Loading...
20040171.pdfEIVID CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BUSINESS roo .5A�a MAILING ADDRESS w z 0 CITY ZIP TELEPHONE -7 -.7 NAME ,P,e 5 / ii� i'l Z--.,),,,? -, ADDRESS CITY ZIP TELEPHONE NAME C, cc 0 ADDRESS 1wit z CITY ZIP TELEPHONE ",-*.7 di 0 L) '7147" �'�2 STATE LICENSE NUMBER EXPIRATION DATE CHFLIQ By 0A1 //Ott? 16) /,2r_v_4) PROPERTY TAX ACCOUNT PARCEL NO. w -1 7(n4;,4/ff.-Cv1 —00 kt-- 0C) _j cr" NEW RESIDENTIAL PLUMBING / MECH ADDITION C:] COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL APARTMENT SIGN REPAIR QRADING FENCE 30-p?w CYDS X FT) DEMOLISH E] TANK OTHER Z GARAGE CARPORT RETAINING WALL RENEWAL ROCERY 'PI (TYPE OF USE. BUSINESS ORACIIVITYI.FXPLAIN: 61 NUMBER NUMBER OF CRITICAL 0 1:0 OF DWELLING AREAS 0 STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE f PERMIT EXPIRES L-/,; I USE PERMIT ZONE 2-- NUMBER zz JOB SUITE,tAPT# ADDRESS 14, P5LT NAMEiSUBDIVISION NO, j LOT NO 7 LID NO, 4,9, Q LID FEE �� $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Ap Proved AW Permit Required Street Use Permit Red d 0 EXISTING PROPOSED Inspection Required X� silewall, Required 0 REQUIRED DEDICATION FT Underground Wiling required 0 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED p Z_ YES 0 NO 0 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE otL rj A L_ li� VV #A I i V. 11 C ft 11i - 1111-111t x. ._u Irm 114,11 q I c " 0) *Y<, ii T- NE ENGINEERING REVIEWED/DATE //A Wk Il FIRE REVIEWED BY DATE a z FE LU z z a z w w Cc LL VARIANCE OR CU SHORELINE OR ADB# INSPECTION BOND R EO'O POSTED I YES C040 SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED I , 0 2."!5' ZS' EXP LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJRSIDE REAR 2- z 2 z PARKING LOT AREA LANNING REVIEWED BY 6ATE REO'D I PROVIDED 2- 1-7 ;;7 CHECKEDBY IT CTION E OCCUPAK 4%d AA I GROUP YPE OF CONSTRU h �TEE 7SPECTOR JAREA OCCUPANT "' v r 1 C17 ArRPESPECIA N C1 QUI ;0 Y OUIRLED14 YES LOAD 1-JU HEAT SOURCE GLAZING % A9 T SLOPE 0, `;Z5 ga- 1 1 li,ii 23,71;0t_��- PLAN CHECK NO: VESTED DATE 5 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. cc PERMIT APPLICATION: 180 DAYS LU cl. PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION En "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS U) LU IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF _j m EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND cr ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 01 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' x I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT: AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S 50WP\NSATION INSURANCE AND RCW 18.27, SIGNATUR VWN� �Olcl AGE T1 DAI. E SIGNED REMARKS PROGRESS INSPECTIONS PER UBC 108/171NAL INSPECTION REO'D VALUATION FEE PLAN CHECK cEE z:zA6 BUILDING Z-70 zi PLUMBING MECHANICAL GRADINGIFILL 1 170 STATE SURCHARGl)i ENG. REVIEW FEES Z, r-7 ENG. INSPECTION FEE .I,ANDSCAPING� e IN_,SPECTIOLN.FEE - -[, PLAN CHECK DEPOSIT RECEIP3 _.� Cis RECEIPT A17ENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 'OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 TOTAL AMOUNT DUE CALL FOR INSPECTION (425) 771-02220 EXT 1333 771-0221 FAX � I f 17- -5,0 1Y APPLICATION APPROVAL This application is not a permit until signed by the BUilding Official or his/her Deputy: and Fees are paid. and receipt is acknowledged in space provided. OFFICIALS SIGNATURE DATE V11) 4311le Z/ —1 REL� DAT E IibINAj-.�f1_E - YELLOW. IfiSPEjTOR V PINK -`QWNER - GOLD -ASSESSOR 0 Il z 0 M -i -n M M 0 -10 0 (= --I K 3: M M Z _z o -n n M M 0 0 0 M Cn M 0 Z z z 0 i 0 M 4- /p/ 7 5 c 12 0 4, ot? L4 o, �2 lo, L/ e C2 .13 3 AO E IVED C-� 3 X, . 82003 1K)l C-3 Ov p lhiTr APPROVED BY FOOTING DRAINS NOT TO BE TIED INTO 00 DETENTION SYSTEM W 2,, U; Zat CD Cc PAW ui F- +:V0, 6 WATER & SEWER INSPECTIONS REQ'D r%Ai I A,)r,-771-nOr)n PYT 1'199 RECEIVIM, FEB 3 2004 PERMIT llff)l INTA z 0 q 0 m -n 0 rn c m 0 0 0 0 c m m z c 0 -n -n m M 0 0 In cn M 0 Z z cl) z 0 0 m RECEIVED k1a Phone ey- v 0 u- PERMJ C U� Lu 1441 #6" 7 Or Cu Oe c 4 424 II,- E� c A// zii/ CO cc c, 0--dre aa LU LU /y will re"la. im C-1 __j 0 m C.) z 7-0 -ta -ro�a 7 q -co e CK I cfj Lij tai uj Eb 0 cmc APPRDVED AS 4b -ENGINE�R ep C-) 0 cun) BY ING c C, 40 4e- tt K celer- 1 Date: L(J pil�e, Femce Co6 LS 6,1 �7, s -511�11 �1-1 9POSED SURFACES TO "b 0 0 ,Zd4--- "ene IYE VftM WITHIN 2 DAY��j r,Ale W 7 -T�l-1. zT. =r.: S i-; Uil) IN 3 "h, 0 ic-/ 5BL 3 Vv.)�44 11 R - 3;Kockerl n L . +- Zo FOOTING DRAINS NOT L_A!Ma TO BE TIED INTO A 12 7/ DETENT10fi., A" V r N 4119 -s/0 -7 Y Fle y A� a c I, c 0 Lu ID 3u:j c r- cr- (j) cn 6? In CID C) cr- 0 U1 Lu OUJ Flor FA? CL U) 3: SEWE T1JQ7 !i� CV LOT (TYFI 0, cN z;-I-) 0 IL LLJ 3",2 Hid Lu UG sT , PEE 12 in LO 0 z 0 i 0 m 3: M m 0 0 0 c: M M z ,c) M 0 -n 3: m M 0 0 0 M C cl) c cn M 0 Z z --I M cn z 0 1 0 m I Height Calculation Worksheet Address: ['CA(�s set Date: hWector(s): 1. Datum Point: 2. Datum Point Elevation: (L' 3 z 0 3. Average Grade: M .4. Maximum Elevation Allowed.� (avftgd giude) 25 U5 C* M 5. Reference Point Elevation Shot to House: M 0 -4 00 (datum elevation) + c� 54 (grade to transit level Hue *shot to ho se) =,3 U M, M z jo 6. Measurements from line shot onto house to roof ridge:' 0 M M 0 0 0 M C CI) r. CD M 0 Z z 0) Total (i z 0 0 M (reference point elevati 7. Actual Elevation t on) nensdremints' from #6) 2 3-D conclusion: (actual) is greater less t (allowed); therefore the house is/ is not over the height requiremen e CDC 16.20.30 requirements -F CE 0 0!1% Q oun 5(j deg 1 A F 7 - - Ut".. it Llhaifjw4s CC mIC6011 z 0 N.71 ".1ri Clapp 0 M 0) M C in the ui CXC iO rTj 0 M. il�(:Jz sr,)ils exposect tor foundations 1) Wine avat n. AtthelinW 0 0 ing foundation excavation and was building ari exit ramp rb- Lhe excavator, The &I coil wrier stakes or forms had not Vf,'( beeri 0 C j,,,Vei 'Denciles up to 8 feet high, Foundation ct S�tc Ila --I M M Z z %,(�Uo.ljy ri,ict �A,'trj - 1/2" dut%rerer. steel soil probe. Fof th-ri-lost :Yarz, diC ea -,tern half > tlamral, bard brown, sancly :�iit 0', - d. lse� maiii hous(�,, conslste.(l 01 ;,-4nrj tvas exposed in tlip- noruleast cornei -)T th C) -n -n at t was obse�V&d In tile WrIbWest 001-nel Of L e ex -a. 'Ita M M d bv approxim, jv 8� of loose, to rnediuni dense, -Lvet to Cn. 0 r 0 M C/) io -he Ora%T o-11. FU C/) 11:,al: material i)e rernoved from the ' oting area as well s f1h M 0 rued or approveci by us, aPI)earcd z ��-ay flij material was not documej -q r- . , - -)r not lip- Usea I -or rouncl2tioll sur port. �Iarl's ixackhcle operat( X —C be ollsite while dley w -re rer iving (tie tuilol f, -fflier at the end of 61C X .,sh�:d. Carl requested that I renirri > z cut 'it' nned Cn 11 to 0 Alll,!l J�,�f tilt - v"Ould ne-,-d try be benched Fic said the--t Woula IrIclude -4 V" 0 1 r n fhi� ,-C 1 i-c i-rcorninen6ed tat 'I �,QCQT'd Silt lellCe ile M .1 flaq, b-ctl il-, one t7,V RECEIVED MAR 16 2004 pEVELOPMENT SERVICES CTR- e CITY OF EDMONDS J'RjNC-'.l'AL I `.J r I E C P-miect No. Dale Proizct S;,,-.,c 3!10;T4 Avenue N%M Proverly KE03706A P4' 1,0canon hf'q A-1-le SUItc 11,K, Wa�hinup?n 9611S-� Kirkland, 18103 841' Avenue West d -sun LLI- !