Loading...
20040525.pdft)mj­ / 1� � DATE RECEIVED mun� 6SF CITY OF EDMONDS ZONE iAgii LICATION JOB CONSTRUCTION PERMIT APPLICATION ADDRESS OWNER NAMEINAME OF BUS INESS :)L"-- , Ll 14 PLAT NAME/SUBDIVISION NO, MAILING ADDRESS CITY 1-- [—Ae��% U LU �-j APDRESS CIT� NAME ADDRESS STATE LIC ill P TELEPHONE ZIP ITELEPHONE 9fo CBL# <3,, ox`- x*�- tJ r7-, ZIP TELEPHONE 9SOOM Vlz,95�- CK NUMBER EXPIRATION DATE cr t�- le)� ) of � A 4 ;�j a UJI PROPERTY TAX ACCOUNT PARCEL NO. CC — 7 lrl�, eq4 /10100 0 NEW E] RESIDENTIAL ADDITION COMMERCIAL .-Or E] REMODEL MULTIFAMILY GRADING REPAIR CYDS E] DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY 0 (TYPE OF USE. BUSINEAS OR ACTIVITir EXPLAIN: W NUMBER NUMBER C a OF DWELLING M o STORIES UNITS DESCRIBE WORK TO BE DONE Lod(�7 fecrom LM . HEAT SOURCE I GLAZING % PLAN CHECK NO: .I— -5`/07— CH;CKM BY PLUMBING / MECH COMPLIANCE OR CHANGE OF USE SIGN FENCE ( — X— E] OTHER FIRE SPRINKLER FIRE ALARM CRITICAL AREAS NUM13ER LOT SLOPE % VESTED DATE S*-/// PERMIT EXPIRE ZO� I PERMIT N U M B E Ft�Y el SUITE/APT# LOT NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRFI) DEDICATION— FT METER SIZE LINE SIZE NO. OF FIXTURES LID NO LID FEE $ I ESCP Approved 13 SW Permit Required 11 Street Use Permit Hori'd 13 Inspection Required 13 Sidewalk Required 13 Undergrokind Wiring roqUirrid 13 PRV REQUIRED YES 11 NO 0 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DATE 0 Cr. W z z F5 z W W VARIANCE OR CU HORELINE OR ADB# I INSPECTION BOND "- REO'D GRYES POSTED IS �6ejN%pp Y'2-1 ONO SEPA REVIEW SIdN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I , LOT COVERAGE REQUIRED SETBACKS (FF.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT L/R SIDE REAR z z PARKING LOT AREA PLANNING REVIEWED BY DATE 5 REQ'D I PROVIDED A14 I o4- Fr) I REMARKS THIS PERMIT AUTHORIZES ONLY�HE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST. AGREES 1­0 INDEMNIFY, DEFEND AND HOLD HARMI ESS RITZ CI FY OF EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NAIURE,AIIISINGDIRECTtYORINDIRECi(Y FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT 13E DEEMED 1`0 MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION * I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DU& AUTHORIZED AGENT OF TILE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASIIINGTON RELATING TO WORKMEN'S COMPENSATION INSURAN C/ AND RCW 18,27. SIGNATURE (M�Nj:R-3)0 �EN T) DATE SIGNED 0 CHECKED BY OF CONSTRUCTION COPE OCCUPANT ITYPE I `1-7 GROUP, SPECIAL INSPECTION OCCUPANT REQUIRED ES JAREA LOAD I&Y REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D z F3 i VALUATION $ Description Plan Check Building Permit_ Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee CALL FOR INSPECTION (425) 771-0220 Y FEE Description State Surcharge City Surcharge Base Fee FEE Plan Chk. Deposi'_ Receipt # rl e-�aa Total Amt. Due Receipt # APPLICATION APPROVAI This application is not a permit Until signed by Ina, Building 011icial or his/her Deputy: and Fees are paid, and receipt is acknowledged in space prqvided. A17ENTION EXT 1333L4' Ir IT IS UNLAWFUL 0 USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBG SECTION 109 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES 1167 13Y b TE ) 11 (d a "C bu )/6) ( ORIGINAL FILE YELLOW - INSPECTO PINK - OWNER GOLD - ASSESSOR ,.1" z 0 i 0 M 0 M C M 0 0 —i (-) 0 C:: M M Z 0 -n n —i 3: M M 0 —Cf) 0 17- 0 M C Cn 9 Cn M 0 Z 17- z cif) z 0 1 0 M im Ma�j 19 04 07:45p -ma�j 11 04 02:37p MAY-O?