Loading...
20040492.pdf8 W DATE RECEIVED LA USE nmy niz rnunhinc IZONE CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BUSINESS MAILING ADDRESS CITY ZIP ITELEPHONE \ /Ilo NAME ZIP ITELEPHONE NAME CBL # Al ADDRESS CITY STATE LICENSE NUMBER L. /I I P 4 1., /./ � /. ., / ., PROPERTY TAX ACCOUNT -1 f/ Y L-J, 7, TELEIRHONE EXPIRATION DATE r/ ICEL NO NEW RESIDENTIAL ADDITION COMMERCIAL REMODEL MULTIFAMILY REPAIR GRADING CYDS P_ DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE OF USE. BUSINESS OR ACTIVITY) EXP�41N, 7�4� 'i 81 NUMBER NUMBER OF OF DWELLING STORIES UNITS DESCRIBE WORK TO BE DONE /I P) ,, I AV,/ HEAT SOURCE I GLAZING % PLAN CHECK NO: PLUMBING / MECH COMPLIANCE OR CHANGE OF USE SIGN FENCE ( X FT, OTHER FIRE SPRINKLER FIRE ALARM CRITICAL t,- V W AREAS (11::��> NUMBER ? LOT SLOPE % VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO It BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. cc PERMIT APPLICATION: 180 DAYS PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALI. CLAIMS FOR DAMAGES OF WHATEVER NAI URE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMI1 SHALL NOT BE DEEMED TO MODIF'� WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 19 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' JOB ADDRESS PLAT NAME/SUBDIVISION r [PERMITEXPIRES PERMIT NUMBER SUITEIAPT# LOT NO PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING - PROPOSED REQUIRED DEDICATION- FT METER SIZE I LINE SIZE I NO. OF FIXTURES LID NO. LID FEE S Tr5CP Ariptoved RW Permit Requ:iod Street Use permit Roq*d Inspection Required sidewalk Required UncIteground Wiring required P PRV REQUIRED RV OU 0 _rYES C3 NO REMARKS OWNER/CQNTRW��aQJEUQWSIBI f().REFJQ_�ION-CONTROLIDRAINAGE I PROPERTY LINE ENGINEER ,gG DATE WAWMETER TO BE REMOVED OR ROSE, BIB wiTH AVB mmu_pp FIRE REOWEDbMp DATE Lu M AT APPROVED DUMP SITE ONLY M VARIAN(6 ORejj_E ffif C OFIR B BOND ik, ARDPOSTED FOR I SPECTION REQ ISM9M N REQ s SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP L , , LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE REAR C3 z z z PARKING LOT AREA I PLANNING REVIEWED BY DATE REO'D I PROVIDED REMARKS CHECKED BY SPECIAL INSPECTION REQUIRED [] YES OCCUPANT GROUP OCCUWNT LOAD IREMARKS a PROGRESS INSPECTIONS PER UBC 108 / IEIC1 09 / IRC1 09 FINAL INSPECTION REQ'D I A VALUATION Description FEE Description State Surcharge City Surcharge Base Fee FEE Plan Chk. Deposit Receipt # Total Amt. Due Receipt # 7 1 o�17 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, rIIAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AMTHE OWNER, 08 THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAI D THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S,90NVIE,�SATION INSURANCE AND RCW 18,27. OFFICIALS71GN I (7A UREI DATE DATE SIGNED -7 LSIGNATURE ER 0 (425) (OWNER 0 AGENT) i.". 771-0220 'RELEASED BY' �ATE ATTENTION EXT 1333 IT IS UNLAWFULTO USE OR OCCUPYA BU I LDI NG OR STRUCTURE UNTI LA FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCLI- ORIGINAL - FILE YELLOW INSPECTOR PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. PINK -OWNER GOLD-ASSrSSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp- Recording Fee z 0 III 0 M -n 0 M C: M 0 0 0 0 C: -j K 2: M M Z IC) --i C 7- U) 0 ­71 Ti M __j > = 9 M M 0 0 0 M U) Cn M C) Z z --I X Cl) z 0 A 0 M k1UUE'F SOUND CLEAN AIR AGENCY Date Received 110 Union Street, Suite 500 RECEIVED Seattle, WA 98101-2038 200300690 www.pscleanair.org JUL 15 M NOTICE OF INTENT ru I M 0 UMR M mi ywo k, Project Type: 1. Q Friable Asbestos Removal 2. Friable Asbestos Removal& Demolition 3. a Demolition -Only PLEASEPRINrCLF-4fiLr. MISMU BE Y0UR-RtTUR-'VA41UVGL48E1- Asbestos Contractor: I Owner/CEO:.. -Contractor 4ailing Address: C% Li �-7, Phone: — - V 1 1,�2 Job No.: RGPT. Ity: State: Zip: 1 Fax: 1. Site Address: City: 5- ip: C6 Site 111-16 - Va 96,5:3 c'ell Manager: -ro/v Y DAdAyrt1.Z-' 1A Local Phone: /;L 5- 6 )i3 Asbestos Survey or No. of Date of Asbestos Was Friable Asbestos Identified? Uyes ZNo El Mat'l Presumed Structures: QAA:5- Survey:. 