Loading...
20040291.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMENAME 041DUSINESS T, MAILING ADDRESS CITY .k U1 Z, A_L,7�JL�17,5 t= ADDRESS x 0 CITY NAME cc ADDRESS 0 U4 A.;, t o rz CITY ZIP TELEPHONE i�� o, *17 6 ZIP TELEPHONE CBL 0 j )I ZIP I TELEPHONE 0 Z 9 `110 71206 (" 0 �� /�,; ,.,j 0 119 1 ST*E LICENSE NUM13ER EXPIRATION DATE CHECKED BY (�, 14 0 2,'Llc x -<j PROPERTY TAX ACCOUNT PARCEL NO. C3 J�. 00 NEW RESIDENTIAL PLUMBING / MECH ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR CYDS FENCE X FT) DEMOLISH TA�K OTHER GARAGE RETAINING WALL ROCKERY El FIRE SPRINKLER FIRE ALARM CARPORT 0 (TYPE OF USE, BUSINESS OR ACTIVITY), 0 U) w NUMBER NUMBER OF DWELLING OF 0 STORIES UNITS DESCRIBE WORK TO BE DONE I USE ZONE [PERMIT EXPIRES PERMiT -`1 NUMBER JOB SUITE/AP AV ADDRESSzy C z PLAT�Alvl E/S U BDIVI SION NO. LOT.NO LID NO. 22 t to FEE $ I ESCP APP70v0d PUBLIC Rj�ff OF WAY PER OFFICIAL STREET MAP RW permit Required E3 Street Use permit Hoq'd [3 inspection Required 13 EXISTING-1-f I I LAC-- PROPOSED Sidewalk Required 0 Underground REQUIRED DEDICATION- FT Wiring required 13 METER SIZE NO. OF FIXTURES PRV REQUIRED 93 YES No 0 Lu REMARKS z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE z W ENGINEERING n7EVIE ED BY,,��` DATE 4 71RE REVIEWED BY DATE w M ic VARIANCE OR CU SHORELINE OR ADI3# INSPECTION BOND REO'D POSTED OYES S SEPA REVIEW SIGN AREA HEIGHT COMPLETE , EXEMPT ALLOWED I PROPOSED ALLOWED PROPOSED '7 EXP 10 21571 LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR 0 3,* z !7 , I E 35 'A 1113, L, 57, 7- -7, 5 ) 5 1 z 'ATr: 5 PARKING LOT AREA PLANNING REVIEWED BY DATE IL REO'D I PROVIDED C T.:I.TUPII�R CHECKED By OF CONSTRUCTION OCCUPANJ�7..., 5,# 4M V /I/ GROUP ]TYPE cly�_ SPECIAL INSPECTION JAREA OCCUPANT LOAD REQUIRED bo YES REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ1D VALUATION $ hAl-I " Description FEE Description FEE FEE Plan Check State Surcharge 2161 HEAT SOURCE GLAZING % LOT SLOPE % Building Permit City Surch arge ECK NO: VESTED DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading a DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE A SEPARATE PERMISSION. t= Engr. Review :E cc PERMIT APPLICATION: 180DAYS Lu PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION Fire Review Plan Chk. Deposit tn -APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS U) LD HARMLESS THE CITY OF IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HO M EDMONDS, WASHINGTON. ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt M OR INDIRECTLY 49 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE !3 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* Recording Fee Receipt 11 1 7� I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAI GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF I his application is not a perinit until signed by the THE OWNER, I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Official or his/her Deputy: and Fees are paid, and TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION tecLipt is acknowledged in space provided. WORKMqTS COMPENZTION INSURANCE AND RCW IB 27. OF I I IGNAATUBE DATE (OWN R A T) DATE SIGNED (425) SIGN M, zo - 771-0220 _NA.ErA�D BY ATTENtION EXT 1333( IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL OfP311GINAOLWFI LE - YELLOW - 14PECTIR A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI NK NER - GOLD -ASSESSOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 GREEN - ACCOUNTING 04/02 PRESS HARD -YOU ARE MAKING 5 COPIES z 0 `1 0 M q =5 M C M 0 ­10 0 C -4 K 2: M M Z 0 _n n M M a 0 0 M C C/) 9 Cn M 0 Z r- M z z 0 1 0 M 10 Owner: Greg Hale Const. Inc. Address: 16605 7 1 s' Pl. W. Lynnwood Wa. 98037 Ph. (206) 650-0699 Tax Parcel : 005550-000-047-02 Lot 4 Property Address: 24219 104 1h Ave. W. Edmonds Wa. 98020 COD �� q..# (� L_01�j -� , 0-1 - '_' -1 61-Y LOT COVERAGE LOT AREA= 11256 S.F. HOUSE & DECKS = 1550 S.F. COVERAGE 1550/11256 = 13.77% IMPERVIOUS SURFACES HOUSE, EAVES & PATIO = 1800 S.F.. DRIVEWAY & WALKS = 1124 S.F. TOTAL = 2924 S.F. tj -_'PArt 10 U 1xv gc). 9 Lu tA V, HEIGHT CALCS - < C.&.1xXGe 2551.00 f\ -roj> ri I- N , I I A= �96.0& 0 LO 6T_ MeTAO— B Q'i C D k Z -7 Avg. Grade —49-.2-5, k Actual =-424-.8-7 051.(os \14 11:) e Ir Maximum =424-.25-- t MN Q WAJ rop 0 XT e? AIA CIT'u (A-V 4M ED R 401 V \"V K,, rA MAR J 9; 2004 PERMIT coUNTER 7 C" 5T Z APPRO" _'S' R'y PLAN'. SIDE_ C 7—_ ft ........ REAR PLOTPLAN OTHER HEIGHT— Scale: I"= 20 Feet I z 0 4 0 M --I -n M C M 0 -40 0 3: M M Z 10 --1 C 0) 0 -n n --I 3:9 rn M 0 —C') 0 r- 0 M C cl) 9 Cn M 0 X -4 3: z C/) z 0 1 0 M Height Calculation Worksheet Address: Date: b — 9- fiWe��tos): 1. Datum Point: t4 Z 0 2. Datum Point Elevation: r9 3. Aver-dgeGrade: LL( 4.. Maximum Elevation Allowed.1 db,9'� 6veritgb giade)4" 25""— 0 M C rn 0: 5. Reference Point Elevation Shot to House: Oc M (datum elevatign) + 71 rade to transit level line 'shot to house) M z 6. Measurements from line shot onto house to roof ridge: C Z, CD C) 0 -T1 OIL M M 0 0 r 0 M C W Q 0, Z X z z 0 Total 6 M 7. Actual Elevation: (reference point elevation') + (measurements from #6) Conclusion: I -7-?_ (actual) is greater 4KS 3"A (allowed); therefore the house is/ is not over the height requirement per ECDC 16.20.30 requirements 1.17 C. 1 S () \1 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.ci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering July 16, 2004 Greg Hale Construction 16605 71" Place W Lynnwood, WA 98037 Re: Building Permit: Site Address: Expiration Date: Dear Mr. Hale: GARY HAAKENSON MAYOR Z 0 A 0 M 2004-0291 24219 104"' Avenue W April 21, 2005 The purpose of this letter is to inforri-i you that the last remaining inspection on your project is a final inspection(s). The final inspection(s) detennines that there are no outstanding life -safety issues and approval allows the City to close your pen -nit file. The City considers the final inspection to be one of the most important inspections conducted on a project. In order to grant final approval the following must be complete: smoke detectors, house numbers, guardrails, handrails, self -close doors between garage and residence, egress from sleeping rooms, safety glazing, weather-stripping, any Engineering department requirements etc. Of course not all of these things may specifically apply to your project but it does give you an idea about the kinds of things that must be complete as well as sorne items that do not need to be installed such as: paint, carpet, moldings, wallpaper, etc. Please be advised pennits expire one year from the date of issuance. if you will need more time to complete the work, permits can be renewed prior to expiration for one half fees. If the pennit expires without a final approval granted by the Building Inspector, full fees are required in order to renew the permit. This can be very costly to you and we strongly encourage You to check your permit expiration date and call for the required final inspection(s). Note: If more than one department is required to final your project, this is noted oil your Job Card. Please feel free to contact me at 425-771-0220 if you have any questions. Sincerely, Permit Coordinator 1,\I'c mp\DST' sW aster l.etters\SRwaaniLtrSFR Incorporated August 11, 1890 Sister Citv - Hekinan, Japan 1, 0 kRTY COPY TUBBS080o"Coosmso January 9, 2004 1RecE:1VE:r) MAR 18 2004 Greg Hale Construction, Inc. PERMIT COUNTER 16605 - 7 1 st Place West Edmonds, Washington 98037 Geotechnical Engineering Report Residential Property 10300 Block of 242 d Place West Edmonds, Washington File No. HAL2-01 INTRODUCTION This letter presents our conclusions and recommendations regarding geotechnical conditions pertinent to proposed residential development of your property located in the 10300 block of 242 d Place West in Edmonds, Washington. Our services have been performed at your request and in accordance with our services agreement dated December 16, 2003. The subject property consists of Lot 4 of Short Subdivision S-2000-82. We understand that you propose to develop the property to include one single family residence. You have asked us to evaluate geotechnical conditions within the property as a basis for providing you with information and recommendations pertinent to the proposed development. Specifically, our scope of services includes: 1. Review of published geologic and topographic information regarding the subject site and adjacent areas. 2. Surface geologic reconnaissance of the site and adjacent areas. 3. Subsurface investigation of soil conditions at the site by means of test pits excavated by a backhoe and operator you provided. 4. Preparation of this geotechnical engineering report providing our observations relative to geotechnical conditions at the site and providing our conclusions and recommendations regarding geotechnical elements of the proposed development. Our services have been provided on the basis of a review of existing information availabletous, geologic reconnaissance of thesiteand adjacentareas during December 2003, observation of test pit explorations on December 19, 2003, discussions with you and Mr. Gary S. Cooper, and our experience. 