-AX -54Z-2 eport NtImbcr R 0-tv of Edulends T()- 7', i I —It I —W�I—r z T N C.C. fin 0 17 1 Et "r"S'T "C COns-, ructI0111 M 15rading S —ij j, 3: rn M 0', -10' 0 0!1�zillc early this ninminp to check on recommended additional foundation excavation. The comTactur had 0 C M rernoved the 00(j, fill -matelial tO CXT)OSe natural medium clense sand. The western. end of th garage clit M z -,-on tenche( nunended, Tfie southem lint: of the garage. cut bad also been sloped haclh. bad bf j. as reco C z > partially but vas, limited by the. stacks of 'footing form panels. Carl informed me that ihey ould slope Llit� cut Nack -ilere wele IninOt ftirther once. the panels liad beein removed. 1, �;aid that would be. impo)-tanc sin-�e I co cut Nv(,)uld help improve aroulld "v"ate-, daylighting at tile base of thc fill material and sioping the 0 -n slabillity. Tht� south-w-,,�t corner of t1if,- e%cavatiori apparently imericepted the rock at the base Of the silt -4 eand into the excavation. fz�nce. -whic'h provided a oath for last nighOs rainwater to drain onto the cut stop M M m I Xk, Oil Irit; Th;,, camed Onuohing, to occar, 'I'bf, contractor will need to prev,--nt surface w-ater fro f o ing Lo 0 f.. I that he he prqlarcd to cover all soils exposed W the .-Ice M of tbe cut slopt-,, Recommended to Car 0 C CD (,irary cul, slopes and stockpiles with 1,)Iastic sheeting to proteel. them frorn efosion. C C/) teMp M 0 Z Thl- holmni cxcavation located in the northwest corner still contained some loose soil based on evaluation orn S -1 that we needed to make another site. visit once the It'0061111 f I "vit", ti -tekl soil prohe. Informed Cal were in-nlace Ot t�e f00tiDq corner� staked. This ,vould alloIA, us to ctieck for loose of diSlul-bed 50ils z Conditions in the. aenial 1,16-undation areas and also to verify that footings were not LOO to the LOP of" tile culs, Cad that Nve could return later in the day. kc said that. would be cokay. Cn z 0 0 M A, 7 4EID r 1 1711. i,Rj NU Pikf- PNI: Jon N. Scindcrp�r� P, lq mi, 02 (1 1:� 7 5 Ll FIELD IREPC ,,T Ass*Qiated itiarth Scieiices, I n c Fipld Repon 3 page I of "Um 53f �;7 Pr tr -4-1 I I Prcqcw-,l Nurntior 911 F111h Avenue, Suitu 100 Kirkland. WashIngton 98033 425-82-1-7701 FAY .125-827-5424 Locatton Wo*thar BW; NU�7)j��T'� JL n nii-e r/ A ro 1) i z q 0 m rk 17 IN: A�,' RE0!_'FSTFT1, 1-3Y-r 0 M m 0 0 4,::; T E 0'. 0 0 c Ck r k p 4tN Ac in m m z r r 4� Jcy c z ,_;C- > cl) 0 -n -n 4L-� -;k4_ ITI m LL 4,Le 0 0 m cl) 04 co M 0 iv -tl,, ct4 F­ 'o�A 4��i d,-, s 0-�- 4-� /k�ibj co L' 40 6/1 0A > z z /4 0 Ld jvj�) "_e� m -71ON EQUIPMENT FIC (40MPAC. _D AREAS OF ADDITIONAL CONCERN: R EjC�E_1_V_E.D_ ADDITIONAL TESTS REQUIRED: YES L NO WHEREI___ DEVELOPMENT SERVICES ' C ' T13. CM-61"ED4006 ki i_-s 4 �3 Fl['�E) REP- F1 Q, R. Ij Repo;! :�obje(t tO -?v1PNY D� A�_�%�l Prc;:(,�ct Manai_ Qr RErPOPI of Fl��i'l Report 0 -1 e n c c pjq&�_t Numr)of r-----L Date Weather 1 03 F: i Ph M11 Bldg. f,srrtilt N �Q i A97 -77 1 J, z 0 -1 4, > Ll 0 Lj 76�— m cl) m m 'D, 0 0 c: r_1 M M z z > F— co 0 _n _n c4 0 c/) 0 m c c/) M 0 A z z cn z RE 0 O'CE I V E EY'" m �T U, r It MAR 16­200004"­ 'V1 FJ'I _TR' FELOPMENT SERVfCES C civ, I)EV CITY OF EDMONDS._ . YL- S -71 - --- --- - b CW� I jo re r- ,view by ;;u 1p C. is 9`3 CITY OF EDMONDS 121 STH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 * FAX (425) 771-0221 Website: www.dedrnondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning* Building- Engineering June 11, 2004 GARY HAAKENSON MAYOR C C Construction Attn: Carl Clapp 8415 192nd St SW Edmonds, WA 98026 Building Permit: 2004-0171 Site Address: 18103 84th Ave W Expiration Date: 3/2/05 Dear Carl Clapp: The purpose of this letter is to inform you that the last remaining inspection on your project is a final inspection(s). The final inspection(s) determines that there are no outstanding life -safety issues and approval allows the City to close your permit file. Th e City considers the final inspection to be one of the most important inspections conducted on a project. In order to grant final approval the following must be complete: smoke detectors, house numbers, guardrails, handrails, self -close doors between garage and residence, egress from sleeping rooms, safety glazing, weather-stripping, any Engineering department requirements etc. Of course not all of these things may specifically apply to your project but it does give you an idea about the kinds of things that must be complete as well as some items that do not need to be installed such as: paint, carpet, moldings, wallpaper, etc. Please be advised permits expire one year from the date of issuance. if you will need more time to complete the work, permits can be renewedprior to expiration for one half fees. If the permit expires without a final approval granted by the Building Inspector, full fees are required in order to renew the permit. This can be very costly to you and we strongly encourage you to check your permit expiration date and call for the required final inspection(s). Note: If more than one department is required to final your project, this is noted on your Job Card. Please feel free to contact me at 425-771-0220 if you have any questions. Sincerely, Permi oordinator Incorporated August 11, 1890 Si0pr Citu - Hpkinan. Jaoan Z I 0 q 0 M I mi .- M) Associated Earth Sciences, Inc. FIN December 5, 2003 Project No. KE03706A CC Construction 8415 192" Street SW Edmonds, Washington 98026 Attention: Mr. Carl Clapp Subject: Geotechnical Evaluation 18103 84thAvenue West Edmonds, Washington RECEIVED DEC - 8 2003 PERMIT COUNTER Wil Dear Mr. Clapp: senting the results of Associated Earth Sciences Inc. (AESI). is pleased to provide this letter pre This letter is -referenced address. our geotechnical evaluation of Lot 2 located at the above based I on our previous work at the site, the completion of three exploration pits, and our single-family residential construction. . This discussions with you regarding the proposed new for the exclusive use Of CC Construction, Mr. Carl Clapp, and his letter has been prepared atio to this project. Within the limitations of scope, schedule, and ic applic n agents for specif ted aeotechnical In h generally accep budget, our services have been performed in accordance wit s area at the time our letter was engineering and engineering geology practicesin effect in thi express or implied, is, made. it must be understood that