6�- '1-03 Was Nonfriable Asbestos Identified? E]Yes'Wo HERA Building NVL- C Ccrfification #: AWY-060 Attach a copy ofthe survey unlessfriable asbestos Inspector: LTo6i*Terr;11 Exp.Date: is identified i 4HERA Survey is required before all demolition projects Demolition Start No. of 1. Ll Training Fire (List Fire Depi.) Information: I Date: Structures: 2. Q Ordered Demolition (attach copy of Order) Demolition 44TV911110 contractr 1 mailin addres an back I Will nonfriable asbestos be left in place during demo? U Yes W No y Contractor:.,-,. If yes, list type and qty. 1. 1 L011 ---,A. I - L- i , I I - - Friable Asbestos Project Informad Start Date: Completion Date: Work Days: M T W Th F Sa Su Hours: Will all friable asbestos Q Yes !s materials be removed? No )tal Qty- to be Removed: Linear Ft. Square Ft. st type(s) of material to be removed: Asbestos[Demolition Project Categories: Notification Period Project Demolition Single-Farnily Residence: Fee Surcharpe C] Asbestos Removal Project Only A. Prior Notice A. T2 5 1. C3 Demolition Project (with or without asbestos removal project) B. 10 Days* B. $50 *(Asbestos removal can begin upon notification; demolition must wait 10 days) )te: If the singlefamily residence is owned by onefamily who has been or will be using the residence as their domicile, the above boxes I or 1B may be checked. A singlefamily residence does not include rental prope muld-family units, or a mixed -use bu�� -21 All Other Demolitions With No Asbestos Removal Project 10 Days S200,) Friable Asbestos Projects (other than Single Family Residence): Asbestos Demo U �: 10 - 259 linear feet or �t 48 - 159 square feet of asbestos Prior Notice 10 Days $150 $50 260 - 999 linear feet or 160 - 4,999 square feet of asbestos 11— 10 Days $300 SIM U 1.000 - 9.999 linear feet or 5,000 - 49,999 square feet of asbestos 10 Days $750 $250 [I > 1-0,000 linear feet or > 50,000 square feet of asbestos 10 Days S2,000 $1,000 El Emergency Asbestos Project or U Emergency Demolition Project Prior Notice I Twice Project Fee I (Single -Family Residences are exempt from emergency fee. however, property owne must provide a written cmergenc request) I certify that the information contained in this notification & supplemental data is, to the best of my knowledge, accurate & complete. Agency Use Onl Representing Date Reviewed BY et Sound Clean Air Agency Form No.: 66-160 (Revised 3/03) TS z 0 A 0 M —i -n 0 M C M 0 0 -4 (-) 0 M M Z C: Cn 0 M n ;u -i > x 9 M M 0 0 0 M C: Cn 9 Cn M 0 z .'T ;U > z En z 0 d 0 M " M The Puget Sound Clean Air Agency requires advance notification before any person commences a ftiable asbestos project involving materials equal to or greater in size than 10 linear feet or 48 square feet and for all demolition projects (regardless of asbestos content) involving structures with a projected roof area greater than 120 square feet (Regulation M, Article 4). All asbestos removal and demolition notifications must be submitted to the Agency on cur -rent Agency forms. Asbestos removal and demolition projects involving materials and structures below the notification threshold are still subject to all other requirements of Regulation HL Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. GUIDELINES FOR SUBMITTING AN-ASBESTOS\DEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes popcorn ceiling material, sheet vinyl flooring. cement asbestos board siding, and duct insulation. Nonfriable asbestos is non-nally found in vinyl floor tiles, window putty and most roofing materials. Step 2. Enter property owner information in Box B. Step 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single-fan-dly residential project, in Box C. Print clearly this is your return mailing label. Step 4. Enter the site address for all notifications in Box D. For multi -structure projects, attach supplemental sheet with a site map (include an address for each site) and a list of the type and amount of friable asbestos to be removed from each structure. . Step 5. Check either asbestos survey or material presumed in Box E. All demolitions require that an Asbestos Hazard Emergency Response Act (AHERA) asbestos survey be conducted by a certified AHERA building Inspector. Attach a col2v of the survey to the notification of a demolition 12roject w en only nonfriable asbestos or no asbestos is identified on the survey. Step 6. Enter the project information in Box F. and check the training fire or ordered demolition box if