Loading...
20040491.pdfDATE RECEIVED FPERMIT EXPIRES CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION USE PERMIT ZONE NUMBER JOB SUITEIAPT# ADD A E S S OWNER NAMEINAME OF BUSINESS PLAT NAMEISUBDIVISION NO. L 0 T NO. LID NO. LID FEE $ �0 LCC u 0 MAILII`jG ADDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING - PROPOSED REQUIRED DEDICATION- FT TEScP qP1mod RW Permit Required [3 Street Use Permit Roq'd [3 Inappection Requ, od [3 Sidewalk Required E3 underground wiring fuquu.. C3 CITY ZIP T E PHONE NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 13 NO L5 uj t ADDRESS REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE z z 0 PRE­1NSPE=0N REQUIRED lu CITY ZIP TELEPHONE 1 0 STREET TO EIR CLEANED OP DEBRIS NAME 0 SIDE S13WER MUST OR CAPPED AT ENGINEERING REV"ItWIRETPOW" ve LIMB DATE 0 WATER METER TO BE BiRminwn o%n cc 0 ADDRESS 01113 W FIRE REVIEWED" 1%vu INSTALWEII DUmPAT "PROVED DUMP, sITE ONhX Uj M 0 CITY ZIP TELEPHONE VARIANCE OR C tSEE 0 CHEI 6W# MLIST 0'4"N BA N 'jo' V110 IiCARD 'OF 13 13OND POSTED STATE LICENSE NUMBER EXPIRATION DATE HE �PK By SEPA REVIM"I' ""3rr-�-Akt"ROL4QUIRI�ME,;NTSHEIGHT COMPLETE EXEMPT EXP ALLOWED PROPOSED ALLOWED , PROPOSED -<j W PROPERTYTAX ACCOUNT PARCEL NO. u "� _1 -1 NEW �X RESIDENTIAL PLUMBING MECH ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (Fr.) FRONT LIR SIDE REAR PARKING REQ'D PROVII ED I LOT AREA PLANNING REVIEWED BY DATE IL GRADING FENCE REPAIR CYDS ( X FT) REMARKS DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: i CHECKED BY ITYP 177- OCCUPANT (///)F,--7 GROUP NUM13ER OF 0 STORIES _7UNII NUMBER OF DWELLING CRITICAL _1� AREAS NUMBER _00/ SPECIAL INSPECTION REQUIRED [:] Y AREA' OCCUPANT LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC 108/IBC109/IRC109 FINALINSPECTION REQ'D P,c I yl VALUATION 1�7 0 U, $ Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE GLAZING % I LOT SLOPE % Building Permit City Surcharge PLAN CHECK NO: VESTED DATE Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Grading BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review ILI PERMIT APPLICATION: 180 DAYS IL PERMIT LIMIT 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection A U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF - 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # W ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Landscapelnsp. Total Amt. Due FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF 1 HIS PERMIT SHALL NOT BE DEEMED TO MODIF`r� WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION." Recording Fee Receipt # 1/6 Ll I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION -W ...... 6 APPLICATION APPROVAL GIVEN IS CORRECT AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGRiE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building 011icial or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF TIIE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged if) space provided. WORKMEN'S C? ,fid%NSATION INSURANCE AND RCW 18.27. (4251 OFFICIALS SIGN ATURE DATE /--7 -7 SIGNATURE WNERAA AGENT) DATE SIGNED 771-0220 RELEAS ATTENTION E)ff 1333 IT IS UNLAWFULTO USE OR OCCUPYA BUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES I 71 M ORIGINAL FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR z 0 0 M =i =6 C M M 0 0 ­11 C) 0 C M M Z ID --I C: _z 0 -n M M 0 0 0 M C cir) 9 W M C) Z z W z 0 1 0 M Ageacy Case No. PUGET SOUND CLEAN AIR AGENCY Date Received I 10 Union Stree4 Suite 500 Seattle, WA 98101-2038 wwwpscleanair.org r, I 200400434 NOTICE OF INTENT Agency use Only r Proiect Tvne: 1. 13 Fri2ble Asbestos Removal 2. W Friable -Asbestos Removal Demolition 3. 11 Demolition Only Asbestos PLAAASEPItINTCLF-Aldt. THIS WILL -87 rGUR NA7URNMAJUNGLA a& Contractor: . . q Owner/CEO: PAI W Ailing Address: Phone: AVIMiT -Gmtractor Job.No.: -Tz-ip ity- State: Fax: P01-1� Site— -Address* P21fKc-,1 City-, 4146yo Zip: Site Manager: "L7-. Loca&Wone:��W/ 2- J - 9,> - >tAsbestoS Surveyor No. of Date of Asbestos Was Friable Asbestos Identified? )AYes UNo El M20 Presumed -I-Structures: ok Surver. X-2�: ��g Was Nonfriable Asbestos identified? ElYes IRNo iERA Buildilg Certification /4VP?v' Attach a copy of the survey whenfiIable asbestos Inspector: has not been identified. 17-Al AJ 1'% f% Exp. Date: a - _7 -,q AHERA Survey is requLred before all demolition projects Demolido No. of 02 U T 'n s I raining Fire (List Firc.DepQ Informad TD 7stluctures: 2. 