Loading...
20040275 (2).pdfI DATE RECEIVED PERMIT EXPIRES a USE PERMIT ZONE CITY OF EDMONDS :2 NUMBER JOB CONSTRUCTION PERMIT APPLICATION ADDRESS OWNER NAME/NAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT LID NO. MAILING ADDRESS .1 W z LID F 3: 1 1 C) 2 r- %4 TESCPf yed 0 P LA PUBLIC RIGHT OF WAY PER OFFICIAL STREET.4AAP RWPROI fed . W.40601 CITY street Us; Permit Req'd ZIP ITELEPHOI EXISTING — 'PROPOSED Inspe.clion Require A ru Sidewalk Required Underground C3 REQUIRED DEDICATION* Fr X. wiring required �10 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED C 'As�%- It a YES13 NO 13 z W 1= ADDRESS REMARKS z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE z U ZIP CITY I JL I L NAME V, 1col M 1 t--M .;=YAYA" '�AGINEERING REVIEWED BY /DATE ADDRESS 0— '0� 0 CITY FIRE REVIEWED BY DATE LU ZIP I -TELEPHONE 0 0 4�2 VARIANCE OR STATE LICENSE NUMBER EXPIRATION DATE CU SHORELINE OR ADB# INSPECTION BOND CHKKED BY 1 0 REO'D POSTED ES EIYES j�(NO S 2d SEPA REVIEW SIGN AREA HEIGHT ;jI PROPERTY TAX ACCOUNT PARCEL NO-�,, CgWl_�TE,, EXEMPT ALLOWED PROPOSjED ALLOWED PROPosEn (5 W EX 14 NEW RESIDE�4-)` PLUMBING MECH - T OVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (F(.) PROPOSED FRONT SIDE REAR FRONT L/Fl IDE REAR ADDITION COMMERCIAL COMPLIANCE OR ei tA, r z W�4 DCHANGE OF USE Iol I(Vib, fqA, z � �iu z XARKING. LOT AREA PLANNING FlEvIEWED 13Y to REMODEL MULTIFAMILY SIGN REO'D I PROVIDED FENCE REPAIR ClInn � X� ( X FT) KS x DEMOLISH OTHER r? Ilic, Qjo TANK GARAGE RETAINING WALL FIRE SPRINKLER ( 7:12� z CARPORT ROCKERY FIRE ALARM 0 (TYPE OF USE,-PUSINESS OR ACTIVITY) EXPLAIN: T7 4 1 E 11 2-a_L=1 I Fr __ /__ - CHECKED BY TYPE CI)qbqST LICTION OCCUPANb, 0 72-4 I &Lzz�5/ 1 9 GROUPz w NUMBER' Nun CRITICAL 0 1 M OF 2. DWELLING. AREAS SPECIAL INSPECTION JAREA OCCUPANT 0 STORIES UNITS -NUMBER REPUIRED LOAD DESCRIBE WORK TO BE DONE R ERAR PROG SS INSPECTIONS PER LIBC 108/FINAL INSPECTION REQ'D z L F X P-1 r 1_0 uvy)),5 91 VU, 14 05 03 �M/ 6yl 0 ir, CZO q nvp tjorft,6 i- lil� VALUATION1 W $ L-) ore .�4 Description FEE Description "FEE I /:V //5z? :k tate Surcharge Chec S �156 j HEAT SOURCE GL;kZ_1NG % LOT SLOPE % - I Building Permi City Surcharge t PLANCHE�Q�N VESTED DATE Plumbing o ol THIS PERMIT AUTHORIZES ONLY THE IWORK NOTED. THIS PERMIT COVERS WORK TO Mel�bldnical Wit - I It BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading :3 SEPARATE PERMISSION. Engr. Review /4�, 119 <11� W PERMIT APPLICATION: 180 DAYS PERMIT LIMIT 1 YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection U) APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, E. IGNS AND SUCCESORS Plan Chk. Deposft" ;N INTEREST, AGREES TO INDEMNIFY, DEFEND AI)o %"M ARMLESS THE CITY OF 1 M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEEs� AND AGENTS FROM ANY AND W Fire Inspection 4 ALL CLAIMS FOR M HATEVER NATURE f r '�'RECTLY OR INDIRECTLY Receipt # X FROM THE ISSUA�PA�CAVAJIPERMIT. ISSUANC� �lj PERMIT SHALL NOT BE 9 DEEMED TO M06IFY, WAIVE QR REDUCE ANY REOU F ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due 0 NOR LIMIT IN A/�)�PNN�,T Y.OhDINANCE PROVISION.- , �17P ABILITY TO EN=,,ANC 21 Recording Fee Receipt # ;�2 4.1 I HEREBY ACKNO 1. EDGE THAT I HAVE READI I �IS ATION; THAT THE INFORMATION GIVEN IS COAREN; AND THAT I AM THE OW FIN DULY AUTHORIZED AGENT OF APPLICATION APPROVAL LA A i AWS REGU TING CONSTRUC- THE OWNER. I AGREE TO COMPLY WITH CITY AND KEE, This application is not a permit until signed by the TION; AND IN DOQ4 0 AUTHORIZED THEREBY. NO PERS�N WILL BE EMPLOYED CALL Building Otficial or his/her Deputy; and Fees are paid. and IN VIOLATION COE OF THE STAT-1 ON RELATING TO FOR INSPECTION receipt is acknowledged in space provided WORKMEN'S C N' 0 1INEANCE AND RCW 18 �T T1 OFFIC!ALS SIGtjATURE DATE SIG ,fiAT-URE4 W�E 'OR AGENT) DATE SI NED .(425) 0 771-0220 -_RE[EAPLr Y DATE ATTENTION EXT 1333 " 1! 1 .") IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL - FILE YELLOW - 114SPECTOR 04/02 PINK - OWNER GOLD - ASS[ 009=QQ WA01"I -Vr)l I ADII= RAAICIK]r. i rlr)DII=Q GREEN - ACCOUNTING W. J� z 0 1 0 ::i::fi rj) M rn 0 C-) 0 C: M M z 0-4 C _z o -n n __`l af M M 0 0 0 rn C: cl) r. (n M 0 Z z z 0 1 0 IT! IMPERVIOUS SURFACE CAI CS HOUSE wl ROOF O.H. - 2103 S.F. GARAGE wl ROOF O.H. - 605 S.F. CONC. STAIRS 33 S.F. DRIVE & WALKWAYS 88 ajF. TOTAL IMPERVIOU 3H3 . TOP or "c)(EXT 100' SEASONAL DRAINAGE —SWALE WATERCOURSE SETBACK PER PLAT 186 % % SILT FENCE — JF zc INSTALL PER CITY OF 1�ft EDMONDS SPECS. ED Top or ROCKERY Igo, 7. STU OF RDCKERY 15 OL TOP OF ROCKERY Ia7: 4' BTIA or ROCKERY ia4 - — - — — — - — qA 14' 24- EXISTING CHAIN 12' LINK FENCE 14* 1 r4 MAIN 0 194.00* , Q/ HANCHFTT r'O RFRIDFNCr CO \S(3 17' 14' TIGHTLINE ALL DOWN SPOUTS , DETENTION 4151L. . I LTO C CITY OF EDMONDS S r-� I I 'a I HEIGHT CALCS, HOUSE POINTS TOP OF ROCKERY 189' % A +187.85' — — — — — — — B +195.90' 1 A 25- C +198.16, [A D +192.09' (D T.O. SLAB 0 193.15' 2—CAR GARAGE A.E.G. 193.50' 20' ACTUAL - 218,33' 6 MAX. HT. - 218.50' r Q 19 GARAGE POINTS - +189.00' 10'— B +193.10, C +195.50' D +1191.85 A.E.G. - 192.36' ACTUAL 207.16' MAX. HT. 207.36' LOT COVERAGE LOT AREA . 