7505-A West Lake Sammamish Parkway Northeast Redmond, Washington 98052 425-882-4850 www.tubbs.com z 0 q 0 M —4 -n W M 0 --10 0 —49 '- . = M M z jo —Z 0 -n M M —0) 0 0 M C V) K 0) Q 0 Z ;U z 0) z 0 M Greg Hale Construction, Inc. January 9, 2004 Page 2 SITE CONDITIONS The property is located between 104 th Avenue West and 242" Place SW in Edmonds, Washington as shown on the Vicinity Map, Figure 1. As shown on the Site Plan, Figure 2, which is based on a drawing dated 4-2-02 by JBMF Consulting Engineers, the subject property consists of a Lot 4, located in the northwest part of the shortplat and adjacent to 104 1h Avenue West. Our Critical Areas Evaluation report dated April 10, 2002 for the area of the short plat that includes the subject property, described topographic, vegetative and prior development conditions within the area of the short plat. Since that report was submitted, the area of the short plat has been cleared and graded to create three building pads, driveways accessing the three lots have been constructed and paved, and storm and sanitary side sewers have been installed. Site grading included construction of a keystone block wall and two rockeries. Recommendations for design and construction of these improvements was not included in either our previous or present scope of services. We understand that the existing roCKenes will be reconstructed based on recommendations by others. Geologic conditions within the area of the short plat were also described in our earlier report. As part of our present services we explored subsurface conditions within the area of the short plat via six test pits, including three test pits within the subject property, excavated at the locations indicated on the Site Plan. A description of the subsurface exploration program and the logs of the test pits are presented in the Appendix. The observed subsurface conditions are consistent with those described in our earlier report. The subject property is underlain by glacial outwash consisting of sand and gravel deposited during the advance and retreat of the last glacier to occupy this area some 13,500 to 15,000 years ago. Local patches of glacial till, deposited directly by the glacial ice, exist within the area of the short plat but none was observed within the subject property. Some fill locally exists within the site. Because of the high infiltration capacity of the surficial soils, little or no surface 'water runoff occurs within the site, and no emergent groundwater seepage was observed in the test pits, on the slope adjacent to 104 1h Avenue West, or elsewhere within the site. 7505-A West Lake Sammamish Parkway Northeast Redmond. Washington 98052 425-882-4850 www.tubbs.com z 0 4 0 M =i --fi U5 --i 0 M C M 0 --10 0 M M Z g) --i C —Z 0) o -n n M M 055 0 r- 0 M C/) Cl) M 0 Z z C/) z 0 1 0 M 0 Greg Hale Construction, Inc. January 9, 2004 Page 3 CONCLUSIONS AND RECOMMENDATIONS GENERAL The subject property is suitable for the proposed residential development provided that proper site development procedures and the recommendations below are followed. The native soils underlying the site consist of glacial outwash sand and are suitable for conventional residential foundation design and construction procedures. SITE PREPARATION AND EARTHWORK We recommend that all sod, organic soil, fill and debris be removed from settlement sensitive areas (e.g., building, pavement and slab areas). The subgrade surface in slab and pavement areas should be proof -rolled with heavy rubber -tired equipment after excavating to the desired grade. The purpose of the proof -rolling is to bring the near -surface soils to a uniform density and to identify any loose areas which might require recompaction or removal and replacement with structural fill. Temporary cut slopes for foundation excavations are expected to be as much as ten feet in height. Temporary cut slopes in the medium dense to dense native soils may be inclined as steeply as IH: IV and, except for minor sloughing, can be expected to stand at that inclination for a period of several weeks if protected from drying. Temporary cut slopes in existing loose or fill soils may be inclined as steeply as 1.5H: IV if protected from drying. Protection from drying applies to natural soil moisture only. Do not add water to temporary cut slopes to improve stability. If steeper