20040190.pdfDATE RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAMEMA�Vf B
_eSINESS
n I— I %
MAILING ADDRESS
CITY
NAME
ADDRESS
PERMIT EXPIRES
USE
ZONE
PERMIT
NUMBER� A e-11 /-Z
JOB
ADDRESS
PLAT
NAMEIGUBDIVISION NO
LOT N
PUBLIC FIIGIiT OF WAY PER OFFICIAL STREET MAP
TELEPHONE EXISTING — PROPOSED
2 775-- LI-3 Zky HFOUIRFI) DEDICAIION� FT
ZIP
1 MEIER SIZE LINE SIZE NO OF FIXTURES
CITY
ZIP
TELEPHONE
54003A
Lj f5
1�7
*ZD 4
NAME
CBL#
ADDRE SS
CITY ZIP TELEPHONE
4
STATE LICfNSE NUMBER EXPIRATION 15ATE /_�ECK� BY
PROPERTY TAX ACCOUNT PARCEL NO.
00q:3qta0()o0i&y06
.
0 NEW
RESIDENTIAL
PLUMBING / MECH
9 ADDITION
COMMERCIAL
COMPLIANCE OR
CHANGE OF USE
13 REMODEL
El MULTIFAMILY
SIGN
REPAIR
GRADING
CYDS
FENCE
( X Fl�
El DEMOLISH
TANK
OTHER
oGARAGE
RETAININGWALL
FIRE SPRINKLER
CARPORT
ROCKERY
FIRE ALARM
(TYPE OF USE, BUSINESS OR ACTIVITY) EXP IN:
NUMBER
NUMBER OF
CRITICAL
OF
DWELLING
AREAS
STORIES
UNITS
NUMBER
DESCRIBE WORK TO BE DONE
1. /jJ - A� 1 71 ;-j L,— A ,,I '1 4- '9 n JILIN t_*31 _P
SUITE/APT#
.__ I (
LID NO
LID FEE $
�_ESCP Approved
RW permit portuard
Street Use permit Hoq'd
inspection floquirod
s f
idewalk FjorIaired
underground
W,ring required
PRV REQUIRED
YES 0 NO 1:1
REMARKS
OWNER/CONTRACTOR HFSPONSIHIE FOR EROSION CONTROODRAINAGE
ENGINEERING REVIEWED BY DATE
FIRE HEViEWED By DATE
L5
Z
cc
W
z
z
Ul
W
cc
C-L
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
'D
BOND
POSTED
RE
---------------
OYES
NO
S
SEPA REVIEW
COMPLETE EXEMPT
SIGN AREA
ALLOWED PROPOSED
HEIGHT
ALLOWED OSED
PROP
EXP
LOT COVERAGE
REQUIRED SETBACKS (FT.)
PROPOSED SETBACKS (FT)
ALLOWED PROPOSED
FRONT SIDE REAR
f-FFf0tjf
'IWIDE 11"n
z
k C31
PARKING
LOT AREA
PLANNING REVIEWED 13Y
DAT
REQ-D PROVIDED
I
REMARKS
CHECKED BY JTYPE OE C NSTRUCTION E OCCUIPANI
GROUP
V
SPECIAL INSPECTION AR A OCCUPANT
REQUIRED [ W LOAD
YES
zj
REMARKS z
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 5
DAW6 trOD100 beejf-po
A
ZVI
HEAT SOURCE
GLAZING %
LOT SLOPE %
6-4
1 ) 3.
Al
PLAN CHECK NO:
0 1-J"
VESTED DATE"
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
I=
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
w PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
(n
!I IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
x FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE
Q DEEMED TO MODIFN� WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
-1
a NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION."
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRLIC-
TION; AND IN DOING THE WORK AUT14ORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATION CIF -THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S CyyPI)ISATION INSURANCE AND RCW 18.27.
SIGNATURE E OR G
DATE SIGNED
L ��,ja
6-3
..