12.001 S.F. BUILDING COVERAGE - 2.708 S.F. (22.56%) OWNERS BRIAN & CHRIS HANCHETT 1103 DALEY PLACE EDMONDS. WA 98020 (425) 775-1550 194— tt��l I LFGAL DESCRIPTION: Lot 10, Harbor Hills, as recorded under Auditor's File #890BOBSO01, records of Snohomish County. Washington. 15' 9. PORCH 14' r— — — — — — — - ,NEW ROCXRY TO TIE INTO EXISTING ROCKERY OU NEIGHBORING PROPERTY . ?08, a06, OF ROMPY 20r TIN! or Poony 1"' WALKWAY eolz e00 Or :00KERY 196' 01 OCKERY 193' 10 W ' ' H. APPFjOVED �A !LL E ey PLANNING t 0 1 U Ex 0 MCK E R IMS T ?NIO T !C: E �ED 48" H. w/o A PERMIT VERTICAL DATUM CB Type I Rim EI-196.3' Bottom of Structure Ei-194.6' B" DIP Out to Southwest EI-194.7' SITE PLAN GRAPHIC SCALE 40 ( IN FEET ) I inch - 20 ft. SPECIAL TRUCK CONDITIONS: 1) AT LEAST 30 MINUTES BETWEEN TRUCKS 2) NO BACKING TRUCKS UP THE INCLINED ROAD 3) 10 mph SPEED LIMIT FOR ALL CONSTRUCTION VEHICLES 4) NO DUMP TRUCKS WITH TRAILERS 3py RECEIVED JAN - 8 2004 PERMIT COUNTER I I SHEFT I AH 9 Height Calculation Worksheet Address: D3 Date: c-7 i L3 r v hispector(s): vv-1 1. Datum Point: 2. Datum Point Elevation: z 0 3. Aver -age Grade: c) 5 0 + 5 4... Max,imum Elevation Allowecf)�'g (averag� g�ade):` 2 C/) 0 MM 5. Reference Point Elevation Shot to House: M 0 (datum elevation) +cG-"52 (grade to transit level line*shot to house) 0 0 3: M 6. Measurements from line shot onto house to roof ridge: M z C— >Z --4 Cl, 0 71 -n 3: M M 0 —Cn 0 0 M C CD 9 CD M 0 Z M z Total :I U., 4�? z 0 0 M 7. Actual Elevation: (reference point elevatioji) +K'41 from#6)=-- 21!� -,)C� Conclusion: Q7 (actual) is greater Kajn&L 18- (allowed); therefore the house is/ is not over the height requiremX��'ethraECDC 16.20.30 requirements I '. E Creationsfor Gi-acious Living ESTATE HOMES DESIGN City of Edmonds Planning Department 121 5h Avenue North Edmonds, WA 98020 To Whom It Most Concerns: RECEIVED JUN 2 6 2003 PERMIT COUNTER 06/18/2003 This letter is written to confirm that I (Craig R. Carney) will act as the "lead design professional" for Brian and Chris Hanchett during the permit process as they submit for permits to construct a single-family home on lot 10 in the Harbor Hills subdivision. I understand that I am responsible for coordinating and incorporating recommendations of other lead design professionals onto the plans or into the submittal packet. I have reviewed the geotechnical report, understand its' recommendations and have incorporated into the design the established measures to reduce the potential risk of injury or damage from any earth movement predicted in the report. In addition, I have explained to the owner the risk of loss due to slides on the site, and have incorporated into the design the recommendations of the geotechnical report and established measures to reduce the potential risk of injury or damage that might be caused by any earth movement predicted in the report. Regards, Craig R. Carney, Assoc. AIA COPY Estate Homes Design, Inc. 16300 Mill Creek Blvd, Suite 121, Mill Creek, WA 98012 (425) 743-3373 office (425) 741-2508 craigc@estatelioniesinc.net e-inail z 0 0 M :q 9 June 23, 2003 RECEIVED JUN 2 PERMIT COUNTER z 0 0 M City of Edmonds Planning Department =i =5 121 5h Avenue North co 0 Edmonds, WA 98020 M C M 0 -10 0 To Whom it Most Concerns: C This letter is written to confirm that the accuracy of all permit submittal information is M M z warranted by us (the property owners). This letter relieves the City and its staff from any > z liability associated with reliance on the permit application submittals. While our application may reference the reports of prior public consultants to the City, all co -n conclusions shall be ours, or our design professionals. In addition, we understand and 0 n accept the risk of developing in an area with potential unstable soils and we will advise, -.q in writing, any prospective purchasers of the site, or any prospective lessees of the M M -0) structures in the site, of the slide potential of the area 0 Regards, 0 M C 0) K Cl) M 0 Z X X z Brian and Chris Hanchett z 0 i 1103 Daley Place 0 M Edmonds, WA 98020 (425) 775-1550 CITY COPY June 18, 2003 City of Edmonds Planning Department 121 5th Ave North Edmonds, WA 98020 To Whom It Most Concerns: This letter is written on behalf of Brian and Chris Hanchett who are submitting for -family residence on lot 10 of the Harbor Hills subdivision. This permits to build a single is to verify the approval of their plans by the homeowners' association as signed by the President of the association. Sharon Cramer President Harbor Hills Homeowners' Association Regards, Brian and Chris Hanchett 1103 Daley Place Edmonds, WA 98020 (425) 775-1550 June 18, 2003 City of Edmonds Planning Department 121 5th Ave North Edmonds, WA 98020 To Whom It Most Concerns: This letter is written on behalf of Brian and Chris Hanchett who are submitting for permits to build a single-family residence on lot 10 of the Harbor Hills subdivision. This is to verify the approval of their plans by the homeowners' association. The following is a list of signatures provided by Harbor Hills' homeowners: Regards, Brian and Chris Hanchett 1103 Daley Place Edmonds, WA 98020 (425) 775-1550 z 9 0 M --I -n M M 0 0 