20040475.pdfDATE RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
gi�NEPI NAMUNA
OF BUSINESS
f $1 4.
1 C t k:-L - q
MAILING ADDRESS
CITY ZIP TELEPHONE
1/j r( Cl iS-, eo
NAME
W
t: ADDRESS
CITY ZIP TELEPHONE
NAME
A -
ADDRESS
CITY ZIP
C�
4
STATE LICENSE NLAABER
PROPERTY TA)� ACCOUNT PAqCEL NO.
CBL 4
TELEPHONE
EXPIRATION DATE I CHECKED
6
11
NEW
13
RESIDENTIAL
ADDITION
COMMERCIAL
REMODEL
ULTIFAMILY
xP EPAIR
GRADING CYDS
11
DEMOLISH
TANK
EiGARAGE
CARPORT
RETAINING WALL
ROCKERY
(TYPE OF IJSE, BUSINESS OR ACTIVITY) EXPLAIN:
14
PLUMBING / MECH
COMPLIANCE OR
OF USE
CHANGE
SIGN
FENCE
( x F-n
OTHER
FIRE SPRINKLER
FIRE ALARM
NUMBER OF CRITICAI%_
NUMBY W
D ELLING AREAS
UNITS NUMBER
DESCRIBE WORK TO BE DONE
4,-�a(&(r z-oiFk
s,fv C (D 2- vo jC F 6 c)
AT 0
ail
fc g 6-
A Aj9l)l).--.Af,- r-) I L_
HEAT SOURCE I 'GLAZING %
LOT SLOPE %
PLAN CHECK NO: VESTED DATE
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
cr PERMIT APPLICATION: 180DAYS
W
PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
U) 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
0
W IN INTEREST, AGREES 10 INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
_j
2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
M
4 ALI. CLAIMS FOR DAMAGES OFWHArEVER NATURE. ARISING DIRECIIYOTI INDIRECHY
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF -I HIS PERMIT SHALL N01 BE
a DEEMED To MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
_j
0 Noll LIMIT IN ANY WAY THE CITYS ABli I7Y 10 ENFORCE ANY ORDINANCE PROVISION.'
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION ' THAT THE INFORMATION
GIVEN IS CORREC1. AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITT I CITY AND STATE LAWS REGULAI ING CONSTRUC
TION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WI[L BE EMPIDYED
IN VI'6LATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WOUMEN'SPQMPENSATION INSURANCE AND RCW 10 27.
WNLR�R�61ENT) 'I DATE SIGNED
SIGN4 I E i�i
,Vf , 17A17�1_ , 1�_, ---,% — I ) /(I 1__Iq
PERMIT EXPIRES
I
USE PERMIT ,,/j ' i
ZONE L
NUMBER
JOB SUITE/APT#
A D D R E S' S 41 lt,� I
,z
PLAT NAME/SUBDIVISION NO LOT NO /LID NO
LID FEE S
TESCP Approved 13
PUBLIC mGH r OF WAY PER OFFICIAL STREET MAP
riw Permit Required
Street use Permit Rnq'd
EXISTING — PROPOSED
inspection Rervillod
.,Idn*alk ReqUirod
REQUIRED DEDICATION— FT
underground
wirino required
METER SIZE
LINE SIZE
NO OF FIXTURES
PRV REQUIRED
YES 0 NO 13
REMARKS
OWNFR/CONIHACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
V
('j TL-,4 K7 o - L3 CA,�,Atr, 6r,- D
ENGINE'ERING NEVIEWED BY
FIRE REVIEWED BY DATE
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
BOND
REO
I
D
I
POSTED
OYES
MKS
S
SEPA REVIEW
SIGN AREA
HEIGHT
COMPLETE EXEMPT
ALLOWED PROPOSED
ALLOWED PROPOSED
,
IV(.
I
k,
I
EXP
LOT COVERAGE
REQUIRED SETBACKS (Fr.)
PROPOSED SETBACKS (FT.)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT LJR SIDE REAR
AQ,
I
I A/L
PARKING
LOT AREA
PLANNING REVIEWED BY DATE
REO'D PROVIDED
REMARKS
wo
Ida
CHECKED BY ITYPf F fONSTRUCTION CODE OCCUPANT
/V-`_ 6t -7 GROUP 1:
SPECIAL INSPECTION JA�EA OCCUPANT
LOAD
REQUIRED [] YES I
0
Z
z
z
6
z
ul
T;
F!