temporary cut slopes are required we should be consulted to develop shoring recommendations. We understand that you anticipate new permanent cut slopes up to 6 feet in height within the eastern portion of the subject property, and rockery walls for erosion protection of those slopes. If rockery walls are used for this purpose, we recommend that they be no more thdii 6 feet in height, and that the toe of the rockery (see Figure 3) be located above a plane sloping 45 degrees downward from any adjacent property line and from any existing buried utilities. Cut slopes faced by rockery walls shall be no closer than 3 feet to the edge of storm or sanitary sewers, or a greater distance if required by the sewer district. If higher cut slopes are required we shall be consulted to provide other recommendations for slope protection. STRUCTURAL FILL All new fill in settlement -sensitive areas shall be placed as compacted structural fill after the site has been prepared as described above. All structural fill material shall be free of debris, organic contaminants and rock fragments larger than 6 inches. The suitability of 7505-A West Lake Sammamish Parkway Northeast Redmond, Washington 9B052 425-882-4850 www.tubbs-com z 0 i 0 rn =i 9 X M M 0 0 C -4 K X M M Z IC) --I C CO o -n n M M 0 5) 0 r- 0 M C 0) 9 Cn M 0 Z r- z C/) z 0 1 0 M Greg Hale Construction, Inc. January 9, 2004 Page 4 material for use as structural fill will depend on the gradation and moisture content of the soil. As the amount of fines (material passing No. 200 sieve) increases, soil becomes increasingly more sensitive to small changes in moisture content and adequate compaction becomes more difficult to achieve. Structural fill shall contain no more than 5 percent fines for placement in wet weather. The percent fines can be higher for placement in dry weather, providing that the fill material is moisture -conditioned as necessary for proper compaction. The sandy native outwash soils at the site are suitable for structural fill. Structural fill placed in building or pavement areas shall be compacted to at least 95 percent of the maximum dry density determined in accordance with ASTM D-1557. Utility trench backfill should be compacted to at least 90 percent, except for the upper 2 feet which shall be compacted to 95 percent. We recommend that structural fill be placed in loose layers not more than 8 inches thick if a small vibratory roller compactor is used (or not more than 12 inches if a 10-ton or larger vibratory roller compactor is used), conditioned to the proper moisture content for compaction, and uniformly compacted before placing subsequent layers. FOUNDATION SUPPORT The proposed residence can be supported on conventional spread and strip footings founded on firm native soil, or can be supported on structural fill directly overlying firm native soil. Footings may be proportioned using an allowable bearing value of 2000 pounds per square foot. This value applies to the total of dead plus long term live loads and may be increased by one-third when considering design loads of short duration such as wind or seismic forces. This value also assumes a minimum width of 16 inches for continuous spread footings and 24 inches for isolated spread footings. The minimum depth of embedment below final adjacent grades is 18 inches for exterior footings and 12 inches for interior footings on firm native soil. Footings adjacent to a downhill slope shall be sufficiently deep to provide at least 6 feet of horizontal separation between the footing and the slope face, and shall be sufficiently deep or distant from the slope that a 1: 1 plane extended from the edge of the footing does not intersect the slope face. Because local areas of loose soil may be encountered at the same level as the medium dense to dense soils, we recommend that the soils beneath the footings be compacted using hand operated vibratory equipment in lifts as described above. Any loose or disturbed soils in the footing excavations, including any test pit backfill, should be recompacted prior to concrete placement. 