0 C --i K X M rn z —Z W o -n n 3:9 MM 0 0 0 M C cl) K Cf) M 0 Z 7' 3: z C/) z 0 1 0 M March 25, 2005 MAR 8 2095 EHGMFEMt4G MVIS'Ot4 Dave Gebert City Engineer Development Services Department Engineering Division 12150' Avenue North Edmonds, WA 98020 Dear Mr. Gebert: My wife and I are in the final stages of building a home with a detached garage (1103 Daley Place permit numbers 2004-0275, 2004-0276). Our site is on a slope and the driveway connects to a private road, which is also on an incline. We constructed our garage to meet the height restriction but our driveway (which was approved at a 13.95% slope) upon final inspection came in over 14% but less than 20%. Due to the difficult nature of this project and our sincere effort to follow our approved plans, we request that the city requirement for a slope less than 14% be waived for our driveway. I can assure you that every effort has been made to follow our engineered plans, but in this one instance, the as -built did not end up exactly as we had anticipated. Thank you for considering our request. Sincerely, Brian and Chris Hanchett 1103 Daley Place Edmonds, WA 908020 (425) 775-1550 b.hanchett@verizon.net z 0 i 0 M -1 -F1 0 M a M 0 0 0 0 C M M z K) --i C _Z 0 71 n M M 0 _W 0 r- 0 M C cl) C 0) M 0 Z z W z 0 1 0 M �rl? C. 1 .8 9 "1 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwxi.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering GARY HAAKENSON MAYOR March 30, 2005 Brian and Chris Hanchett 1103 Daley Place Edmonds, WA 98020 Permit #2004-0276, Driveway Slope Exceeding 14% RE: 1103 Daley Place Dear Brian and Chris, This letter is being sent in response to your letter dated March 25, 2005 requesting naximurn allowed driveway slope of 14%. The driveway slope approval to exceed the i was checked in several areas during a field inspection on March 24, 2005 and found to be between 14% and 20%. It is understood that the detached garage was constructed at appropriate levels so as not to exceed the height restriction and the grade of the road was previously established. Your request to exceed the allowed driveway slope of 14%, up to a maximum of 20% is approved. Sincerely, DAVID K. GEBERT, P.E. CITY ENGINEER jm c: Street file k.,�ermit #2004-0276 Incorporated August 11, 1890 z 0 M NorthStar Land Surveying, Inc. Professional Land Surveyors PO Box 2139 Snohomish, WA 98291 Tel 1-800-619-8223 Fax 360-862-9921 June 2, 2004 To Mike Snook City of Edmonds Development Services Department 121 5th Avenue N Edmonds, Wa., 98020 Dear Mike: In reference to the Hanchett property located on Lot 10, Harbor Hills as recorded under Auditors Me #8908085001, records of Snohomish County, Washington. I personally reviewed the computations made for the foundation staking and staked those points in the field. The only structure that is actually on the setback lines Is the garage and it was staked utilizing the existing property comers on site, care was taken during the staking process to ensure that the setback requirements were met. The Setbacks comply with the approved Plot Plan. Sincerely, Jon E. Pendergraft, PLS Northstar Land Surveying Z,-� I NDE S F S 1)31051 &-,r- RECEIVED JUN - 4 2004 PERMIT COUNTER Z 0 i 0 m DODDS RECEIVED JUN 2 6) 2ii"'.3 GeoSciences Inc. PERMIT COUNTEF Post Office Box 2385 Kirkland, WA 98083 Tel: 425.827.1084 Fax: 425.828.944 3 Mr. & Mrs. Hanchett: Job Number 23005 1103 Daley Place March 18, 2003 Edmonds, WA 98020 z 0 Subject: Geotechnical Engineering Report 0 M Proposed New Residence Lot 10 of Harbor Hills Edmonds, WA. 98020 0M C Dear Mr. and Mrs. Hanchett: MO 0 0 C This report is the result of our work on Lot 10 of the Harbor Hills Short M Plat in Edmonds, Washington. The purposes of our work were to M z evaluate the characteristics of the subsurface soil and groundwater on > the site, provide geotechnical engineering design guidelines for shallow structure footings, and provide geotechnical engineering guidelines for Cn 0 -n earthwork and grading. The scope of our work consisted of logging and -n sampling three test pits excavated on the property with a backhoe, X 9 M conducting laboratory testing consisting of sieve gradation and moisture M a content tests, engineering analysis, and creation . of this report 0 0 M summa rizing our findings:and conclusions. No.warranty is expressed.or C Cn 9 Cn implied. Please see Plate 1 for guidelines in the use and application of M 0 z F— this report to your project. M surface Conditions: z The property is Lot 10, of the Harbor Hills Short Plat in Edmonds, 3: Washington. The general location of the properLy is shown on the Vicinity Ma Plate 2. p z 0 At the time of our fieldwork, the site was generally cove red with grass. M There was a. slight to moderate slope down to the west and north. There is a drainage swale running along the north side of the property. Subsurface Investigation and SummaEy Three test pits were excavated on the property at the locations shown on the Site Plan, Plate 3. The, test pits were excavated to a maximum depth of nine feet below existing grades with a backhoe. C,f-%Pv CITY ".