Loading...
20040195.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS 67A<'-'Y MAILING ADDRESS 7rfj�l CITY ZIP TELEPHONE '7741. ­pll, z--- NAME ADDRESS -71- A/ f CITY ZIP / I �, e, (/,- / /_ 7�; NAME — 611_tllvz�p, ADDRESS CITY ZIP STATE LICENSE NUMBER A2 " /, le TELEPHONE 7z-121. �1:511q CBL 4 TELEPHONE EXPIRATION DATE I CHECKED BY 21 PROPERTY TAX ACCOUNT PARCEL NO. U 31 00,,57�rOP000100700 FA NEW P, RESIDENTIAL PLUMBING / MECH ADDITI ON COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR GRADV CYDS ,:_ TI's 6 FENCE X FT E] DEMOLISH 1:1 TANK El OTHER z o GARAGE CARPORT E3 RETAINING WALL ROCKERY 11 FIRE SPRINKLER FIRE ALARM (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: us NUMBER N MBER OF CRITICAL U N U OF To ELLING AREAS M W 0 STORIES U I NUMBER N DESCRIBE WORK TO BE DONE 0 Ve, A Fr 11oni I *, I/ r.� 0 & �_/ - f 7 &:L �91tc) 1) V USE ZONE JOB ADDRESS PLAT NAME/SUBDIVISION NO PERMIT EXPIRES PERMIT NUMBER SUITE/APT# LOT NO. LID NO. LID FEE $ TESCP Apptovld PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Polind 1`10(lulf0d [3 situal use permit Rocl,d 0 EXISTING — PROPOSED inspection Required 1133 Sidewalk paquired REQUIRED DEDICATION FT Undwground Cl Wiringf0clUlfed METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED I YES E3 NO 0 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 2e,C ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DAT VARIANCE OR CU HORELINEORADB# I INSPECTION I BOND REO'D POSTED OYES ��Ko I S SEPA REVIEW SIGN AREA HEIGHT COMPLETE I EXEMPT ALLOWED PROPOSED ALLOWED. PROPOSED LXP LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR FRONT L/R SID.E JWwkF-- 0/ '*-A Al 9vel .91 YIPY/1 4F 4e, zlo PARKING LOT AREA PLANNING REVIEWED B D E. REO'D I PROVIDED I �7 V cc W z z E5 z LU LU CHECKED BY ITYPE OFCONSTRL19TION V _A/ CODE -7-1 I OCCUPANT GROUP z F3 M W014zREQUIRED SPECIAL INSPECTION JARX3 Z, -30 OCCUPANT LOAD I REMARKS P p ROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D ,of -A C_ A — HEAT SOURCE GLAZING % LOT SLOPE % 45914— 1 PLAN CHECZ: _� _12 VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. ir LU PERMIT APPLICATION: IBODAYS IL PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFX WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 2 NOR LIMITIN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* k I HE I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF IV T T HE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TjTION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED 0 V I IN VIOLATIO� OF THVLA13OR CODE OF THE STATE OF WASHINGTON RELATING TO Won WORKMEN) �OMPEYSATION INSURANCE AND RCW 18.27. G ATU (00 �RA G E N T) DATE SIGNED VALUATION 01 Description FEE Description FEE Plan Check State Surcharge Building Permit __111.71 City Surcharge Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit zl/!� :D Fire Inspection Receipt # LandscapeInsp. Total Amt. Due Recording Fee Receipt # 7/ APPLICATION APPROVAL CALL This application is not a permit until signed by the FOR INSPECTION Building Official or his/her Deputy: and Fees are paid, and receipt is acknowledged in space provided. OFFICIALS SIGNATURE DATE 42 771-0220 AS VY DATE A7 ON E)ff 1333 "1 IT I /N FUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A SIA PECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 04102 PRESS HARD -YOU ARE MAKING 5 COPIES ORIGINAL - FILE YELLOW - INS4CTI! PINK - OWNER GOLD - ASSESSOR GREEN -ACCOUNTING I z 0 i 0 ITI :q --fi 0 M C M 0 0 C) 0 C: M ITI Z n, --I CE :1 W 0 n M ITI 055 0 r- M Cl) Cn M 0 Z z z 0 ITI m ZONE SETBACKS: ADD GUTTERS /DOWNSPOUTS FRON�7z:��5 AND SPLASHBLOCKS SIDE io- REAR L4v/'—,4 OTHER ;? L-OT HEIGHT— e2 T<Lpi24p:�,5 =- KAV- FIE 'Oc)�jo ) FOR EA06ION Re X, L > < APPROVED BY PLANNINIS f 'D r f, - AS NOTED K3ev\j lmqepv(ms BY ENGINEERINP Date: �Ll- el-w x 14ktzA44o4oGk Pr--S. -/5 -31 M -Z t!P I�PMONKI WA CITYCOPY FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE—&/,z LEASE SIGN z 0 PLANNING DIVISION DATE' i PLEASE SIGN 0 PROJEC SITE ADDRESS 7eq /-?z S bi 0 M C M 0 0 PERMIT 9 B# DATE INSPECTED 0 C: M qrn3m,mn*�,T r) xxTn12Y TO E INSPECTED Aulnld SFIe MZ LJJL,j _r�_4 , -61- 1 A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED o Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:fbmis 10/0 1 a --i C ](ng o -n n M M 0 &5 0 r- 0 M cz cn 9 U) M 0 Z X z U) z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... VVIQ� Wall.......................... Pier/Porch ................. Retaining Wall ........... z 0 Slab Insulation .......... PLUMBING: Underground ............. Rough -in ................... M C Commercial Final ...... M 0 0 0 HEATING: M Gas Test .................... M z Gas Piping ................. > z Equipment ................. Commercial Final ....... 0 -n _n __4 EXTERIOR SHEATHING = NAILING .......................... M M FRAMING ........................ 0 0 M FIRST FLOOR FRAMING ... C (1) C/) Q INSULATION ................... Z r- Floor Insulation ......... Wall Insulatio n ........... x z Ceiling Insulation ....... SHEETROCK NAILING ... vv\3 C4- Cn z SPECIAL INSPECTION 0 0 M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z" 04