Loading...
20040434.pdf­�� FDATE _RECEIVED_ CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OW�JR NAMEMAME (?�F_13USINESS jE7jt_L)6i L MAILING ADDRESS 8,0 Af &15 �(01 vew Sur /1-c 7 CITY zip TELEPHONE �5 e 4- Ne I 1,;�e 6- - 3 V-1- 0 V/ V NAME t= ADDRESS CITY NAME 5 .1 z LIJ ADDRESS 01 t;l CITY PL L 6/ 5 14ve, st )_Coo ZIP TgLEPHONE qLloq jCBL# 1`7 ZIP TELEPHONE 2�1 0")--7 1 q - .2-3 (33 STATE LICENSE NUMBER t:XPIHATIUN DAIE CjCKED RY ve 60 .15 3�0 5/ PROPERTY TAX ACCOUNT PARCEL NO. a-�j 3,9 6 00 /C),�, C7 cro NEW 11 RESIDENTIAL El PLUMBING / MECH ADDITION F] COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL _�KMULTIFAMILY SIGN REPAIR GRADING FENCE CYDS ( X FT) DEMOLISH TANK GARAGE RETAINING WALL FIRE SPRINKLER CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN- Re,,5,,de4,,7�a-11 5(f" NUMBER NUMBER OF CRITICAL OF .3? 1 DWELLING AREAS f STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE r, e- C,-w ,i e -,�7 /I HEAT SOURCE I GLAZING % PLAN CHECK NO: a LOT SLOPE % VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= HE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS CL PERMIT LIMIT'. I YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HFIRS. ASSIGNS AND SUCCFSORS U) IN INTEREST, AGREES to INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF M EDMONDS. WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OFWHATEVER NATURE, ARISING DIRECIIYOR INDIRECILY FROM THE ISSUANCE OF I HIS PERMIT. ISSUANCE OF THIS PERMIT SHALL N01 HE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIIIEMENT*OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY 1 HE CIM ABILITY TO ENFORCE ANY ORDINANCE PROVISION' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION. 111AT THE INFORMAIION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR IHE DULY AUTHORIZED AGENT OF THE OWNER, I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND HCW 1&27. SIG F b DATE,,SIC�N�D Z -, / /�? /x Z/ ,rRE (OWN I 'Or_ � _4W 1 1 PERMIT EXPIRES USE PERMIT ZONE /)y 7� NUMBER JOB PUITE/APT# ADDRESS PLAT NAME/SUBDIVISION NO, LOT NO. LID NO. LID FEE I ESCP Approved 13 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Required El Street use Permit Roq'd 0 EXISTING - PROPOSED inspection Required 11 Sidewalk Required 13 REQUIRED DEDICATION� FT onrlinground Viaing required 0 METER SIZE LINE SIZE 0. OF FIXTURES PRV REQUIRED I YES 13 NO 13 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ENGINEERING REVIEWED BY FIRE REVIEWED BY VARIANCE OR CU SEPA REVI EW COMPLETE EXEMPT EXP I LOT COVERAGE ALLOWED PROPOSED DATE DATE SHORELINE OR ADIII I INSPECTION BOND REO'D POSTED OYES ONO S I HEIGHT ALL C )SED ALLOWED , PROPOSED REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) FRONT SIDE REAR FRONT UR SIDE REAR PARKING LOT AREA I PLANNING REVIEWED BY REO'D I PROVIDED I REMARKS DATE (9 z re W z z Uj W (3 z z z CHECKED BY IT7Yyk ONISTRUCTION OCCUPANT GROUP A 171� -Z, L SPECIAL INSPECTIO14 rREA OCCUPANT REQUIRED [:] YES LOAD REMARKS z PROGRESS INSPECTIONS PER UBC I 08/FINAL INSPECTION REQ1D Ei _11 VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee CALL FOR INSPECTION (425) 771-0220 ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FEE Description FEE State Surcharge City Surcharge Base Fee Plan Chk. Deposit Receipt 4 Total Amt. Due Receipt # /V` APPLICATION APPROVAL I his application is not a pennit tintil signed by the Building Official or his/her Deputy. and Fees are paid, and receipt isacknowledged in space piovided I 'j A rr�CIAIIS SIGN TURE DATE RFI.rASFD BY 091/03 PRESS HARD -YOU ARE MAKING 4 COPIES I IT, ORIGINAL - FiLE YELLOW - INSPECTOR PNK-OWNER GOLD -ASSESSOR z 0 4 0 1711 —i -n t M 171 0 0 C-) 0 M ITI z C _z > Cf) o -n n M M 0 _U) 0 r- 0 M W M Z z W z 0 0 IT! FINAiL PRQJECT APPROVAL FORM TO: DATE: MEMO TO. PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE P—LEAsr SIGN ENGINEERING DIVISION DATE PLEASESIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT PQZ/V�7777 SITE ADDRESS— ._0( PERM A B# IT _______�DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED ja,A?Q!!� 1'�,61LIA4 --It— A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANIDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector I . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fonns:ocaprv1 3/25/04 in --I -n M C 0 M 0 --I C) 0 r M M z 10 -A �:r (n 0 -n nx M M 0 0 0 M C U) 9 Cn M C-) Z X z --I X C/) z 0 1 0 M 9 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment............ Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z 0 i 0 ITI