& ft -, , W LOT 10 - HARBOR HILLS Job Number 2300S March 18,2003 Pa e 2 9 The test pits were observed, logged and sampled by the undersigned engineer during excavation. Recovered soil samples were subjected to selected laboratory . testing consisting moisture content and sieve gradation tests. At the conclusion of the testing all collected results were collated, organized and analyzed. Z 0 Although there may very well be variations from the following, we expect 0 the subsurface description below to apply to much of the site: Much of the site is overlain with around four feet of variable 0 M C gravell. silty sandy fi much of which has abundant wood y M 0 0 __10 and logs in it. Underlying the fi at Test Pits 1 and 3 was 0 around 2.5 feet of soft, wet Peat. A brown to gray, medium- X M dense to dense, gravelly silty sand underlies the entire site M Z starting at a depth of six to eight feet below existing grades. C Z > Seeping groundwater was noted in our test pits during F- --i excavation at 3.5 to 5.0 feet below grades. C/) 0 -n M The final test pit logs attached to this report are our interpretations of M CJ) the field data and the laboratory tests. The stratification lines on the 0 logs represent approximate ..boundaries between soil types at the 0 M C Cn 9 Co exploration location. In actuality the transition may be, gradual. The M 0 relative densities and moisture descriptions on the logs are -interpretive Z descriptions based on observed conditions during drilling. The logs X should be reviewed for specific subsurface information at each of the locati o*ns tested. Z Cn Z 0 M LOT 10 - HARBOR HILLS Job Number 23005 March 18,2003 Pa e 3 9 General Conclusion Summary: 1) The site appears feasible to develop provided the recommendations contained in this report are incorporated into the plans. 2) It appears the biggest potential problem on this site will be the capture, control and drainage of groundwater around and z 0 under. the residence and the driveway, both during and after 0 construction. M 3) To facilitate drainage and bearing, we recommend the entire building pad be underlain with a minimum of 1. 5. feet.of 2" to Fn --i 4" compacted quarry spall rock which is placed atop, 0 M C competent native soil. Slabs on grade and driveways should M 0 be over -excavated to competent native ground and backfilled 0 0 C with clean crushed rock. The ground under the spall rock M M should be sloped to drain to the northwest corner of the M z excavation, where all the drainage will be collected -into a pipe C z and discharged to an approved discharge facility. > 4) It appears that most to all of the excavated soils for this project will be unusable as structural fill. 0 -n Foundations: M M 0 The proposed new structure may be supported on conventional 0 M C C/) continuous and spread footings bearing on a minimum of 1.5 feet of F. Cn M 0 compacted 2-inch to 4-inch quarry spall rock placed atop competent Z r- undisturbed gravelly silty sand. A maximum bearing pressure of two ;U thousand five hundred (2,500) pounds per square foot (psf) may be used in structural design. The design bearing pressure may be increased by > z one-third to accommodate short term wind and seismic loads. All footings should bear at least eighteen (18) inches below the outside Cn z finish grade. Over -excavation to place the spalls should be anticipated. 0 To preclude shear failure of the ground, we recommend continuous and 0 M spread footings have minimum widths of sixteen (16) inches and two (2) feet, respectively. Quarry spalls placed under footings should extend out beyond the edges of the footings a minimum distance equal to one-half the fill depth. For example, if two foot of compacted quarry spalls was placed under an sixteen -inch -wide footing, the minimum width of the spalls (and therefore the footing excavation) would be forty inches. LOT 10 - HARBOR HILLS Job Number 23005 March 18,2003 Pa e 4 9 Our calculations indicate that footings bearing as specified above will settle approximately one -half -inch between building corners, between isolated spread footings, and for every forty feet of continuous footing distance. Lateral loads such as wind and seismic forces are accommodated by Z friction between the foundation elements and the bearing soils, and by passive earth pressure against the foundations. However, passive earth rn pressure is only available if compacted structural fi is used to backfill against the foundations. The passive resistance in these cases can be Co assumed to be an equivalent fluid pressure of three hundred (300) X 0 M pounds per cubic foot (pcf). M 0 0 0 0 X M Seismic Design: M Z The site is classified as Seismic Zone 3 by the Uniform Building Code. > Z We recommend the designer utilize a site soil coefficient Of SD in their CD 6" analysis. 