Loading...
20040126.pdf�All�kimlm,iiLS Aw(j DATE RECEIVED/_ CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNERNAM Aglow International @ Edmonds office Bldg. MAILING ADDRESS 131 2nd Ave. South CITY ZIP TELEPHONE Edmonds NAME N/A ADDRESS CITY ZIP I TELEPHONE NAME Smith Fire Systems ADDRESS 3813 168th St. N.E., Suite 1 CITY ZIP I TELEPHONE Arlington 98223 P60-651-7701 STATE LICENSE NUMBER EXPIRATION DATE CH7 SMITHFS1360T 11-02-2004 PROPERTY TAX ACCOUNT PARCEL NO. 00454800102300 NEW RESIDENTIAL AUDITION COMMERCIAL REMODEL APARTMENT REPAIR GRADING CYDS DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN [:] PLUME31NG / MECH F1 COMPLIANCE OR CHANGE OF USE SIGN FENCE ( X FT) OTHER RENEWAL NUMBER NUMBER OF CRITICAL OF DWELLING AREAS UNI' NUMBER o STORIES 2 DESCRIBE WORK TO BE DONE )I Relocate existing sprinklers and add new Isnrinklers to accomadate the tenent HEAT SOURCE GLAZING % LOT SLOPE *6 PLAN CHECK NO: 0 1 -5— 1 VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS uj PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION "APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY 0 F -j 2 EDMONDS. WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND cc 4 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE a DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE -j 0 NOR LIMIT IN ANYWAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT ' AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION. AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27 SIGNATURE (OWNER OQ�G �T) DATE S)INED USE ZONE JOB ADDRESS PLAT NAME/SUBDIVISION NO. PERMIT EXPIRES PERMIT NUMBER LOT NO PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRED DEDICATION— FT METER SIZE LINE SIZE-7 NO. OF FIXTURES I. SUITE/APT1f LID NO. LID FEE $ TESCP Appfoyed 0 AW Permit Required 0 Street Use Permit Req d E] Inspection Required 0 Sidewalk Required 0 Underground wifing required 0 PRV REQUIRED YES 0 NO 0 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ENGINEERING REVIEWED/DATE cc uJ z z E5 z uJ FIRE REVIEWED BY DATE w 01 cc 2,3 -- 0 Y VARIANCE OR CLI SHORELINE OR ADB#1 INSPECTION BOND REO'D POSTED I 0 YES 0 No SEPA REVIEW SIGN AREA HEIGHT � ... EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I , , LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR z E z PARKING LOT AREA 1 PLANNING REVIEWED BY DATE Ix -j REO'D I PROVIDED REMARKS CHECKEDBY ITY _T,VSTP,UCTION 9 Cgp�� OCCUPANT GROUP 45 SPECIAL INSPECTOR OCCUPANT REQUIRED JAREA LOAD REMARKS C3 z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 5 VALUATION FEE �E PJ.A� BUILDING GRADINGIFILL STATE SURCHARGE REVIEW FEES rMaIN'SPECI ION FEE L LANDSCAPING S r,NSPECT,ON FEE P RECEIPT P PL LAN CHECK DEPOSIT ATTENTION %.- IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI. CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 5/98 RECEI To rAL AMOUNT DUE CALL FOR INSPECTION (425 7 71 - 0 2.) 2 0 EXT/333 771-0221 FAX APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid.and receipt is acknowledged in space provided. ;7FICIALS SIGNATURE DATE (Y �. So, o 0 -2 3 -0 V- PLEASED BY DATE V-f1Ah141W,,1 5ell %e� ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR z 0 A 0 M :q =5 C0 --A 0 M C M 0 0 0 0 C: rn M Z —z x Cl) o -n n M M 0 0 0 M C Cn F, Cn M C) Z X z Cl) z 0 1 0 M '*1 .. m CASCADE TESTING LABORATORY, INC. TESTING& INSPECTION/ ENGINEERS 120 1 �8 - PREVIOUS No. 12919 N.E. 126TH PLACE I KIR K LAND. WASH I NGTON 98034 (425) 823-9800 EVERETT (425) 259-0817 REPORT No. DATJ� CERT. NO. 0/1 CS L� 2. 