7505-A West Lake Sammamish Parkway Northeast Redmond, WashIngton 98052 425-882-4850 www.tubbs.com Z 0 i 0 M =i 9 C M M 0 0 —i C) 0 C ­4 r. M M MZ 10--1 C 0 -n n i M M M 0 0 0 M C M 0 Z Z __q M Cl) Z 0 1 0 M 0 Greg Hale Construction, Inc. January 9, 2004 Page 5 0 Floor slabs can be supported on grade if site preparation is accomplished as previously recommended, or can be supported by structural fill directly overlying firm native� soil. The subgrade soils should be proof -rolled as recommended above and compacted using vibratory equipment or replaced with compacted structural fill if loose areas are observed. A base course layer consisting of a minimum thickness of 4 inches of clean gravel containing no more than 5 percent fines should be placed beneath the floor slab to provide uniform support and a capillary break. FOUNDATION RETAINING WALLS The basement walls for the proposed residence function as retaining walls and shall be designed as such. Assuming that the walls that are allowed to deflect 0.01 times the height of the wall, we recommend an active lateral pressure equivalent to a fluid density of 40 pounds per cubic foot (pcf), assuming level backfill compacted and drained as outlined below. If the backfill surface slopes no steeper than 2H: IV percent upward away from the wall, a lateral soil pressure value of 60 pcf should be used. Resistance to lateral footing loads can be developed both through friction on the base of the footings and passive pressures along the sides. Friction resistance on the base of the footing be computed using an internal soil friction angle of 30 degrees. Passive soil pressures may be computed using an equivalent fluid pressure of 300 pounds per cubic foot, providing the backfill around footings is compacted to at least 95 percent of maximum dry density (ASTM D-1557). These resistance values include a factor of safety of about 1.5. The above lateral soil pressures assume the walls will be backfilled with clean, free - draining sand or sand and gravel containing less than 5 percent fines (material passing the No. 200 sieve). This drainage zone should be at least 18 inches thick horizontally. The drainage material and remaining backfill placed behind the wall and not supporting structural elements should be compacted to a pproximately 90 percent of the maximum dry density. Heavy compaction equipment should not be operated within 3 feet of the retaining walls; no compaction tests will be necessary within 3 feet of the walls. A permanent subsurface drainage system should be installed at the base of all subsurface walls. These subdrains should consist of rigid, smooth -wall, 4-inch-diameter (minimum) perforated PVC pipe, nonwoven filter fabric such as Mirafi drainage product or equal, and surrounded by pea gravel or well -graded gravelly sand or sandy gravel with less than 3 percent fines (soil finer than the No. 200 mesh sieve) based on the fraction smaller than 3/4 inch. The drainpipes should discharge into tightlines sloped to drain by gravity to 7505-A West Lake Sammamish Parkway Northeast Redmond, Washington 98052 425-882-4850 www.tubbs.com Z 0 0 M C M 0 __40 0 C M M Z C 0 -n n M M 0 0 0 M C C/) 90) M 0 Z M Z Z 0 0 M 0 Greg Hale Construction, Inc. January 9, 2004 Page 6 0 the existing storm sewer system. Roof drains shall not discharge into the footing drain system. SITE DRAINAGE AND EROSION CONTROL We understand that the City of Edmonds requires water to be routed through an on - site infiltration trench prior to being conveyed to the storm sewer system. We recommend that the bottom of the infiltration trench be sufficiently deep and distant from any adjacent downhill slopes so as to meet the setback requirements specified above for footings. We recommend that water from footing drains be routed directly to the storm sewer via a tight line. If the footing drains must be routed through the infiltration trench, the outlet from the infiltration trench to the storm sewer shall be at an elevation at least 3 feet lower than the footing drains in order to avoid the possibility of water from roof drains backing up into the footing drain system. The surficial soils within the subject property are susceptible to potential erosion and ro are shallow debris slides if disturbed by construction or other activities. Erosion cont Is therefore recommended, including the proper control of surface water runoff, minimizing the time of exposure in the area stripped during construction, and prompt revegetation. LIMITATIONS This report has been prepared for Greg Hale Construction, Inc. and its representatives for use in planning, pen-nitting and designing residential development of Lot 4. Descriptions of subsurface conditions relative to foundation support and other aspects of the proposed development are based on surface observations and shallow subsurface explorations, and conditions should be confirmed by observations in the excavations at the time of construction. Within the limitations of scope, schedule and budget, our services have been accomplished in accordance with generally accepted geotechnical practices followed in this area at the time the report was prepared. No warranty, expressed or implied, should be understood. 