822-1918 8101 S.W, Nyberg Rd, Tualatin, OR 97062 (503)692-8127 FAX(503)691-0517 Height Calculation Worksheet Address: Date: L ector(s): Isp 1. Datum Point: zrx��-\ z 2. Datum Point Elevation: 0 M 3. Average Grade: 0S. + 5 .)d-b. CAO .4. Maximum Elevation Allowed: averagdgiade)`­2 0 IM C 0 M 0 5. Reference Point Elevation Shot to House: 0 0 C C� 0 6 (datum elevation) + b (grade to transit level Une *shot to house) M z ID 6. Measurements from line shot onto house to roof ridge: C z -4 W -n o x M M 0 0 M C 0) 9. Cn QO Z > z 0) Total z 0 -i 0 M 7. Actual Elevation: �1'4 (reference point elevation . (measurements from #6) i-clu. I Conclusion: (actual) is greate --Ws th*n (allowed); therefore the house is/ is not over the height requir=ent-ptr�ECDC 16.20.30 requirements J�JAH 2e '04 04:33PM PIPER JAFFRAY INC CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The pmject at ur)der building —T— reqi lnsp�ction and/or testing per UBC Chapter 17 permit number =E-111-71 uires special i and WAC Amcndincnts 1702. The comEpLete list of special inspeebons is anaciiid to tb�is document. BEFORE A IFIERMT CAN BE ISSUED: The owner and contracto� and special inspector shaU completo th�.s aqeernent and the attached structural test(s) and inspections schedule including the requirW acl=owledgments. AP . PROVAL OF SpEcLAL ][NsPECTORS: Each special inspector shall be approved by the Building Official nor to pexforminsapy.duties or tions. Each special inspector shall submit 1? . I' Special inspectors shall display statmwt a*,. cations to the uilding Official r review. identification W Pen p3efforrami special inspections on site. Special irispection and testing shall meet 1_ the minimtx,71, requirements of 6BC Chapter 17 and the followiiag: A. Duties K Ic-smial Insp"J." 1. Obse.:,-ve Work The special inspecto, shaU observe the site work for conformance with the approved (staquyed) plans and sp�cificatiO]15 and applicable workmanship provimons of the 'UBC- Architect or Eqineer reviewed shOP drawings may be used only as an aid to ftispection. �pec;ial inspections are to be performed on a continuous i basis —meaning that the special �nspector is on site at aU times observing the work requihng s ecial inspection. Periodic lasp--ctions, if any, must have prior approval by the Ciry,bas on a separate written plan revi,:iwed and approved by the B Official and the engmeer or architect of:record. 2. Izepurt Non -conforming I!ems The special inspector slall 'bring noncontomung items to the ir=ediate attention Of the contTactor and note all such items in the daily field rqport. Any item not resolved in a timely mai r mr shall be immediate cause of th.e special inspector to nott fy the Building Official of the plau deviation error, change or omismon. it sliall also be the duty of the special inspector to proij:-,ptly noti?y the engineer or architect- 3. Complete Daily ReporU Each special mspector shall c!ornplete and sign both the special inspection record and the daily rcporl form for each day's insp=tion. These records shall ren�ain at the jobsite with the conT.r3ctor for review by the City Building Inspector. 4. Furnish Weekly Reports The S rgaicy shall farnish the City with weekly reports Of tests pecial inspector or inspection ag and ir�ecfions. The jcr_t engimeer.or architect, and others as designated shall also be copied on repo:rts, WeelTy reports must include the following: Des -ription of daily im-ipections and tests made with applicable locations r List of all nonconforming items it Report on status of noncoaforming items (rcsolvc4 or unresolved) Iteft-tized changes authorized by the Arc�hitect, Engineer and City if not included in nonconformance items S, Fum.jjh Final Construction Repoirt rhe ")Ccial inspector or inspeCtIonagency shall submit a final signed report to the City stating that --;I itcms requiring e4ial inspection and testin were fuffilled and reported. And, to the best'.