0 Ordered Demolition (attach co2y of Order) Demolition Insert demolition contractor's mailingpddress on ba& Will nonfiiable asbestos be left in place during demo? U Yes No Contractor: tc> e-- J e:(-42-�r vi, i If yes, list t3W and qty. Iff Fri2ble Asbestos Project Inform2tion: _ FS. Da�. ��z 0 'Pe Corr4iletion Date: fZe�05� WorkDays:.M T W Th F Sa Su Hours: Will all friable asbestos Yes matefials be removed? 81"110 tal Qty. to be Removed: Linear Ft. Sq FL ermal System Insulation: I LJ Boileff—umace Ins. ---- 0 Duct Ins. U Pipe Ins. Other rfacing Mat'l: I U Fireproofing LJ Paints LJ Plaster Ll Textured Coatings Odm-. sc. Mat'l TU Cement Bd. U Cement Pipe U Friable Flooring or Roofing Mat'l Cd=-. Asb;es1-6s/DiEmaffriaff 1—ro—Jec`t-Cabit6r-lesi---- Notification Period Project Demotition Single -Family Residence: Fee Surchare Asbestos Removal Project Only A. Prior Notice Demolition Project (with or without asbestos removal project) B. 10 Days* -A—M �13. -S-5-O—) *(Asbestos removal can begin upon nodfication; demolition must wait 10 days) Ite. If the singlefamily residence is owned by onefamily who has been or wifl be using the residence as their domicile, the above boxes or 1B maybe checkeit A single family residence does not include rental prope multi-famifyunitsora mixed -use building. U All Other Demolitions With No Asbestos Removal Project 10 Days $200 Friable Asbestos Projects (other than Single Family Residence): Asbestos Demo U ;-> 10 - 259 linear feet and/or 2t 48 - 159 square feet of asbestos Prior Notice— 10 Days $100 SIGO U 260 - 999 linear feet and/or 160 - 4,999 square feet of asbestos 10 Days $200 SIGO U > 1,000 linear feet and/or >5,000 square feet of asbestos 10 Days $750 $250 U Emergency Asbestos Project or LJ Emergency Demolition Project Prior Notice I I Twice Project Fee (Single -Family Rcsidences are exempt ftom emergency fee; however, propetty owners must provide a written ernerg t) Iccrtify that the informanwonc tained in this notification &suppkm=tal data is, to thcbcstof rnyknowicdgcac-curatc&cornpJetc. y Use Only ta7t//7 sign A 4vresentinz Date R, ie�,d t Sound Clean Air Apf-nry r-nrni Wn - fA-iAn nini% �v z 0 i 0 M --I -n W C M M 0 0 -i C-) 0 C ­4 F. T- M M Z I[) --i C co 0 -n n M M 0 U; 0 r- 0 M C Cn 90) Q Z .4w X z --I r Vi z 0 1 0 M The Puget Sound Clean Air Agency requires advance notification before anyPerson commences a fiiable asbestos projec . t involving materials equal to or greater in size dian 10 linear feet oi-`481.-sq�. feet and for all demolition projects (regardless of asbestos content) involving structures with a projected r . 00"f"airea &eater diari 120 square feet (Regulation Ell, Article 4). All asbestos removal and demolition notifications mtik'b'�*.'s­ubfnitted' the Agency on current Agency Ao forms. Asbelos removal and demolition p Jects involving matee"nabn and structures below the notification threshold . are still subi 6ct to all other reguirements of Re tulation III, Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. I DeamUtion PfxASE PM7 CLEARLY. Contractor. Owner/CEO: Mailing Address: Phone: Contractor's Job #: I!d City: State: Zip: Fax: GUIDELINES FOR SUBMITTING AN ASBESTOMEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes p . opcom ceiling material, sheet vinyl flooring, cement asbestos board sidino, and duct insulatiom Nonfliable asbestos is normally found in vinyl floor tiles, window putty and most roofing materials. 3tep 2. Enter property owner iriformition in Box B. 3tep 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single-family residential 3roject, in Box C. Print clearly this is your return mailing labeL I 3tep 4. Enter the site address for all notifications in Box D. For multi -structure projects, attach supplemental sheet.witha site . map Include an address for each site) and a list of the type and amount of friable asbestos to be removed from each structure. 'tep S. Check either asbestos survey or material presumed in Box E. All demolitions require that an Asbestos Hazard Emergency tesponse Act (AHERA) asbestos survey be conducted by a certified AH'ERA building Inspector. - Attach a copy of the surygy to the totification of a demolition project when only m—fKable asbestos or no asbestos is identified on the survey. ;tep 6. Enter the project information in Box F. and check the training fire or ordered demolition box if appropriate (a copy of the ifficial order must be attached). All asbestos must be removed prior to conducting a training fire. Additional training fire equirements are contained in Regulation 1, Section 8.08. If any nonfriable asbestos materials will be left in place during