7505-A West Lake Sammamish Parkway Northeast Redmond, Washington 98052 425-882-4850 www.tubbs.com z 0 M =i 96 r M M 0 0 0 C: M M Z 0 -n n MM 0 0 0 M C cl) 90) Q 0 Z 3: z --I X Cl) z 0 i 0 M E''- Greg Hale Construction, Inc. January 9, 2004 Page 7 We trust that this report meets your present needs. If you have any questions regarding this report or if we can provide additional services, please call. Yours very truly, 0j a s Tubbs Geosciences ".0 0 56 ed 0 Donald W. Tubbs Donald W. Tubbs, Ph.D. Engineering Geologist NT S. WAS 0 V) 24330 ON L Enayat S. Aziz, P.E. EXPIRES: 12/24/04 Geotechnical Engineering consultant to Tubbs Geosciences Document ID: HAL201 R I 7505-A West Lake Sammamish Parkway Northeast Redmond, Washington 98052 425-882-4850 www.tubbs.com Z: 01 M -n M 0 M C M 0. 0 0 C M M z C —Z' > C/) 0 -n -n M M 0 0 M C 0) Mo Z z --i M z 0 M ri�irr To f p.m some so m so ft VICINITY MAP FIGURE 1 z 0 A 0 m -n M c m 0 0 --40 0 c: -4 K M M M Z ID cn 0 -n ri --I m M 0 U5 0 r- 0 M CD co M 0 z 3: > z cn z 0 0 m I* le dwp 00 4. 1� Pw -Ctd 43�0 � I�w " d3.11 loift "I VOP (L33J M) Orr Z CM < w IL a: UJ U. En co ca alb E - G' I BATTElt. W J CD > co OPLIGINA-L VARIABLE EXCAV,kT%OI4 OWL"( 0 & MIN.TNICKHM 4'- V QUAKILY 5 Z�Z 9ax I"MINUS VVASHED VtOC.V- AS NEEDSD --PILTIEIL FABRIC AS NSEDS-D G;' PEMF PIPE AS NSEDSD Fop SU13SLip-PI-CE WN'Mk. Rockery walls shall be constructed of rocks in the following size categories, Two -man rocks (300 to 600 pounds), 13" in least dimension; Three-man rocks (800 to 1200 pounds), 16" in least dimension; Four -man rocks (1500 to 2200 pounds), 18 " in least dimension. The rock material shall be hard, sound, durable and free from weathered portions, seams, cracks, and other defects. Rocks should be as tabular in shape as possible; rounded or very angular rocks shall be avoided. The larger rocks shall be placed at the base of the wall. Four -man rocks shall be used for the bottom course in walls higher than 6 feet. The lowest course of rocks shall be keyed into firm foundation material at least 12 inches below the adjacent grade. Rocks shall be selected and placed to minimize void space between rocks. Rocks shall be placed in a manner such that the long axis of the rock is normal to the face of the wall. To the greatest extent possible, rocks shall be placed with faces in contact; point contact shall be avoided. Inclining interfaces between rocks shall slope downward toward the back of the wall. After setting each course of rock, voids between the rocks shall be chinked on the back with quarry rock to eliminate any voids larger than two inches across. ROCKERY WALL SCHEMATIC TUBBSO&DOMOSM80 FIGURE 3 Z 0 i 0 m M 0 0 0 C M M Z C _Z 071 _n M M 0 C-1) 0 r- 0 M C C0 9 C0 M 0 Z X > Z X Cf) Z 0 4 0 m APPENDIX A SUBSURFACE EXPLORATIONS z 0 The subsurface conditions within the subject site and adjacent areas were explored by excavating six test pits with a track -mounted backhoe on December 19, 2003. The test pit M locations are shown on the Site Plan, Figure 2. The locations are approximate an d were estimated in the field based on site features shown on the Site Plan. The explo rations were 0 M C backfilled with the excavated material and compacted with the backhoe bucket. M 0' 0 The test pits were continuously monitored by an engineenng ge ologist from our firm 80 C --i who observed the materials encountered, noted ground water conditions and maintained a M M Z! detailed log of each exploratio n. The soils encountered were classified in general accordance C 2� > with the classification system shown in Figure A- 1. The test pit logs are presented in Figures 3: CD A-2 through A-3. o -n, -n M M 0 V5 0 0 M C 0) C/) �Mo 3: > z 3: C() z 0 __4 0 M SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS SYMBOL GROUPNAME GRAVEL CLEAN GRAVEL GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GP POORLY -GRADED GRAVEL COARSE GRAINED GRAVEL GM SILTY GRAVEL SOILS More Than 50% of Coarse Fraction GC CLAYEY GRAVEL Retained WITH FINES on No. 4 Sieve SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND More Than 50% Retained on No. 200 Sieve SP POORLY -GRADED SAND More Than 50% SAND SM SILTY SAND of Coarse Fraction SC