no repdred: No other warranty, p f stable slopes. Our re ornmendations or engineering design can yield a guarantee o It I c identify and reduce the inherent risks to the Observations, findings, and opinions are a means to owner. The subject site was Lot 2 of a four -lot plat originally subdivided by Ivir. Orlo Fuller. Lot 2 cleared and graded for construction 0 square feet in area and had been I was approximately -14,00 s not built. The southeast quarter of the lot is graded of a previously planned house that wa ely down to the west and steeply relativeiy flat while the remainder of the lot slopes moderat down to the north. A 6- to 8-foOE-high cut into native soils occurs along the ea-st side of the lot tural fill. Current plans are to 1-.4 While the moTth-half of the lot has been graded with struc. portio , n - of the lot with a garage construct a house with a daylight basement on the central 1 3 constructed at the northwest corner of the lot. 911 Fifth Avenue, Suite 100 Kirkland, WA98033 Phone 125 827-7701. Fax -425 827-5,12, z P 1. , - AESI completed a geotechnical evaluation of the lot for the previous owner, Mr, Tom Pinkum, entitled "Geotechnical Evaluation, 18103 84" Ayenue West, Edmonds, Washington" dated May 22, 2002. AES1 also performed part-time construction observation of site grading activities as documented in our field reports numbers- 1. through 7 frorrijanuary 3, 2002 to May 1, 2002. These documents are attached to this letter. The current evaluation involved the completion of three exploration pits (EP-1 through EP-3) at the approximate locations shown on Figure 1 - Logs of the exploration pits are attached to this letter. The purpose -of the exploration pits was to evaluate the consistency f.jhq fj 1 11 or native soils exposed at the approximate foundation subgrade elevation for the new structure. Exploration EP-1 encountered native soil consisting of dense to very dense, moist, brown to gray silty sand at depth of about 6 inches below I existing site grade. Explorations EP-2 and EP-3 encountered previously placed structural fill to the full depths explored of 41/2 and 2 feet, respectively. Subgrade at the foundation elevation was evaluated at each location by hand probing with a 1/2-inch-diameter steel rod. Penetrations into the subgrade soils were less than 3 inches'"'under the full body weight of the observer. In our opinion, the subgrade soi . Is are suitable for support of the planned house foundation. The stope on the north side of the lot is approximately 10 to 12 feet high and primarily placed during the previous grading activities. The unprotected composed of structural fi slope has experienced erosion as evidenced by the occurrence of several I- to 2-foot-deep ruts However, on the slope face and the accumulation of transported soil at the base of the slope. the slope appedrs to be stable and we did not observe evidenc ' e of slumping or sliding indicative of slope failure. In our opinion, construction of tne new house will not impact the rovided the recommendations for erosion control presented in our stability of the slope p previous letter and good construction practices are implemented. Our explorations and previous site observations indicate that, from a geotechnical standpoint, the parcel is suitable for the p�6posed development provided the recommendations containe . d 9 herein and in our previous May 22, 2002 letter are properly followed. The bearin stratum is relatively shallow and spread.footiftg foundations may be utilized. We understand thatthe distribution of foundation loads of the two-story, wood -frame building will be typical; . no concentrated loads are anticipated. Consequently, foundations bearing on the dense native soils or structural fill bearimi on the dl-nse native soils are capable of providing suitable buildin- suppqrt. We recommend that an allowable bearing pressure of 2,000 pounds per square foot (pst) be utilized for design purposes, including both dead and live loads. An increase of one-third may be.used for short-term wind or seismic loading. Perimeter footines should be buried at least 18 inches into the surrounding soil for frost protection. However, all founded in footings must penetra-te to the prescribed bearin.- stratum and no footing should be or above loose, organic, or, existing fill soils. We recommend that AESI be allowed to observe tile fouiidation subgrade conditio - ns once the foo . tirig trenches have been excavated,'but prior to placing reinforcing steel, in order to -confirm that actual conditions are consistent with those observed in the exploration pits. Z 0 A 0 M M We are available to provide additional geotechnical consultation as the project design. develops and possibly changes from that upon which this letter is based. We recommend . that.AESI perform a geotechnical review of the plans prior to final design completion. In this way, our earthwork and foundation recommendations may be properly interpreted and implemented in the design. This plan review is not part of the current scope of work and budget. We are also available to provide geotechnical engineering and monitoring services during and, construction. The integrity of the foundation depends on proper site preparation construction procedures. In addition, engineering decisions may have to be made in the field that variations in subsurface conditions become apparent. Construction monitoring in the event services are not part of this current scope of work. If these services are desired, please let us know and we will prepare a cost proposal. We have enjoyed working with you'on this study and are confident that these recommendations will aid in the successful completion of your project. Should you have any questions, or require ftirther assistance, please call us at your earliest convenience. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington Jor�k. So�nde aard, P.G., P.E.G. Aidociate Geologist a JEXPIRES 2iZ7/?;��S�- G. Aaron McMichael, P.E., P.E.G. Senior Geotechnical Engineer Attachments: Figure 1 - Site and Exploration Plan Field Reports Exploration Logs Geotechnical Evaluation, 18103 84" Avenue West, Edmonds, Washington (Dated May 22, 2002) KE03700AI Projects\21003706IXEMT WZK 3 z 0 i 0 M LEGEND EP-1 N Approximate location of exploration pit A NOT TO SCALE REFERENCE: BASE MAP PROVIDED BY CLIENT. FIGURE 1 Associated Earth Sciences, Inc. SITE AND EXPLORATION MAP DATE 12/03 64TH AVENUE PROPERTY PROJ. NO. KE03706A K2J EDMONDS, WASHINGTON r C C .0.0 Terms Describing Relative Density and Consistency 0 Well -graded gravel and (2 L) SPT )blows/foot co 0 GW gravel with sand, little to qnsn!