-,f his/her knowlelge the pro)-ect is in coNormance with the approved. plans and and the applicable worlananship provisions of the a-pecl. I sations, approved change orders TIBC Items not in conformance or unresolved items or any discrepancies m impection 'cove!�,:Lge, (i.e., missed inspections, pe-liodic inspection when continuous inspections were reqm-,A, etc.) shall be specificAly itmnized in tl�s report. / Z 0 i 0 M q U5 M C 0 M 0 --j 0 0 C --j K X M M Z 0 -ri n M M 0 U5 0 r- 0 M C: cl) 9 Cl) M 0 Z 3: Z 0) Z 0 1 0 M �04 JFJAN 28 - '04 04;-f3PM PIPER JAFFRAY INC /10 ReSIDqnsibilities I. Notify the Special ]Inspector It is the duty of the contractor to notif� the special inspector when work is ready for special jiispection. Note, the items listed on the atwhed schedule md as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at thejobsite. 3. Ret;ain Special Inspection Records Tile contractor is responsible to retain 'at the jobsite all special Inspection records submitted by the special inspector. These records are to be provide6to the Ciiy building inspector upon request- C, Cit, 9; E dMoults_Bnading Delp uument onsihilifies 1 - A0101rOvc special iDWOOrs Or iUWCtj0n agencles %c- building department sball approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports ectors, shall be Work requiring special i ti n and the performance of special insp �-6%tained prior to .Moliatored by the City BuiiTdingolnspector. His/her approval must b placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue CertUicate of OccUP2ncY mpancy after all weeldy special inspeWon The Building Official may issue a Certificate of 00 reports including the final report have been, submitted and accepted. I owner Rupan-gNiffies 'ne project owner or the engineer or architect of record acting as the owner's agent shall fimd special inspection semces. E. Engineer 0 ect ol RgcQrd Rftlionsibilitta The enginecr or a hilect of record shall include special inspection requirements on the plans and specifications. AC]KNOWLEDGEMENTS I liave rea� and agree to comply with the terms and conditions ofthis agreement. ate, r- Owner---': Date Special Insp6ctor Ge'neral Contractor ---.Date I lav I C�� City Building Offici ; bp z 0 i 0 M --i -n C M M 0 0 0 0 C: --I K X M M Z o -n n M M 0 V5 0 r- 0 M C Cn 90) M 0 Z z z 0 i 0 M ol/26/ j7CIRRA ASSOCIATES 'JAFFRAY W1 1111 / P .10/19 P. 3/4- L�4 B, - Cori tax-ReanGaMin 1- Notify �hv Spm:W Wpector Ic is the duty of the con=ctor to votfy the spccW inspector when work is ready for special m . spect= N.ote, the ite= listod cm ft armched schedWe =d as noted an thr, approved plam md speaffic-ations art, required to have special in4wduns. -Mequate notice sball be pravided by thz conft-4ztar so dia ffie special idspector bas timc to become &milim with tht proi ect. I 2. Pro�ideAocaGstuAPproved.Plabs; The- con=mr is�re4mhsiblc for providing the 4mcial inspector accew to appmved plans at 3. Retain SpecW Inq9tfiam Records r is iosp=ak io retain at the all 'al r& 'ttnd 710 ccutuft apm 1nspccWm rcoo submit— by-�ht speeW inspeaftT. Ilese records to provide6w the City building in�or upon -C.- 1 'Apiprove spedal impeciers or laqwfim agendes rf&� - traildirtZ dcpzrtmfmt slmll aMrove &U qxcial iWactars and special inspccucu, I 'Moy.ftor spedid ln�pection and 2ppro" wmkbr reporU Work on =d' 1b 0 of SPCCW iaspecA= da be e TV-"fouer4aa=npcpDiroYaJ must be )jAajnrA prior to inomE! 7bidn'ighe&P8itya1B Inspeepr. 4 pla�czncnt o ctmcmte or other shilar actvifics in addi6�n to tha of the spaial inspector. 