0 _n n 3:9 rn m Site Drainage: 0 0 M C Cn The site should be graded during construction so that surface waterand K CJ) M 0 all seeping groundwater be directed away from the excavation. - Water Z should not be allowed to pond where foundations, pavements, or slabs X are to be constructed. X > Final site grades adjacent to all buildings should be sloped away from Z the structures for a minimum distance of five feet. Z 0 Footing drains are required for this project.as a redundant safety factor, --i and should consist of a slotted four -inch -diameter PVC pipe bedded in, M and covered with a minimum of six inches of drain rock. The center of the pipe should be placed at the elevation of the bearing surface. A non- woven geotextile fabric (Mirafi 140N, Supac 4NP, or other equivalent should be wrapped around the outside of the drain rock. The PVC pipe should be sloped to drain, and may be connected the roof and surface water discharge pipes down -gradient and away from the structures. V LOT 10 - HARBOR HILLS Job Number 23005 March 18,2003 Page 5 All drains (roof, surface water, and footing drains) should discharge to an appropriate discharge facility. If at all practical, gravity drainage is preferred over utilization of a pump to achieve drainage. Excavation Slopes: Temporary and permanent excavations and slopes for this project must 0 M meet all applicable government safety regulations. Temporary cuts to -i -n depth of four feet may be attempted vertical, although they will most U5 0 probably not hold. Excavation slopes greater than four feet in depth rn C should be cut no steeper than 1:1 (Horizontal:Vertical). Flatter slopes rn 0 0. may be required depending upon local variations in soil conditions and 0 0 C whether there is abundant seeping groundwater. Contractors working in X M excavations, or adjacent to slopes should. use caution at all times. M Z Sudden caving of the side slopes is possible. C: 2 es which are not otherwis Permanent cut and fill slop e reinforced should Cn not exceed 2:1 (H:V). 0 -n M 0 U5 General Earthwork and Structural Fill: 0 0 M Site construction should begin by stripping and clearing the building C Cn 9 Cn, M 0 area of existing fills, peaty soils, vegetation, and any other. deleterious Z r e. material. Stripped materials may have to be removed from the sit' Groundwater seepage was noted during our fieldwork. The contractor should anticipate and be prepared to accommodate moderate to he avy > Z' seepage into even shallow excavations. Cn Structural fill is defined as any fill placed below structures, including Z 0 slabs, where the fill soils need to support loads without unacceptable --i 0 deflections or shearing. Structural fill should be clean and free -draining,. M and should be placed above unyielding native site soils in. maximum eight -inch -thick loose lifts and compacted to a minimum of 95% of Modified Proctor (ASTM D1557). Soil is typically difficult to place and compact as structural fill if more than three percent from the optimum moisture content at the time of compaction. During wet weather or under wet conditions, structural fill should consist of a granular soil having less than five pe rcent silt or clay �'M LOT 10 - HARBOR HILLS Job Number 23005 March 18,2003 Page 6 (measured on that portion which passes the 3/4-inch sieve). During dry weather, water may have to be added to the soil to achieve the required soil density. Wet Weather Construction: Z 0 If the site is developed during extended periods of wet weather or in the M winter, the following are anticipated additional costs and changes which should be anticipated: 0)-f 0 X C M 1) Excavated slopes will have to be protected with plastic. M 0 .2) All of the excavated soils, will be unusable as structural fill. 0 00 3) Foundation excavations will require an additional over C M excavation on the order of at least six inches a nd replacement M Z with compacted quarry spalls. C Z 4) Numerous site visits will be required by this office to evaluate conditions, confer with the contractor, and make remedial Cn recomm endations. 0 -n 5) Costs of maintaining the site and adjacent streets/ properties --I will increase. M M 6) A reinforced construction access road consisting of geotextile 0 Ui 0 fabric, quarry spalls or cement stabilization may be required. 0 M C (0) 9 Cn Q 0 Z Closure: This office should be retained to review the final, development plans to X > verify site specific subsurface requirements have been met and our Z recommendations have been accurately interpreted in the plans. X co This office should also be retained to provide geotechnical engineering Z 0 -4 consultation and observation services during design and construction. 3 M 1 This will allow us to: 1) Confirm that design conforms to expected and encountered subsurface conditions; 2) Confirm that subsurface soils exposed during excavation are consistent with those anticipated; 3) Evaluate whether earthwork, subgrade preparation and subsurface drainage activities conform to the intent of the contract specifications and plans: and, 4) Provide recommendations for design changes in the event of changed conditions. 