demolition, heck yes and list the type and quantity of material. ;tep 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed: surfacing material such as opcom ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. tep 8. For Single -Family Residential projects; check BOX H1A for renovation -projects, BOX HIB for demolition projects with or, rithout asbestos removal. Asbestos removal may be conducted after a complete notification is -received, but demolition activities can nly begin on the 10'h day after the notification is received. Mote. If the singlefamily residence is owned bypnefamily who has een or will be using the residence as their damicile� boxes 1A or IB may be checked A singlefamily residence does*not include ?ntal property, mufti -family units, or any mixed -use building. or Commercial asbestos projects (or projects that do not qualify as Single Family Residential); check the project category H2 - that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge idditional fee) in your payment. To file for an emergency asbestos or demolition project, check the appropriate box I — 5 and the ?plicable emergency box in H6. All emer en re 11-0 must be accon-manied bv a letter from the nmne.rtv num,-r th. tep 9. Please certify the accuracy and completeness of the information provided by signing the notification in Box 1. landatory amendments to the notification are required for changes that increase the project category, change the types of asbestos iatcrials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for ork schedule changes if the contractor is participating in the Agency work schedule Fax program. A $25.00 processing fee is -required ,r all amendments. iget Sound Clean Air Agency asbestos regulations and forms can downloaded from the Agency web page at w%vw.pscleanair.org. )r technical assistance contact (206) 6894058 and for administrative inquiries contact (206) 6894090. get Sound Clean Air Agency Forrn No.: 66-160 (Revised 9/03) TS Z 0 M q 9 M 0 0 -40 0 C= M M Z 10--i C -Z 0 0 -n n rn M 0— 00 0 r- 0 M C (1) 9 Cn Q 0 Z 3: Z Cn Z 0 i 0 M RABANCO Cant # WASTE SHIPMENT RECORD 1. Waste Generated Site Name and Address: Owner 's Name: Owner's Phone No.: JA 14 2. 'Operator's Natne and Acrdfes Operator's Phone No.: vv 3. Waste Disposal Site (WDS) Nome. Address. and Physical Site Location: WDS Phone No.: RABANCO REGIONAL LANDFILL 1-800-927-5641 500 Roosevelt Grade Rd. Roosevelt. WA 99356 4. Responsible Local. State or EPA Agenc y Name and Address: PSAPCA I 10 Union Street Seattle, WA 98101 5. Description of Waste Materials; 6. Containers 7. Total Quantity No. Type 3 M (YP) Asbestos Containing Matedals 8. Special Handling Instructions and Additional Information: DOUBLE BAGGED & LABELED 9. OPERATOR'S CERTIFICATION: I hereby declare that the contents of this consignment are fully and accurately described above by proper shipping name and are classified. packed. marked and labeled, and are in all respects in proper conclition for transport by highway according to applicable international and government regulations. Printed/Typed Nome Signature Month Day Year 10. Trartsi owledgm&nV& Receipt of Materials Printed/Typed Name Signature Month Day Year 1, -1 - 11. Transboo�er 2 4cknowI6Zfdm6nt g(Receipt"of Moterlols� Printed/Typed Name Signature Month Day 7jor Rabanco Transfer 2733 3rd Ave. S. -2, I- -�.' 7 4, Seattle, WA 206 -646-2565 12. Discrepancy Indication Space 14- Waste Disposal RRLC 13. Authorized Waste Disposal Site Owner or Operator: Certification of receipt of asbestos materials covered by this manifest except as noted in item 12 Printed/Typea Nome Signature Month y Year 0 WHITE: Peturn to Operator YELLOW: Waste Site PINK: Transporter WHITE- Operator z 0 1 0 M -4 -n M 0 -10 0 C MM M Z C - z o -n n M M 0 0 0 M C M 0 Z z Cl) z 0 0 M -I' = El- rrrr -tc 77-7�— �7-lm -Tr- F, rT RABANCO RECYCLING CO. A DIVISION OF RABANCO COMPANIES 2733 3rd Avenue South Seattle, Washington 98134 (206) 623-4080 C/ 0 4 /04 197 0 3.15 8 T I �.W- TICKET NUMBER 10-5 J. ls�) — Co -�o GHsH AcCOUNT Jo b: tl ANTHONY 7 RUCK 01 1 VAN EDMONDS PRODUC T AS ES I Q8 SL; A L E 0 4 11.14 1 N U nocii 46*--'0 LOS—MAN WT 10 �-35- 4600 L)3L5--MAi\1 W) 001 WIVI X. R E F I) !,;I 'I k x 6 0.1 C10 4 UJOINdE We X41 -ev DEVYN CUSTOMER SIGNATURE 'y Recycled I HAVE READ AND AGREE TO THE CONDITIONS 6dTHE REVERSE SIDE. '.. _, �.i i -, 4.1 , ; ; !.... * Agency Case No. PUGET SOUND CLEAN AIR AGENCY Received 110 Union Street� Suite 500 Seattle, WA 98101-2038 pscleamir.org 200400434 P NOT.ICE OF R4TENT C - I V� ;,�rency vse,om.ly - .