� 00 0 to 4 u- a) 0,; � no fines Very Loose r - 0 V Coarse- V) U. Loose 4 to 10 " (u 0 0 (1) M > 'ato 0 0 Poorly -graded gravel Grained Soils Medium Dense 10to30 > 0 a) %000000 Test Symbols .2 0 *C—n wo*o'o GP and gravel with sand, Dense 301o50 0 0 G = Grain Size IT 00000 K0 0 000 Very Dense >50 little to no fines 0 c) .000 m = Moisture Content 6 00.00. Z Z C'4 Z 0 g2nE!§� SPT(')blows/fOOt A = Atterberg Limits 6 ED c: Z U.) 0 Silty gravel and silty Very Soft 0 to 2 C = Chemical a r_ 10 0 ca (D GM gravel with sand Fine- Soft 2 to 4 DD = Dry Density .A 0 0 Grained Soils Medium Stiff 4 to 8 K = Permeability r Z Stiff .0 0 8 to 15 Clayey gravel and Very Stiff 151o30 U) >30 All GC clayey gravel with sand Hard -0 Component Definitions ..... Well -graded sand and Descriptive Term Size Range and Sieve Number Larger than 124 0 : " X .... SW sand with gravel. little Boulders ca to no fines Cobbles 3" to 120 0 LL 0 Gravel 3"to No. 4 (4.75 mm) U) iL Coarse Gravel Poorly -graded sand 3" to 3/4" M > 0 0 a) U) 0 SP and sand with gravel, Fine Gravel 3/4N to No. 4 (4.75 mm) 'a No. 4 (4.75 mm) to No. 200 (0.075 mm) a) 0 little to no fines Sand C 6 No. 4 (4.75 mm) to No. 10 (2.00 mm) 0 Z Coarse Sand 2 Silty sand and Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm) 10 U) sm with Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm) un silty sand 'd Smaller than No. 200 (0.075 mm) 0 gravel Silt and Clay u_ kul L? Ln Clayey sand and (3) Estimated Percentage Moisture Content sc Dry - Absence of moisture, ta clayey sand with gravel affgt!Lt� the touch Com 3onent dusty, dry to Trace <5 Slightly Moist - Perceptible Silt - sandy silt, gravelly silt, Few 51010 moisture 4) ML silt with sand or gravel Little 15 to 25 Moist - Damp but no visible > CD r_ With Non -primary coarse water Y) U) M F >' = I constituents: > 15% Very Moist - Water visible but C3 M -� Clay of low to medium not free draining Fines content between plasticity; silty, sandy, or 6 C: CL 5% and 15% Wet - Visible free water, usually Z M gravelly clay, lean clay from below water table (A tn E M _j P111A, U) U) u) *0 Symbols M -Ei. Organic clay or silt Of low a. .2 Blows/6"or (D _j OL plasticity Cement grout Sampler portion of 6* 0 surface seal 2 Type 0 Elastic silt. clayey silt, silt 00 OD Sampler Type Bentonite 2. Description seal with micaceous or Split -Spoon MH diatomaceous fine sand or Sampler 3.0" 00 Split -Spoon Sampler Filter pack with LO 0 n 2 silt (SPI) blank casing 3.25" OD Split -Spoon Ring Sampler section 0 Clay of high plasticity, ch 0 c) Bulk sample Screened casing -0 Ctj sandy or gravelly clay, fat 3.0" OD Thin -Wall Tube Sampler or Hydrotip m E clay with sand or gravel (including Shelby tube) with filter pack Grab Sample End cap Fn :2 Portion not recovered Organic clay or silt of (4 OH medium to high (1) Percentage by dry weight Depth of groundwater plasticity (2) (SPT) Standard Penetration Test ATD = At time of drilling (ASTM D-1 586) Static water level (date) Peat, muck and other (3) in General Accordance with M PT highly organic soils Standard Practice for Description (5) Combined USCS symbols used for R) M D-2488) fines between 5% and 15% 0 and Identification of Soils (AST Classifications of soils in this report are based on visual field and/or laboratory observations. which include density/consistency, moisture condition, grain size, and plasticity estimates and should not be construed to imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification methods of ASTM D-2487 and D-2488 were used as an identification guide for the Unifed soil classirication System. Associated Earth Sciences, Inc. ion Log Key Explorat FIGURE A-1 Z 0 4 0 M -1 -n M C M 0 0 -10 0 C --i ic :C M M Z C 0 -n n MM q 0 0 M C cl) C 0) M 0 Z Z Cl) Z 0 A 0 m M 01, OA CL CD LOG OF EXPLORATION PIT NO. EP-1 the named oject and should be This log Is part of the ire re Ion of this trench at the f pared by Associated Earth Sciences, Inc. (AESI) fc�,r a epo omp e interpretation. This summary y to the locap read together with th t r por'iT Ilets tiles on or c time of excavation. Subsurface condi ion may change at this location wit he passage of time. The data presented are a simplfication of actual conditions encou ntered. DESCRIPTION Wediurn dense, moist to wet, brown, SILTY SAND. Y I - Advance Outwash Dense, moist, brown to gray, SILTY SAND. Probe <1/2". 2 Bottom of exploration pit at depth 2 feet 3 4 5 6 7 U-4 8 9 10 12 13 14 15 16 17 - 18 - 19 84th Avenue Property E Edmonds, WA n Associated Earth Sciences, Inc. Project No. KE03706A Logged by: JNS November 2003 Approved by: ILVI IEJ CL U VA This log is part of read together with CL time of excavatio a simplfication of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 LOG OF EXPLORATION PIT NO. EP-2 the report repared by Associated Earth Sciences, Inc. (AESI) for the named project and should be that repoxfor corglete interpretation. This summary agplies only to the location of this trench at the n. Subsurface condi ilons may change at this location wit the passage of time. The data presented are actual conditions encountered. DESCRIPTION Loose, moist to wet, brown, SILTY SAND. Medium dense to dense, moist, brown, SILTY SAND (Fill). Probes <2". Bottom of exploration pit at depth 4.5 feet ------ —20 N 84th Avenue Property E Edmonds, WA 0 Associated Earth Sciences, Inc. Project No. KE03706A Logged by: JNS November 2003 Approved by: rM5:M a. z 0 !J 0 M COX M C M 0 0 0 M M Z� 10 C z > 0 -n M M 0 0 0M C W r, Cn Q0 Z ;U: M > z 3:- z 0 M LOG OF EXPLORATION PIT NO. EP-3, Nssociated Earth Sciences, Inc. (AESI) for the named ect and should be This log is part of the report repared by j Roni of this trench at the :S read together with that repoxfor complete interpretation. This summary %plies only to the loca CL time of excavation. Subsurface condi ions may change at this location wit the passage of time. The data presented are a simplfication of actual conditions encountered. DESCRIPTION Medium dense, moist, brown, SILTY SAND. Probe <3". 2 Bottom of exploration pit at depth 1.5 feet 3 4 5 6 7 8 9 10 12 - 13 - 14 - 15 - 16 - 17 - 18 19 0 0 20 Cq 84th Avenue Property E W Edmonds, WA 0. Associated Earth Sciences, Inc. Project No. KE03706A Logged by: JNS C1 November 2003 0 Approved by: 11 rR N U Z 0 0' M. co M: C M 0 01 0 C M M Zr C z 0 -n n MM 10 CI) 0 0 M C CA M 0 Z r- W z 0) z 0 I * 0 % . M I �'l ff'. Assotiatdd Earth Sclences, Inc. May 22, 2002 Project go. KE01732A' Lighthouse Cottages and Homes 55,4 Seamont Way - Edmonds, Wdshington 98020 Attention: Mr.. Tom Pinkum Subject: Geotechnical Evaluation 18103 84thAvenue West Edmonds, Washington Dear Mr. Pinkum: letter in As- requested, Associated Earth Sciences, Inc. (AESI) is pleased to provide this er is response to the City of Edmonds Plan Review #02-138 dated April 29, 2002.. This lett onitoring activities as visits to. the site -to perform �arthwork m based on our previous referenced in our Field Report Numbers .1 through 7, review of available geologic information, and an undated site plan, for the new home (Sheet No. 3) prepared by. Me lor & Associates. and Homes, Mr. use'Cottages This letter has been prepared for the exclusive use of Lightho cific application to this project. Within the limitations of Tom Pinkum, and his agents, for spe scope, schedule, and budget, our services have been. performed in accordance with generally ffect in this area at the accepted geotechnical engineering and engineering geology practices in e red. No other warranty, expressed or implied, is made. it must be thhe our letter was prepa understood that no recorrimendkions or engineering -design can yield a guarantee of stable slopes. Our bbservations, findings, and opinions are a means to -identify and reduce the inherent risks to the owner. 