Loading...
20040196.pdfDATE RECE C1W OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS OtJe j4oN 10N� AHO (1 CC MATTING ADDRESS Uj z c) CITY Ij OS ZIP TEL.EPHONF T?eN-Lo NAME t- U ul t: ADDRESS CITY ZIP TELEPHONE NAME CB IF TPv-fL"-G,K2_udT) ADDRESS CITY PERMIT EXPIRES USE PERMIT ZONE NUMBER JOB SUITE/APT# ADDRESS PLAT NAMEISUBDIVISION NO LOT NO LID NO. LID FEE $ I ESCP Approwd 13 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit floquirod A S!root Use Porroil Floq'd 13 EXISTING — PROPOSED Inspection Requilrid Sidewaik Roquifed REQUIRED DEDICATION F1 Underground 13 Wiring required METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED I I YES NO REMARKS OWN ER/CON TRACI OR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE P" �10WA"Jffivi 21WY RING REVIEWED By _ DATE Vr L Jo's -4653 STATE LICENSE NUMBER �XPIRAIION DATE CHECKED BY V FIIANCE OR Q6 7 17N r U 4 0 01 4>1 M fl / / eM 441-av SEPA REVIEW PROPERTY TAX ACCOUNT PARCEL NO. I I COMPLETE EXEMPT 0 03 6 L'I I OC�' 14) 0 OT-) , EXP y NEW RESIDENTIAL 1:1 PLUMBING I MECH LOT COVERAGE ALLOWED PROPOSED ADDITION COMMERCIAL COMPLIANCE OR 13 CHANGE OF USE 0 REMODEL MULTIFAMILY SIGN PARKING PROVI REQ'D DED GRADING FENCE REPAIR CYDS ( x FT) 'L"- REMARKSLI_,' DEMOLISH TANK OTHER C, GARAGE RETAININGWALL CARPORT ROCKERY FIRE SPRINKLER El FIRE ALARM C., 11 CrYPE OF USE, Bu�� ESS OR APTIVITY) EXPLAJN: E C _�'_ . ' — - , I /) h ) Y'�% A / / /I -, \ r,=ECKEDBY [E�of NUMBER OF 3 STORIES NUM13ER OF DWELLING UNITS CRITICAL AR NU DESCRIBE WORK TO BE DONE L P'rk�I;Z_3 T13 I r'j T-041 C 1. 1) CC r-j C iQ �f It Cj ls<�'. L' HEAT SOURCE GLAZING % LOT SLOPE % PLAN CHE N�/ VESTED DATE THIS PERMIT AUTHORIZES ONLY THE"WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS. SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION *APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTERES r, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMi ESS THE Cl T-Y OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDiRECTI-Y FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF IHIS PERMIT SHALL NOT 13E DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILIFY TO ENFORCE ANY ORDINANCE PROVISION." I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION. THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRuc- TION ' AND IN DOING IHE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING 1-0 WORKMEN'S COMPENSATION INSURANCE AND RCW 18 27 6 SIGNAT(RE) R Ad N DATE SICINED DATE 7� SrRELINE OR ADIII INSPECTION BOND REO'D POSTED OYES ONO HEIGHT ALLOWED PROPOSED ALLOWED PROPOSED cj , -r'. REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) FRONT SIDE REAR FRONT IJRSIDE HEAR LOT AREA I PLANNING REVFEWED 13Y DAT CONSTRUCTION SPECIAL INSPECTION JAREA REQUIRED JK YES I OCCUPANT GROUP OCCUPANT LOAD ul z z a z Lu LL1 (5 z F_ z 5 CL REMARKS a PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D I �q VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee CALL FOR INSPECTION (425) 771.nt3gn FEE Description FEE State Surcharge City Surcharge Base Fee Plan Chk. Deposit ­7 Receipt # Total Amt. Due I Receipt # APPLICATION APPROVAL I his application is not a permit until signed by the Building Otficial or his/her Deputy and Fees are paid, and receipt is acknowledged in space provided. DATE RFI 'E�� ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES 1) fly DATE 4 .