20040339.pdfI
DATE RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAME/NAME OF BUSINESS
:34 � M C + VI Cx IvA H r-1 C Ck 1) 1
MAILING ADDRESS
-719oq -
CITY
NAME
ADDRESS
CITY
fl, �� - so W
ZIP TELEPHONE
-;qA _-7
ICTelerl .
ZIP [TELEPHONE
PERMIT EXPIRES
r I - I I -
USE PERMIT 11
ZONE NUMBER ZA'
JOB SUITE/APT#
ADDRESS -10
0 011 � 1 5 41-, 5+, SWt MMMMMMMEM
PLAT NAME/SUBDIVISION NO. 4 LOT NO. LID NO.
LID FEE $
TESCP Approved
PUBLIC RIGHI OF WAY PER OFFICIAL STREET MAP
RW Permit Required 13
Street Use Permit Roq'd 13
EXISTING - PROPOSED
inspection Required C3
Sidewalk Required E3
REQUIRED DEDICATION- FT
Underground
Wiring required
METER SIZE
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
0
YES No
CTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE
z
5
Z
uj
NAME
CBL#
wora*416
Trlic-
110 aLl
ADDRESS
C16 log fA..
f
44'c� le /IV e,
CITY
ZIP
TELEPHONE
SQq�k,
"'11111
-1003
1 Ga -_50NVx_ 115 10
STATE LICENSE NUMBER EXPIRATION DATE
CHE(fKED 13Y
NOR22:s-t
Igo 6,k 110
6/
PROPERTY TAX ACCOUNT PARCEL NO.
I
0o's 10
loo000300
NEW
RESIDENTIAL
PLUMBING / MECH
ADDITION
COMMERCIAL
COMPLIANCE OR
CHANGE OF USE
REMODEL
MULTIFAMILY
SIGN
REPAIR
GRADING
CYDS
FENCE
El ( X FO
DEMOLISH
TANK
OTHER
GARAGE
RETAINING WALL
ROCKERY
FIRE SPRINKLER
FIRE ALARM
r
CARPORT
I
(TYPE OF USE, BUSINESS OR IICTIVITY) EXPLAIN:
r
j
n
M
NUMBER NUMBER OF
OF DWELLING
I I
CRITICAL
AREAS
I
STORIES J:�Ve.]
UNITS
NUMBER
DESCRIBE WORK TO BE DONE GPIC
tely)tj
01
161
ENGINEERING REVIEWED BY DATE
FIRE REVIEWED BY DATE 1411
VARIANCE OR CU
SHORELINE OR ADBH
INSPECTION
BOND
REO'D
I
POSTED
I
OYES ONO
S
SEPA REVIEW
SIGN AREA
HEIGHT
COMPLETE EXEMPT
ALLOWED PROPOSED
ALLOWED PROPOSED
EXP ,
,
,
LOT COVERAGE
REQUIRED SETBACKS (FT)
PROPOSED SETBACKS (FT)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT LIR SIDE REAR
z
PARKING
LOT AREA
PLANNING REVIEWED BY DATE
e
HEAT SOURCE GLAZING %
Forad I �
PLAN CHECK NO:
LOT SLOPE %
VESTED DATE
DIED
REMARKS
121.9 /-_114V6,' e21,11
'SI(I
4
CHECKED
OCCUPANT
GROUP
SPECIAL INSPECTION AREA vuUUrMIN I
REQUIRED [] YES LOAD
REMARKS z
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D Ei
FEE Description FEE
State Surcharge
City Surcharge
Plan Chk. Deposit
Receipt #
Total Amt. Due
Receipt #
APPLICATION APPROVAL
This application is not a permit until signed by the
Building Official or his/her Deputy: and Fees are paid, and
receipt is acknowledged in space provided.
FEICIAL5SIGNATURE DATE
0 1--) L
ELE14 E -If
DATE
ATTENTION —
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 6RiGINAL FILE YELLOW - INSPECTOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - ASSESSOR
04/02 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN - ACCOUNTING
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.'
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION
GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENr OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, No PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
SIGNATUt (OWNER 0,,� T)�) DATE [IG
TID
VALUATION
$ ol,
Description
Plan Check
Building Permit
Plumbing
Mechanical
Grading
Engr. Review
Engr. Inspection
Fire Review
Fire Inspection
Landscapelnsp.
Recording Fee
CALL
FOR INSPECTION
(425)
771-0220
v
I
z
0
A
0
M
--I -n
U5 --I
3:
0 M
C
rn
0
110
0 C
4 C
M M
M Z
—Z
3:
0 -n
n
MITI
055
0 r-
0 M
C C/)
K C0
M
Z
3:
z
W
z
0
1
0
M
.. M
4") C. is,)'
GARY HAAKENSON
CITY OF EDMONDS MAYOR
1215TH AVENUE NORTH -EDMONDS, WA98020 - (425) 771-0220 -FAX (425) 771-0221
Website: wwwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
July 16, 2004
Attn: Jaime and Diana Macandog
7804 175th St SW
Edmonds, WA 98026
Building Permit: 2004-0339
Site Address: 7804 175th St SW
Expiration Date: 5/6/05
Dear Jaime and Diana Macandog:
The purpose of this letter is to inforrn you that the last remaining inspection on your
project is a final inspection(s). The final inspection(s) deten-nines that there are no
outstanding life -safety issues and approval allows the City to close your. permit file.
The City considers the final inspection to be one of the most important inspections
conducted on a project. In order to grant final approval the following must be complete:
smoke detectors, house numbers, guardrails, handrails, self -close doors between garage
and residence, egress from sleeping rooms, safety glazing, weather-stripping, any
Engineering department requirements etc. Of course not all of these things may
specifically apply to your project but it does give you an idea about the kinds of things
that must be complete as well as some items that do not need to be installed such as:
paint, carpet, moldings, wallpaper, etc. Please be advised permits expire one year from
the date of issuance. If you will need more time to complete the work, permits can be
renewed prior to expiration for one half fees. If the pen -nit expires without a final
approval granted by the Building Inspector, full fees are required in order to renew the
pen -nit. This can be very costly to you and we strongly encourage you to check your
pennit expiration date and call for the required final inspection(s). Note: If more than
one department is required to final your project, this is noted on your Job Card.
Please feel free to contact me at 425-771-0220 if you have any questions.
Sincerely,
00
'tPern-iit oordinator
Incorporated August 11, 1890
Sister City - Hekinan, Japan
Z
0
0
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall ..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -In ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING ..........................
FRAMING ........................
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
20*0531v/
z
0
i
0
171
—i -n
C M
M 0
0
—40
0 C
--I
3: M
M z
_Z
Cl)
0 _n
n
M M
0
0
0 M
C C/)
9 Cn
Q 0
Z
z
3:
z
0
i
0
ITI