(5
z
0.
REMARKS I
EQ'D
PROGRESS INSPECTIONS PER UBC I 08/FINAL INSPECTION Fm�
FEE I Description FEE
7` State Surcharge
City Surcharge
Base Fee
PlanChk.Deposit 161 J9
Receipt # 114
Total Amt. Due
L Receipt # I
APPLICATION APPROVAL
I hisapplication is not a permit until signed by the
Building Official or his/her Deputy: and Fees are paid. and
recuipt isacknowledged in space provided
OFFIC19n 5 SIGN�fl [)AT E
iTrt EA, -1) BY DATE
ATTENTION 14 4 Y% I I jjj "i,4
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL ILI yh,
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 0111GINAL FILE YELLOW � INSFECT�ufj
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER COLD ASSESSOFI
09�03 PRESS HARD -YOU ARE MAKING 4 COPIES
VALUATION
$_ga
Description
Plan Check
Building Permit
Plumbing
Mechanical
Grading
Engr. Review
Engr. Inspection
Fire Review
Fire Inspection
Landscapelnsp.
Recording Fee
CALL
FOR INSPECTION
(425)
771-0220
D
03
FA
z
0
1
0
M
=P�
U5 --j
0 M
C
M
0
0
0 C
--i ?,
X M
M Z
JD --i
C
X
Cn
q -n
n
M M
0
0
0 M
C: (/)
90)
M 0
Z
z
--I
X
W
z
0
1
0
M
q
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: mvwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building Engineering
C)
June 14, 2005
z
0
Northern Marine & General Contractors
0
Robert Filippini
=i :_n
5751 Mt Baker Highway
--I
Derning, Washington 98244
M,
RE: Repair Permit #2004-0475 @ Park Place Condos, 400 Howell Way, Edmonds
M
0
00
C
M
Dear Mr. Filippini:
M Z
The City is in receipt of ERD's field reports for the subject project. As you and I discussed last
C z
>
week the purpose of securing copies of the reports was. to ascertain what inspection s were
W
performed by ERD as it is now your intent to have ERD approved as the special inspection firm
0 _n
-n
of record forAllis project since your firrn failed to contact the City Building Inspector for code
required progress inspections (such as framing, exterior sheathing and lath).
M M
Please be advised, the s ubject building permit was not conditioned to require special inspection.
0 co
0
0 M
Special , inspections can be performed (in lieu of City inspections) provided the Special
C CD
C CD
inspector(s) is approved, in' advance, by the City Building Official (per International Building
Q0
Z
Code Section 1703). As of this date, no person or Frill, including ERD is approved as the special
inspection Frill of record for this project.
On a related issue, from the ERD reports provided and viewing their attached field photographs
z
it is apparent that structural repairs were made during the project,that would have required City
inspection approval. Again, according to City records no inspections were requested. Note, it
Would also have been possible to request special inspection for this portion of work as well,
z
0
(performed by a WABO certified inspector or State licensed structural engineer --again, with the
0
understanding that tile special inspector is approved in advance by tile City Building Official).
M
The City has already contacted ERD and verified that their staff engineer was not called out to
the site at any point during the pr *CCt, thus no Field reports appear to exist to Substantiate tile
01
structural repair work, framing, exterior sheathing, and no field reports were provided
specifically approving tile lath installation. Also, a check of City inspection rec ords revealed no
-or these items.
inspections were requested oi- performed by the City Building Inspector f
Incorporated August 11, 1890
Sister City - Hekinan, Japan
Mr. Filippini
June 14, 2005
Page Two
In order to work toward resolving this matter the following is required to be submitted to the
City by June 24, 2005:
Statement of Qualifications from ERD in accordance with IBC 1703 (upon receipt of the
0
SOQ a decision shall be rendered, if ERD has the proper qualifications to perform any
.4
aspect of special inspections for this project)
Special Inspection Testing Agreement form. signed by ERD, Northern Marine and
=i �R-
building owner(s)
Ui
Written proposal from Northern Marine as to how the omission of required structural
0 rn
C
inspections and lath inspections shall be resolved
rT1
0
0
0
If you have any questions please feel free to cont act me during City business hours of 9:00am. to
C
noon and 1:00pm to 4:00pm, Monday through Friday at 425-771-0220 extension 1226.