appropriate (a copy of the official order must be attached). All asbestos must be removed prior to conducting a training fire. Additional training fire requirements are contained in Regulation 1, Section 8.08. If any nonfriable asbestos materials will be left in place during demolition, check yes and list the tv . pe and quantity of material. Step 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed: surfacing material such as popeom ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. Step 8. For Single -Family Residential projects; check BOX HIA for renovation projects, BOX HIB for demolition projects with or without asbestos remoyal. -*Asbestos removal -may-be conducted after a complete notification is received, but demolition activities can only begin on the 10h day after the notification is received. Note: If the singlefamily residence is owned by onefamily who has been or will be using the residence as their domicile, boxes 1A or 1B may be checked. A singlefamily residence does not include rental property, m ulti-family units, or any mixed -use building. For Commercial asbestos projects (or projects that do. not qualify as Single Family Residential); check the project category H2 - 5 that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge ',additional fee) in your payment. To file for an emergency asbestos or demolition project, check the appropriate box I — 6 and the ipplicable emergency box in HT be aFcompa*d by a letter from the propegy owner demonstrating the -,ieed to conduct the oroiect immediately in accordance with the reguirements in Regulation III, Section 4.03 (cl 3tep 9. Please certify the accuracy and completeness of the information provided by signing the notification in Box 1. Aandatory amendments to the notification are required for changes that increase the project category, change the types of asbestos -natcrials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for .York schedule changes if the contractor is participating in the Agency work schedule fax prograrn. A $25.00 processing fee is required -'or all amendments. 3uget Sound Clean Air Agency asbestos regulations and fornb1can downloaded from the Agency web page at www.pscleanair.org. -or technical assistance contact (206) 689-4058 and for administrative inquiries contact (206) 689-4090. luget Sound Clean Air Aecncv FnrmNn - 6i�-1 A() lRevi"(' 11nil T'Z Z 0 1 0 M =i:fi Cl) 0 M C M 0 0 0 C —4 T. = M M Z 10--i C Cn 0 -n n M M 0 0 0 M C cn K Cn Q 0 Z X Z Fn Z 0 4 0 M 1.5111IJ �4W� FUUET SOUND CLEAN AIR AGENCY Date Received 110 Union Street, Suite 500 RECEIVED Seattle, WA 98101-2038 200300690 www.pscleanair.org JUL 15 2M NOTICE OF RqTE novi r L'V'0gM=4 I k. Protect Type: 1. 13 Friable Asbesto3 Removal 2. Q Friable Asbestos Removal & Demolition 3. Demolition Only 6 Property Owner: I-4AIV A :'P1 Phone: qA9-4C111- 546.311Z714z- a 64 1-0 -A� 0 1.1-1 4ailingAddress: city: State Wl� zip:Y�Oa-26 V% !!'� -I U 1k PLEAMPRINTCLEARLr, MIS KLL BE! YOUR RETURNMAILING LABEL. Asbestos Contractor: Owner/CEO:...,.,,I-r -Contractor lailing Address: Phone: Jo No.: RUT. n. :ity: State: Zip: Fax: 1. Site City: Q) Address: _M0A W, zip: M _�t Site I-C6 - q 7-1 - j96 673 c: el Manager: -ro Iq Y L) o rn Local Phone: J/;L -e, - 6 91 " a.4 AAYY V Asbestos Survey or T—No. of Date of Asbestos Was Friable Asbestos Identified?' LlYes W( 0 NIat,i Presumed I Structures: Survey: 6� -1,V -0.3 Was Nonfriable Asbestos Identified? 0Yes *Qqc .HERA Building AWL 4,4� Certification #: 1,009r,060 Attach a copy of the survey unlessfilable asbestos Inspector: LTokr,*Ter/-;/i Exp.Date: J.-�4-0j4 is identified. ,,4 HERA Survey is required before all demolition projects Demolition Start No. of 1. LJ Training Fire (List Fire Depi.) Information: Date: I Structures: 2. Ll Ordered Demolition (attach copy of Order' Demolition ittiog contractor. In �aj a wt back- I Will nonfriable asbestos be left in place during demo? LJ Yes W No .Mr r4l�zn ddress). ContractorLP,VA/K)q 2-A-1 If Yes, list t3w and qty. V 14 C KN6, =&AV�VL Friable Asbestos, 10 Project Info—ati Start Date: Completion Date: Work Days: M T W Th F Sa Su Hours: Will all friabld asbestos Yes materials be removed? Q No )tal Qty. to be Removed: Linear Ft. Square Ft. st type(s) of material to