Loading...
20040415.pdfI DATE RECEIVED USE CITY OF EDMONDS ZONE JOB CONSTRUCTION PERMIT APPLICATION ADDRESS Ivy) OWNER NAMENAME OF BUSINESS U f I A A 17)1% if PLAT NAME/SUBDIVISION NO. MAILING ADDRESS A ZIP TELEPHONE .7 NAME W 7RESS Cr 4 CITY NAME r, ADDRESSF 0. a CITY ZIP STATE LICENSE NUMBER ,q F&,c d oC( . 6 PROPERTY TAX ACCO-UN' TELEPHONE C_ 1AW I L/ —1 1 NEW e-IFIESIDENTIAL ADDITION COMMERCIAL REMODEL MULTIFAMILY 0 REPAIR El GRADING CYDS 11 DEMOLISH D�-<ANK 1 :1 GARAGE CARPORT RETAINING WALL ROCKFRY (TYPE OF USE. BUSINESS OR ACTIVITY) EX�Kft �. *� I .�A I � no CBL PERMIT EXPIRES PERMIT NUMBER .It 1VDdj SUITE/APT# LOT NO. LID NO. I LID FEE $ TESCP Approved I PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Pormit Fi0quired 13 Straot Llso Parrilit Roq'd 13 EXISTING — PROPOSED Inspoction Roquired C3 Sidewalk Floquand REQUIRE[) DEDICATION� Fi Undaigrotind WiringfocImfud C3 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 11 NO 13 W z z RACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 5 z W ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DATE uj VARIANCE OR CU SHORELINE Oil ADBI INSPECTION BOND FION E CHECKED) BY REO'D POSTED I 70 OYES ONO S SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I , , PLUMBING / MECH LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE HEAR COMPLIANCE OR I z z CHANGE OF USE — z PARKING LOT AREA PLANNING REVIEWED BY DATE E3 SIGN REO'D I PROVIDED FIRE-1 MARrNHAL. FENCE x — FT) REMARKS HE PRESENT FOR OTHER ANK t7l.- REMOVAL, OR CAP FIRE SPRINKLER 1 3 FIRE ALARM NUMBER�,V NUMBER OF CRITICAL OF DWELLING AREAS STORIES UNITS NUMBER DESCRIBE WORK -TO BE DONE �, \ I 11 'N" N.1-4 r /or P10"'f e4,1A2 A Z_LLII&� ilrwd d/411 111P1t1;1z�AjC,,i` 1Q,(%A7 11-i 0 HEAT SOURCE GLAZING % PLAN CHECK NO., LOT SLOPE % VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 100 DAYS PERMIT LIMIT., 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUThORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR COD�_4f` THE STATE OF WASHINGTON RELATING TO WORKMEN),��NSATIONJNS22NC) AND FIC Ill 27. qIGNATOk-LOWNERIOR kGENT1,e1-%X DATE SIGNr1r OCCUPANTu GROUP SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] YES LOAD REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D F3 - A CHECKED BY FQIL- - VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapeinsp. Recording Fee CALL FOR INSPECTION (42.15) 771-0220 A17ENTION F I I EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FEE Description FEE State Surcharge City Surcharge Base Fee Plan Chk. Deposit Receipt 0 Total Amt. Due Receipt It APPLICATION APPROVAL I hisapplication is not a permit until signed by the Building Oflicial or his/tier Deputy: and Fees are paid, and receipt is acknowledged in space provided. I�IA) S S G T RF D TYE NA t,� -1 EASED BY DA`TE 09iO3 PRESS HARD -YOU ARE MAKING 4 COPIES ORIGINAL FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR :3 M z 0 i 0 M --I -n 0 M C ITI 0 0 --1 C) 0 M M Z JD --i C: z 3: 0 _n n M ITI 0 Cn 0 r- 0 M C cl) 90 ITI 0 Z z Cn z 0 1 0 M Fi1r4 CmWy Im PO B= 31228 SaUde WA 98-103 206-547-2347 Lic. # FUXOCIOSORU FQNP. MCI T Amse Y, —2-e W City Lic M.-ONW." AOMM: ck" &ad NMI Sallon UDWSMund ad WL Fill wUh SOMWAU21 POWGUMN Pump A chm am ( Fam Cut off of mom vc= WA AUcx Rm and mp them pumumady below graft (pow cksm am cap) pump A dm (UvW nm) am PUOU unftgmuvA ad Uumk OA off of Man' vmt and War pq= md cap ON= pumAn=Uy below gmda, 13 Fmp out am -Sallou Unda&MwW all Muk. Emav&W ud mman &M oil lank Um buk AU &be hole and d'Wm of Lank in proper man=. Rol AJD� VFR. 0 a z 0 4 0 m -n m 0 0 m m z cD o -n n m M 0— cl) 0 r- 0 M C cf) cl) M 0 Z :-i > z --I m 0) z 0 m FINAL PROJECT APPROVAL FORM RECE IVED TO: J U N 0 4 2004 DATE: DEVELOPMENT SERVICES GTR, MEMO TO: PERMIT COORDINATOR, bbffl5MTbivisioN FROM: FIRE DEPARTMENT DATE 5J PLEASESIGN ENGINEERING DIVISION DATE - PLEASE SIGN PLANNING DIVISION DATE--, PLEASE SIGN PROJEC 7- SITEADDRESS- PERMIT ADB# -DATE INSPECTED_Zq��() c�f. _J �2_ DESCRIPTION OF WORK TO BE INSPECTED-U -Sr A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of : GRANT FINAL PROJECT APPROVAL 01 - GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1 . 2. 0 RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fom1s:ocaprv1 3/25/04 z 0 i 0 M :q =� Fn --i r M 0 0 0 0 r M M Z On: o -n n x > M M 0 U5 0 r- 0 M C Cn K Cf) M C) Z r- i M r z z 0 A 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -in ................... Commercial Final ...... HEATING: Gas Test ..................... Gas Piping ............... Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING.......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ............ oq-157 V z 0 4 0 M —i -n M M 0 0 M M Z 0 --1 C Cn 0 -n n _,I MITI 0 0 M C Cf) 9 C/) M 0 Z ;U > z z 0 0 M