Loading...
20040464.pdfa DATE RECEIVED �RMITEXPIRES CITY OF EDMONDS USE PERMIT ZONE NUMBER,,'/)/V CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS OWNER NAME/NAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT NO. I LID NO� LID FEE S LMI�IA_a 6n /Rej'7LAj I W MAILING ADdRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP IESCP Approved AW Permit FlOquir0d 0 13 2. h EXISTING — PROPOSED street use Permit Florid inspection Fleitt"frid Sidowall, Required 0 0 E3 CITY ZIP TELEPHONE REQUIRED DEDICATION— FT Undorgiound vViring inquin", 0 METER SIZE LI�E NO. OF FIXTURES PRV �EQUIRED NAME L) ___[ Y E _!!Sj0*( NO 7E ILI W t: ADDRESS REMARKS z z x L) 2Z. -Z� OWNER/CONIRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE --- 3 z f77�F- f "-7 . .20 7,?C7ezW z LLI CITY ZIP ITELEPHONE �J:mcnA� NAME CBLft ersihdi I I —ENGINEERING REVIEWED BY DATE irl ADDRESS CITY STATE LICENSE NUMBER PROPERTY TAX NEW ADDITION ZREMODEL REPAIR DEMOLISH GARAGE CARPORT (TYPE OF U Bl. - ('Ucs TELEPHONE 4 Z.��) q -721. 'EXPIRATION DATE i 0 _a ID LINT PARCEL NO. RESIDENTIAL De -'COMMERCIAL MULTIFAMILY GRADING CYDS TANK EiRETAINING WALL ROCKERY 4ESS OR ACTIVITY) EXPLAIN uj NUMBER NUMBER OF 13 OF DWELLING M 0 STORIES UNITS 7 DESCRIBE WORK TO BE DONE k 0 _01D A7170 7'� . . . . . 13Fjencii G Wr HEAT SOURCE % (A k � a C, — PLAN CHEC"O- E!r—PLUMBING / W)(CR COMPLIANCE OR E] CHANGE OF USE E] SIGN FENCE 11 ( _3& 4& FT) OTHER FIRE SPRINKLER FIRE ALARM CRITICAL AREAS NUMBER LOT SLOPE % 1114 VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS W PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANI. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, N��SHINGTON, ITS OFFICIA1 S, EMPIOYEFS, AND AGENTS FROM ANY AND ALI, C1 AIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIREC FLY OR INDIREC FLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED 10 MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE _j 01 Noll LIMI T IN ANY WAY I HE ci ry�S ABILITY 10 ENFORCE ANY ORDINANCE PROVISION x I HEREBY ACKNOWLEDGE THAT I HAVE READ TWS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR 111E DULY AUTHORIZED AGENT OF THEOWNER I AGREE TO COMPLY WIIII CITY AND STATE LAWS REGULATING CONSTRUC. 1ION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF TIIE STATE OF WASIIINGTON RELATING TO W0AKMFN'_';-C13k4_PE_FtaATION INSURANCE AND RCW W 2T TURE (b%VNE9 4T) DAT ' GNED 1 1 X_'7 t. //,- ZIP FIRE REVIEWED BY DATE w VARIANCE OR CU SHORELINE OR ADB# I INSPECTION BOND AX-0 _j3EQ'D POSTED I A.-35- [11YES ONO IS SEPA REVIEW SIGN AREA HEIGHT COMPLETE , EXEMPT ALLOWED PROPOSED ALLOWED I PROPOSED EXP 7%,,vj, 2G-)-.57 Ak, LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (Ff.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJRSIDE REAR z z PARKING LOT AREA PLANNING REVIEWED BY DATE 5 CL REQ'D PROVIDED REMARKS IV, ,I.- reg,.w.4 1-tlst,ef — CHECKED BY ITYPE OF CONSTRUCTION I CIE UL'L.Ut-AN'4% 7 GROUP6 SPECIAL INSPECTION JAREA OCCUPA �'j REOUIRED '0015, f? �'o YES Z it /-f7 zt2/ REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 5 I 4�kd,4144-1 hV CAW(* KtiilIW61�V, VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee FEE Description FEE ,;-,I State Surcharge City Surcharge Base Fee jZ_11 Plan Chk. Deposit Receipt N -7 Total Amt. Due R-eceipt 9 [;<e2 APPLICATION APPROVAL This application is not a permit until signed by the CALL Building 011icial or his/her Deputy: and Fees are paid, and FOR INSPECTION receipt isacknowltidged in