Loading...
20040134.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BUSII�JESS S T-C— \� G \0 0 0 6 L- 1) S MAILING ADDRESS C\ CITY ZIP TELEPHONE C�)Mot,)Ii)S %o& NAME l'- U W ADDR SS CITY ZIP TELEPHONE NAME 0 Gj tj ADDRESS 6 k-� \ o Z' Y-N t_'S CBL 0 if 6, I 1W I I PERMIT EXPIRES 1211 USE Z E ON PERMIT NUMBER JOB ADDRESS SUITE/APT# PLAT NAME/SUBDTVISION NO. LOT NO. LID NO. LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP IESCP Apotoved RW Ptirmil Rocitmed Street Use Permit Roq'd EXISTING - PROPOSED inspection Floquifed Sidewalk Required REQUIRED DEDICATION- FT Uode(ground Wiring requirud METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 13 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE �� eW, R)12, (:;ItJAt-, iW7FT?-,il0t�3 ONWI-t5 FIRE REVIEWED BY V CITY ZIP TELEPHONE 1. VARIANCE OR CU SHORELINE OR ADBN INSPECTION BOND STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY POSTED *To W Ncv--" 'ROPERT)�TAX ACCOUNT PARCEL NO. X DATE 4t&U4L(:""!a' El NEW RESIDENTIAL PLUMBING / MECH ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR GRADING CYDS FW x I Os FT) A -- DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER z CARPORT ROCKERY FIRE ALARM (TYPE OF USE. BUSINESS QR)ACTIVITY) EXPLAIN: rx 0 in uj 0 M NUMBER OF NUMBER OF DWELLING CRITICAL AREAS 0 STORIES C-42- UNITS NUMBER(!�)/ DESCRIBE WORK TO BE DONE wo 10 �ev-j L f\ V'x i'_1 6' nilz-w 'A ce) k e:� Y) LUA\ 6koll HEAT SOURCE I GLAZING % I LOT SLOPE % PLAN CHECK NO: I VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO L_ BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE :3 SEPARATE PERMISSION. Ui PERMIT APPLICATION: 180DAYS PERMIT LIMIT'. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS U) W IN INTEREST, AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS THE CITY OF _j EDMONDS. WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIREC RY OR INDIREc rI.Y FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT HE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CHYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION x I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION ' THAT THE INFORMATION GIVEN IS CORRECT; AND 'THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THEOWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Ui z z a z Ui uj cc U: II OYES ONO S SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I , I LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE REAR C3 z 2 z PARKING LOT AREA PLANNING REVIEWED 13Y DATE 15 REO'D I PROVIDED I I CL REMARKS CHECKED BY PF CONSTRUCTION CODE OCCUPANT ITYPE Z5�j 1477 GROUP SPECIAL INSPECTION OCCUPANT REQUIRED [] YES JAREA LOAD REMARKS z PROGRESS INSPECTIONS PER UBC I 08/11FINAL INSPECTION REOID a M VALUATION Description FEE Description FEE Plan Check State Surcharge Building Permit City Surcharge Plumbing Base Fee Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapeinsp. Total Amt. Due Recording Fee Receipt # CALV APPLICATION APPROVAL I his application is riot a permit until signed by the Building Official or hisitier Deputy: and Foos are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S CAjf,�,� �SqN INSURANCE AND RCW W 27. FOR INSPECTION receipt is aclinowledged in spacu provided QFFICIALS SIGNATURE BAT E T) DATE SIGNED 'z (425) Jb tkk&� L 771-0220 Fj:IFAFfD BY DATE' A17ENTICIN EXT 1333 7 IT IS UNLAWFUL TO USE OR OCCUPY A BU!LDING OR STRUCTURE U14TIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 09/03 PRESSHARD-YOUAR MZAKIZ4COPIES ORIGINAL - FILE YELLOW - IOSPEC*O PINK - OWNER GOLD - ASSESSOR z 0 A 0 ITI -i -n 0 M M 0 0 0 0 C: M M z o -n n M M 0 0 0 M Cn M Z 7-1 z --i X Cl) z 0 ITI NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. . 131 9 a J 710 ed Q00m. Q-Y-OaM DNIU33NISN3 Ag Wa (1310N QV -l:!A0Hdd\j )JDlNnoollNH3d qv?,L's WOZ 83i .49#01 'M V-7- Cl A DO 3 N I-xa <Na T- -sc, IK rc, yj U E t108dd 03 ^-Ica xboh ISO �, d3G ON SCjj�oj ir 3 jo Al" -:--4 LL LL I I C3 kl)� k�Vv Q-1 -�53 v a-75cl'A-e iC-,4 "nyrl'5; HMO P X.--3 ���Nj 17V do= 711 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. cm Lu Z: c" 5 M W LJJ LE Lu FIN AY, PROJECT APPROVAL FORM. TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE--------- k�,01 -, -4MJLaL—ENGINEERING DIVISION DATE nZA= SM " PLANNING DIVISION DATE-------� z PROJECT =-n SITE ADDRESS --I PERMIT ADB#--.DATE.INSPECTED 3: M M 0 --10 0 DESCRIPTION OF W ORK TO BE INSPECTED Z�L /I --i A field inspection was conducted to determine nnal compliance with.approved plans. Final approval a: M M z JO --i C: -2 denotes that there are no objections from the above signed Departm ent to the release of > PERFORMANCE BONDS and the granting of:,. 3: Cn 0 -n A ;d GRANT FINAL PROJECT APPROVAL > M M 0 ui 0 r- 0 M C Cl) K Cl) M C) Z r- i M GRANT PROJECT APPROVAL WITH COND MONS NOTED > a copy of CONDITIONS given to owner/contractor by inspector a: z Cn FINAL INSPECTION - OUTSTANDING ISSUES z 0 FAMED a Copy of CORRECTION NOTICE given to owner/contractor by inspector. M 2. 3. R.E_]NSpF - GRANT FINAL PROJECT APPROVAL ,CTE Date D OUTSTANDING ISSUES Si ocaprvl.doc.l:temp:bldg:formsIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Z, 0 Slab Insulation .......... 0 M PLUMBING: Underground ............. Rough -in ................... M M Commercial Final ...... 0 -10 0 HEATING: --j x M M z Gas Test .................... C Gas Piping ................. Equipment ................. Commercial Final ....... 0 -n n EXTERIOR SHEATHING 3:9 M M NAILING.......................... 0 FRAMING ........................ 0 0 M C FIRST FLOOR FRAMING ... (n M 0 Z INSULATION ................... ;U Floor Insulation ......... Wall Insulation ........... > z Ceiling Insulation ....... SHEETROCK NAILING ... Fn z 0 SPECIAL INSPECTION ... M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 0 A4w ot 0