3- Issar. Cerd9catc of Occupancy The Building Official 4 _;nay ism a Cxrd&-afc of Occupancy after all Wa4dy rpeoial hzs�oll rqports tacluding tbg ft,19 rq)oft bavc bom xubmifted Rnd aoMted- The p�ajcct owrw ar fbe enginew or architca of rteord acting as the owner's agent ahall fimd special inspection Gem=. U, a z M. (07 TO 1 11 T. q, -671 M.- 17 1 i f ; ACKNOVUXDGMENTS I h a ve.ry ad and agree to comply -Kith. the I erw an d co n dido = ofMis agr" M 014 Special lnspec.i- CA Cx==;a C*wractor City BWldirg O�ffi / / 2- FI/O z 0 i 0 M =i =n- 0 M C M 0 0 0 C: M M Z 10-1 C lcng o -n n M M 0 -Cn 0 r- 0 M C (n K Cn M 0 Z z z 0 i 0 M 0 2jAN 2e 104 04:34PM PIPER JA::*FRA'Y' IMCNG r.Lrr-m j;�-rnr,, 425-823-2203 . .-I P. 9/10 - 2 3. NOWTOm speda Inspector of the conw it is the duty notitr dm q3=11 inqxctar whm work is juuW fbar special on. 140tc, the iu=s listed on the UWcj=A sc�atule Aa as noted on the approved invecli all be pl= and specificafi=s are required to b;Lvc specil) h1S1=tiOns- -Adequm notice sh, providod by the conawtor so that The specW iaspecuw has time to become familiar with the projccL 2. Provide Acmv to AIPPrOvCd PIMIMS Tb,a conmgw is rcqxwhiblc far roviding tho special inspector amm to VPTuvcd plans at thcjobcite. 3. -Re"iR Spe4aj Inspeakm RKOrds b m's ne conmetmr is respowiNe ic retatm At the MtO aU pection rec"& svb=itttd by the special hmpoclOr. TbW recards are toj� pmvidasd9teo"the City building ins� UPDn C- city I. ApProve Wedw imspedors or bxpwtias acendes d spwzial inspactioxi 7he building dqmrftmcW Ghall awmve all Speew inqloctolrs an reqau=Pt=t& 2. r4oQjUW speaW jUjpv . eCign snd *ppro" wnkly reparts shall be umng zpc�iai tion and the 1O=acsd Wqrk rcq prior to ;namtcmA b tbit Cit)r =usz b y the Special inSpedDr. plw=cnt of concrete or Other Ui6211a ktivities in addition to that of 3-' LL&ur CertWacate of Oc"PASeY a Catfic&w of O=paucy after all We&1V %I&Cial inqx=fiGn Mhe Building OIScW t"y lqsuz repoms Mwjxj� ft fasl report bave begn albaniTtod and 300epted. D- Tic P�Ojact owner or the engmeer or zchj�w of rccord acting a the owYmes agent shaD fimd Spernal. inspection zeyviccs. CWS ou the plans and The rmg6= Or arewlect O:f r�� xW in4ude specW inspcefion rcQu=m spcciraczxions. AcXN()WLMGEMENTS I haw read and agy= (o comPtY wiMAD INNU and condidow of thil o'gremmen't ow=---� - P spe�:ial InspCetor <:k=Cj-4 VZ g z 0 1 0 M =i 9 rn --i 3: M C M 0 0 0 C: M M Z 10 --1 C: —Z 3: 0 -n n M M 0 —0) 0 r- 0 M C CO 9 Cn M 0 Z ;U z --I M C/) z 0 i 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE__8/,,e 111 PI EA E SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT 1,4 SITE ADDRESS 7 2--49 AIA t tlL S 7- PERMIT # 2-0!2 �- —O)Z(I)&! ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED o Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES c3 Copy of CORRECTION NOTICE given to owner/contractor by inspector 1 . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date ocaprv1.doc.1:temp:b1dg:fbnns 10/01 Sign. z 0 1 0 Zi =5 0 M C M 0 C) 0 C: --i K 3: M M Z 0 n ;d > M M 0 0 M Cf) Q Z X --I r z --i X 0) z 0 q 0 M I 1� n RECORD OF INSPECTIONS INSPECTOR DATE APPROVED ETBACKS ..................... V> FOUNDATION: Footing ...................... Wall .......................... vv-) Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In .................... Commercial Final ...... HEATING: Gas Test .................... n S Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... n- FRAMING ........................ M Tz, <� FIRST FLOOR FRAMING ... 7 7- INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. SUIe Sewer fe'_ Amout Paid --ONO I 3Mk Usued— WaterMeter,c,.*::, AmountPaid—,.. Date PurchnsCC P oc-/ .owe A m o u n t Date L z 0 i 0 M -4 -n M C M 0 0 --I (-) 0 C M M Z 2a); o -n ri M M 0 0 0 M C: C/) K cn M 0 Z 3: > z 0) z 0 M