20040241 (2).pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
PLEASE SIGN
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE
PLEASE SIGN
PROJECT fkw �f�
SITE ADDRESS —
PERMIT# DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED /-7-4/1
A field inspection was conducted to determine compliance with -approved plans. Final approval
.denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
1 .
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:terap:b1dg:f6rn1s:ocaprv1 3/25/04
z
0
4
0
M
--I -n
C M
M 0
0
0
0 C
M
M Z
K) --I
C
3:
CAI
o -n
n m
-i >
3:9
M M
06
0 r-
0 M
C CD
?. cn
M 0
Z
z
-i
M
Cn
z
0
M
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
)-,2
FOUNDATION:
Footing......................
Wall ..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -In ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment.................
Commercial Final .......
EXTERIOR SHEATHING
NAILING..........................
7-d -
FRAMING ........................
/vA
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
`7
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY .............
The Initials MT arc Milto"
Thollipson, a teinporary contract
inspector ror the City.
z
0
A
0
M
—4 -n
(J)
M
M
0
__10
0 C
M
M Z
C _Z
CO)
o -n
n
ITIM
0
0
0 M
C C/)
9 C/)
M 0
Z
:..i
z
_4
M
0)
z
0
i
0
M