-2eo4 11:26 NW Teamworks / CarCobat NW Teamw6rks / Cargabat 425-893-9371 425-833-9371 CITY OF EDMONDS SPECL4LL INSPE M.ON AND TESTING AGREEMENT p. 2 P. 02/04 p. 2 The Project at -Z-cP-1 1 1-1 . . . %*& , ed tnxkT builditl W=1 mnx=twn an&ar testing per UBC Chapter 15 list of inspecdong is attacl%cd to this docurdeaL 1702 Urf AUN742�71e �=W specia] com etc W= BEFORE, A FERMff CAN BE ISSUED: The owner and conftWor and somal inspectcar shall complete this agreement aDd the attached structurd ust(c) and i risr "pris schedule iticluding the required ackrmwledgmcnts. z 0 APPROVAL OF SPECUL INSPECTORS: Each special inspQcWr xb&U be aW ved by the Building Offmial prior to perfo duties tions. Each speold n"Pector Shall subrait or ' Hng OfficialiT Speciol in�rs. display 'thc�%= M ficalions to review. sha LU onnin iiii impq�c �i on &itc. S inspection and bestmg shall Tricet WVpc1f -9 ZpW pccW =n a =nrmuin "ouimema of TMC Chapter 17 and the folkywirW A- Dutim and Basna hillUM Of "t si=W 1"W.4c4ar M 1. owerve WWk The special hupector shall observe 1he sitc work for conformance with the ved the TJBC M 0 0 --10 phtw. and Bpc.cifications and applicable wodmmsbip provicions of 0 "a=1W or Engineer rim ed dmwingg nmy be used anly as an zid.to, inspectiom C: K s 'a In o:wbc cd on a icatimiot" bizirmeanirug thsd the spmal pecu ppicemm am t i M iiispectur is on site at alJ fmcs observing (he work requirmg specis in�xi. Periodic M Z mspectionse if MY, must have pr-= 20w val by the City based an a ceparaft written plan eM ved by the Biaildin0f5cial and Ow edgincor or mrhitect ofrecord. JD -i C mylewed and 2. Report Noi*-coilformill 16MU The sp=al ixivectar = Wing noncenfb Awn to the bnmediate attention of the r4r Cn contracior and rote aH such item in h, fit report. Any item not resolved in a dnwly 72 0 -n mmmcr shall be immediate cam of the Special in5p� to noW the Buildhig Official of the -h plan devialion , c=r, change: or OmissiorL It Shall also be the duty Of the SPOCial finPecw to Promptly noi�& the crigmecr or wrJnt=L M M 3. Compkta Dw-ly K 'W inspection record and the daily Each spccW* compicic mul sign both the sp=_ 0 Z-n 0 r- report fwm for each day's inspectim Thczc records shall remain at the jobste wrth the 0 M C Cn coria-aeor 1br review by the City Binilding InVector. 9 C/) 4. Furnfab Wv9W RePOrft Q 0 Z r- -I The special inspector or ingpectioxi agency shall. fmaish the City with weeldy reports of tests ' INW iiapectiona. The ect * ond others as dempueed sball also be c000datireparb- wwyrcpoT"tsprm"�r-o=rluam&Wtlbecct.61hminr. ordwil - Nemons and tcsft madc with applicable locatk= B1,i:a"0?a1UMn==0YrMMg items > Rcpori an obihs of nanconfunning itcw=sz. lved or unresolved) included in z iteraized changes authorized by ilic tect� Pkigineer and City if not L.Confornmarice, item Cn S. Funaiiali Final Construe Rxpert z The special inspector or mqxx:t.wm agency shall submit a final mi to the City stating that all item and ' were tzra A.4 to the inspec tion testing td and M and 910 0 0 be3t of his/h cage the ClCt 15 In CGXLfQEMWWCC With M� .:qj:�n owl i plans 'ficatiorm approved chanse =9 and the applicable higntro*lOns of ft M C . Item not in ccm1brmimce or unrcsolved items or any diw�-�,cs m inspection coverage. (i.c.. inissed inspacu *odic inspection whexi continuous ir�nis wt= pe.