20040220 (2).pdfDATE RECEIVED
USE
CITY OF EDMONDS ZONE
JOB
CONSTRUCTION PERMIT APPLICATION ADDRESS
OWNER NAME"E OF BUSINESS
PLAT NAMEISUBDIVISION NO,
_41 I
MAILING ADDRESS
110 iqr`�
CITY
L'Upluz
ADDRESS
CITY
NAME ; '
ADDRESS
CITY
4!2ii'l 4
STATE LICENSE
PROPERTY TAX
NEW
ADDITION
REMODEL
REPAIR
DEMOLISH
EiGARAGE
CARPORT
(TYPE OF USE, I
A4.. oFr-
VCL� f - J:tp -
ZIP TELEPHONE J":*
C? 8 C),-)� . 'Vff'
j 'FAM�v - V61%
ZIP ITELEPHONE
CBL N
I
ZIP TELEPHONE
fy 5&so7l 77 If S!"78 57�
EXPIRATION DATE I CHECKED BY
r
74�4T PARCEL NQ
RESIDENTIAL
COMMERCIAL
MULTIFAMILY
13
GRADING CYDS
E]
TANK
RETAINING WALL
ROCKERY
NUMBER NUMBER OF
OF DWELLING
STORIES UNITS
DESCRIBE WORK TO BE DONE
4a
A �A z . . A/ rl^e . z
HEAT SOURCE I GLAZING %
PLAN CHECK NO:
PLUM13ING / MECH
COMPLIANCE OR
CHANGE OF USE
SIGN
o FENCE
X FT)
0
FIRE SPRINKLER
FIRE ALARM
CRITICAL
AREAS
NUMBER
LOT SLOPE %
VESTED DATE
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
I= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
W PERMIT APPLICATION: 180 DAYS
PERMIT LIMIMI YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
4
x FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE
0
_j DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
0 NOR LIMIT IN ANY WAY THE C11YS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. -
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT., AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LA13OR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
SIGN3W9E (OWNER OR GE�N ATE SIGNED
XZ , �-
PERMIT EXPIRES
PERMIT
NUMBER jii(V4 �11'
b, �,
f c' IM: fA PT#
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
EXISTING - PROPOSED
REQUIRED DEDICATION- Fr
METER SIZE I LINE SIZE I NO. OF FIXTURES
LID NO,
LID FEE S
TESCP Approved
13
RW Permit Required
0
Street Use Permit Roq'd
13
Inspection Required
13
SidnWaN Required
E3
Underground
wiring required
13
PRV REQUIRED
YES13 NO 11
REMARKS
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE
ENGINEERING REVIEWED BY DATE
FIRE REVIEWED BY DATE
a
Z
cc
uj
z
z
LU
uj
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
BOND
REO'D
POSTED
IS
E]YES ONO
SEPA REVIEW
SIGN AREA
HEIGHT
COMPLETE EXEMPT
ALLOWED PROPOSED
ALLOWED PROPOSED
EXP ,
I
,
LOT COVERAGE
REQUIRED SETBACKS (Fr.)
PROPOSED SETBACKS (FT)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT URSIDE REAR
0
z
L
z
fl.
PARKING
LOT AREATPi7ANNING
REVIEWED BY DATE
REQ�D I PROVIDED I I I 1 1;
REMARKS
//r/19 k�� /
_��S I
CHECKED BY ITYPE OF CONSTRUCTION 0 OCCUPANT
6149-7-2 7_vc,,_- GROUP
SPECIAL INSPECTION JAREA OCCUPANT
REQUIRED LOAD
0
REMARKS z
PROGRESS INS�ECTIONS PER UBC 1 08/FINAL INSPECTION Irilt:U-U 1 !3
ca
Ell
Description
Plan Check
Building Permit
Plumbing
Mechanical
Grading
Engr. Review
Engr. Inspection
Fire Review
Fire Inspection
Landscapelnsp.
Recording Fee
FEE
�1_11
L�X,j
CALL
FOR INSPECTION
(425)
f [ I.Uzzu RELE S§fDIfY /DATE_
AfTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
-INSPECTC
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL -FILE YELLOW
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK -OWNER GOLD -ASSESSOR
GREEN - ACCOUNTING
04/02 PRESS HARD -YOU ARE MA INU 0 ut-IF-0
Des6ription
State Surcharge
City Surcharge
FEE
Plan Chk. Deposit
Receipt #
Total Amt. Due
Receipt #
APPLICATION APPROVAL
This application is not a permit until signed by the
Building Olficial or his/her Deputy: and Fees are paid, and
receipt is acknowledged in space provided.
FFICIALS SIGNATURE DATE
z
0
4
0
M
--I -n
M
C
M 0
0
__10
0 C
—4 K
X M
M Z
10--i
C _z
3:
0 -n
n
—1
af
M M
0-0)
0 r-
0 M
C W
9 Cn
Q 0
Z
r
z
z
0
1
0
M
0
� I
-fP C. 1 89Z
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTH * EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
Website: www.dedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning- Building* Engineering
February 18, 2004
Janice Trickell
Cinderella's
Post Office Box 1645
Edmonds, Washington 98020
RE: Fence/Arbor and Gate @ I 10 0 Avenue North
Dear Mrs. Trickell:
The purpose of this letter is to inform you that the City has received a citizen's complaint
regarding a fence and arbor with gate, constructed without City approval, that blocks the
required barrier free pedestrian access leading from the rear accessible parking space to
the front of your building. Edmonds Community Development Code Chapter 20.10
requires design approval for all exterior changes to commercial and multifamily buildings
in the City. Building permits are required in order to assure code compliance is met. The
State Barrier Free Code does not allow required accessibility access to be impeded or
blocked.
Please inform my office within 10 days date of this letter with regard to whether you will
make complete application for all required City approvals or whether you will remove the
fence, arbor and gate. If you choose to submit for applications note that violation
investigation fees shall be charged in addition to nonnal application fees.
If you have any questions about the complaint, please feel free to contact me directly at
425-771-0220 extension 1226. If you have any questions about the permit submittal
requirements please contact Marie Harrison, Senior Permit Coordinator at 425-771-0220
extension 1389. If you need additional time to make a decision please inform me in
writing of an alternate date.
Sincerely,
Jeannine L. Graf
Building Official
Incorporated August 11, 1890
Sister City - Hekinan, Japan
Z
0
A
0
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING ..........................
FRAMING ........................
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
GOWAthlIft . ..................
z
0
4
0
M
:;:H
M
C
M 0
0
0 C:
-4 K
= M
M Z
C _Z
0)
0 _n
n
MM
0-
0)
0 r,
0 M
C Cn
9 0)
Q 0
Z
;U
__4
3:
z
z
0
i
0
M
I