CLAYEY SAND Passes WITH FINES No. 4 Sieve FINE SILT AND CLAY ML SILT - CIL CLAY GRAINED INORGANIC SOILS ORGANIC OL ORGANIC SILT. ORGANIC CLAY Liquid Limit Less Than 50 SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT More Than 50% INORGANIC Passes CH CLAY OF HIGH PLASTICITY, FAT CLAY No. 200 Sieve Liquid Limit ORGANIC OH ORGANIC CLAY. ORGANIC SILT 50 or More HIGHLY ORGANIC SOILS PT PEAT on" MOISTURE MODIFIERS: NOTES: 1 Field classification is based on visual examination of soil in Dry - Absence of moisture, dusty, dry to the touch general accordance with ASTM D2488-90. Moist - Damp, but no visible water 2. Soil classification using laboratory tests is based on ASTM . Wet - Visible free water or saturated, usually soil is obtained 02487-90. from below water table 3. Descriptions of soil density or consistency are based on Interpretation of blow count data, visual appearance of soils, .1 and/or test data. 6---Z 0 TUBBSUBDOCOM032 SOIL CLASSIFICATION SYSTEM FIGURE A-1 z 0 11 0 M I 0 LOG OF TEST PIT DEPTH BELOW SOIL GROUP GROUND CLASSIFICATION DESCRIPTION SURFACE SYMBOL (FEET) TEST PIT TP4 011.0 SP Dark brown sand with some gravel, some silt, some roots (loose, damp) [topsoil] 1.0-4.0 SM Medium brown silty sand with some gravel, some roots (medium dense, damp) [Vashon recessional outwashl 4.0,5.0 SP Gray sand with some gravel, trace of silt, trace of roots (dense, damp) [Vashon recessional outwashl 5.0-7.0 SM Gray silty sand with some gravel (very dense, damp) [Vashon till] 7.0-9.0 SP Gray sand with some gravel, trace of silt (very dense, damp) [Vashon advance outwashl Bottom of test pit at 9.0 feet on 12/19103 No groundwater seepage observed TEST PIT TP-2 0.0.5 SM Dark brown silty sand with some gravel, some roots (loose, damp) [topsoil] 0.5-1.5 SP Brownish gray gravelly sand with trace of silt, trace of roots (medium dense, damp) [Vashon recessional outwashl 1.5-3.5 SP Gray sand with some gravel, trace of silt, trace of roots (medium dense, damp) [Vashon recessional outwashl 3.5-5.5 SM Gray sand with some gravel, trace of silt, trace of roots (very dense, damp) [Vashon advance outwash) Bottom of test pit at 5.5 feet on 12/19/03 No groundwater seepage observed DEPTHS ON THE TEST PIT LOGS, SHOWN TO 0.1 FOOT, SHOULD BE CONSIDERED ACCURATE TO 0.5 FOOT oem cln-a Tuimsuko ks-ML-7 ks-�w LOG OF TEST PIT FIGURE A-2 LOG OF TEST PIT DEPTH BELOW SOIL GROUP GROUND CLASSIFICATION SURFACE SYMBOL DESCRIPTION (FEET) TEST PIT TP.3 0.2.5 SP Brown sand with some gravel, some silt, trace of roots, some construction debris (loose, damp) [fill] 2.5-3.5 SP Gray sand with some gravel, some silt, some roots, some construction debris (medium dense, damp) [fill] 3.5-4.0 SM Dark brown silty sand with some gravel, some roots (medium dense, damp) [buried topsoil] 4.0-7.0 SM Medium brown silty sand with some gravel, some roots (medium dense, damp) [Vashon recessional ourwashl 7.0-9.0 SP Brownish gray sand with some silt, trace of gravel, trace of roots (dense, damp) [Vashon advance outwashl Bottom of test pit at 9.0 feet on 12/19/03 No groundwater seepage observed TEST PIT TP-4 SP Dark brown sand with sorn 0.0.5 e gravel, some silt, some roots (loose, damp) [topsoil] 6.0-3.0 SP Brownish gray sand with trace of gravel, some silt, trace of roots (medium dense, damp) [Vashon recessional outwash] 3.0-6.0 SP Brownish gray sand with some gravel, some silt, trace of roots (very dense, damp) [Vashon advance outwashl Bottom of test pit at 9.0 feet on 12/19103 No groundwater seepage observed DEPTHS ON THE TEST PIT LOGS, SHOWN TO 0.1 FOOT, SHOULD BE CONSIDERED ACCURATE TO 0.5 FOOT LOG OF TEST PIT FIGURE A-3 z 0 0 M 0) M C ITI 0 0 0 M M Z' C —Z o -n -n M ITI 0 C—/) 0 0 M� #;I C W 9 Cn M 0 Z z z 0 M 0 LOG OF TEST PIT * DEPTH BELOW SOIL GROUP GROUND CLASSIFICATION SURFACE SYMBOL DESCRIPTION (FEET) TEST PIT TP,5 0.3.5 SM Dark brown silty sand with some gravel, some roots (medium dense, damp) [fill] 3.5-4.5 SM Reddish brown silty sand with trace of gravel, trace of roots (medium dense, damp) [Vashon recessional outwashl 4.5-7.0 SP Medium brown sand with some silt, trace of gravel, trace of roots (medium dense, damp) [Vashon recesssional outwash] Bottom of test pit at 7.0 feet on 12/19/03 No groundwater seepage observed TEST PIT TP-6 0-1.0 SM Medium grayish brown silty sand with some gravel, trace of roots (dense, damp) [fill] 1.0-2.0 SM Dark brown silty sand with trace of gravel, some roots ( medium dense, damp) [buried topsoil] 2.0-6.0 SP Medium grayish brown sand with