= _qn�, . - requdnxL etc.) shall be specifically iteftiizod m tWs.Mm Matj 19 04 07:45p NW Teamworks Cargabat Ma!j 11 04 04:17p NW Teamworks,/ Cargabat mny-420-2004 11.27 425-893-9371 425-o93-93?1 F. 3 p. 2 P. Mo,04 CanlMdur 1Iesgj=&ifiWJj=a 1. NoW the Special Ii3qHxtW 11 is the duty Of the 00afteW to notify the spwigl inspe� wbm work is rcady for special inspeefion. Note, the items listed an the attached schodule nd as nuted On the approved plans and specifications am mquh-ed to have special inspectimm Adequate notice shau be prcmded by the coutractor so that The special inspector has fw2c to becOM filmiliar with the Project. 2. Provide A..c W Approved PI&R3 The ccmftcwr is responsible for PT*VidU3g ft special inspcdor aceess to approved ptMs 24 theiabsite. 3. Retain Special InspectIOD Records The contractor is responsible to rctain at the 'Obsitc; 11 jai inspection records submitted qec' City building irmptaor upon in�r. Then McaT& we C pro by dw specW to vided to the request. 1. ApprwespeeWinspechn orlasp"flonagencies The.building dqMtMmC=t shall RPPMY-- all Vexisl WqW-'WM and VMW UISPectiOn 7- Moottor special Ins 'an and &#prove weekly reports pecb WoCk 8VTOal bon. and dw perfannmee of . sPeCI IMBPOCtan &hall be = Inspector, Mvlmr approval nyust b,-- obtained prior to rnoni City BI placement �ocaucrete or officr simiLir activides in Axidition to thd of Me Special kFpedur- 3. Issue Certificate of Occupancy -me BUIWW official way isme a Caltificate of Occuplancy after all Weekly special hqxxtion - _g iepow incItAing the final report have be= stibmitted and iccepted. D- 0wmItr Hmta�ftwl 7be project owner or the eagincer or mrhited of record ading as the ownces agent mhall,f�nd spwal inMection scmces. EnrineernrArrhifectofftwicdIt The enginecr or arcldtect of record shall include Wcc;W inspection requkmwts on the plans mad specificafions. ACIMNMEDGEMENIS- I have read and agree to comply with tAr,- reraw and Condwom of this agreement. own —Pat� —( - /C.-Wo - - -Td -t, Z11 E7&*� - L^OL. ,C...,i-ar---SpeciaJbispector:d�� I t�'��J�Affk I-e- P )01�& Gcneral City Building 0, t5r-,E-�, F7� .4 r-cyv- z 0 0 --i -n M 0 0 0 0 M M Z ID --I C o -n n M M 0 (—n 0 r- 0 M C Cn 9 Cn M 0 Z z (n z 0 i 0 M 9 ma�j 19 04 07:46p NW Teamworks / Cargabat 425-893-9371 p.4 0.5/12-12004 WED ILI: 14 F,�X 425 672 0501.1 Lyzinwood flonda -Wrrin. Q) 0 0 0 0:; 3 A,!V, Co,,I�e Amento No-4981 P, r. kl,./ Car-gabat 425-993-33,, P Ma , , , - -, ;, 4 - , r I'AY-07-2004 li-_37 P - 03/04 QW10001C &MOANNUO L Nofd� The SpecW Inspector It ir thD duty Of the QGfftrRctQr to 110fify the special inspector when wwk is peady for spmial hmpectiam Note, the items listed on the anadwd schedule gad as noted on the approved plans sad speefficatiow am rrqubed to havc special inspectiow. Adequmme nofice sW be pluvidcd by the cnntmetor go that the special inspectar baa time ID bcoomo fiuniliar with thr, pr*cl. 2. Provide Access to Approved PIRms The cona=tor is trzponsi"ble for providing the special inxpector acems to approved plans at thajobsim 3. Reftla Slpechd Inepw1lon Recorda nw conftctor is mspongible lo rctain at the j*obst* to all is] InWcaripu records wbrnined by the special inspeclor. Thme recoirda are to be provi=ft City building kapector upon request. C- x1f EdWands Building DellgrMcut RrayanAblHfies I . Approve ispecial inspectors or hLqxrdoIm qg*ncles nc building department shaD Vprovc all spedal iwpecto= and speaw bWrxtion rcquimmeaft. 