M: rn
rn Z
Sincerely,
o -n
Jeannine L. Graf
M M
Building Official
CD
0
0 M
C Cn
9 Cn
M 0
:C
65
z
0
0
GARY HAAKENSON
CITY OF EDMONDS MAYOR
12 1 5TH AVENUE NORTH EDMONDS. WA 98020 - (425) 771-0220 FAX (425) 771-0221
website: www.d.edmandsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building Engineering
C.
J1.111el, 2005
Park Place Condominium
z
ATTN: Homeowner President
0
400 Howell Way
Edmonds, Washington 98020
M
RE: Repair Pen -nit 92004-0475 for EIFS
9
M
C
Dear Homeowner President:
M
0
Tile purpose of this letter is to inform your association that the general contractor for this project,
0 0
C
Northern Marine, has. informed our office that a private special, inspection, rh -in was hired to
M
M z
perfon-n progress, inspections throughout the repair wor k at the Park Place Condos.
C
z
Unfortunately, Northern Marine failed to gain City approval in advance as required by
International Building Code Sections 1703 & 1704 which requires that special inspection
-icai ce of this
expertise be verified and approved by the.City Building Official. Tile signif 1
0 -n
,
omission is enhanced because Northern Marine also failed to contact the City for progress
-n
,
inspections and it is our u riderstanding that.the work is complete
M M
Cn
In order to resolve this matter the following is required to be submitted to the City by June 13,
0
0 M
2005:
C (D
0 Statement of Qualifications from the Special Inspection firin
Z
* Copies of WABO certifications of staff members
0 Copies of Professional Engineer Licenses of staff inernbers
X
0 Copies of all field inspection reports for this project
0 Complete the enclosed Special Inspection Testing Agreement fon-n
z
3:
Once this information is submitted it will be.reviewed by my office in a timely manner. If the
co
special inspection firm is approved and if all field reports are acceptable this matter can be
z
0
resolved. If You have any questions about this letter or requirement please feel free to contact me
0
during City business hours of 9:00am to noon and 1:00pni to 4 :00pm, Monday through Friday at
M
425-771-0220 extension 1226.
Sincerely,
Jeannine L. Graf
Building Official
Cc: Northern Marine
Incorporated August 11, 1890
Sister Citv - Hekinan, Japan
GARY HMKENSON
CITY OF EDMONDS MAYOR
12 1 5T
HAVENUENORTH - EDMONDS,WA98020 * (425)771.0220 FAX(425)771-0221
Websile: www.d.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
1.11 C. SL)�) Planning - Building Engineering
August 12, 2005
Northern Marine & General Contractors
Mr.Robert Filippini
5751 Mt Baker Highway
Derning, Washington 98244
RE: Repair Permit #2004-0475 @ Park Place Condos, 400 Howell Way, Edmonds
Dear Mr. Filippini:
Tha I A you for.your timely response to all City requests to date regarding this matter. 'File City
is in receipt of copies of field reports performed by ERD and Northwest Wall and Ceiling Bureau
relative to the subject project. The City finds these documents to suffice questions co. icerning
the sheathing that was replaced oil this project (minimal amount primari ' ly associa.ed with
planter boxes), and the r lath installation. The City therefore considers the matter to be closed.
If you have any questions please feet free to contact me during City business hours of 9 00am to
noon and 1:00pm to 4:00pm, Monday through Friday at 425-771-0220 extension 1226.
Sincerely,
Jeannine L. Grar
Building Official
Incorporated August 11, 1890
z
0
0
M
q:9
M
C
M 0
0
0
0
M
M z
-Z
>
Cn
0 -n
-n
q
:c
M M
0 5)
0
0 M
C C/)
C 0
Q 0,
Z
z
0)
z
0
0
M
t
c-TY OF EDFADdDS & CODE FNMRVATION
Ntrl A�RE5S! �"�TUwAT
U�All . � -0 mm, � .Fn .2
-tMWT CALC�=":
fIt--T— 0,
Ufa
C -IF
'loxiElD N,
12
"PARK PLACE EDIAONDS"
A SIX UNf-i CONDOMINIUM
acio WYATU Wxy
9!m
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE
IT IS DUE TO THE QUALITY OF THE DOCUMENT.
'.7 - -.�
APPROVED FOR
JANlES R. fRWII-,r & ASSOCIATES
I.!* A
ARGHTECT"
-C-00 .1:71f S-�,. EDMONDS. WA. S1025
JURI- 1 2004
CoPV BUILUING DEPT.