M
1ALUATION
;171) 1
Description
FEE
"Ian Check
7
3uilding Permit
-01
�lumbing
vlechanical
I
zirading
Engr. Review
Engr. Inspection
Description FEE
State Surcharge
City Surcharge
/7 ,1 � I
Fire Review Plan Chk. Deposit (A/
Fire Inspection Receipt it
Landscapelnsp. Total Amt. Due 47
Receipt #
Recording Fee th�
APPLICATION APPROVAL
I his application is not a pounit until signed by the
CALL Building 011icial to hisihor Deputy: and Fees are paid, and
FOR INSPECTION receipt is acknowledged in space provided.
OFFICIA1 S SIGNATURE DATE
(425) &" vf
771-0220 SFO BY,
1", 1 / /
ATTENTIOIV-� t:x I 1;jJj �Lx)
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
04/02 PRESS HARD -YOU ARE MAKING 5 COPIES
OHIGONAL FILE YELLOW 'INSIXCTOR
PINK OWNEII GOLD ASSESSOR
('414FEN ACCOUNtINCI
z
0
1
0
M
--I -n
0 M
C
M 0
0
10
0
M
M Z
_z
M
C0
0 _TI
TIX
>
M ITI
0
0
M
Cl)
90)
M 0
Z
z
z
0
I
0
ITI
04
100.01
C4
lAl-Av
ACO-A ll-55
51TE PLAN
NOTES:
— NO GRADING REQUIRED
— NO ADDITIONAL
STORM DRAINAGE
REQUIRED, MAINTAIN
EXISTING D.S.
LOCATIONS AND
DRAINAGE PATTERNS.
PROJECT DATA
LOT COVERAGE
ONNER
RESIDENCE
I,A"5.F.
GEOFFREY * ELANE STEVENS
DECKS 4 PLAY SURFACE
700 5. F.
IB713BBTH AVE. W
EDMONDS/ WA q520(o
COVERED PORCH
272 5. F.
LEGAL DESCRIPTION
DRIVES AND WALKS
750 S.F.
TOTAL
31378 S.F.
LOT 16 EDMONDS SEAVEIW
LOT AREA
12,250 S. F.
TRACTS
PERCENT COVERAGE
27.6 %
PARCEL NO.
00434600001606
IMPERVIOUS AREA
(II'-IRTY Cru) In
TOTAL IMPERIOUS AREA
3375.00 S.F.
WEIC-iflT CAL-GS
A - 100 .5' AVERAGE GRADE — 100.5'
5 = 100.5, ACTUAL MAX ROOF HEIG+4T
C - 100.5' MAXIMUM ROOF HEIGHT ALLONED -
D, - 100.5'
Design 4 Construction Management
F. F BRONN lq5l6 Linden Ave. N.; Shoreline, WA 618133
z
0
4
0
M
-i -n
M
C
M
0
-40
0 C:
--4 F.
X M
M z
o -n
-n
M M
065
0 r-
0 M
C cl)
9 C/)
Q 0
Z
X
>
z
Cl)
z
0
0
M
W�
GARY HAAKENSON
CITY OF EDMONDS MAYOR
UE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
121 5TH AVE N
Websile: wwadedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Ck Planning - Building - Engineering
C. 10
December 22, 2004
Attn: Geoff & Elaine Stevens
18713 88th Ave W
Edmonds, WA 98026
Building Permit: 2004-0190
Site Address: 18713 88th Ave W
Expiration Date: 3/8/05
Dear Geoff & Elaine Stevens:
The purpose of this letter is to inform you that the last remaining inspection on your
project is a final inspection(s). The final inspection(s) deten-nines that there are no
outstanding I i fc-safety issues and approval allows the City to close your pen -nit file.