2. Monitor spedal Inspechion and 40prove weddty reports Work . . 'al tift Wd ft 1=,= =UUM9 Spec] ��; of special - tom shxU N: MOW h 11Y F=g bspector. anmroval Masi bc=- Od 007 to Y the C, placcrtnent ot-concmte or athcr dadlzir wtivities in aMiti0iito thfil of the special inspeacy. 3. lung certillcate Of GeLapancy The Building OMWwAY icsuc 2 Ce"ific2tC Of 0=Ta0cY after an vveeldy'specw inspection =POM incigWU�8 the fittal rr-port have been Fuhmi and accepted. in- oymerjj"ponliblintle, The p!oject'ownw or 11he ergincer or ambLitect of record =ling as the ownces Sgemt Shan.fund SpMal irsspCciJon services. E, Fnrilleer or Arch of Recard-F , mongibilMew Ile emgiuccr or wchitcet of record sbail inchute special inwectiorm mquimmucnts an the pL= aM specifications. ACKN0WLEj)GEhC&lVTS- I have read and agnm to cvmply wigh I)w term and condidons offAb aereemr*. ,-,5 j1- -__12� — V-T dIF PR jqc� i . c-- - Spedw Lnspw Geriffal Contrk IV W"4 �F, 472MUNA I' z 0 0 M =i 9 Ui --i 3: 0 M C M 0 0 0 0 C —4 K 3: M M Z 3: 0 -n rl --I 3:9 M M 0 0 0 M C (1) 9 C/) Q 0 Z 7-1 3: z --I 3: Cn z 0 i 0 M Ma�j 19 04 07:46p NW Teamworks / Cargobat 425-893-9371 P.5 Ma�j 11 04 02:37p NW Teamuiorks CLrgobat 425-033-9371 p. 3 t-AY-O?-2004 11:2? P.04/04 01". �Nftp a W.'2 &JUT" Opt-ftrAPULAL oaf - fs--,L— Imm pnwrma XEMVEPORCED CONCRETE. GUNrM GROUT AND MORTAIL SMVL7URALSTEkEJWELDMG- Ctmerqu Gembe- C-na Wirmsmak"baw.) Asplimlit — Show ill� Mcmirscmas pAblourl�mv um — EMPNU= 0 DAp 13 FdM mix 0931ion — Ukm=Wc bnroc*m OSbop OSW RCWAXciw pollam" — Hw"—sm sadma 3S6&nmft1!!!!m 0 sb" ADT;cw bmw C3N 0 x Ov ()Dow DAM rm*.-vp sw000 —MMDmk%*WIxjbwpmc&= Ra"Memelt Smd Aud" Im"CrAm I A&W Row vkj"t taspmcdm PRECASVPRES=ESSIM C014CVWM-. Comarae loom %WmW bApamim MLASONRY- - SVMW bWPM%im SMUCS UWA —PMh-6&VYAORP—TcMrMasmvU&W.W*R?Iio, I" —SwbGMu=Tcw[Mm Gnpwt.F;aMvftAftommlil) — Pbw—m lawcemim C(Uftift FLREPRWFINC..- pummmall jurpufmcm Daysky Tcm —TWp*mmTcm —bxF-R..,Wnf RGULATM CONCRE-M- Sam* mw -rem Vail Wkwft Fn-L MATMAL: A-qn*=Tcsts FkM Deasky SrRUC7URAL VVOOD- -ShCWWAhNAIdqWpftI= bq=w;o. of oiwwmr-sb,. hmpwwm c(Tru"Jeaft R& ADDMONAL INYMUCnOM ON OTHOt I rS AND MPECTIONS: TWC Te' Na: TOTAL P.04 z 0 1 0 m :q 9 U5 0 m c m 0 0 --10 0 C: --I K X M M z JO --I c 0 -n n m M 0 Z;5 0 r- 0 M C cn 9 cn M 0 Z X --I 3: z U5 z 0 1 0 m 0 File Number GEoENGINEEI`tsr� FIELD REPORT I 1136- 001 -00, TO 100 Project Data Ebb Tide C01111LI0111illil.1111S. Unit # 10 1 I"loor/lIalio Slab .1111N. 16, 2004 8410154... AVENUE NE REDMOND, WA 98052 Repail (425) 861-6000 Owner Time of Arrival: Rworl Nompor EbbTide Condominitinis 0845 FR 7-16-04 Prepared by* Location Time of De-p-arlure Page IlOyd Bellsoll Calitionds Washington 1430 1 of'12 purpose Of 'A-41 %*leather Travel Time Permit 1`11111`11301' Special Inspection; Pill Pile Insiallalitm Stililly. wal-ill 1.75 2004-0525 (Ednionds.) Upon arrival to the silo I assessed personal %altily hrizards, 0 Y(l or [3 Releffed to Stio Safety Plan and Salely Tailgate if applicable Safety HaZatdS Were Addressed by . 