space provided. OFFICIA6"IGNAT y E DATE (425) -77-1 nf3d3n RE[ EASP BY 6�=iiiiiiiiii , "'. I I , '' I � ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL L A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL -FILE YEIIOW'-1N_%KE('T0/R CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK-OVVNER GOLD -ASSESSOR 09,03 PRESS HARD -YOU ARE MAKING 4 COPIES -1 z 0 1 0 M -11 -n M M 0 --j 0 0 M M Z x o -n n MITI 0 0 0 M C: cn K cn M 0 Z X -4 r z --I Cn z 0 M CL r- 1z .tm a] ; - — - — - — - — - — - — - — - — - — - — - — - — - U) ID C; a/* IQ El 3 13) (37) (3y) (M) DISH WSH'G 4* DINING AREA (13) t2l D$CLOM PAM MIA (It COMM 24 U SERVICE AREA (28) (29) (41) is T�L (a) Is BAKERY z 0 2 >4 Z W Z f3O� 0 WSW" Ch LO Z CED WAMWMA ft Scott & Cindy Abrahamson ft Scott & Cindy Abrahamson SIDEWALK MT& 10) % Shell Creek Grill 526 Main Street IZ Imu um� cesno; am off yr Edmonds, WA. 98020 Met, r4 FA 425.775.4566 196 Sq.Ft. EXTERIOR SERVICE AREA NORTH CONTENTS RECEIVED 700 Sq.Ft. OUTSIDE DINING AREA FIFTH AVENUE SOUTH MAN / WEB PU JUN 1 1 2004 Proposed Floor Plan Equipment Layout DATE BUILDING DEPT. Site Plan NOTE SEE SHEET A/2 FINISH FOR: SCHEDULE 04/1612004 RKv. owl W KIM old"04 EQUIPMENT SCHEDLILE/LEDGER REV. W16M SCALE 1/8" = 1'-0" 1,698 Sq.Ft. MAIN BUILDING PLUMBING SCHEDULE/LEDGER Drawing No. �41r"f'IX7 Powby REVISED 05/11/04 RESTROOM(S) 05/25/04 PARKING SEE SHEET CS/1 A-1 REVISED FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FIRE DEPARTMENT DATE 2� Lr FROM: SIGN z ENGINEERING DIVISION DATE 0 i PLEASESIGN 0 PLANNING DIVISION DATE PLEASESIGN =n- PROJECT f M C SITE ADDRESS- A- 3 M 0 0 C PERMIT#? C)o Lf - 6 -/-G Lf ---ADB#_DATE INSPECTED__I::66��� M M z C: 2 DESCREPTION OF WORK TO BE INSPECTED En A field inspection was conducted to determine compliance with -approved plans. Final approval o -n -n;o denotes that there are no objections from the above signed Department to the release of > PERFORAIANCE BONDS and the granting of M M 0 U5 0 r- 0 M C: CD GRANT FINAL PROJECT APPROVAL 9 cn M C) Z r- 3: z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector CIO z 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbrms:ocaprv1 3/25/04 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN kn ; r) -I C_� ENGINEERING DIVISION DATE ­PUASF z 0 SIGN i 0 PLANNING DIVISION DATE' PLEASE SIGN zn PROJEC M M a 0 SITE ADDRESS 0 0 PERMIT _ADB# INSPECTED -�e C: M M Z DESCRIPTION OF WORK TO BE INSPECTED L Cn A field inspection was conducted to determine final compliance with approved plans. Final approval o -n denotes that there are no objections from the above signed Department to the release of n ;d --i > PERFORMANCE BqLNDS and the granting of: X 9 M M 0 U5 0 r- 0 M C: (n GRANT FINAL PROJECT APPROVAL 9 Ct) Q 0 Z r- 7-1 T ;U --I r z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED --i u Copy of CONDITIONS given to owner/contractor by inspector a: Cn z 0 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Sign_ ocaprv1.doc.1:temp:b1dg:fbnns 10/0 1 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE, DEPARTMENT DATE PLEASI: SIGN z ENGINEERING DIVISION DATE 0 i PLEASESIGN 0 PLANNING DIVISION DATE 9111104- ��CSIGN PROJECT 4,k -T�a6 M MO __10 SITE ADDRE SS_ 1 -7 5" Ae_ 0 0 C 3: M PERMIT ADB# DATEINSPECTED 911-710"�- M Z DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. - Final approval 0 -n n ;d denotes that there are no objections from the above signed Department to the release of __4 > PERFORMANCE BONDS and the granting