The City considers the final inspection to be one of the most important inspections
conducted on a project. In order to grant final approval the following must be complete:
smoke detectors, house numbers, guardrails, handrails, self -close doors between garage
and residence, egress from sleeping rooms, safety glazing, weather-stripping, any
Engineering department requirements etc. Of course not all of these things may
specifically apply to your project but it does give you an idea about the kinds of things
that must be complete as well as sot -no items that do not need to be installed such as:
paint, carpet, moldings, wallpaper, etc. Please be advised permits expire one year from
the date of issuance. If you will need more time to complete the work, permits can be
renewed prior to expiration for one half fees. If the pennit expires without a final
approval granted by the Building Inspector, full fees are required in order to renew the
permit. This can be very costly to you and we strongly encourage you to check your
permit expiration date and call for the required final inspection(s). Note: If more than
one departinent is required to Final Your project, this is noted on your Job Card.
Please reel free to contact me at 425-771-0220 if you have any questions.
Sincerely,
Permit Coordinator
Incorporated August 11, 1890
Sister Citv - Hekinan. JaDan
z
0
i
0
M
4-0 C. is) 11
CITY 0- F EDMONDS uAn i hrVA MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
Website: wwwxi.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
February 23, 2004
Attn: Geoff & Elaine Stevens
18713 88th Ave W
Edmonds, WA 98026
Application: 03-365 / Addition
Expiration Date: March 12, 2004
Dear Geoff & Elaine Stevens:
The above referenced permit application is ready to be issued and will expire on March
12, 2004. According to Edmonds Community Development Code 19-00.010, approved
applications are only valid for a period of 90 days unless a written request for an
extension is submitted to the Building Official showing that circumstances beyond the
control of the applicant have prevented action from taking place. If an application
extension is granted it may only be extended 180 days for a total period of one year from
the received date of the application. If you need and are eligible for an extension you
must submit a request in writing to the Building Official prior to March 12, 2004.
In order to pick up your permit the remaining items due are: 1. A City Business license
for C.E. Construction or owner needs to sign an owner exemption form, and 2. A balance
due of $988.50.
Please be advised, once the permit application expires, the application materials and plans
will be destroyed within ten working days. Also, if the project is pursued in the future a
new permit application and new fees will be required.
If you have any questions please don't hesitate to contact our offices at 425-771-0220.
Sincerely:
Theresa Umbaugh
Permit Coordinator
Incorporated August 11, 1890
Sister Citv - Hekinan, Japan
z
9
0
M
V 11NAIL rKUJ VA— I Alrrrk," V I-VJLj r "OUVI
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM:
FIRE DEPARTMENT DATE
PLEASE SIGN
ENGINEERING DIVISION DATE
V P 1. 1, A, IMS fG - . - I
PLANNING DIVISION DATE
PLEASESIGN
PROJECT 5hrva f
SITE ADDRESS
PERMIT # 'Z& 4 -6 L�__OADB# DATE INSPECTED 1�4 116ti—
DESCRIPTION OF WORK TO BE INSPECTED —
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
/x�/GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED.
El Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
1.
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:teMp:b1dg:romis:ocaprv1 3/25/04
z
0
1
0
M
--I -n
M
0
0
0
0 C
-4 ?.
3: rn
M z
X
Cn
o -n
n
M M
0
0
0 M
C Cn
9 Cn
Q 0
Zr-
z
-1
M
Cn
z
0
1
0
M
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final ......
HEATING:
GasTest ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING..........................
FRAMING........................
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
INSPECTOR
.ffi T
OZE
DATE APPROVED
Oct
tf:,_ D4
e4(
*2
4990 V40*ooe
Tile initials Ware Miltoll
Thompson, a temporary contract
inspector for the City.
z
0
A
0
M
--i -n
55 --1
3:
M
0
—40
0 C
M
M z
n,
C
J,
0 -n
n
M M
0 5)
0 r-
0 M
C (n
9 Cl)
M 0
Z
;U
3:
z
in
z
0
ITI
I