be removed: Asbestos[Demolition Project Categories: Notification Period Project Demolition Single -Family Residence: Fee Surchare 0 Asbestos Removal Project Only A. Prior Notice A. $25 1. C3 Demolition Project (with or without asbestos removal project) B. 10 Days* B. $50 *(Asbestos removal can begin upon notification; demolition must wait 10 days) I I )te: If the singlefamily residence is owned by onefamily who has been or will be using the residence as their domicik, the above boxes I or JB may be checked. A singlefamily residence does not include rental prope 'muld-family units, or a mbced-use build' JA All Other Demolitions With No Asbestos Removal Project -10-Dlys. $200�) Friable Asbestos Projects (other than Single Family Residence): "Auu, I:- I IM11[if-I U �: 10 - 259 linear feet or �: 48 - 159 square feet of asbestos PriorNotici . I�Pays $150 $50 U 260 - 999 linear feet or 160 - 4,999 square feet of asbestos J U tLo t)4sluu-i $300 sloo —1.000 - 9,999 linear feet or 5,000 - 49,999 square feet of asbestos rjd $750 $250 LJ > 10,000 linear feet or> 50,000 s inre feet of asbestos rl O;Ai'�*Q'NDS 2,000 $1,000 Emergency Asbestos Project or mergency Demolition Project 7:T- Prior Notice Twice Project Fee (Single-Farmly Residences are exempt from emergency fee: however, property owners must provide a written emergeni , request) I certify that the infort-nation contained in this notification & supplemental data is, to the best of my knowledge, accurate & complete. Agency Use OnI 17 J Sih-atuAl Representing Date Reviewvd Bv et Sound Clean Air Agency Form No.: 66-160 (Revised 3/03) TS z 0 q 0 M M C M 0 --40 0 C: --I K M M M Z J0 C Cl) 0 n M M 0 U; 0 r- 0 M cl) Cn Q 0 Z ;U z C/) z 0 1 0 M The Puget Sound Clean Air Agency requires advance notification before any person commences a friable asbestos project involving materials equal to or greater in size than 10 linear feet or 48 square feet and for all demolition projects (rega7idless of asbestos content) involving structures with a projected roof area greater than 120 square feet (Regulation IM, Article 4). All asbestos removal and demolition notifications must be submitted to the Agency on current Agency forms. Asbestos removal and demolition 12roiects involving materials and structures below the notification threshold are still subject to all other requirements of Regulation M, Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. PLWEPRWTCL_r,4)tLY. rit[SWILLOEYO(IARETEMV.tL4iUvOLANEI- J. Demolition Contractor. T Ile- Owner/CEO: Contractor's Mailing Address: Phone: Job City, State: Zip: Fax: GUIDELINES FOR SUBMITTING ARASBESTOS\DEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes popcorn ceiling material, sheet vinyl flooring,, cement asbestos board siding, and duct insulation. Nonfriable asbestos is normally found in vinyl floor tiles, window putty and most roofing materials. Step 2. Enter property owner information in Box B. Step 3. Enter the asbestos contractor or property owner infon-nation, if the property owmer is conducting a single-family residential project, in Box C. Print clearly this is your return mailing label. Step 4. Enter the site address for all notifications in Box D. For multi -structure projects, attach supplemental sheet with a site imp (include an address for each site) and a list of the type and amount of friable asbestos to be removed from each structure. . Step 5. Check either asbestos survey or material presumed in Box E. All demolitions require that an Asbestos Hazard Emergency Response Act (AHERA) asbestos survey be conducted by a certified AHERA building Inspector. Attach a copy of the survey to the Step 6. Enter the project information in Box F. and check the training fire or ordered demolition box if appropriate (a copy of the official order must be attached). All asbestos must be removed prior to conducting a training fire. Additional training fire requirements are contained in Regulation 1, Section 8.08. If any nonfriable asbestos materials will be left in pjace during demolition, check yes and list the ty . pe and quantity of material. Step 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed: surfacing material such as popeom ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. Step 8. For