Loading...
20040195A.pdfW '; DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS MAILING ADDRESS 2- -7 4/ orl 4:%?, k)"17 CITY ZIP TELEPHONE NAME I CITY NAMF , . 6(0z� ADDAESS � A CITY STATE LICENSE NUMBER PROPERTY TAX ACCOUNT M NEW ADDITION REMODEL 1:1 REPAIR DEMOLISH GARAGE CARPORT (TYPE OF USE. I ZIP [TELEPHONE CBI_ # ZIP TELEPHONE EXPIRATION DATE CHECKED BY RESIDENTIAL PLUMBING I MECH 04�COMMERCIAL COMPLIANCE OR CHANGE OF USE MULTIFAMILY El SIGN GRADING CYDS FENCE x FT) TANK RETAINING WALL El FIRE SPRINKLER ROCKERY FIRE ALARM OR ACTIVITY) EXPLAIN .1 W NUMBER NUMBER OF CRITICAL OF DWELLI AREAS UNITS NUMBER 0 STORIES DESCRIBE WORK TO BE DON '*7 S- 2 S-0 s�" P . r/ ts 6 �s HEAT SOURCE GLAZING % LOT SLOPE % PLAN CHECK NO: VESTED DATE 2 '--' - 1" - --,7 2 'tj— 5 . -5 1 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE .j SEPARATE PERMISSION. t= PERMIT APPLICATION: 180DAYS PERMIT LIMIT.''I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION in 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS in W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF _j I EDMONDS, WASHINGTON, ITS OFFICIMS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHAT EVER NAT URE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT, ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO FNFORCE ANY ORDINANCE PROVISION.4 X.1 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THEOWNER I AGREE TO COMPLY WHIT CITY AND STATE LAWS REGULATING CONSTRUC- TION, AND IN DOING THE WORK AUTHORIZED THEREBY NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN��MPENSATION INSURANCE AND RCW 11127. SIGNATURYWNI,E _)/R AG 1) DATE SIGNED k/ USE ZONE JOB ADDRESS PLAT NAMEISUBDIVISION NO PERMIT EXPIRES PERMIT L NUMBER SUITE/APT# A �//" %,: � - , LOT NO. LID NO. LID FEE $ I ESCP Approve(- 13 PUBLIC RIGliT OF WAY PER OFFICIAL STREET MAP RW Permit Required 13 Street Use Porrnit Reqpd EXISTING — PROP I -9. inspection Required 'M Sidewalk Required 13- REQUIRED DEDICATION FT UndergrOUnd Wiring lOqUired 0 METER SIZE LINE SIZE I N . OF FIXTURES I PRV REQUIRED YES C3 NO 1:1 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ENGINEERING REVIEWED BY DATE 12, / 2,"� /0:5 F I R lEjEj I ME� �E! B rY VAR/ANCE OR CU SHeRELINE OR ADBO INSPECTION BOND RE9 D POSTED OYE S (NO S SEPA REVIEW SIGN (AREA HEIGHT COMPLETE EXEM ALLOWED PROPOSED ALLOWED PROPOSED EXP 17 LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR Ala,,,-k , q_ PARKINC,,y I V LOT AREA PLANNING REVIEWED BY DATE REO'D PROVIDED REMAR 1 �5; �702-0 UJI z z uj La a: rL CHECKED BY ITYPE OF CONSTRUCTION CODE OCCUPANT Aw GROUP SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] YES LOAD REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQU Ei J! VALUATION $ vid Description FEE Description FEE Plan Checkr:d ..,I State Surcharge 4�) mit Building P:er it City Surcharge Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapelnsp. Total Amt. Due Recording Fee Receipt # APPLICATION APPROVAL This application is not a permit until signed by the CALL Building Official or his/her Deputy: and Fees are paid, and FOR INSPECTION receipt is acknowledged in space provided. OFFICIAIS SIGNATURE DATE (425) 771 -0220 ( RE AS ATTENTION " Ex 1 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 6EkdAVIL)L A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE - YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER - GOLD - ASSESSOR 04 02 PRESS HARD -YOU ARE MAKING 5 CO IES GREEN - ACCOUNTING z 0 M --I -n 0 M C: M 0 0 -4 C) 0 C: —4 K x M M z 10 --1 C: X Cl) 0 _TI n M M 0 5 0 r. 0 M C U) 9 Cn M C-) Z X z U) z 0 IT! 1.0 '. 1 sc)z CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering February 23, 2004 Attn: Bob Harty 10627 Northeast 147th Bothell, WA 98011 Application: 03-553 / Precision Tune / Parking Lot Expiration Date: March 12, 2004 Dear Bob Harty: GARY HAAKENSON MAYOR The above referenced permit application is ready to be issued and will expire on March 12,2004. According to Edmonds Community Development.Code 19.00.010, approved applications are only valid for a period of 90 days unless a written request for an extension is submitted to the Building Official showing that circumstances beyond the control of the applicant have prevented action from taking place. If an application extension is granted it may only be extended 180 days for a total period of one year from the received date of the application. If you need and are eligible for an extension you