some silt, trace of gravel (medium dense, damp) Ivashon recessional outwashl 6.0-7.0 SP Brownish gray sand with some silt, some gravel (dense to very dense, damp) [Vashon advance outwashl Bottom of test pit at 7.0 feet on 12/19/03 No groundwater seepage observed DEPTHS ON THE TEST PIT LOGS, SHOWN TO 0.1 FOOT, SHOULD BE CONSIDERED ACCURATE TO 0.5 FOOT 0 LOG OF TEST PIT San TUBB 0 85 n 0 @ 0 r�it EE FIGURE A-4 z 0 M� cnl 3: M C 0 0 0 C, M M z C z -n M M 0) 0 0 M C V) 9 C/) Q 0, z X 3: z z 0 0 M TU13BS(MCM8aC�6nC8a Date: 5/4/04 F I E L D REPORT Page: I of I Owner: Greg Hale Construction, Inc. File #: HAL2-01 Purpose of visit: Foundation inspection Weather: Partly cloudy I arrived at the site at 10:45 am. Project: 24219 - 104 1h Avenue West Permit#: 2004-0291 Field report #: 1 Prepared by: Donald W. Tubbs The foundation excavation is complete. The footing excavations are directly underlain by native soils consisting of glacial outwash sand; a small area of glacial till appears to exist beneath at least part of the area of the gara ge floor slab. I probed the soils within the footing areas using a half -inch steel probe, and observed that the native soils are generally medium dense to dense, except for two small areas (near the southeast comer of the house and near the center of its west wall) where loose soils existed to a depth of over a foot. I recommended that those two are a*s be overexcavated and replaced with some of the nearby stockpiled gravelly sand, placed and compacted in 8-inch lifts. I also recommended that the footing areas be subsequently recompacted to a uniformly dense condition using hand -operated vibratory compaction equipment. This will be verified during a second field inspection tomorrow morning. No temporary or permanent cut slopes greater than 10 feet in height exist within the site. The permanent cut slopes to the north and east of the house are approximate 6 feet in height. The slope includes an upper segment inclined approximately 3H: IV, and a lower segment consisting of a single tier keystone block wall 3 feet in height. It is our opinion that the keystone block walls that have been constructed will adequately provide the intended erosion protection along the lower portion of the slope. I left the site at 11: 15am. Attachments: Distribution: Signed: MM -S CTR. Cgly oF EDMOtlo' 7505 West Lake Sammamish Parkway Northeast Redmond, Washington 98M 425-882-4850 www.tU z 9 0 M ­'M Date: 5/5/04 F I E L D REPORT Page: 1 of 1 owner: Greg Hale Construction, Inc. Project: 24219 - 104" Avenue West File #: HAL2-01 Permit #: 2004-0291 Purpose of visit: Foundation inspection Field report #: 2 Weather: Partly cloudy Prepared by: Donald W. Tubbs I arrived at the site at 10:00 am. The two areas of loose soils that were observed yesterday have been excavated and replaced with structural fill consisting of compacted gravelly sand. The footing areas have been compacted using hand -operated vibratory compaction equipment. The compacted native and structural fill soils within the foundation area were probed with a half - inch steel probe, and verified as suitable for the design bearing value of 2000 psf provided in our geotechnical report dated January 9, 2004. I left the site at 10: 15am. R C FIVED MAY 10 2004 DEVELOPMENT SERVICES CTR. CITY or EDMONDS Attachments: Distribution: Signed: 7505 West Lake Sammamish Parkway Northeast Redmond, Washington 98059- 425-882-4850 www.tubbs-com FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE—__� T ENGINEERING DIVISION DATE zli nLUZWN z 0 PLANNING DIVISION DATE�__ M PROJECT 2,1q 104 tL fille- SITE ADDRESS ------------- :�h),J� �1.ADB#________pATE.INSPECTED_ PERMIT #-. DESCRIPTION OF WORK TO BE INSPECTED 01, A field inspection was conducted to determine flnal, compliance with approved plans. Final approvat denotes that there are no objections from the above signed Department to the release of ONDS and the granting of: PERFORMANCE BO GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector. 2. 3. RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date Si ocapr4docItem , p:b1dg:fb=s10/01 q :T, M C 0 M 0 --A C) 0 C: ­4 g. r M M Z J0 C0 0 _n > MM 0 Y) 0 r- 0 M C Cn 9 Cn M Z M z co z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Sm Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. n7 z 0 q 0 M —i -n C/) 0 M C M 0 0 0 C M M Z ID C C/) o -n n M M 0 0) 0 M C Cl) i 9 C/) M 0 Z z --I W z 0 0 M The Initials MT are Milton Thompson, a temporary contract inspector for the City.