-Proiect Tvipe: 1. El Friable Asbestos Removal 2_ M Friable Asbestos Removal Demolition 3.d-Derpolition Only Asbestos P=., Contractor: '.ailina Address: Owner/CEO: Phone: MINIM M11- tau. 10�0 o.: ity- I State: Zip: Fax: P7. iii�o_v site__. Addressi glog '23 5/- SA,1 _ty-!!� . �Z�Avo�s Zip: Site Manager: _Amqg 04 - t7-. ?aaau -,� — I L._Mr.rte-� 4 .WAsbestos Survey Or No. of Date of Asbestos Was Friable Asbestos Identified? XYes UNo C3 M20 Presumed Structures: Survey- Y-'- S�-e 74" Was Nonfriable Asbestos Identified? QYes IRNo IERA Building Certification I M 10pro// Attach a copy ofthe survey whenfilable asbestos Inspector: Tpipy,; Exp. Date: Z - _q - tv has not been identified. AHERA Survey is required before all demolition projects Demolidon Start No. of I. U Tramiing Fire (List Fire.D��L) Information: Date: StrMt1res, �,p R2'. Q Ordered Demolition (attach copy of Order) Demolition Insert demolition contractor's mailingpddreu on back- Will nonfriable asbestos be left in place during derno? U Yes Jff No Contractor: If yes, list type and qty. Friable Asbestos Project Information.* Start Date: :�,�o 'oe Completion Date: , Work Days: . M T W Th F Sa Su Hours: Will all friable asbestos Yes materials be removed? 9"110 tal Qty. to be Removed: Linear Ft. Square Ft. ermal System Insulation: U13loilerkFurnaceins. Upuctins. UPipeins. Other. rfacing Mat'l: I U Fireproofing U Paints 0-Plaster LJ Textured Coatings Other. sc. Mat'l I U Cement Bd. U Cement Pipe U Friable Flooring or Roofing Mat'l Other Asb;eMs/M-m­d1itidff 1-r—ojeEt_Calit�6rifie�; Notiflcation Period 1 Project Demolitio-n- Single-Fan-dly Residence: Fee Surch Asbestos Removal Project Only A. Prior Notice Demolition Project (with or without asbestos removal project) B. 10 Days* -A-12J ��- �110 *(Asbestos removal can begin upon notification-, demolition must wait 10 days) Ite. If the singlefamily residence is owned by onefamily who has been or Wit be using the residence as their domicMe, the above boxes or 1B maybe checked. A singlefamily residence does not include rental prope multi -family units, or a mixed -use budding. LJ All Other Demolitions With No Asbestos Removal Project - ,- r- - g A I ig� Jt9 Days $200 Friable Asbestos Projects (other than Single Family R idenc4f, fc-- I` 'Alb9-to's- Demo U 2t 10 - 259 linear feet and/or;-,, 48 - 159 square feet of asbestos Pp*x Votice 10 Days $100 $100 LJ 260 - 999 linear feet and/or 160 - 4,999 square feet of asbestos - 10Days $200 $100 LJ > 1,000 linear feet and/or >5,000 s�uare feet of asbestos p. .-plir-tiT -0 —Emergency .;FRVICIES CISDays $750 $250 Asbestos Project or U Emergency Demolition Proje6r'__C­lTy OF f DWML)43rior Notice Twice Project Fee (Single -Family Residences are Cxempt from emergency roe, however, property owners must provide a written emergency request) n I certify that t c info t ntained in this notification & suppkm=tal data is, to the best of nry knowledge. accurate & complete, Age y Use! Only U r dW Sig.-tyK —hepresenting Date Re viewAed B Z-V C� -t Sound Clzan Air Apenry Fnmi M� - fA_1AA t0­:­A n1f%1% -0 z 0 i 0 M —i -n C M 0 --1 0 0 C: M M Z r,) -4 C 0 _n n M M 0 -C/) 0 r- 0 M C C/) 9 Cn M 0 Z z 0) z 0 M The Puget Sound Clean Air Agency requires advance notification before any person conimences a ftiable asbestos project involving materials equal to or greater in size ffiari 10 linear feet of `48 :-Square ...feet and for all demolition projects (rcgara�csi of asbestos content) involving structures with a projected ro6ia'rea &eater than 120 square feet (Regulation 111, Ax-ticle 4). All asbestos removal and demolition notifications m6t b�' . 96iiitted.to the Agency on current Agency forms. Asbesto*s removal and demolition-proiects involving materials and"structur:es"below the notification ireshold . are still subi&t to all other requirements of Regulation 1H, Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. I Denwiltion Contractor's Mailing Address: Phone. Job #: city-, State: zip: Fax: GUIDELINES FOR SUBMITTING AN ASBESTOSIDEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes popcorn ceding material, sheet vinyl flooring, cement -isbestos board siding, and duct insulation. Nonfriablc asbestos is normally found in vinyl floor tiles, window putty and most roofing :naterials. 