Single -Family Residential projects; check BOX HiA for renovation projects, BOX HIB for demolition projects with or without asbestos remoyal. -,Asbestos removal -may -be conducted after a complete notification is received, but demolition, activitics c=---- only begin on the 10th day after the notification is received. Note: If the singlefamily residence is owned by onefamily who has been or will be using the residence as their domicile, boxes IA or IB may be checked. A singlefamily residence does not include rental property, multi -family units, or any mixed -use building. For Commercial asbestos projects (or projects that do. not qualify as Single Family Residential); check the project category R2 - 6 that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge ladditional fee) in your payment. To file for an emergency asbestos or demolition project, check the appropriate box I — 6 and the �pplicable emergency box in HT All emergency reguests must be accompanied by a letter from the property owner demonstrating the aeed. to conduct the proiect immediately in accordance with the reguirements in Regulation III, Section 4.03 (c). 3tep 9. Please certify the accuracy and completeness of the information provided by signing the notification in Box 1. Vlandatory amendments to the notification are required for changes that increase the project category, change the types of asbestos materials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for .vork schedule changes if the contractor is participating in the Agency work schedule fax prograrri. A $25.00 processing fee is required .or all amendments. ?uget Sound Clean Air Agency asbestos regulations and forms can downloaded from the Agency web page at www.pscleanair.org. -or technical assistance contact (206) 689-4058 and for administrative inquiries contact (206) 689-4090. luRct Sound Clean Air Auencv Fnrm Nn - (1(1_lAn lRi.vicoli IMIN TC Z 0 M =i :R Vi M 0 0 -10 0 C: -4 ?. I rn M Z JO -4 C _Z cn 0 -n n M M 0 (_n 0 r- 0 M C: cn K Zn M 0 Z Z -1 X ZB Z 0 A 0 M -A TABLE OF CONTENTS Subject 1.0 SCOPE OF WORK 2.0 SURVEY METHOD 3.0 LABORATORY INFORMATION 4.0 BUILDING DESCRIPTION 5.0 FINDINGS 6.0 CONCLUSIONS AND RECOMMENDATIONS 7.0 LIMITATIONS OF SURVEY APPENDICES Sample Locations (Map) Laboratory Results AHERA Certifications & Laboratory Qualifications Page 0 2 Cn 3 M, C M 0 00 0 4 C M M z 5-6 C CO 7-8 O.M 9 M M —00) 0 F- 0 M C 0) C Cly M 0 Z A B z C z 0 0 M SCOPE OF WORK An Investigative survey for asbestos containing materials (ACM) was conducted on a residential structure located at 8017 238th Street SW, Edmonds, WA. The Inspection was conducted on April 14, 2003 by John Terrill, an AHERA certified building inspector. This inspection was performed at the request of Tony DiPangrazio, property owner. The purpose of this Inspection was to Identify asbestos containing materials that would be impacted by the planned demolition of this structure, The asbestos survey section is written to comply with the AHERA asbestos sampling procedure as stated in 40 CFR 763.86. This protocol is required for all asbestos surveys prior to a building demolition under the Puget Sound Clean Air Agency, (PSCAA). Regulation III, Article IV, revised July 13, 2000. The asbestos survey also satisfies the "Good Faith" asbestos inspection requirements as stated In Washington Administrative Code (WAC) 296-62-07221(2), "identification". As stated In this regulation, the owner of a structure scheduled to be renovationidemolished must provide a contractor with a written report of the asbestos containing materials to be disturbed during renovation/derriolition. The National Emission Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61 requires a survey by an accredited asbestos Inspedor prior to demolition of a structure. A floor sketch Indicating sampling locations has been included in Appendix A. Z 0 0 m CD 0 m 0 -40 0 C m m Z C —Z 0 mm 061) 0 0 m C/) M 0, Z > Z Cn Z 01 0 m 8017 238th Weet SW, Edmonds, WA PrQ)W # 20D3-176 2.0 SURVEY METHOD Asbestos Survey Method A walk-through Inspeaon of all accessible areas of this structure was performed to identffy potential asbestos, -containing materials. The walk-through inspection Included a review of the Internal and external