Loading...
20040422.pdfI DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION UVVNtH NAMEINAME OF BUSINESS _40 Lu MAILINU ADDRESS z ? :�5")6— / D 0 U11T ZIP TELEPHONE 2NA E, LU l'- ADDRESS Ully ZIP TELEPHONE LNI A 4ME 07 CBL is ADDRESS L;Ily ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATION DATE CHECK By PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL PLUMBING I MECH ADDITION COMMERCIAU <ok COMPLIANCE OR 0 CHANGE OF USE REMODEL I A% MLa M SIGN REPAIR r.PA1---- CYDS FENCE ( X Fn DEMOLISH TANK OTHER E GARAGE l CARPORT RETAINING WALL ROCKERY FIRE SPRINKLER FIRE ALARM (TYPE 0 USE, BUSI ITS OR ACTVLTY) EXPLAIN: N M U IVI B EAR OF NUMBE� OF QRITICAL STORIES DWELLING UNITS AREAS NUMBER C DESCRIBE WORK TO BE DONE —0,51 LOT PLAN CHECK NO: VESTED THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC M DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARCI :i UEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180DAYS CL PERMIT LIMIT., I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION cn 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESOVIS cn uj _j IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF X- EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND x I ALL CLAIMS FOR DAMAGES OF WHATEVER NAI URE, ARISING DIRECTLY OR INDIRECTLY X FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF 1HIS PERMIT SHALL. Nor 8 a E _j DEEMED TO MODIFY� WAIVE OR REDUCE ANY REQUIREMEN1 OF ANY CITY ORDINANCE x 01 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCF Pnnviczinm - I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. TION; AND IN�=NG THE WORK AUTHORIZED THEREBY, NO PERSON WILL, BE EMPLOYED IN VIOLAPON 0 , THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORK)AffN S C059&4r.,ATION INSURANCE JINO�_RCW 18 27. RV A60 DATE SIGN 1) 71 LI-04 I PERMIT EXPIRE 6SF USE ZONE mo� PERMIT NUMBER 2 2 JOB 0 B D D ADDRESS R E SS L SUITE/APT# P LAT NAI I' E SUBD PLAT NAME/SUBDIVISION NO. IV LOT 00 LID NO. rXISTING LID FEE $ 1 G PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved 13 RW Permit Roqwred 13 E S T PROPOSED Street Use Permit Reqd E3 inspection Requited [3 11 f1FQUIRFD DEDICATION. FT Sidewalk Required Underground E3 wiring required 0 METER SIZE LINE SIZE I NO. OF FIXTURES PRV REQUIRED YES 1:1 NO 1:1 1 REMARKS OWNER/CONTRACIOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE RING FIRE REVIEWED BY VARIANCE OR CU SEPA REVIEW COMPLETE EXEMPT EXP I LOT COVERAGE ALLOWED PROPOSED PARKING REQ'D I PROVIDED REMARKS CHECKED BY Iffi DATE DATE BOND SHORELINE ORAD111 I INSPECTION REO'D POSTED DYES ONO IS SIGN AREA HEIGHT ALLOWED , PROPOSED I ALLOWED . PROPOSED REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (Fr.) FRONT SIDE REAR I FRONT LIR SIDE REAR LOT AREA I PLANNING REVIEWED BY SPECIAL INSPECTION IAREA DATE PPE OCCUPANT/-) Y GROUP 1��_ OCCUPANT LOAD .-;I- z z 5 z W Lu a z 2 z REMARKS 0 PROGRESS INSPECTIONS PER UBC 1081FINAL INSPECTION REQ'D �0 VALUATION $4 Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapeirisp Recording Fee CALL FOR INSPECTION (425) 771-0220 E XT 1111 FEE Description State Surcharge City Surcharge Base Fee FEE Plan Chk. Deposit Receipt # Total Amt. Due Receipt # L APPLICATION APPROVAL [his application is not a Permit until signed by the Building official or his/tier Deputy: and Fees are paid, and receipt is acknowledged in space provided ------------------- :kFIAWL)SIGNA�TURIF D .1 EASE[) BY IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL - FILE YELLOW - INSPECTOR 09103 PRESS HARD -YOU ARE MAKING 4 COPIES PINK OWNER GOLD -ASSESSOR K z 0 M q =fi 0 M C: M 0 0 --I () 0 C M M z JO --i (n o -n n ;d > M M 0 0 0 M C Cn 9 (n M 0 Z X M z -4 M CD z 0 i 0 M I N ytp of (Ibmonb (Et' DEPARTMENT OF BUILDINGS ImA, PER UNIFORM BUILDING CODE SECTION 109 At: Occupancy established by this certificate: R1/U1 ilding Permit #: Dwellina Units: '4** Construction: VIN No. Stories: Base + 2 Basement: Yes Maximum Occupant Load **28** -(Per U.B.C. 1002) Room capacity signs, when required, must remain posted at all times. Owner of Building: 548 Dayton LLC, David Calixto_Address: 13256 Northup Way #10, Bellevue, WA 98005. THE 550 Dayton Street Condo HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 1997 Edition of the UNIFORM BUILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 2nd - day of June 1 2005 _ C EF BUILDING OFFICIAL BY: This certificate shall be posted in a conspicuous public area and shall not be removed. mutilated or obscured and shall be maintained in legible condition at all times. Any change of occupancy cruse requires a building permit and a new Certificate of occupancy issued by the City of Edmonds Building Official. I.P.. A. 44"'. 