3tep 2. Enter property owner informition in Box B. 3tep 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single-family residential )roject� in Box C. Print clearly this is your return mailing labeL 3tep 4. Enter the site address for all notifications in Box D. For multi -structure projects, attach supplemental sheet with a site . map 'include an address for eaclx site) and a list of the type and amount of friable asbestos to be removed from each structure. ;tep S. Check either asbestos survey or material presumed in Box E. All demolitions require that an Asbestos Hazard Emergency tesponse Act (AHIERA) asbestos survey be conducted by a certified AHERA building Inspector. Attach a copy of the sMM to the totification of a demolition l2roiect when only nonfriable asbestos or no asbestos is identified on the surve ;tep 6. Enter the project information in Box F. and check the training fire or ordered demolition box if appropriate (a copy of the ifficial order nmst be attached). All asbestos must be removed prior to conducting a training fire. Additional training fire equirements are contained in Regulation I, Section 8.08. If any nonfriable asbestos materials will be left in place during demolition, heck yes and list the type and quantity of material. ;tep 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed: surfacing material such as opcorn ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. tep 8. For Single -Family Residential projects; check BOX H1A for renovation. projects, BOX H111 for demolition projects with or tithout asbestos removal. Asbestos removal may be conducted after a complete notification is -received, but demolition activities can aly begin on the 10'h day after the notification is received. lVote. Lf the singlefamily residence is owned by pnefamily who has een.or wifl be using the residence as their domicfie� boxes 1A or 1B may be checked. A singlefamity residence does*not include wal property, multi -family units, or any mbced-use building. or Commercial asbestos projects (or projects that do not qualify as Single Family Residential); check the project category R2 - that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge idditional fee) in your payment_ To file for an emergency asbestos or demolition projcct, check the appropriate box 1 — 5 and the ?pUcable emergency box in H6. All emergencv reauests must be accoMpanied by a letter from the prope= owner demonstrating the -ed to conduct the proiect immediately in accordance with the requirements in Regulation a Section 4.03 (c). tep 9. Please cer* the accuracy and completeness of the information provided by signing the notification in Box I. landatory amendments to the notification are required for changes that increase the project category, change the types of asbestos aterials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for ork schedule changes if the contractor is participating in the Agency work schedule fax program. A $25.00 processing fee isrequired ,r all amendments. iget Sound Clean Air Agency asbestos regulations and forms can downloaded from the Agency web page at www-pscicanair.org. )r technical assistance contact (206) 6894058 and for administrative inquiries contact (206) 6894090. get Sound Clean Air Agency Fonn No.: 66-160 (Revised 9/03) TS Z 0 i 0 M :q --fi M C M 0 C) 0 C -4 K X M M Z _Z 3: W 0 _n n M M 0 —0) 0 r- 0 M C Cl) 9 Cn M 0 Z 7-1 Z --i X Cn Z 0 M RABANCO Cont-# WASTE SHIPMENT RECORD 1. Waste Generated Site Name and Address: Owner's Nome: (Sv�r s Phone No.: IAI %1 1 )14 — I - 2. Operators Name an Acrdfes!s: operator's Phone No.: ilovQ 3. Waste Disl3osol Site (WDS) Nome. Address, and Physical Sitb-00o—tlon: WDS Phone No.: RABANCO REGIONAL LANDFILL 1-800-927-5641 SW Roosevelt Grade Rd. Roosevelt, WA 99356 4. Responsible Local, State or EPA Agenc y Nome and Address: PSAPCA 110 Union Street Seattle, WA 98101 5. Description of Waste Materi als; 6. Containers 7. Total Quantity No. Type 3 M (yd') Asbestos Containing Materials 8. Special Handling Instructions and Additional Information: DOUBLE BAGGED & LABELED 9. OPERATORS CERTIFICATION: I hereby declare that the contents of this consignment are fully and accurately described above by proper shipping name and are classified. packed. marked and labeled, and are in all respects In proper condition for transport by highway according to applicable international and government regulations. Printed/Typed Name Signature Month Day year 14 10. Transporter IAcknowIeddm&nt/cf Recei�t of Materials Printed/Typed Name So-ociture Month Day year L 4 Trons�oi�er 2 Pfcknowledgme"n'i qf Receipt "'of Motericilli Printed/Typed Name Signature FM—ionffi- Day Yea r Rabanco Transfer Ave. S. L-,2 2733 3rd Seattle, WA 206-646-2565 12. Discrepancy indication Space Waste