aspects of this structure. The locations and types of potential asbestos containing materials were noted. Sufficient bulk samples of building materials (vinyl floor tile, roofing, wall materials, etc.) were obtained of each material to satisfy the requirements of the Asbestos Hazard Emergency Response Act (AHERA) rules and regulations. These samples were placed Into plastic sample bags, numbered and recorded. Homogeneous Materials Homogeneous materials are defined as an area of Asbestos-ContaInIng Material (ACM) or Presumed Asbestos -Containing Material (PACM) which appears similar throughout In terms of color, texture, and date of material application. The report listing for hamogerious materials will appear as follows: Sample Number matedall Description Location Asbestos % Area (W) Friable (yesino) Job#-01 -01 white floor tile kitchen Job#-01-02 whttefloortile kitchen Job#-01-03 1while floor file kitchen Under OSHA Guidelines, a minimum of three negative analysis of a single suspect homogeneous asbestos containing material Is required to prove a negative result for surfacing materials and thermal system Insulation. NVL LabDratorles, Inc., 4708 Aurom Ayenue North, Seattle, WA 98103 ob, Mnm "-i.ni nn . ;:v mrAN n1ol., owt Page 2 Z 0 i 0 m 8017 23ft Street sw, Edmonds, WA Projed 0 2003-175 3.0 LABORATORY INFORMATION Laboratory Analysis — Asbestos Samples are analyze� in our laboratory using polarized light microscopy (PLM) with dspersion staining. It samples are not homogeneous, then subsamples of the components were analyzed separately. All Buk sampWs are anallmed using F-PA Method 600/R-931116 with the following measurement uncertainties for reported % Asbestos (110/9-0-3%, 5%=>1-9%. 1 0%=5-15%. 20%=10-30%,50%=40-80%). For samples containing more than one separable layer of materials, the report vAll Include findings fbr each layer (labeled Layer 1, Layer. 2, etc.). The asbestos concentration In the sample Is determined by visual estimation. Laboratory Accreditation. Professional accreditations for NVL Laboratories, Inc,, include the flollowing: NVL Laboratories, Inc., is currently accredited by the National Institute of Standards and Technology (NIST) under the National Voluntew Laboratory Accreditation Program (NVLAP) program for bulk asbestos fiber analysis. NVLAP Lob Code 102063-0. NVL Laboratories, Inc., Is approved by the American Industrial Hygiene Association (AJHA) Asbestos Analysts Registry (AAR) program fbr airborne asbestos fiber analysis. Counter ID 7412. NVL Laboratories, Inc., is currently accredited by the American Industrial Hygiene Association (AlHA) under the Industrial Hygiene Laboratory Acc4-editation Program (111-ILAP). The IHLAP program is designed specifically for laboratories involved in analyzing samples to evaluate workplace exposure. Certification Number 563. NVL LaboratoriGs, Inc., Page 3 4708 Aurora Avenue North, Seattle, WA 98103 Ph OAR% 4,17-nInn . Vv MAI $M.-WaA Z 0 i 0 m 11 111111111 8017 2386 Street SW, Edmonds, WA Project # 20M-175 4.0 BUILDING DESCRIPTION General Building type: This is a single story, wood framed, single-family residence with a full parlially finished basement. Primary external components: Z The primary external component is wood siding. M Type of foundation: The house Is constructed on a full, partially belomi grade, concrete basement, orrl� Roofing materials: 0 M 0 -4 0 0 C Roofing Is asphalt shingles. m %ffindow types: M Z' C Windows are wood framed with glazing compounds. Flooring: 0 -n -n Flooring is primarily hardwDod. There Is sheet vinyl In the kitchen and bathrooms. M M Thermal systems wlinsulation types: 0 r- 0 M C 0) There Is a forced air heating system without suspect thermal Insulation. C co m 0 Finishing: Z X Partitions, walls, and lids are gypsum wallboard, Z M NVL Laboratorles, Inc., 4708 Aumrs Avenue North, Seattle, WA 98103 Mh llng% s;A7-nlr%n . =� OAM FVXA_i01A 8017 238th Street SW, Edmonds. WA Project # 2003-175 5.0 FINDINGS Inventory offtspect Asbestos -Containing Materials sample Material Location Asbestos Number Description - M 2003-175 1: sheet vinyl flooring back entrance in 1: ND -1-1 2: fibrous basement 2: ND Area 2003-175 1: sheet vinyl flooring back entrance in 1: ND -1-2 2: Cbrous basement 2: NO, backinqlmastic 2DO3-175 bricklmortar maln, Chimney ND -2-1 2003-176 1: sheet vinyl flooring kitchen flooring 1: NO -3-1 2: fibrous 2: NO 3: sheet vinyl flooring 3: NO 4: fibrous 4: ND backing/mastic 5: linoleum 5: ND 6: fibrous backing 6: NO 2003-175 1: sheet vinyl flooring kitchen flooring 1: ND -3-2 2: fibrous 2: ND 3: sheet vinyl flooring 3: ND 4: Obrous 4: ND backing/mastic 5: linoleum 5: ND 6: fibrous backing 6: ND 2003-175 1: sheet vinyl flooring bathroorn flooring 1: ND -4-1 2: fibrous 2: ND 3: sheet vinyl flooring 3: ND 4: fibrous 4: ND backing/mastic 5: felt backing 5: ND 2003-175 1: sheet vinyl flooring bathroom flooring 1: ND -4-2 2: fibrous 2: NO 3: sheet vinyl flooring 3: ND 4: fibrous 4: NO backing1maslic 5: fell backing 1 5: NO I J NL) - mne betectec * This material is less than 1% asbestos If It Is considered as a component of the composited sample. Please refer to the end of the next section for Information on materials containing less than % asbestos. NVL LaborQWBS, Inc., 4708 Aurora Avanue North, Seattle, WA 98103 Di% 11)nAl r,47-ninn . =� fo)nr,% AIA-10IR Page 5 z 0 4 0 M -1 -n 0 m C M 0 __10 0 C M M z ID --I C 0 -n -n M M 0 C_ 0 0 m C C0 9 0) Q 0 Z z --I X C/) z 0 M 8017 238th Street SW, Edmonds. WA project # 2003-175 Sample Material Location Asbestos Area Friable Numbw Oescription _119_ (W) (yesino) 2003-175 splash guardfadhesive around kitchen NO -5-1 counter 2003-175 splash guard/adhesive around bathroom NO -6-1 shower * - 2003-175 1: paint living room wall 1: NO not -7-1 2: joint compound 2: 2* quantified no 3: gypsum wallboard 3: NO 2003-175 1: point north bedroom wall 1: NO -7-2 2-- Joint compound 2: 2* 2003-175 1: painLqoint compound -i6dt—hbedroom wall —i-.- 2 * -7-3 2: joint compound 2: 2* 3: gypsum wallboard 3, NO 2003-175 Window glazing laundry room window NO -8-1 compound-_ 2003-175 thermal Insulation attic crawl space NO .9-1 batting- 20D3-175 thermal insulation attic crawl space NO .9-2 battlina 2003-175 1: thermal Insulation attic crawl space 1: NO -9-3 batting 2: residual roofing felt 2: NO 2003-175 1: roof shingles roofto-p 1: NO -10-1 2: roofing felt 2: NO 2003-175 1: roof shingles rooftop 1. NO -10-2 2: roofing felt 2: NO 2DO3-175 vapor barrier underneath exterior NO -11-1 siding_ 2003-175 vapor barrier underneath exterior NO -11-2 1 siding - NU - None U8D8C1eQ This material is less than 1 % asbestos It It is considered as a component of the composited sample. Please refer to the end of the next section for Information on materials containing less than % asbestos. Any suspect material(s) not identified above should not be disturbed, and tested Immediately. The suspect material must be treated as asbestos containing until testing proves otherwise. NVL Laboratories, Inc.. Page 6 4708 Aurora Avenue North, Seattle. WA 98103 1 Ph r7nm rA7.n'nn - r-%p 1?nc;� AM.' Q'Ift Z 0 -1 0 m BO 17 238th Street SW, Edmonds, WA Projeet # 20M-11 76 6.0 CONCLUSIONS AND RECOMMENDATIONS ASBESTOS The following summarizes the homogemous Asbestos -Containing Materials (ACM) and Presumed Asbestory-Containing Materials (PACM) Identified at the residential structure located at 8017 238th Street SW, Edmonds, WA on April 14, 2003. 1. Joint Compound: (material number 2003-175-7) There Is an undetermined quantity of asbestos -containing joint compound associated with the gypsum wallboard system throughout the structure, This material is less than 1% If it is considered as a component of the wall system. Please refer to the and of this section for information on materials containing less than 1% asbestos. Approximations of square footage are offered as an added service to the client. These numbers are not exact values and should be confirmed by the client and participating contractors, If discovered, all ACIVIs that will be disturbed as a natural part of renovallorVdemolition and are required to be removed and disposed of In accordance with Washington State Regulations. Washington State Department of Laborand Industries and PSCAA require that the abatement be performed using Certified Asbestos Workers under the direct on -site supervision of a Certified Asbestos Supervisor. Further, NVL suggests that an AHERA inspector review this property after'abatement to ensure all ACIVI has