of: M M 0 5 0 r- 0 M C CD GRANT FINAL PROJECT APPROVAL 9 C/) M 0 Z r- z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED --I a: 0 Copy of CONDITIONS given to owner/contractor by inspector U5 z 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES 3d Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 1 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tcn11):b1dg:1brn1s:ocaprv1 3/25/04 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE— PLEASE SIGN z 0 PLANNING DIVISION DATE 4-A-1 h�- M PROJECT' =n rn M SITE ADDRESS 11-7- M 0 0 PERMIT 4 _DATE INSPECTED A �64 �ADB# 0 C: --i K x M M Z DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval � (n denotes that there are no objections from the above signed Department to the release of 0 _n PERF ORMANCE BONDS and the granting of: n M M i,Z'GRANT FINAL PROJECT APPROVAL 05 0 r- 0 M C cq 9 0) M Z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector (n z 0 FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 M 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signaftire 1:tenip:b1dg:f6nns:ocapn,1 3/25/04 400 Graf, Jeannine From: Gebert, David Sent: Monday, October 25, 2004 8:38 AM To: lmkealy@windermere.com' Cc: Bullock, Steve; Gruwell, Meg; Graf, Jeannine Subject: Parking at Red Twig Mike, I have looked into your question regarding the parking requirements at the Red Twig. The Edmonds Community Development Code sets criteria for the number of parking spaces required for private development projects. The Planning Division applies the code and determines the number of parking spaces required for a specific project. The Building Official also determines the requirement for how many parking spaces must be ADA accessible. Meg Gruwell is the Planner who worked on the Red Twig project. She has informed me that the required number of parking spaces was 3, but the project provided 4. Hope this information helps. if you have any additional questions about the required number of parking spaces, Meg Gruwell can be reached at 771 0220. Dave 0 4 0 M --------- --------------------- cub DEPARTMENT OF BUILDINGS PER UNIFORM BUILDING CODE SECTION 109 Permit # 2004-0464 At: 117 5l".'Ave S. Occupancy established by this certificate: Dwelling Units: **N/A*** No. Stories: I B Type of Cori struction: V-N Maximum occupant Load *"Interior.46, Exterlor:46 (Per UBC 1002) Room capacity signs, whep'��p t�t remain posted at all times. Owner of Building Tomlinson MaryJ'ewell Addre-si- 'Pd''60X 27230 Seattle, WA 98125 997 Edition The Red Twig has been hispectej and approved as complying with the requirements of the 1 of the Uniform Building Code as adopted by t6e;Clty for the gripup.anO.division of'occupancy and the use for which the proposed occupancy is classified. Issued this 23 day of Sep'ember 2004 CHIEF BUILDING OFFICIAL BY: This certificate shall be posted in a conspicuous public area and shall not be removed, mutilated or obscured and, shall be ma ained in legible condition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. 10 see WMW .6 W W. 61 a a I - a, as, (1) (1) (1h (1) (b , � 4) (1� (T) (1) (1) (T) (1) TV � q/ T q/ q/ T T T T T T T -------------- - ------- -- - ---- ------ 4 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED vv) SETBACKS ..................... - FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. Mq evoq&q v,000"' z 0 i 0 M —i -n C/) M C M 0 0 __10 0 C IT! 171 z r') ­4 C o -n n M M 0 0 M a 0) 1 F. Cn M 0 Z r- z 0) z 0 i 0 M