Disposal RRLC 13. Authorized Waste Disposal Site Owner or Operator: Certification of receipt of asbestos materials covered by this manifest except as noted in item 12 Printed/Typed Nome Signature onth y r 0 WHITE: Peturn to Operator YELLOW: WaSte Stte PINK: Tronsporter WHITE- Operotor z 9 0 M -4 -n Co 0 M C M 0 --1 0 0 C --i ?. X M M z C —Z 0 -n n —4 3: M M 0 V5 0 r- 0 M C cl) C C() M 0 Z r— .qT X z 0) z 0 0 M J.. RABANCO RECYCLING CO. A DIVISION OF RABANCO COMPANIES 2733 3rdAvenue South Seattle, Washington 98134 (206) 623-4080 TICKET NUMBER 04/;:�0/04 0 00 tl 9 U 0, tE 10 -55 I 0,iO CO :�O CHS)-f ACCOUNT Job;ll ANTHONY T RUCK 0 VAN PRODUCY: r4l�'BESl (j, U Ro �L,48 - 46-�-Ql 1-k-AS—il q Wl" .10 . -1�35 041�--10/04 �T TARE. - 460v, W 21 0 Ott 17 R f: F I 'I �j X 6 �j- & . , - 0.- 90 *4(' M.041110111 CHPINOE WeX41"IflaSbev" — I)EVt*N cq Fl.cycled CUSTOMER SIGNATURE I HAV E READ AND AGREE TO THE CONDITIONS 6d�HE REVERSE SIDE. TABLE OF CONTENTS Page Subject z 1.0 SCOPE OF WORK M 2.0 SURVEY METHOD 2 Cn C M 3.0 LABORATORY INFORMATION 3 m 0 0, --10 1c: 4 M 4.0 BUILDING DESCRIPTION M z ID C 5.0 FINDINGS 5-6 55 0 -n 7 -n 6.0 CONCLUSIONS AND RECOMMEND ATIONS M M 7.0 LIMITATION S OF SURVEY 8 0M C CO) w Q 0 Z APPENDICES A z Sample Locations (Map) Laboratory Results B z AHERA Certifications & Laboratory Qualifications C 0 M I 9005 238th Street SW, Edmonds, WA Project # 2004-177 1.0 SCOPE OF WORK An investigative survey for asbestos containing materials (ACM) was conducted at a single family residential structure and an adjacent shop/RV shelter located at 8005 238th Street SW, Edmonds, WA. The inspection was conducted on April 5, 2004 by John Terrill, an AHERA certified building inspector. This inspection was performed at the request of Mr. Tony DiPangrazio, Owner. The purpose of this inspection was to identify asbestos containing materials that would be impacted by the planned demolition of this structure. The asbestos survey section is written to comply with the AHERA asbestos sampling procedure as stated in 40 CFR 763.86. This protocol is required for all asbestos surveys prior to a building demolition under the Puget Sound Clean Air Agency, (PSCAA), Regulation I 11, Article IV, revised July 13, 2000. The asbestos survey also satisfies the "Good Faith" asbestos inspection requirements as stated in Washington Administrative Code (WAC) 296-62-07221(2), "identification". As stated in this regulation, the owner of a structure scheduled to be renovation/demolished must provide a contractor with a written report of the asbestos containing materials to be disturbed during renovation/demolition. The National Emission Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61 requires a survey by an accredited asbestos inspector prior to demolition of a structure. A floor sketch indicating sampling locations has been included In Appendix A. NVL Laboratories, Inc., Page 1 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 Z 0 i 0 M 8005 238th Street SW, Edmonds, WA Project # 2004-177 2.0 SURVEY METHOD Asbestos Survey Method A walk-through inspection of all accessible areas of this structure was performed to identify inspection included a review of the Ing materials. The walk-through potential asbestos -contain locations. and types of potential asbestos The internal and external aspects of this structure. r tile, noted. Sufficient bulk samples of building materials (vinyl floO containing materials were of the to satisfy the requirements Z were obtained of each material roofing, wall materials, etc. ples Act (AHERA) rules and regulations. These sam 0 -4 Asbestos Hazard Emerg ency Response Into plastic sample bags, numbered and recorded. 0 M were placed Homogeneous Materials Homogeneous materials are defined as an area of Asbestos -Containing Ma terial (ACM) or appears similar throughout in terms of M C M 0 bestos-Containing Materi al (PACM) which Presumed As g for homogenous materials will date of material a pplicabon. The report listin 0 -40 0 C color, texture, and appear as follows: M M Z Location Asbestos Area Friable Sample Material fe es/no 10-4 C _Z Number Descri tion .ob#-01-01 whitefloortile kitchen tile kitchen 0 -n _n i kitchen 1 -133 1white floor t,,,-. M suspect Under OSHA Guidelines, a minimum of three negative analysis of a single rfacing a negative result for su _Cn 0 r- 0 M C= CD homogeneous asbestos containing material is required to pro ve 9 co materials and thermal sy stem insulation. M 0 Z r- X. Z W Z k 0 M NVL Laboratories, Inc., Page 2 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 