9 The project consists of.constructing a new single-family residence with gara e on a sloping lot, ashington. The approximately 14,000-square- located east of 84' Avenue West in Edmonds, W foot lot sloped down to the north at a pre -development. inclination of about 23 to 28 percent. ge of the Plans are to -construct a daylight basement on the north part of the lot to take advanta.., ion* of the lot. Site grading during the early the flatter, south port slope.with a garage on develop . ment of the lot removed existing., topsoil and vegetation to expose native, dense, brown, slightly silty sand with Some grave! over the entire lot. This material is interpreted to be 911 Fifth Avenue, Suite 100 - Kirkland, WA 98033 Phone 425 827-7701 -Fax 425 827-5424 z 0 q 0 M -4 -n. M C M 0 0 0 C M M z IC) -4 C _Z 0 -n -n M M 0 0 M, ic 0) M 0 Z X, �z --I Z' 0 0 M I Vashon advance outwash, which is consistent with the geologic mapping of the site as shown in the Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington by J.P. Minard dated 1983. Foundations for the house will typically be placed upon the dense native sand with the exception of the northwest corner of the house. At this location, previous grading activities exposed minor ground water seepage that resulted in pumping and soft subgrade in this area. Based upon the recommendation of AESI, this area around the northwest corner of the new house was overexcavated and replaced with 2 to 21/2 feet of structural fill consisting of 2-inch- diameter crushed rock. This material was compacted to a firm and unyielding condition suitable for support of the proposed house. Foundations founded on the dense native sand or soil bearing of 2,000 pounds per - structural fill can be designed using an allowable foundation square foot (psf). All foundations should be provided with a footing drain consisting of �-iiich- diameter, rigid, perforated, PVC pipe placed approximately 2 inches below the bottom of the footing and bedded in 4 inches of pea gravel wrapped in filter fabric. These drains should be separate from the roof drains. -M All roof drains should be tightlined to an appropriate and approved stor water conveyance facility. Storm water should not be allowed to discharge directly onto the site slopes as this may cause slope instability and erosion. To mitigate and reduce the erosion hazard potential and off -site sediment transport during construction, we recommend the following: 1. A rocked construction entrance should be provided. 2. Surface water should not be allowed to flow across the site over unprotected surfaces. 3. All storm water from impermeable surfaces, including driveways and roofs, should be tightlined to a suitable temporary storm water collection system and tightlined to an appropriate discharge point. 4. Silt fences should be placed and maintained around the perimeter of the downslope side of the proposed construction area throughout the entire construction phase of the project until permanent landscaping and permanent storm water collections facilities have been installed. 5. Soils that are to be reused around the site should be stored in such a manner as to reduce erosion from the stockpile. Protective measures may include, but are not necessarily limited to, covering with plastic sheeting,, the use of low stockpiles in flat areas, or the use of hay bales and/or additional silt fences around pile perimeters. 6. Areas stripped of natural vegetation during, construction should be replanted as soon as possible or otherwise protected. Z 0 i 0 M I Structural fill placed to date on the site has been tested by AESI and either meet the minimum 95 percent compaction when compared to ASTM:D 1556 or the material was removed and replaced with crushed rock structural fill. If fill is to be placed on slopes steeper than 5H:IV (Horizontal: Vertical), the base of the fill should be tied to firm, stable subsoil by appropriate keying and benching, which would be established in the field to suit the particular soil conditions at the time of grading. The keyway will act as a shear key to embed the toe of the new fill into the hillside. Generally, the keyway for hillside fills should be at least 8 feet wide and cut into the lower, dense sand or stiff silt. Level benches would then be cut horizontally across the hill, following the contours of the slope. No specific width is required for the Z benches, although they are usually a few feet wider than the dozer being used to cut them. All 0 fills proposed over a slope should be reviewed by our office prior to construction. 0 M After overexcavation/stripping has been performed to the satisfaction of the geotechnical engineer/engineering geologist, the upper 12 inches of exposed ground should be recompacted Cn 3: 0 to at least 90 percent of the modified Proctor maximum density using ASTM:D 1557 as the M C M standard or approved by the geotechni cal engineer or his representative by hand probing if the 0 --1 0 0 subgrade consist of native soil. If the subgrade contains too much moisture, adequate C recompaction may be difficult or impossible to obtain and should probably not be attempted. :r M M Z In lieu of recompaction, the area to receive fill should be blanketed with washed rock or quarry 10-4 C spalls to act as a capillary break between the- new fill and the wet subgrade. Where the > exposed ground remains soft and further overexcavation is impractical, placement of an engineering stabilization fabric may be necessary to prevent contamination of the free -draining 0 -n layer by silt migration from below. n M M After the recompacted, exposed ground is tested and approved, or a free -draining rock course 0 is laid, structural fill may be placed to attain desired grades. Structural fill is defined as non- 0 M C Cn ganic soil, acceptable to the geotechnical engineer, placed in maximum 8-inch loose lifts o r... 9 CD M 0 with each