9ts' FIELD REPORT PROM g::�V Li LOCATION k,-23 2,A TO: pq� e, BLDG. PERMIT NO. ZW4 — EA Q-s' OWNER WEATHER TEMP. AT AM AT PM ENGINEER C_ -WR—CHITECT ATTN: — t-,% 7ONTRX)OR (2) INSPECTION PERFORMED (3) ITEMS INSPECTED FOUNDATIONS RESTEELICONCRETE R�ETEEL ONLY — FOOTINGS SLAB 'TR RESTEELIMASONRY STR.STfWELDING — AUGER CAST PILES — COLUMNS OTHER STR.ST/BOLTING — DRILLED PIERS — WALLS — BEAMS ^A�InKl 1ADrAQ% �w (5) CONCRETEIMASONRY MIX NO. DESIGN STRENGTH (f'c) SUPPLIER TOTAL CU. YD. PLACED SLUMP (INCHES) SPECIMENS CAST AIR CONTENT SEE CYLINDER REPORT NO. —YES —NO _ ITEMS INSPECTED WERE IN CONFORMANCEWITH BLDG. DEPT. APPROVED PLANS REMARKS: ef ocfq\.P- 'j k 0 rs c_j AA ct, L�3 ekltl �%"I -3, C-A_ N%, 3�\-) k , W-7� TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S), NAIAI�E(S)l PRINTED BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY. INC. INSPECTOR SIGNATURE REVISED 8100 SIGNED BY z 0 i 0 m -i -n F) --I 3: m M 0 0 -40 0 c: M M z c —Z cn 0 -n n m M 0 C-1) 0 0 m c 0 c cn m 0 Z > z cn z 0 0 m FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: -FIRE DEPARTMENT DATE. J PLEASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT JALt-/ IAZ72�-]&A,114 SITE ADDRESS- 'q /' 0 /00 PERMITV -60q—d('2,(,, ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED 5P(L1,k_Le:r(z LA"Q(24:� A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbmis:ocaprv1 3/25/04 z 0 1 0 M --I -n M C: M 0 --1 0 0 C: --i K M M M Z 0­1 C: U) 0 _n > M M 0 0 0 M C: Cn F. Cn M 0 Z 7-1 M z ---I U) z 0 --i 0 M W a M OMMMMMMMUMMME M ' MMM (Cttp of (lb onbo (ttrtt'r f tat�t�' etttv all tp DEPARTMENT OF BUILDINGS PER UNIFORM BUILDING CODE SECTION n, AV At: 1232 4uth #100 Buildin ermit # 2004-0125 0. Occupancy established by this ceri ficate: Dwelling Units: **N/A*** Stories: 2 4111 B Type�of, uction: II-N1 Sprinkled Basement: No Maximum occuMnt Load (Per USC 1002) Roor*apaCjtyV'LSjg S, . -times. ustr6main posted at all Owner of Building iteA' W'i line, WA 98177 ,The - Agloi�v Intemational has bee d art requirements of the 1997 Edition of the Uniform Building Code as adopted by fo the y and the use for wh - Occupancy Is classified. F �ch the proposed Issued this 293i� 2004 SWIEF BUILDING OFFICIAL BY: This certificate shall be posted In a conspicuous public area and shall not be removed, mutilated or obscured and shall b in legible condition at all umes. Any change of occupancy or use requires a building permit and a now Certificate of Occupancy Issued by the City of Edmonds Building official. It 00o sees 00006100''Was see assess, W, - - - ------- ------ -------- ---- -------- RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... ------------ Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... ------------- MISCELLANEOUS .......... 9 FINAL Q---"hh--6r- .................. 60mo,_ tow d90*0fZb IoWrpol*(�MeelL z 0 w, 0 M M M 0 __10 0 C M M Z n, C2 0 -T1 n M IT! 0 0 0 M C (1) 9 Cn Q 0 Z ;U --I 3: z --I 3: W z 0 0 IT!