Fx (206) 634-1936 .11., M E, - 8005 238th Street SW, Edmonds, WA Project # 2004-177 3.0 LABORATORY INFORMATION Laboratory Analysis — Asbestos Samples are analyzed in our laboratory using polarized light microscopy (PLM) with dispersion staining. If samples are not homogeneous, then subsamples of the components were analyzed separately. All Bulk samples are analyzed using EPA Method 600/R-93/116 with the following measurement uncertainties for reported % Asbestos (I %=0-3%, 5%=>l -9%, 1 0%=5-15%, 20%=10-30%, 50%=40-60%). For samples containing more than one separable layer of materials, the report will include findings for each layer (labeled Layer: 1, Layer: 2, etc.). The asbestos concentration in the sample is determined by visual estimation. Laboratory Accreditation Professional accreditations for NVL Laboratories, Inc., include the following: NVL Laboratories, Inc., is currently accredited by the National Institute of Standards and Technology (NIST) under the National Volunteer Laboratory Accreditation Program (NVLAP) program for bulk asbestos fiber analysis. NVLAP Lab Code 102063-0. NVL Laboratories, Inc., Is approved by the American Industrial Hygiene Association (AIHA) Asbestos Analysts Registry (AAR) program for airborne asbestos fiber analysis, Counter ID 7412. NVL Laboratories, Inc., is currently accredited by the American Industrial Hygiene Association (AIHA) under the Industrial Hygiene Laboratory Accreditation Program (IHLAP). The IHLAP program is designed specifically for laboratories involved in analyzing samples to evaluate workplace exposure. Certification Number 563. NVL Laboratories, Inc., 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 Page 3 Z 0 4 0 m =i:9 = i 8005 238th Street SW, Edmonds, WA Project # 2004-177 4.0 BUILDING DESCRIPTION General Building type: This property is a two level, wood framed residential structure with an adjacent shop/RV shelter. Primary external components: The primary external components on the house ate wood siding. The exterior of the shop is metal siding. Type of foundation: -grade concrete The house rests on a full, below grade, concrete basement. The shop is an on slab. Roofing materials: Roofing is asphalt shingles over roofing felt on the house and metal on the shop. Window types: Windows are wood framed and utilize glazing compounds. Flooring: Flooring is primarily bare wood under carpeting, There is sheet vinyl in the bathrooms and kitchen and linoleum in the wet room and closet on the second level. Thermal systems w/insulation types: The heating system is a forced air furnace without suspect thermal insulation. No suspect thermal insulation was noted on the water heater. Finishing: Interior finishing on walls, lids, and partitions is plaster and/or gypsum wall board. There are some ceiling tiles in the west room on the second level. NVL Laboratories, Inc., 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 Page 4 Z 0 M 3: M, C M 0 0 C m M Z C — Z 0) 0 _n 3:9 m M _V) 0 0 M C V) j'� 9 M M 0 Z 7-1 M Z --I Z 0 1 0 M N' " ff: .8005 238th Street SW, Edmonds, WA Project # 2004-177 5.0 FINDINGS Inventory of Suspect Asbestos -Containing Materials Sample Material Location Asbestos Area Friable ? Number Description (ft2) (ves/no) 2004-177 1: blue/white sheet upstairs bathroom 1: ND -1-1 vinyl 2: gray felt 2: ND backing/mastic 3: gray felt 3: ND 4: black felt 4: ND 2004-177 12" x 12" ceiling stapled on -in upstairs west ND -2-1 tile room 2004-177 1: brown sheet kitchen flooring 1: ND -3-1 vinyl 2: gray felt 2: ND backing/mastic 3: beige sheet vinyl 3: ND 4: gray felt backing 4: ND with mastic 5: particle board 5: ND 2004-177 1: brown linoleum residual piece in closet of 1: ND -4-1 2: black felt west room on second level 2: ND backing 2004-177 1: brown sheet on floor by furnace 1: Nb -5-1 vinyl 2: grey felt backing 2: 45 10 yes 2004-177 1: mortar chimney, basement 1: ND -6-1 2: gray flue sealant 2: ND 3: tan flue sealant 3: ND 4: brick 4: ND 2004-177 1: ceramic tile main bathroom 1: ND -7-1 2: mastic 2: ND 3: plaster 3: ND 4: grout 4: ND 5: caulk 5: ND 2004-177 1: gray sheet vinyl flooring in main bath 1: ND -8-1 2: gray felt 2: ND backing/mastic 3: tan sheet vinyl 3: ND 4: tan felt 4: ND backing/mastic 5: tan linoleum 5: ND 6: black felt 6: ND backing/masbc ND - None Detected NVL Laboratories, Inc., 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 Page 5 z 0 A 0 m --I -n 0 rn C m ;j 0 __10 0 C rn M z C _z E:: 0 71 .M mff 051) 0 r- . 1. 