Loading...
20040420.pdfCITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS ANe'�'Fz_l' 2)0AJ,*7_-0L1F, Cc MAILING ADDRESS uj z '0' 7007 L19KF— R,4qL-.L- JVe';,'t4& I/J)Q-/ CITY ZIP , ITELEPHONE Y_ 'i5z1Vf6-v'b -s- 9SO,7 �'125-778-36-7 W l'— NAME I CITY NAME ADDRESS CITY STATE LICENSE NUMBER ZIP I TELEPHONE 0.) :Z-�jr_ ZIP 90-3-3 TELEPHONE — 1-125-96 EXPIRATION DATE 31 / re )(')10 El NEW RESIDENTIAL ADDITION COMMERCIAL REMODEL MULTIFAMILY REPAIR GRADING CYDS DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: CBL # 1(09-5 WA PLUMBING I MECH COMPLIANCE OR OF USE CHANGE SIGN FENCE FT) I X OTHER Ld3--Fy64_x&tyK FIRE SPRINKLER FIRE ALARM gn w NUMBER NUMBER OF CRITICAL OF DWELLING I AREAS I 'ev/04 0 STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE A,4—C17mjn 01� . (?19Z_1_0 A A9 I/ 11,�qg 4�J60PJ— /A/ HEAT SOURCE GLAZING % I LOT SLOPE % PLAN CHECK NO: i VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: IBODAYS PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 4APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECILY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF 'I HIS PERMIT SHALL NOT BE DEEMED TO MODIFY� WAIVE OR REDUCE ANY REQUIREMEN1 OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION I I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PEHSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18 27. SIGNAI�t" (OWNER OR . ENT) DATE SIGNED 41 USE ZONE ,JOB ADDRESS PLA1 NAME/SUBDIVISION NO V IPERMIT EXPIRES PERMIT NUMBER SUITE/ PT# L L OT NO. f )LID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRED DEDICATION— FT METER SIZE I LINE SIZE I NO. OF FIXTURES LID FEE $ TESCP Approved RW Permit Required 13 Street Use Permit Rorl'd E3 Inspection Raq irod [3 Sidewalk Aoqu�;Od C3 Underground Wtnng required 13 PRV REQUIRED YES 0 NO C3 REMARKS OWN E R/CON TRACTOR RESPONSIBLE FOR EROSION CONTROWDRAINAGE ENGINEERING REVIEWED BY DATE a Z z z LU FIRE REVIEWED BY DATE Im rL U, VARIANCE OR CU SHORELINE OR ADBI I INSPECTION BOND REO'D POSTED OYES ONO S SEPA REVIEW SIGN AREA HEIGHT COMPLETE , EXEMPT ALLOWED I PROPOSED ALLOWED , PROPOSED EXP LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT IJR SIDE REAR z 2 z PARKING - tGT R Nr, REVIEWED BY DATE 5 REO'D I PROVIDED in A L CL REMARKS OPIEZISWLEINFF IFE)ff CHECKED BY ITO CONSTR N OCCUPANT4 GRO v (Liz SPECIAL INSPECTION JAREA OCCUPANT REQUIRED 11 YES LOAD REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D a VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection FEE Description State Surcharge I City Surcharge FEE Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapelnsp. Total Amt. Due Receipt N Recording Fee APPLICATION APPROVAL I his application is not a perinit until signed by the CALL Building ofliciii or his/her Deputy: and Fees are paid, and FOR INSPECTION receipt is acknowILdged in space provided; -_^,CIAL,,S )SIGNAT U RV/ TE (425) 771-0220 A.EASED BY DATt ATTENTION MA I I IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD ASSESSOR 04102 PRESS HARD -YOU ARE MAKING 5 COPIES GREEN ACCOUNIING z 0 1 0 M —i -n in- -i X 0 M C M 0 0 0 0 C: M M Z W 0 _n n M M 0 0 0 M (j) (n M 0 Z X __q X z --i 3: U) z 0 1711 FINAL PROJECT APPROVAL FORM /(�00 mr—C-EIVED TO: JUN 0 3 9"004 DEVELOPMENT SERVICES CTP, DATE: 00/0�" CITY OF ED1.10,NDS, MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION —0 t-f FROM: FIRE DEPARTMENT DATE N ENGINEERING DIVISION DATE—. PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT SITE ADDRESS- , I PERMIT #_qoo q,-_Q Lf t_o ADB#____________PATE INSPECTED A-Lp, 4:t, DESCRIPTION OF WORK TO BE INSPECTED 1— A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Departm I ent to the release of PERFORMANCE BONDS and the granting of: -GRANT FINAL PROJECT APPROVAL /��tq X**,*, ***4c* GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1 . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:forms:ocaprv1 3/25/04 z 0 i 0 M =, =n M C: M 0 --i (-) 0 C: M M Z 0 —1 C: U) o -n n ;u > M M 0 �5 0 r- M cf) C/) M Z ;U z -1 z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. z 0 Retaining Wall ........... Slab Insulation .......... PLUMBING: --I -n Underground ............. 0 M C 0 Rough -In ................... M 0 Commercial Final ...... 0 C: M HEATING: M Z JO --I Ga's Test .................... C: GasPiping ................. Equipment................. 0 n Commercial Final ....... m m EXTERIOR SHEATHING NAILING .......................... 0 0 M C C/) FRAMING ........................ Cn Q 0 FIRST FLOOR FRAMING ... Z r INSULATION ................... ;U -4 Floor Insulation ......... z Wall Insulation ........... Ceiling Insulation ....... Cn z SHEETROCK NAILING ... 0 0 SPECIAL INSPECTION ... 171 MISCELLANEOUS .......... FINAL APPROVAL-Feftl- . .................. 0