9 0 PLATE 1 GUIDELINES IN THE USE AND APPLICATION OF THIS REPORT Lot 10 of Harbor Hills, Edmonds, Washingto The report for Job Number 23005 was prepared in accordance with local generally accepted engineering principles, practices and standards. No warranty is expressed or implied. The findings and recommendations. contained in this report are based upon the limited services you requested. Geotechnical engineering requires the application of professional judgment, as no study can completely quantify subsurface conditions. It is our opinion the owner should, without hesitation, undertake any additional work specified in the report as it is our opinion this work is necessary to augment and/or fulfill site specific requirements. This report is an informational document, and is not to be used for contractual purposes. Any interpretations of subsurface conditions in this report, including the test pit logs and/or text discussions are based on our testing, analysis, experience, and judgment. There is no warranty that these subsurface conditions occur anywhere on the site except at the exact location and exact time when and where the field tests were conducted. Groundwater levels can be especially sensitive to seasonal and other changes. This report may not be applied to other sites or another project on this site without our written permission. We are not responsible for interpretations others may make,using this report. The conclusions and recommendations in this report assume that the field tests which we conducted and our interpretations accurately portray and represent subsurface conditions at the site. If, during excavation and/or construction significantly different subsurface conditions are encountered from that described in this report, our firm should be notified at once to review these conditions and, if necessary, revise our recommendations. If there is a significant lapse of time between our report submittal and the start of construction, we should be retained to review and verify site conditions. Unanticipated soil conditions are commonly encountered during excavation and construction, and this simply cannot be fully anticipated by periodic soil and/or rock sampling at widely -spaced testing locations. The owner should be prepared to accommodate potential extra costs through the development of a contingency fund. This firm cannot be responsible for any deviation from the intent of this report including, but not limited to the nature of the project, the construction timetable, and any construction methods discussed in this report. The recommendations contained in this report are not intended to direct the contractor's methods, techniques, sequences or procedures, except as may be specifically described in the report. This firm will not be responsible or liable for any construction, scheduling, or safety activity on this site. During construction we reserve the right to stop our inspections and other activities if there are unpaid bills which are more than 30 days overdue. z 0 1 0 M -i -n M C M 0 0 C M M z K) -i C —Z E: CD o -n n M M 0 0 M C cn 9 Cn M C) Z z --I M 6 z 0 M I r I NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. isle re' a aa A —J! r AV I ws k) A AV UK9 A AV 41 OKS CA ag t; A AV at -FL cws A AV ROB ::c V) Alw 0 AV �r 13 4J in A AV RUS bi A 4"yal,31 AV A 'W KLW U06 al FR- —1771P cd Ulf ld IS16= pi Ae A IAV W6 -cs PL A AV VU wo UKLII t= A Id KLS6 'S4 WS6 AV - 5 Al t%*u cd 1�0 a AV 51 111-96 t7-1 45 NIM PAM AV C--,Il s AY H16 '�,A �AWKL0010 1.4 1.4 V) 15 --- Val AV -F > +0 AV I 2w 112i AV t; 0 cd KLY Y W :s c AV HL9 44 AV RLS 0 0 s 4J y s AT W 5;oNnwnqi i c\j ko 0 Ln .,/9. 0 Cd .14J 0 Iq CO Cd 0 tn 0 Q, Cd I rL 44 4J M..9 1. 1 LOON z 0 i 0 m rn 0 0 c M Z c > Z 0 -n mm 0 m C/) Cf) m 0 a SAMPLE SAMPLE DESCRIPTION 0 U- j — W > W Uj C13 W -j = �- U- W W W ca 0 to 0 (n ca cL IX W F— 02 C/) >- z U) D U) Brown Gravelly Silty Sandy Fill, wet, soft, with abundant big pieces of wood and logs. 2- 3- 4- 5- 6- 7- Gray to brown Gravelly Silty Sand, wet to 2 ... saturated, medium dense to dense. Moisture 8- Content 22.5% at 7.75 feet and 13.8% at 8.5 feet. 3 9- 10- SOIL AND , -,RING COMPLETION LOG PROJECT NUMBER: JN23005 TEST PIT NUMBER: TP-3 PROJECT: Hanchelt Residence LOCATION: See Plate 3 EXCAVATION METHOD: Backhoe GROUND SURFACE ELEVATION (ft rnsl): 190 LOGGER: Mark K. Dodds, P.E. WATER LEVEL AND DATE (ft bgs): 5.0 ATE SAMPLE SAMPLE DESCRIPTION W 0 i - W W > L� CO U 7- < 0� W- W -i 0 -j 0 �-- LL CL Ix W 03 (n ca W D 0 Cn z (n (n Brown Gravelly Silty Sandy Fill, wet, soft, with abundant big pieces of wood and logs. 2- 3- 4— Brown Peat, wet, soft. 5- 6- Gray to brown Gravelly Silty Sand to Gravelly Sand, wet to saturated, medium dense. 7- 8- 9- \stopped at 9.0 feet. GWT near 3.5 feet ATE. 10- PLATE 6 Sieve Gradation Analyses Lot 10 of Harbor Hills, Edmonds, Washington Test Pit #2; 7.51 - 8.0' Sieve % Pass 2)) 100 3 /4)) loo 3/8" 100 #4 100 #10 99.3 #40 9,1.9 #100 27.4 #200 13 . 4 0 DODDS RECEIVED GeoSciences Inc. rfIq Post Office Box 2385 JUN 2 6 2U1.JJ Kirkland, WA 98083 PERMIT COUNTEP Tel: 425.827-1084 Fax: 425.828.9443 Mr. & Mrs. Hanchett Job Number 23005 1103 Daley Place June 24, 2003 Edmonds, WA 98020 0 Subjecti Plan Review Letter and Minimum Risk Statement 0 Proposed New Residence M Lot 10 of Harbor Hills Edmonds, Washington M Reference: 1) Set of Plans (Sheets A2. I - A6. I S 1. 1 M M 0 0 Prepared by Estate Homes Design, dated 6/16/03 -10 0 2) Engineering Analysis and Design - Hanchett Residence C By Warren R. Lance, P.E., dated 6/l/03 M M z Dear Mr. & Mrs. Hanchett: C —Z 3: V) We have reviewed the geotechnical aspects of the above two references. 