0 Staying /Yed to Construction and Equipmoni I lazards 0 Other (describer General I visited tile Ebb Tide Condonlillit.1111S at tile request or Jells Johanson of Corke Arnento. Inc. 10 COIllPIctC Special inspections during pill pile installation ror tile Jillit H101 Floor/Patio Slab repair work. The Ebb Tide Condominiums are locate within a 4-story building on the shore of Puget Sound at 200 Beach Place ill Edmonds, Washington. The special inspection visit was completed as part of tile City of Edmonds permit requirements as summarized ill tile docurnent titled -City of Edmonds Special inspection and Testing Agreement." OL111-services were completed in general accordance with our Change Order No. 2 dated May 18. 2004, and authorized by tile Cory Heins ordie EbbTiLle Condominium Association oil July 8. 2004. T -ris. When I arrived at the site I met with Josh Krause of NW Tearnworks (General Conti -actor) and Carl Bill Justin Burris. and Adalberto Martinez of" Pacific Piling and Underpinning (pill pile installer). I observed tile rollowing: 0 A I -root wide (east -west), 1.6-root long (norill-SOLIth) strip of concrete been removed along the West edge orthe tile -covered concrete patio slab at Unit #101. Tile east edge of tile removed strip had L-K-en Saw CLIt and the West edge or tile removed strip was coincident with the cast edge of tile exposed aggregate concrete courtyard. A 4- to 6-inch void was observed beneath the patio slab (see Photo Sheets). No voids were observed bellizaill tile exposed aggregate courtyard slat) along the saw cut r-1 trench. • Concrete and other construction waste had been stockpiled and covered with a tarp, within the courtyard area. Pin Pile Installation • Plywood sheets were placed against tile windows -and sliding doors or Unit #101 to protect them frorn breakage (see attached photo sheets). ITATel IE�IXAEPRESENTATIV DATE THIS FIELD REPORT IS PRELIMINARY 7 A prolinimary report is provided solely as evidence that field Observation wasperl eyod in, 1 '1', n Observations an(Vor Conclusions nndlor n.-cornmendirlions conveyod in tho final report V.1 i TE ot -tied in if pielimnary report from and shrill take precedence over those indict THIS FIELD REPORT IS FINAL hIEVIEWED BY DATE A final ificioll is .11, Instrument Of pralosr4onai soroce. Any conclusions drawn from lills repor should be oiscussed with find OVilhinled by the Professional involved t 7 k0foLf r to comply with the plans and specification thrOughOul This report presents opinions loinind as a result of Cot ahservallon of activil:es lelaiing to Otto 59rvices only. We rely oft the con facto trio dulal'On of the project Irrespective Of the presence of our represonliltivs Our work does not include supervision o( wection at the workal Others Our firmyAll not be fespon&ble fo, job or site s.1j&1y of olhers on this project, DISCIAIMEn Any olactiefiie lorin. !ncs,milo or hard copy cl the original docurnerill (ernnil, toxi, table. andfor figure). if provided. and any attachments nro only a COPY Of file Original cloctunrint I ho original dr�-urrenl is stored by CeoEnginerfts, inc and %ill sylve Iq 1110 ojf�cijj docurnow of record Attachments: Pile Site Plan, Photo Sheets (3 pages), Pin Pile Installation Record sheets (2 pages), Pin Pile Test Record