lift being compacted to at least 95 percent of the modified Proctor maximu rn density Z using ASTM:D 1557 as the standard. In the case of roadway and utility trench filling, the ;U backfill should be placed and compacted in accordance with current City of Edmonds standards. The top of the compacted fill should extend horizontally outward a minimum Z distance of 3 feet beyond the location of the perimeter footings or roadway edge before sloping down at an angle of 2H: IV. Cn Z 0 Based on our observation of the previously performed site grading and review of the proposed I site plan for the new structure, in our opinion, construction of the house will not decrease the 0 M stability of the existing slope provided the recommendations in this letter are followed and, good construction practices are used. The house may be supported on shallow foundations that bear either on the dense native soils or properly prepared structural fill. Site grading activities to date have been completed in accordance with recommendations made by AESI at the time the work was being performed. A representative from our firm should inspect the stripped subgrade and be present during placement of structural fill to observe the work and perform a representative number of in- 3 place density tests. In this way, the adequacy of the earthwork may be e valuated as filling time. it is important to understand progresses and any problem areas may be corrected at that uniformity or that taking random compact ion tests on a part-time basis will not ensure As ch, we are available to aid the owner in developing a acceptable performance of a fill. su suitab le monitoring and testing frequency. We appreciate the opportunity to be of service to y ou on this project. Should you have any ques tions regarding this lett er or other geotechnical aspects of the project, please call us at your earliest convenience. z 0 Sincerely, _4 ASSOCIATED EARTH SCIENCES9 INC. O� M Kirkland, Washington co C M M 0 —10 00 C M MC M Z� ks C S/Z f Z- 0 -n 0 33222 '�P M GISTIE:V- M 0 0 0 M C UY JUARESV27/2,co3 ic Cn M 0, 1 G. Aaron M ond g aard P. G. cMichael, P.E. Jo Sond gaard, P.G. Z —1 ;U: Senior Geotechnical Engineer fociate logis Geologist z Vi z M JNS/af KE01732AI PROJECTSU2001732 \KE\WP - W1K 4 FIELD REPORT ASSOCIATED EARTH SCIENCES, INC. 911 Fifth Avenue, Suite 100 179 Madrone Lane North Kirkland, Washington 98033 Bainbridge Island, WA981 10 425-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 TO: Tom Pinkum 5 GLi �J'L;l Edmonds, WA 98020 425/774-6767 ATTN: Tom Pinkum AS REQUESTED BY: Ron Den Adel I THE FOLLOWING WAS NOTED: Date Project N-ame Project No. 2 1/03/02 Soundview/Pinkurn KE01732 Location Weather th No. end of 84 Ave W. No of 184 ST Sw -ir 7-- Prtly cIdy 55 Municipality Report No. Edmonds 1 Engineer/Architect Bldg. Permit No. Client/Owner C6 4 L �314 +;,i4,-uc uy General Contractor/Superintendent Soundview/Ron Den Adel Grading Contractor/Superintendent Soundview/ Ron Den Adel AESI was on site part time today at the request of the client, Tom Pinkum. We inspected and located bearing material beneath the soil zone on the north side of the building lot which is located on the NE quadrant of the project area. A portion of north end of the building site had been a excavated to an elevation of approximately 196' in elevation, which is 10 to 12 feet below the final sub grade of the home site. A orancye tan very sandy, slightly silty till with little gravel was exposed directly beneath the soil horizon. The contact between the dark gray topsoil and the till zone is very distinct and this contact was clarified for the operator who will continue to excavate the lot for the remainder of the day. A V2" 0 stainless steel hand probe was used to verify the bearing material in the one I O'x 10' area exposed during the site visit and penetration depths of approximately I inch 47firm. and unyielding material, referred to in the preceding paragraph was noted. This fill material is also being excavated from the SE quadrant of the project (SE building lot) and will be used as structural fill on the NE lot. The Contractor should have this lot excavated by early tomorrow morning (1/4/02) and we will make a site visit to verify bearing material on the complete excavation. We have established a Proctor value for this material earlier in the year (124.1). We recommended that the Contractor cover the excavated fill material in the event of rain. Loose material on the project needs to be tarped and/or Mulched . Silt fences need to be maintained along the perimeter of the project. Test # Location Elev. (ft) % IVIC ---T-Proctor % Compaction Pas;'/Fail CONCERNS: SLOPE GRADE ON NORTH END OF NE BUILDING LOT. A SIGNED CONTRACT WITH Tom PINKUM ADDITIONAL TESTS REQUIRED: YES, NE BUILDING LOT LIFTS COPIES TO: FIELD REP.: R M Hall DATE MAILED: PRINCIPAL / PM: JNS Z 0 rn E; - FIELD REPORT ASSOCIATED EARTH SCIENCES, INC. 911 Fifth Avenue, Suite 100 179 Madrone Lane North Kirkland, Washington 98033 Bainbridge Island, WA981 10 425-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 TO: Tom Pinkum Edmonds, WA 98020 425/774-6767 ATTN* Tom Pinkum LAS REQLIESTE`D­BY-.Ron Den Adel THE FOLLOWING WAS NOTED: Psoe 1 of 1 Date Project Name Project No. 1/04102 Soundview/Pinkurn KE01732 Location th No. end of 84 Ave W. No of 184 ST Weather Sw Pirtly cIdy SS Municipality Report No. Edmonds 2 Engineer/Architect Bldg. Permit No. Client/Owner General Contractor/Superinten dent Soundview/Ron Den Adel Grading Contractor/Superintendent Soundview/ Ron Den Adel AESI was on site part time for two visits today at the request of the Client. We monitored the excavation of the Client's lot beneath the garage area. The Contractor had not completed the excavation to bearing sandy material at the time of the first visit. We noted a seeping spring area on the west side of the excavation during this visit. During the second site visit the Contractor had still not completed the complete excavation down to bearing material. A 1/2"0 stainless steel hand probe was used to verify those areas excavated below the soil horizon and into the sandy bearing material. Several areas of soft material were noted in the vicinity of the spring area, which probed easily to depths of twelve inches. We recommended the Contractor excavate this saturated material and backfill with 2 inch crushed material. Several other soft spots were noted that probe eight to 12 inches and were brought to the attention of the Contractor while we were on site. Jon Sonderaaard will inspect the final excavation for bearincy material durina his site visit with the Client later today. CONCERNS: SOFT BEARING MATERIAL IN NUMEROUS SPOTS. ADDITIONAL TESTS REQUIRED: YES, NE BUILDING LOT LIFTS :3 P, lZ COPIES TO: FIELD REP.: R M Hall DATE MAILED: PRINCIPAL / PM: , ';r,6r 2-- Z 0 1 0 m FIELD REPORT ASSOCIATED EARTH SCIENCES9 INC. Field Repod #:?r. Page of Project Name P Project Number 911 Fifth Avenue, Suite 100 Y-j�7 0I '+ 32- A Kirkland, Washington 98033 50LkAA4ke1J L-V 4 Weather 4 -827-7701 FAX 827-5424 L a on 25 e '4 !w A"w Bldg. Permit Number Municipality TO: -to vx L*,t�AA AA Engineer/Architect -T Z et cd 5.