must submit a request in writing to the Building Official prior to March 12, 2004. In order to pick up your permit the remaining items due are: A balance due of $75 .00. Please be advised, once the permit application expires, the application materials and plans will be destroyed within ten working days. Also, if the project is pursued in the future a new permit application and new fees will be required. If you have any questions please don't hesitate to contact our offices at 425-771-0220. Sincerely: Theresa Umbaugh Permit Coordinator Incorporated August 11, 1890 Sister Citv - Hekinan, Japan z 0 1 0 M -11 -n M C M 0 --10 0 C M M Z ID --I C —Z 0) o -n n M M 0 —Cn 0 r- 0 M C Cn 9 Cn M 0 Z r- X z z 0 i 0 M I CITY OF EDMONDS 121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221 Website: ww6edmondsma.us DEVELOPMENT SERVICES DEPARTMENT 117 C. C)" Planning - Building - Engineering October 9, 2003 Mr. Bob Harty, Sole Proprietor 10627 Northeast 147 th Bothell, Washington 98011 GARY HAAKENSON MAYOR 1h RE: Precision Tune Auto Care Store #4128 @ 8129 244 Street Southwest, Edmonds Dear Mr. Harty: The purpose of this letter is to inform you that it has been brought to my attention that within the last three years the parking lot at the subject business has been re -surfaced or re -paved without first obtaining permit approval from the City. A parking lot permit is required by Edmonds Community Development Code Chapter 18.95.000 which states, 'no person shall construct, modify and/or expand a parking lot without ... a building permit'. The issuance of a permit allows the City to verify compliance to drive aisle width, curb stops, parking stall size, traffic flow, barrier free (accessible) parking (etc.). We understand that you may not have been aware of the requirement to obtain a pen -nit but since it has been brought to my attention I am required to enforce the code and assure that a permit is issued in order to be fair and equal to all citizens. Enclosed please find the City handout that describes the drawings needed to obtain a parking lot permit. I have also enclosed a permit application fonn. Please complete the fon-n and submit to my office with the necessary drawings, so that a permit can be issued. Note, it is highly likely that alterations would be required in order for your parking lot to be code compliant; for example, it is our understanding that currently there is no accessible parking space(s). Code requirements will be noted on the plans during review and you will be required to make those changes. Also, please be advised that violation compliance fees are assessed on all required applications since work conu-nenced without City approval and a permit. If you have any questions please feel free to contact me during City business hours of 9:00am to noon and 1:00pm to 4:00pm, Monday through Friday. If there are circumstances beyond your control that will prevent you from submitting a complete parking lot application by October 31, 2003 please inform my office immediately and propose an alternate date. Sincerely, Jeannine L. Graf Building Official hicorporated ALI_qLlSt 11, 1890 Sister Citv - Hekinan. Jar)an Z 0 M C M M 0 0 0 M M Z C 0 -n Ti M M 0 0 0 M C Cn 90) Q 0 Z Z Z 0 1 0 M FINAL PROJECT APP OVA-111i FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE------� MXAU SM In LW ENGINEERING DIVISION DATE ----- PLANNING DIVISION DATE�� PROJECT SITE ADDRESS 6� Z-A�T 4?111"1-),:;i0r- aL PERMIT # ADB#__DATE.INSPECTED--:����/�4/ee'�-/ DESCRIPTION OF WORK TO BE WSPECTED A(, 1'�A 122j::f� �,� A field inspection was conducted to determine final compliance with.approved plans. Final approval* denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of : , GRANT FINAL PROJECT APPROVAL GRAM PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAMED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector. 1. P1 3. RE_INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvl.doc.l:te":bldg:fonnsIO/OI z 0 3: M C: M 0 --10 0 C: --i K X M M Z 0-4 C: -Z 0 -n n ;U —i > r F. MM 0 0 0 M Cn Cn Q 0 Z r- M ;0 z --i 3: Cn z 0 M I.J RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... 1Q HEATING: Alz Gas Test .................... 4 Gas Piping ................. Equipment ................. AIA Lei Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR L4 OCCUPANCY .................. z 0 4 0 ITI —­1 -n C M M 0 0 0 0 C: M M Z C/) 0 _n n M ITI 0 0 0 M Cn (n Q 0 Z > z --I 3: Cj) z 0 0 1711