sheet, Certilicate of Certification for the test ram (3 pages) Distribution: Corke Amento (Jens Johanson: Pacific Engineering Technologies (Mark Uchimura: 111LICNI'llUraftaceriltech.com), Pacific Pile and Underpinning (Carl Burris tax 425-486-4025), NW Teamworks (Josh Krause: info@ nwtearnwgrks.corn), TAT, File Ise JUL 2 12004 PERMIT COUNTER z 0 4 0 IT! -n Cl) 3: 0 M C: M 0 0 C) 0 C 3: M M Z _Z o -n n i 3:9 M M 0 —C/) 0 F_ 0 M ci) C/) M 0 Z 7`1 X > z 3: 0) z 0 1 0 ITI IFile No. 11130-00 1 -00. Task 0 100 July 16. 2004 Paue 2 1 Pin piles were installed by Pacific Piling and Underpinning o The pin piles were installed using a 140-I)OUnd, hand operated pileurnatic jack -hammers. 0 The pill piles consisted of 5.25-foot long lengths of 2-inch diameter ASTNI A53 Grade A ER.D Schedule 80 pipe. o Slip connections between the piles consisted of 1.75-inch steel bar. The connections were 12- inches long %vith a ?--inch long sleeve pre -welded at the middle of' the bar for a total apparent. additional pile ieiip th or 2-inches once installed. No welding was completed during tile installation. o Five piles were installed at 6.5 root intervals along tile centerline of the trench (see attached pile plan) 0 Tile piles were advanced until enibechlient rates of less than [-inch per minute were attained at embedillent depths of 17 to 25 feet (see attached Pin Pile Installation Record summary sheets). o Tile piles were cut-off at approximately 9-inches bclo\v est-inlated finish slab elevation per NNV Tearnworks. 0 Pile Caps Consisting Of a '/4-inCh thick, 4-inch by 4-inch plate that had been welded oil to 18-inch long 1.75-inch steel bars were slipped into the top or each pile. The steel bars of soille of the pile caps were cut down to 12-inclies in length to avoid interference WiLli slip connections per the structural engineer (Mark Uchimura of Pacific Engineering Technologies). Pin Pile It I was load tested by Pacific Piling and Underpinning • A load test criteria of 8,000 pounds was specified (200% of the 4,000 pound design load) with less than 1/2-inch of additional embedment. • Tile load test was completed with a Simplex 100-ton rain reacting against a steel load fraine that was bolted to tile building. An Enerpac gage and hand pump were used to charge tile rain. • An incorrect gage calibration relationship was used during the initial load test and Pile #1 was loaded in excess of the required test criteria. Pile #I was loaded to approximately 11.250 pounds (1,000 psi gage pressure) with 0.084 inches or additional embedment and then to approximately 20.500 pounds (1,700 psi gage pressure) which resulted in additional embedment of 1.75 inches (see attached Pin Pile Installation Record summary sheets). o Pile 41 was unloaded and then driven with little or no eilibedillent following the initial load test. Tile load test was repeated using tile correct gage calibration relationship. A load of 8, 100 pounds (approximately 2001X, of the 4,000 pound design load) resulted in a total or 0.079 inches of additional embedment. The 8, 100 pound load was maintained for 10 Minutes. o Based Oil Our observations and measurements. Pile #1 illet the required load test criteria. It is our opinion that Piles #2 through #5 also niect the required load criteria because of' the consistent installation