� 4 Client/Owner z AeV110- )( 0 d General Contr-d6LLA 0 ATTN: M Earthwork Contractor/Superintendent A_j AS REQUESTED BY: LL&"' M THE FOLLOWING WAS NOTED: 4 -Z(ZP- M 0 w 4-1 Oc 4%�� 0 S �Ld is , \. - �0 M M z A,1 C— > Z A r- -1 4-, X A-�Lr 0 -n n 14 �.l - �10 —L. M M 0 0 'M As A La C: CD 4' Al 411 � 0 4- Z 0 re A-5 TZ-1 D IS-E-1 'Z- > L) z -Ft' I k^'c�-q C."r 4- +7) e--L _j f+ At/ -�It( z \,I,?-r4 c-'J 0 (D ke-e d 0 I IT! FIELD COMPACTION EQUIPMENT UTILIZED: AREAS OF ADDITIONAL CONCERN: - ADDITIONAL TESTS REQUIRED: 17YES F-1 NO WHERE? FIELD REP: "Cup -- COPIES TO: DATE MAILED: *PROJECT MGR: *Field Report subject to review by AESI Project Manager FIELD REPORT ASSOCIATED EARTH SCIENCES, INC. Field Report# Page z- of -L ' Project Name Project Number Dale 911 Fifth Avenue, Suite 100 3 Z-A Kirkland, Washington 98033 Loc Weather 425-827-7701 FAX 827-5424 Location TO: Engineer/Architect CIL ng n er/Arche- c Client/Owner C'L GeneralContra W-up-111 R-11dent ATTN: E t war 0 tr. arthwork ontractor/Supenntendent AS REQUESTED BY: THE FOLLOWING WAS NOTED: L4_s.� -AW r -5 Lo L s AZSk�_-_4 MC A�/Vu­f, 4-o -J�� e� jlc� A ',A )"aVt(CL"V -L 5 -1�) r 0 A. 'j-,, I t4f z. OL) ('k A L­4�1�1 r e �Uks -fiUACZ3 +t-A L AU t'i L L 't L V A-r( FIELD COMPACTION EQUIPMENT UTILIZED: AREAS OF ADDITIONAL CONCERN: lncr% 17yr_-, FINO WHERE? ADDITIONAL TES 15 REQUI COPIES TO: FIELD REP: DATE MAILED: *PROJECT MGR *Field Report subject to review by AESI Project Manager z 9 0 M =Pfi M M 0 —10 0 M M Z C _z CA 0 _n .M MIMI 0 0 M C 0) 9 C/) Q 0 Z X z z 0 0 M ASSOCIATED EARTH IN(;. 911 Fifth Avenue, Suite 100 179 Madrone Lane North Kirkland, Washington 98033 Bainbridge Island, WA98110 425-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 Date Project Name Project No. 1/05/02 Soundview/Pinkum KE01732 Location Weather th No. end of 84 Ave W. No of 184 ST Sw Prtly cIdy 55 Municipality Report No. Edmonds 4 Engineer/Architect Bldg. Permit No. Client/Owner General Contractor/Superintendent Soundview/Ron Den Adel Grading ContractorlSuperintendent Soundview/ Ron Den Adel Z 0 M FHL VULLUVVINU VVAO NU I MU: =n Test # 1 pass 2 2 pass 4 3 pass 5 4 pass 6 Location DD Center 108.6 Center 107.9 -Center 107.1 Center 106.9 _-Eley. (ft) -11, -11, -11, -11, %IVIC 20.2 21.4 21.6 22.6 Proctor 124.1 124.1 124.1 124.1 % compaction— 87.5 — 86.9 86.3 86.1 — Pass/Fail — F F F F CONCERNS: CONDITIONS TOO WET, MATERIAL TOO WET. D1557 ADDITIONAL TESTS REQUIRED: YES, LIFTS ON NORTH END OF PROPERTY COPIES TO: FIELD REP.: R M Hall JNS �k DATE MAILED: PRINCIPAL / PM: __4 YO ASTIVI W M C M0 0 -10 0 C -4 M M z —1 —Z 0 _n M M Or. C/) ic C/) M 0 Z z ASSOCIATED EARTH SCIENCES, INC. 911 Fifth Avenue, Suite 100 179 Madrone Lane North Kirkland, Washington 98033 Bainbridge Island, WA981 IQ 425-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 4 -4 TO: Tom Pinkum S'5� !S--�o4c,4 LJ&--i Edmonds, WA 98020 425/774-6767 ATTN: Tom Pinkum AS REQUESTED BY: Ron Den Adel THE FOLLOWING WAS NOTED: Pnnp 1 nf 1 Date 2roject No. 1115/02 <EO1732 Location th No. end of 84 Ave W. No of 184 ST Weather Sw Prtly cIdy 55 Municipality Report No. Edmonds 5 Engineer/Architect Bldg. Permit No. ClienlJOwner General Contractor/Superintendent Soundview/Ron Den Adel Grading Contractor/Superintendent Soundview/ Ron Den Adel AESI was on site part time today at the request of the Client to inspect the site and check the onsite backfill material for moisture content. We observed that the excavation area had been drained of all water from last weeks rains from a sump located on the NW quadrant of the excavation to drain standing water on the west side of the excavation. The initial lift, which failed compaction tests was very muddy and should be removed prior to any further lift activity and brought down to the gravel base on the west side and the excavated base on the east side. Moisture readings were taken of the stockpiled material and moisture readings of 21-23 )% were noted. In our opinion this material is currently too wet to properly compact without further drying. CONCERNS: ADDITIONAL TESTS REQUIRED: COPIES TO: FIELD REP.: R M Hall DATE MAILED: PRINCIPAL/ PM: _JLNS� ASTIVI D 1557 z 0 m FIELD REPORT 4SSOCIATED EARTH SCIENCES, INC 911 Fifth Avenue, Suite 100 179 Madrone Lane North "<irkland, Washington 98033 Bainbridge Island, WA981 10 125-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 TO: Tom Pinkum 5Sq '�e4ea,,t- Qc%,�J Edmonds, WA 98020 4251774-6767 ATTN: Tom Plinkum AS REQUESTED BY: Ron Den Adel ,THE FOLLOWING WAS NOTED: 4 Pacie I of 1 Date T—Projectirsiame Project No, 1/16/02 Soundview/Pinkum KIE011732 Location ST Weather No. end of 84 Ave W. No of 18 4th Sw Ovrcst 40 Municipality Report No. Edmonds 6 Engineer/Architect Bldg. Permit No. Client/Owner L4,,1hu,64 14&-1-S �- '-- -d'e--neral Contractor/Superintendent Soundview/Ron Den Adel Grading Contractoribupennienuent L Soundviewl Ron Den Adel AES1 was on site part time for two visits today at the request of the Client. We were called to inspect backfill material located in downtown Edmonds for use on the property. The material in question was a brown gravelly, silty till with some cobbles. A Troxler '440 was used to take moisture readings on the material, which was running from 12-14 percent moisture content. The Contractor was currently hauling in several loads of this material on to the building site. We recommended doing a test strip of the import material over a 24 inch gravel layer of 2 to 4 inch material. A strip of material was backfilled to approximately 12 inches in thickness and test rolled with a smooth vibratory roller. Excessive pumping was noted after* 3 passes and it was determined that the material was too wet by a few percentage points. The material is acceptable if it is dry enough. The Contractor is considering stockpiling some of this material on site for later use. COMPACTION EQUIPMENT: SMOOTH VIBRATORY ROLLER (SMV) ASTM D 1557 ADDITIONAL TESTS REQUIRED: COPIES TO: FIELD REP.: R M Hall 4 PRINCIPAL / PM: JNS r d1l � 11,11 DATE MAILED: 4---42; :1 z 0 1 0 m FIELD REPORT --SSOCIATED EARTH SCIENCES, INC. 911 Fifth Avenue, Suite 100 179 Madrone Lane North V-irkland, Washington 98033 Bainbridge Island, WA981 10 1 5-827-7701 FAX 827-5424 206-780-9370 FAX 780-9438 TO: Tom Pinkum 604"2,L% �� (41� 5 5%t Se--, m-,. 