been removed by the contractor. Hidden wall and coiling cavities that are not accessible during the time of surveying can sometimes conceal ACIVI. Thus, NVL recommends that an AHERA inspector/project manager be on sfte at the time of renovation/demolibon to ensure that any potentially asbestos - containing materials uncovered during the process of renovation/demolition be dealt with property. NVL Laboratories, Inc., Page 7 4708 Aurora Avenue North, Seattle, WA 98103 Ph /)MR% 447-ninn - cr� i-onRN AV-101A Z 0 0 m -"M 8017 23 Bth Street SW, Edmonds, WA IR-Yoject # 2003-175 Materials Containing 1 % Asbestos or Less The OSHA asbestos standard(s) regulate occupational exposure to asbestos, Including asbestos containing material (ACM). Please see (a) Scope and Application and (b) Definitions z for 'Asbestos* and wAsbwdos Containing Material," for the General Industry, Construction and 0 Shipyard asbestos standards. In the OSHA Construction Standard, work Involving materials 0 containing 1 % or less asbestos would be considered unclassified. Unclassified asbestos operations cover employees likely to be exposed In excess of the permissible exposure limit (PELs). and who are performing operations not covered by Class I through IV. For construction work involving unclassified asbestos the applicable requirement will include; an X exposure assessment. use of vacuum cleaners equipped with HEPA fifters, use of wet M methods and prompt cleanup of debris, use of respirators.and protective clothing, training and m 0 record keeping 0 0 0 X M, M z Further, If a negative exposure assessment cannot be made, air monitoring would be required as part of the exposure assessment. C z > CD 0 n m M 0 0 C CD C0 �Mor Z z Z� 0 0 m NVI- Uiboratodes, Inc., Page 8 4708 Aurora Avenue North, Seattle, WA 98103 Ph MAI S;A7-ninn * cv v)m% RqA-1-4n E, - 8017 238(h Street SW, Edmonds. WA Projedil 2003-175 7.0 LIMITATIONS OF SURVEY The sole purpose of this survey report is to document asbestos -containing materials discovered In the survey of suspect materials by NVL Laboratories parsonnel at the residential stuckire located at 8017 238th Street SW, Edmonds, WA on April 14, 2003. This site visit consisted of a thorough visual walk-1hrough of the building for the purpose.of Z 0 viewing and sam ling potential ACMs. As hazardous material surveys are non -comprehensive p 0 by nature, NVL Laboratories, Ina, cannot be held liable flor materials which require destructive m mans to access, maborials which are hidden from sight (e.g. materials hidden behind walls), materials which cannot be found due to their obscure nature, or which otherwise cannot be 9 discovered wfth reasonable diligence. -1 C This document is the sole property of NVL Laboratories and the property owner, or his agent, m 0 authorizing this survey. 01 0 0 C m M Z C —Z —4 F- :C C& 0 -n -n M m Cl) -0 r om C/) ic CD Inspecteg by: m 0 Z r, X John Terrill Z AHERA Building Inspector AHERA Certification No.: 1004060 Cn AHERA Certification Expires on: February 4, 2004 Z 0 0 m NVL Laborelorles, Inc., Page 9 4708 Aurora Avenue North. Seattle, WA 98103 Ok OnAN AA7-ninn . F:v i*7ns;% s;*AA--ooqPt MEMO TO: FROM: PROJECT SITE ADIE FINAL PROJECT APPROVAL FORM TO: DATE: PERMIT COORDINATOR, BUILDING DIVISION FIRE DEPARTMENT DATE PLEASE SIGN �/,,�X-/_ENGINEERING DIVISION DATE_k1Q__LZa,7-1-' I'LLANLSMN 7 V��-7 PLANNING DIVISION DATE # f a y,-- - PERMIT ADB# DATE INSPECTED ellel-) DESCRIPTION OF WORK TOBE INSPECTED 1404,),1,0 kf� 0 1 A field inspection was conducted to determine compliance with -approved plans. Final ap proval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector I . 2. 3. RE —INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date SignatUre 1:ten11):b1dg:fonns:ocaprv1 3/25/04 z 0 1 0 !'9 =i:9 U5 --I 0 M C M 0 0 --1 0 0 M M Z 0­4 C Cn 0 -n n ;u > M M 0 0 0 M C: U) K U) Q 0 Z r- M z Q) z 0 i 0 M Afti RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... GasPiping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... Au P , SHEETROCK NAILING ... SPECIAL INSPECTION ... 1A MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. "91 z 0 i 0 M -i -n M C M 0 0 -40 0 C M ITI Z C _Z E: -4 � 255: o -n n M M 0-0) 0 r- 0 ITI C 0) Q 0 Z ;U -4 z --I 0) z 0 I 0 M