&I Z_ OHIGINAL - FILE YELLOW - INSPE(iroR PINK - OWNER GOLD - ASSESSOR =11 M q z 0 1 0 M zi =fi 0 M C M 0 C) 0 C: M M Z X Cn 0 ­n n --I x M M 0 _U) 0 r- 0 M C Cf) 90) M 0 Z z Cn z 0 I 0 M PARKING DISRUPTION/CLOSURE FEE CALCULATION Project/Address: One Ten James 1110 James calculated by Jeanie McConnell Date: 1 1-Mar-04 Bars#: 111.000.000.344.120.000-000-00 Assessed Land value (per County Assessor) of abutting property Area of abutting property (sf) x Assessed land value per square foot of abutting property (land value divided by area of property) disruption/closure multiplier(l%) I% of assessed land value per square foot (land value per sf x disruption multiplier) Parking area disrupted in square feet 8.5 ft wide > 88 ft long - Monthly parking disruption fee (1 % land value per square foot x area of sidewalk disrupted) Estimated number of months of disruption SUBTOTAL PARKING DISRUPTIONICLOSURE FEE ADMINSTRATIVE PROCESSING FEE (fee to be paid prior to permit issuance). TOTALFEE $ 700,000-00 (divided by) 30,056 sf (equals) $ 23.29 per sf (times) 0.01 (equals) $ 0.23 per sf (times) 748 sf (equals) $ 174.21 per mo. (times) 12 (equals) 2, 0 �-5 0 (plus) $ 140.00 (equals) $ 2 2 NOTE: The above fee must be paid prior to or at the time of permit issuance. If actual months (or portion thereof) of disruption is more or less, then a fee adjustment will be made at the time of Engineering final inspection. as of 23 Apr 03 v.vnstr formsxd1sruption-closure fees z 0 I 0 M -n Cn M M 0 0 0 0 C M M z C 0 -n n� -4 MM Cl) 0 r- 0 M C CO) 9 Cl) M 0 Z z Cl) z 0 0 M FINAL PROJECT APPROVAL FORM TO: C>� DATE: 10 A 21,914 MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE PLEASP SIGN PLANNING DIVISION DATE 1c, — 1 o c4 PLEASE SIGN PROJECT W-Awpf-AN-A re'7'�'rf SITE ADDRESS PERMIT# W24­019 6 ADB#_ DATE INSPECTED i o — i a — o cA DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRE CTION NOTICE given to owner/contractor by inpector 2. 3. RE-fNSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJ E CTAPPROVAL Date Signature 1AetnP:b1dg:forms:ocaprv1 3/25/04 z 0 M --i -n r rn C M 0 C-) 0 rn M z 10--1 Cn o -n n X > M M 0 0 M Cn U) M 0 Z r- .qM z --I X U) z 0 1 3 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE ME-ASF SIGN k ENGINEERING DIVISION DATE_ZW PLEASE SIGN PLEASE SIGN —PLANNING DIVISION DATE PROJECT SITE ADDRESS PERMIT#20(0q- Q19�6 ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED /I A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: /\/, GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE given to owner/contractor by inspector I . 04 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:fbmis 10/0 1 z 0 1 0 ::i =55 M 0 0 0 0 C --i g M M M Z r') —i C W 0 -n n;u --i > M ?. MM 0 0 0 M C Cn K Cn Q 0 Z r z Cn z 0 M FINAL PROJECT,,kPPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLFASIF SIGN olvc-2L,6C� 44_ ENGINEERING DIVISION DATE PLWE SIG?4 v PLANNING DIVISION DATE. PIy_kSE SM PROJECT____4Z0/ [A A A r- SITEADDRESS___.,/_`�/`�� PERMIT (2)Q4- / 9 _6 _ADB# 'DATEINSPECTED ')(11140-5e DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE B.ONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED a Copy of CONDITIONS given to owner/contractor by inspector 1. FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector I . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:f6mis 10/0 1 z 0 r M M 0 0 --I C) 0 C M M Z -Z Cn 0 -n n M M 0 0 0 M C (n K Cn Q 0 Z r z z 0 1 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PEF2VVr'JQOO R, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE _7 MEASE SION V ENGINEERING DIVISION DATE— nXASF SIGN PLANNING DIVISION DATE — PLEASE SIGN PROJEC k /1-1— C_(1 SITE ADDRESS__�� M4�� PERMIT # ADB# --PATE INSPECTED 2- DESCRIPTION OF WORK TO BE INSPECTED —r-O <-, A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of : *GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES c3 Copy of CORRECTION NOTICE given to owner/contractor by inspector 1 . 04 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:teMP:b1dg:fbrmS 10/0 1 z 0 i 0 !'9 0 M C M 0 0 C) 0 C: M M Z 1C) --I C Cn 0 _n n x -4 > M K M M 0 U5 0 r- 0 M C (1) 9 Cl) M 0 Z r- M z z 0 1 0 M I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -in ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING 11's NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 1,91 07- A A4tMAA4 v4v-1 Ir r'? 24 z 0 i 0 M --i -n M C M 0 0 0 C M M z C o -n n M M 0 0 0 M cl) C/) Q 0 Z ;U z C/) z 0 1 0 M