1, W" .J Edmonds, WA 98020 425/774-6767 --ATTN: Tom Pinkurn AS REQUESTED BY: Ron Den Adel ,4E FOLLOWING WAS NOTED: I Pane I of 1 Date T—Project Name Project No. 5/1102 Soundview/Pinkurn KE01732 Location Weather 1h No. end of 84 Ave W. No of 184 ST Sw prtly c1dy 55 Municipality Report No. Edmonds 7 Engineer/Architect Bldg. Permit No. Client/Owner General Contractor/Superintendent Soundview/Ron Den Adel Grading Contractor/Superintendent Soundviewl Ron Den Adel AESI was on site part time today at the request of the Client. We were asked to do a footing check the .-zxcavation base, which had sat dormant for the winter due to wet weather conditions. The client had I originally intended to place about 12 feet of structural backfill in this area located on the north side of the 'property lot. The client has determined to place a daylight basement in this location in lieu of the lifts originally intended. The area measures, by pace approximately -3 ) 7 � x -3 ) 7' in both N/S and E/W directions and is at the grade level desired by the client to place the structure. ' The NW portion of this excavation had a spring head and an area of about 20' NS x 20' E/W was mucked out last winter and about 2-3 feet of quarry spall was placed in this area. The remainder of the excavation exposed very sandy tills and was, at that time, firm and unyielding. "' We hand probed the complete excavation base exposure with a 1/2" Ostainless steel hand probe and "penetration depths of .5 to 1.5" to firm and unyielding material were noted in all locations. No standing water was noted anywhere in the excavated area. A 'minor amount of excavation is necessary around the SE i 4 corner of the basement footing area of less than 12" which is already in the sandy tills and we would L-- 'anticipated similar bearing conditions here. We recommended approximately 61' of 5/8" crushed material be backfilled and then rolled on this basement slab footing area prior to installation of the slab and basement footings durina a conversation with -the client �Jlast week. inQ material. Jn our opinion the excavation base at it!S Current level has passed inspection as bear _ Test # Location Elev. (ft) T % IVIC 1 Proctor 1 % Compaction Pass/Fail r-ONCERNSMINOR EXCAVATION REQ. AROUND SW CORNER. DDITIONAL TESTS REQUIRED: FIELD REP.: R M Hall COPIES TO: DATE MAILED: (�Jp -2- PRINCIPAL / PM: J N S ASTIVI D 1557 z 0 4 0 m Associated Earth Sciences, Inc. 4 January 23, 2004 Project No. KE03706A Cy poxpq7 CC Construction 8415 192"' Street SW Edmonds, Washington 98026 z 0 0 M Attention: Mr. Carl Clapp 0 M C Subject: Response to City of Edmonds Review Conu-nents M 0 0 18103 84hAvenue West 0 0 C, Edmonds, Washington M M z > Reference: City of Edmonds Plan Review Comments -n o December,17, 2003 -n M M Associated Earth Sciences, Inc. 0 0 M Geotechnical Evaluation r_ Cn C 0) December 5, 2003' M �zo� W, Dear Mr. Clapp: >: z As requested, Associated Earth Sciences, Inc. (AESI) presents this letter in response to the ESI has addressed the above -referenced City of Edmonds review comments. Specifically, A C/) bject comment shown z ueotechnical issues. contained in Comment No. 4. Please see the su G below in italics, followed by our responses. M 4. "Soils R!eport: Provide reconimendations for retaining ivall1rock-en? design with sloped backfill, expected total and differential settlements for footings bearing (it one end on native soils and at the other end on structural fill, especially during a seisinic, event as defined in UBC Division IV, and lique/iiciion potential due to the presence of water. 827-7701 - Fax 125 827-5424 911 Fifth Avenue, Suite 100 - Kirkland WA 98033 Phone 125 "Rockery installation niust comp�y with the requirements of the City of Edmonds Handout # 21. Special inspection is required for rockeries. See tiered rock-ery section of handout including details. Review of the proposed site grading plan indicates that a 2-foot-deep cut will be required to achieve the proposed crawl space elevation within the southeast section of the house. Two 4- foot-high, tiered rockeries are proposed for the small (6- to 8-foot-high) cut slope located along the east side of the lot. The southeast corner of the house will be within 4 feet of the lower rockery, and the upper rockery will be approximately 6 feet back from the lower rockery. Further, the back slope behind the rockeries will be nearly level. See the attached Rockery Sketch. Given this foundation/rockery geometry, it does not appear that any significant surcharge loads will be induced on either the lower rockery or the perimeter foundation wall of the house. Thus, no special design criteria are required other than use of standard -rockery construction techniques as shown in the City.of Edmonds "Rockery and Retaining Wall Permit Requirements". The foundation excavation for the proposed house will expose natural, dense, outwash silty sand within the southeast section, -and approximately 2 to 4 feet of dense, silty,sand structural fill within the northwest section of the foundation. As discussed in the above -referenced letter, AESI recently completed 3 test pit excavations on the site to evaluate the consistency of the fill. The fill soils exhibited medium dense to dense conditions and were firm and' unyielding when probed with a steel rod under full body weight of the observer. Thus, it is our opinion that the structural fill is suitable for support of the planned house, foundation. We recommend that AESI be allowed to observe the foundation subgrade conditions once the footing trenches have been excavated and prior to placement of forms and steel in order to confirm that the actual conditions are consistent with those observed in the exploration pits. Total and differential settlements, for foundation elements designed using the recommended 2,000 pounds per square foot soil bearing capacity, are anticipated to be less than I inch and 1/2 inch, respectively. Seismic events should not induce significant settlement within the site's dense natural soils or compacted structural fill. Some seepage was encountered \�ithin the lower southwest corner of the lot. This area was cleared of unsuitable woody debris and soft soils, and filled with compacted, 4- to 6-inch quarry rock. Silty sand structural fill was then placed above the rock. Due to the dense consistency of the natural site soils and compacted structural fill, the presence of the observed seepage does not present a liquefaction hazard for this lot. The proposed rockery walls are being placed against dense cut soils, and are spaced far enough apart to avoid surcharging the proposed house foundation and the lower rockery. In our opinion the proposed rockeries meet the requirements of the City of Edmonds Handout # 21. 2 Z 0 1 0 M Cl) M C M 0 0 -40 0 C M M Z C Z 0) 0 -n Ti MM 0 0 0 M C 0) 9 0) M 0 Z Z 0) Z 0 1 0 M