447. 4-M. O.AU S.-M 4 I WIS. (T) (-T� (T) (1) (1) (1) (1) (T) (T) (1) 4) (T) (T) (b 4) 1( (T) (1) (b (b 4� q/ q )q/\Yq)qjw 41 kv kv \V \V \V �v T \V "(D" ) \V T \V \V T \V \V )\Vk M ----------- ----------- t;41A! -f.*:...* 104,11, 1100 a a T A, A, A, AAA, AAt itp of ebmaltb (Ct DEPARTMENT OF BUILDINGS TEMPORARY CUUNCY do rAtt 0 Ut PER UNIFORM BUILDING CODE SECTION 109 ENTIRE BUILDING gXCEPT SUITE 102 At: occupancy established by this certificate: R1/U1 uilding Permit Dwelling Units: **4' Construction: VN No. Stories: Base + 2 Basement: Yes Maximum occupant Load **28** (Per U.B.C. 1002) ust remain posted at all times. Room capacity signs, when required, M owner of Building: 54 xto, Address, 13256 Nort A 98005 THE 550 Dayton Street Condo HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 1997 Edition of the UNIFORM 13UILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 4th day of- Mav 2005 TEMPORARY OCCUPANCY EXPIRES JUNE 2,2005 CHIEF BUILDING OFFICIAL BY: This certificate shall be posted in a conspicuous public area and shall notberemoved,mutiiated or obscured and shall be maintained in legible condition at all times. Any change of occupancy or use requires a building permit and a new Certificate of occupancy issued by the City of Edmonds Building official. sale. FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE ILCAIESIGN PLANNING DIVISION DATE PROJECT SITE ADDRESS PERMIT #,40:� ADe#_ DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. F approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED' [:1 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tenip:b1dg:rorms:ocaprv1 3/25/04 z 0 M -i -n 0 M C M 0 C) 0 M MZ JO --I C C/) 0 _n n ;U -4 > 2: 9 M M 055 0 r- 0 M C Cn 9 U) M C-) Z r- .AT ;0 z z 0 M V MEMO TO: FINAL.C)ROJECT APPROVAL M--.A I - TO: PERMIT COORDINATOR, BUILDING DIVISION DATE: FROM: FIRE DEPARTMENT DATE EASESIGN ENGINEERING DIVISION DATE_.��Z_S 1 �6 6- 4. �I-E t I - PLANNING DIVISION DATE PLEASE! SIGN PROJECT— (I 6;,6.2< 1:0 SITE ADDRESS PERMIT _ADB# DATE INSPECTED . '�"Z,?_ 7 110-5 DESCRIPTION OF WORK TO BE INSPECTED X_ use_ A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRAW PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 13 Copy of CORRECTION NOTICE given to owner/contractor by inspector I . pi 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprv1.doc.1:temp:b1dg:fomis 10/0 1 z 0 M ,q 5i M 0 0 0 0 C: --I K 3: M M Z a -i c:: 3: U) 0 -n n X > M M 0 0 M Cn K Cn Q Z r z Cn z 0 i 0 M I= FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PER -MIT COORDINATOR, BUILDING DIVISION FROM: FIRE, DEPARTMENT DATE 411���_.,_ PLWE SIGN ENGINEERING DIVISION DATE - PLEASE SIGN PLANNING DIVISION DATE PLFASR SIGN PROJECT 4C _2( SITEADDRESS DATE INSPECTED' PERMIT ADB# DESCRIPTION OF WORK TO BE INSPECTED r) A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCLBONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISS UES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tcnip:b1dg:r6m1s:ocaprv1 3/25/04 z 0 q 0 M --i -n 55 -4 3: M C 0 M 0 0 C: --I g X M M z JO --i c:: lug) 0 _n n ;d .-q > x 9 M M 06 0 r- 0 M C Cn 9 Cn M Z r z Cf) z 0 M . i-K RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING ........................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. -gym-, z 0 1 0 M M M 0 0 0 C M M z C C() 0 _n M M 061) 0 r, 0 M C Cn F. cf) M 0 Z z Cn z 0 0 M LI Height Calculation Worksheet Address: S7 0 -Pa s_o— Date: hispector(s): 1. Datum Point: z 2. Datum Point Elevation: 0 M 3. Average Grade: Orc) -7 4. Maximum Elevation Allowed: (averA& giade):;2§"— CO M 0 5. Reference Point Elevation Shot to House: M 0 0 0 (datum elevation) +,S - �'7 (grade to transit level line *shot to house) 03J7 M Mz 6. Measurements from line shot onto house to roof ridge: C > z CI) -n o n _j 3: M M 055 0 0 M C CD 9 Cn M 0 Z r- z 3: CO Total:,�-?,Q z 0 M 7. Actual Eleva don: (reference point elevation� (meastirements from #6) Conclusion: Qc�,07( (actual) is greater /07ess:th�jAin '8­7 (allowed); therefore the house is/ is not over the height -requirement per ECDC 16.20.30 requireinents