"ITY JL JL -;
i
PARKING DISRUPTION/CLOSURE FEE
CALCULATION
Project/Address:
calculated by ALC
Bars#: 111.000.000.344.120.000.000-00
Park Place Condos
Assessed Land value (per County Assessor)
of abutting property
Area of abutting property (sf) 107 x 140
Assessed land value per square foot of abutting
property (land value divided by area of properly)
disruption/closure multiplier(l%)
1 % of assessed land value per square foot
(land value per sf x disruption multiplier)
Parking area disrupted in square feet
8.5 —ftwide )- 40 ft long
Monthly parking disruption fee
(1 % land value per square foot x area of sidewalk disrupted)
Estimated number of months of disruption
SUBTOTAL PARKING DISRUPTION/CLOSURE FEE
ADMINSTRA TIVE PROCESSING FEE
(fee to be paid prior to permit issuance).
TOTALFEE
Date: 6.3.04
$ 277,000.00
(divided by) 14,980 sf
(equals) $ 18.49 per sf
(times) 0.01
(equals) $ 0.18 persf
(times) 340 sf
(equals)
$ 62.87 per mo.
(times)
12
(equals)
$ 7L4�
(plus)
$ 140.00
(equals)
$ 894.451
NOTE:
The above fee must be paid prior to or at the time of permit issuance.
If actual months (or portion thereof) of disruption is more or less, then
a fee adjustment will be made at the time of Engineering final inspection.
as of 23 Apr 03
v:Wstr forms1disruption-closure fees
z
0
4
0
M
0 M
C
M 0
0
0
0 C
M
M z
C
0 -n
n
x
rn M
0 —0)
0 r- I
0 M
C W
9 CO
Q 0
Z r- p
Cl)
z
0
0
,1
SIDEWALK DISRUPTIONICLOSURE FEE
C-ALCULATION
Project/Address:
calculated by ALC
Bars#: 111.000.000.344.130.000.000-00
Assessed Land value (per County Assessor)
of abutting property
Area of abutting property (sf) 90 x 120
Assessed land value per square foot of abutting
property (land value divided by area of property)
disruption/closure multiplier(I %)
I % of assessed land value per square foot
(land value per sf x disruption multiplier)
Sidewalk area disrupted in square feet
5 ft wide Y 40 ft long
Monthly sidewalk disruption fee
(I% land value per square foot x area of sidewalk disrupted)
Estimated number of months of disruption
SUBTOTAL SIDEWALK DISRUPTION/CLOSURE FEE
ADMINSTRATIVE PROCESSING FEE
(fee to be paid prior to permit issuance).
TOTALFEE
Park Place Condos
Date: 6/3/2004
$ 277,000.00
(divided by) 10,800 sf
(equals) $ 25.65 per sf
(times) 0.01
(equals) $ 0.26 per sf
(times) 200 sf
(equals) $ 51.30 per mo.
(times) 12
(equals) Fj7 ----I
(plus) $ 140.00
(equals) $ 75 5.56
NOTE:
The above fee must be paid prior to or at the time of permit issuance.
If actual months (or portion thereof) of disruption is more or less, then
a fee adjustment will be made at the time of Engineering final inspection.
as of 23 Apr 03 V:\dvrw\bldg\04-178 park place condos disruption -closure fees.xls
z
0
1
0
rn
--i -n
rn
C
M
0
0
0 C
X M
M Z
0 _111
_n
m M
0
0
0 M
C CD
C Cn
M 0
Z
>
z
CAl
z
0
1
0
m
k.
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
S ETBACKS ......................
FOUNDATION:
Footing......................
Wall..........................
z
0
Pier/Porch .................
--I
Retaining Wall ...........
171
Slab Insulation ..........
PLUMBING:
171
C
Underground .............
0
0
0
Rough -in ...................
C
IT11
Commercial Final ......
M z
HEATING:
C z
GasTest ....................
x
CO)
Gas Piping .................
Equipment.................
IT11 M
Commercial Final .......
0
0
EXTERIOR SHEATHING
0
C: 171
Cn
NAILING ..........................
co
Q 0
Z'
FRAMING........................
FIRST FLOOR FRAMING...
;U
INSULATION ...................
>
z
Floor Insulation .........
Wall Insulation ...........
0)
z
Ceiling Insulation .......
0
0
SHEETROCK NAILING ...
171
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
..................