0 rn C 0) M 0 Z ;U z W z 0 0 rn -1 M 8005 238th Street SW, Edmonds, WA Project # 2004-177 Asbestos - continued z 0 -I 0 M ND - None Detected Any suspect material(s) not identified above should not bp disturbed, and tested immediately. The suspect material must be treated as asbestos conta(6,ing until testing proves otherwise. Page NVI- Laboratories, Inc., 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 -8005 238th Street SW, Edmonds, WA Project # 2004-177 6.0 CONCLUSIONS AND RECOMMENDATIONS ASBESTOS -Containing Materials (ACM) and The following summarizes the homogeneous Asbestos I Presumed Asbestos -Containing Materials (PACM) identified at a single fami y residential structure and shop/RV shelter located at 8005 238th Street SW, Edmonds, WA on April 5, 2004. 1. Vinyl flooring: (material number 2004-177-5) -containing felt backing on the There is approximately 10 ff of brown sheet vinyl with asbestos basement floor by the fumace. No suspect Asbestos -Containing Materials (ACM) or Presumed Asbestos -Containing Materials (PACM) were noted associated with the shop/RV shelter. If discovered, all ACMs that will be disturbed as a natural part of renovation/demolition and are required to be removed and disposed of in accordance with Washington State Regulations. Washington State Department of Labor and Industries and PSCAA require that the abatement be performed using Certified Asbestos Workers under the direct on -site supervision of a Certified Asbestos Supervisor. Further, NVL suggests that an AHERA inspector review this property after abatement to ensure all ACM has been removed by the contractor. .. Hidden wall and ceiling cavities that are not accessible during the time of surveying can sometimes conceal ACM, Thus, NVL recommends that an AHERA inspector/project manager be on site at the time of renovation/demolition to ensure that any potentially asbestos - containing materials uncovered during the process of renovation/demolition be dealt with properly. NVL Laboratories, Inc., Page7 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 - Fx (206) 634-1936 Z 0 1 0 IM :; =n- mi, C1005 238th Street SW, Edmonds, WA Project # 2004-177 7.0 LIMITATIONS OF SURVEY The sole purpose of this survey report is to document asbestos -containing materials discovered in the survey of suspect materials by NVL Laboratories personnel at a single family residential structure and shop/RV shelter located at 8005 238th Street SW, Edmonds, WA. This survey was performed on April 5, 2004. This site visit consisted of a thorough visual walk-th ' rough of the building for the purpose of viewing and sampling potential ACMs. As hazardous material surveys are non -comprehensive by nature, NVL Laboratories, Inc., cannot be held liable for materials which require destructive means to access, materials which are hidden from sight (e.g. materials hidden behind walls), materials which cannot be found due ' to their bbscure nature, or which otherwise cannot be discovered with reasonable diligence. This document is the sole property of NVL Laboratories an d the property owner, or his agent, authorizing this survey. Inspected by: Reviewed by: Paul W. Jackson John Terrill Project Manager AHERA Building Inspector AHERA Certification No.: 1007611 AHERA Certification Expires on: February 3, 2005 NVIL Laboratories, Inc., 4708 Aurora Avenue North, Seattle, WA 98103 Ph (206) 547-0100 . Fx (206) 634-1936 Page 13 Z 0 1 0 M -4 -n M M 0 __110 0 C M M Z ID --I C: Z co 0 m M 0 _C0 0 r- 0 M C V) M 0 Z > Z __I W Z 0 m FINAL PR03ECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLPASESIGN ENGINEERING DIVISION DATE A;' 2,jZ PLANNING DIVISION DATE I PROJECT SITE ADI PERMIT A ADBrr DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED AQi,,,-7,­-, A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to tile release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GIANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 93 RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tem13:b1dg:fomis:ocaprv1 3/25/04 z 0 M -n 0 M C M 0 0 0 M M Z 0 -n n;U > MM 0 0 0 M (Z Cn 9 (n Q 0 Z r— M X z Cn z 0 M PJ6 '17, 1 U, RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall........................... Pier/Porch .................. Retaining Wall..... Slab Insulation .......... PLUMBING: Underground ............. ,Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... —7 MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. zvoq,�- o q 97 V/ z 0 i 0 M -i -n 3: M M0 0 _11 0 0 C --I :C M M Z 6, -1 CE 0 -n n MITI 0 0 M C a) 9 CO) M 0 Z 3: > z 0) z 0 0 M