0 -n The following are our comments: M M 1) Reference 1, Sheet Al. 1 - Site Work/ General should reference 0 —co 0 r our geotechnical engineering report. 0 M C CD 2 Reference 1 and 2 - All isolated spread footings should be a 9 CD minimum of two foot square, as specified in our report. :MO Z 3) Reference 2 - The bearing pressure used in design is actually less than the 2,500 psf given in our report. This is acceptable.. 4) Drainage behind the rockeries and the overall rockery design methodology should be specified in the plans, unless the z -4 rockeries are only going to be one rock high. 3: 5) Footing drains (and other drains) will have to drain and Cn z discharge somewhere. This should be specified on the plans. 0 0 M In our professional opinion the plans and specifications prepared by the structural engineer and the designer, except as noted above, conform to the recommendations in the geotechnical engineering report. The risk of damage to the proposed development or to adjacent properties from soil instability will be minimal, subject to the conditions set forth in our report. In our opinion the proposed development will not increase the potential for soil movement. X & CITY CO'Dv M HANCHETT PLAN REVIEW LE7TER Job Number 23005 Pa e 2 June 24, 2003 9 our analysis indicates that there will be less than a 15% chance of earth movement within a twenty-five year period by the on -site improvements. Measures taken to mitigate the hazard include surface and subsurface water capture, control and drainage; removal of unengineered fill from the site; and the installation of engineered fill, structur ally -reinforced walls and concrete footings to support the structure and thus the surrounding ground. Please contact us if there are any questions. -4 =6 Thank you, 3: 0 M M 0 DODDS Geosciences Inc. 0 0 C M K. MZ b WAS A:� C= Z Milk C0 0 -n M M 0 0 M EXPIRES C C/) C0 Q 0 Z Mark K. Dodds. P.E. _4 > Z 55 Z 0 0 M N I Geotechnical Engineers, Geologists Group Northwest, Inc. & Environmental Scientists August 6, 20033 Ms. Ann Bullis Development Services Department City of Edmonds 121 - 5hAvenue North Edmonds, Washington 98020 R EE C E I V E D A (it - 8 2-1 A BUILDING DEPT. Subject: Hanchett Residence ECDC 19.05 Geotechnical Review 1103 Daly Place Edmonds, WA G- 1673 Dear Ms. Bullis: Per your request, Geo Group Northwest, Inc. is pleased to provide geotechnical review comments for the proposed Hanchett residence in accordance with Meadowdale ECDC (Edmond Community Development Code) 19.05 Provisions for "Earth Subsidence and Landslide Hazard Areas." REVIEWED SUBMITTALS Geo Group Northwest reviewed the following submittals: "Geotechnical Engineering Report," by Dodds GeoSciences, Inc.(Dodds), dated March 18,2003 0 "Plan Review Letter and Minimum Risk Statement," by Dodds, dated June 24, 2003 9 Drawings C I and C2 by Erich 0. Tietze and Associates, Inc., dated July 2, 2003 0 Drawings "Hanchett Residence" by Estate Homes Design, Inc., dated June 16, 2003 4 "Meadowdale Earth Subsidence Packet" by City of Edmonds PROJECT DESCRIPTION The project site is located at 1103 Daly Place in Edmonds, Washington. Based on our review of the submittals, we understand the project site is located about 2 miles south of mapped Medowdale Landslide Hazard Area. However, Plat Requirements mandate that the project be reviewed in accordance with Meadowdale ECDC 19.05 Provisions. ^VV 13240 NE 20th Street, Suite 12 Belleuve, Washington 98005 Phone 425/649-8757 FAX 425/649-8758 Z 0 4 F5 M --1 -n M M 0 0 0C M M Z JD —1 CE X Cn 0 -n n rn M 0 0 0 M C C/) r, Cn M 0 Z X --i 3: Z --4 3: CD Z 0 -1 0 M 0 August 6, 2003 G- 1673 City of Edmonds/Hanchett Page 2 Per the referenced Estate Homes Design drawings, the proposed development appears to consist of a two-story wood -frame single family house with a daylight basement. The ground surface of the project site slopes east to west at grades from 10 to 20 percent. Based on the referenced Dodds' geotechnical report, we understand that the project site is in general underlain by 6 to 8 feet of loose or soft fill and peat, which is underlain by medium dense to dense "gravelly silty sand" to the bottom of the test pits at 8 to 9 feet. Groundwater seepages were encountered at 3.5 feet below grade. CONCLUSIONS AND COMMENTS Based on our review of the submittals, it is our professional opinion that the geotechnical report was prepared in general accordance with the standard of practice in the profession. The risk of ground movement caused by the proposed development appears to be minimal as long as the geotechnical recommendations are followed. In addition, our review comments are as follows: I The formation of the peat and the ground water seepage need to be discussed in the geotechnical report. 2. The Quarry spall mat needs to be filter fabric protected and some provisions or arrangements to drain the water should be on the plans. 3. The geotechnical report should provide specifications for the "Granular Free Draining Backfill" shown in Detail I on Sheet S 1. 1 of Estate Home Design Drawings. 4. The geotechnical report should provide recommendations for the lateral earth pressures (i.e. active and at -rest) on basement walls, which should be considered in structural designs. 5. Comments No. I and No. 2 from Dodd's June 24, 2003 letter should be implemented in Estate Home Design Drawings A4. 1. Geo Group Northwest, Inc. z 0 4 0 M =i 9 V5 —1 0 M C M 0 0 0 C --I K X M M Z ID --I —Z W o -n n M M 0 0 0 M C cl) 9 Cn M 0 Z X z 0) z 0 i 0 M M August 6, 2003 G- 167' 3 City of Edmonds/Hanchett Pag 3 MUTATIONS Our geotechnical review was conducted based solely on the information included in the reviewed submittals, and was in accordance with "general accepted engineering practice" under similar conditions in this area. Our geotechnical review does not relieve the responsibility and the liability of the "geotechnical engineer of record" for this project. Sincerely, Geo Group Northwest, Inc. Lee Lu, P.E. Senior Engineer 20114 William Chang, P.E. MAL Principal :2/19 geotech review comnients.wpd Geo Group Northwest, Ine. z 0 i 0 M 4 =6 M 0 0 0 0 C M M z K) -i C M o -n n M M 055 0 r- 0 M C C/) K Cn M 0 Z z CD z 0 i 0 M DODDS GeoSciences Inc. Post Office Box 2385 Kirkland, WA 98083 Tel: 425.827.1084 Fax: 425.828.9443 Mr. 8& Mrs. Hanchctt Job Number 23005 1103 Daley Place December 9, 2003 Edmonds, WA 98020 z 0 Subject: Geotechnical Comments and Addendum M Proposed New Residence Lot 10 of Harbor Hills Edmonds, Washington 0) 0 C: M Reference: 1) City of Edmonds Structural Comment #1, 7/15/03 M -10 0 Q 2) Geotechnical Review Letter by GeoGroup Northwest C: By William Chang, P.E. dated 8/6/03 M M z Dear Mr.'& Mrs. Hanchett: C -Z > --q 3: Cn We have reviewed the geotechnical aspects of the above two references. 0 The following are our comments: 1 Reference 1, Comment 1 Regarding recommendations to M M 0- co prevent soil strength loss due to liquefaction during an 0 0M earthquake. We do not consider the underlying subsurface to C Cn Cn be liquefiable during a credible earthquake as the structure M0 Z will bear on spalls placed atop medium-dens,e to dense competent native ground. 2) Reference 2, Item 1 - We are uncertain if the peat on� this lot is X due to native deposition or if it was dumped onto, the lot z sometime in the past. The entire plat, including this. lot, has significant groundwater seepage. All peat will be removed Cn from under building areas. Groundwater capture, control and z 0 drainage is of paramount importance on this project and has 0 been taken into account during design. M 3) Reference 2, Items 3 & 4 - See Section Below. 0 HANCHETT ADDENDUM # 1 JO b Number 23005 December 9, 2003 Pa e 2 9 Basement and Retaining Walls: Basement and retaining walls must be designed to support the lateral earth pressures which abutting soils will impose. The following recommendations are for walls which are less than twelve feet high that support relatively -level backfill: z 01 Active Earth Pressure 35 pcf ..... Passive Earth Pressure 275pcf .................... 0 M Unit Weight of Soil ... 115 pcf .................................. Coefficient of Friction 0.35 ................................ =i 9, The Active Earth Pressure recommended above assumes the wall can M C MO deflect at least 0.002 times the wall height. If this assumption is 0 0 0 incorrect, a uniform lateral pressure of one hundred psf should be added C' to. the wall pressure given above. The values recommended above are M M z ultimate values and should be reduced by an appropriate safety factor JO (F.S.). In general we recommend a minimum F.S. of 1.5 for overturning C > and sliding. The resultant force froin the soil (neglecting the passive Cn pressure force) can be calculated by taking moments about the toe of the wall and should pass through the middle third of the footing. The above design values do not include hydrostatic pressures behind the MM walls and assume that no surcharge slopes or loads (such as 0 0 M construction traffic) are placed above or near the walls. Design values C Cn Cn can also be exceeded if heavy construction equipment operates above the Q 0 Z walls closer than twelve feet. If any of these conditions exist then the 7-1 above design values should be augmented by appropriate additional M pressures. If walls higher than twelve feet are required for this project, please contact our office for additional recommendations. z X Basement walls should be appropriately waterproofed and all walls should be backfilled with a clean compacted free -draining granular soil. z 0 If on -site soil is used as wall backfill, then an approved drainage 0 composite will need to be used. Either the granular backfill or the M approved drainage composite will prevent the buildup of hydrostatic pressures. Granular wall backfill should contain no more than five percent silt or clay, no organics, and no cobbles greater than four inches in diameter. The percentage of sand (from the #4 sieve to the #200 sieve) should range from 25%.to 75%. During compaction of the wall backfill care must be taken not to damage the wall. The top one to two feet of wall backfill. should consist of relatively -impermeable soil or topsoil.