activities at the site. z 0 m 0 M C m 0 --40 0 C --j K X M M Z 0 -1 C —Z W 0 -171 n --i m m M 0 0 0 m C CAI 9 CD M 0 Z X z z 0 i 0 m I j I Looking southeast at Unit #101 12-inch wide saw cut trench tit west edge of Unit #10-1 patio slab. Note the 6-inch void beneath the patio slab. No void was observed beneath the exposed aggregate courtyard slab to the west (right) GWENGINEER� Ebb Ticle Condominium: July 16, 2004 Photo Sheet #1: Pin Piles z 0 i 0 m =i =-n Cf) 0 m c rn 0 -1 0 0 c -4 K X M M z �M (1) o -n n ;u > m M 0 0 0 M C/) cn M C-) Z z C/) z 0 1 0 m Driving Pile #5 (north end of trench in foreground) and #1 (South end of trench in background). Piles are 2-inch diameter driven with a 140-pound hammer 44 L 11, pch, long, 1 2 h Inc Alarneter,,,.� 1,: sleeve ly -4, Q-4-` 'Al i e-- Ll Li 12-inch long slip coupler (left) inade with 1.75-inch steel bar and 2-inch long sleeve and slip pile cap (right) made from 1/.4-inch thick, 4-inch by 4-inch plate welded onto 18-inch long 1.75-inch steel bar. Note: sonle of tile top plate bars were Cut down to 12 inches to avoid interference with slip couplers. GWENGINEERS,�g Ebb Tide Condominium: July 16, 2004 Photo Sheet #2: Pin Piles z 0 1 0 m :q:fi V5 --I 0 M C m 0 0 0 0 C --i g 2: M M Z ID —i C —Z W 0 -n ri X > m M 0—W 0 r- 0 m C= Cn F. Cn M 0 Z r- m ;U z CO z 0 -1 0 m I I v. C5 US M 6� W Q LO 00 Lr) CIS C9 91 LU Cr W Pile #1 load test. Note steel reaction frame (left) bolted to building. �W 4�, A �-z Gage pressure at -720 psi resulted in ram force of -8,100 pounds or -200 percent of design load. A total of 0.079 inches of additional embedment was recorded during the load test. Ebb Tide Condominium: July 16, 2004 GWENGINEER� r -- I - Photo Sheet #3: Pin Piles z 0 1 0 M --I -n 55 --1 0 M C M 0 0 --10 0 C M M Z 10 C/) 0 -n n M M 0 0 0 M C CI) 9 U) M 0 Z r z --I r C/) z 0 -1 0 M tomoo too, tot :ll tml d lool, A 5 o, =7 lot, old, 9 V/ d UNIT #101 1 .. 110'ro" F7 EXIST, SLAB 0 D CsL GRADE AN DE BEAN TO REMAIN Role jo dr !01 7 4mm. . . . . . . . . . . . . . tomorn': . . . . . . . . . . . . . . . . . . . . too =oolooloot . . . . . . . . . . . ................... 0 to . . . . . . . . . . . . . . . I I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .0*0.040..' . . . 9 . 1"... 0 o a ::*.:: . . . . . . . . . . . . . . . . . . . . . 0 a o a . to . . . . . . . . . . . to . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . too . . . . ... . . . . . . . . . . . . . . . . 4 1 0 1 1 . . . . . . to to ............ .. I I ........ .......... to ....................... ....................... to. w -. to ...... .... ............. ...... 6.010, 1 1 1 1 1 . . . . . . . . . . . . . . . . . . I I . . . I . . . . . . . I . . . . . . . 1 0 1 0 1 . . * 1 0 . 0 0 1 0 to . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I I - - I - - 11*1 to to Ir — I. :7Z ............ - 6 - 0 - . - * - * . .. . 0 1 0 ... 1.1.1.* ...... 0 ............ 111. .......... 1. , '. l. ........ 11-1 ....... low, ...... 11.1 ............... . . . . . . too., ... I..o .......... too 1-1 .... ......... 0 .0.0 .... ............... to . . . . . . . . . . . 010.4.0.* 0 6 0 6 000161"'ll. :.o 0 0 0 0 0 W 9 0 a 0 . . . . . . 17.0. too lop . . . . . . . . 1 0 a . . . . . . . . . . . . . I I . . . . . . . . . . I - - I - I I . . . . . . . . . I I I I . 1 0 . 0 . 0 . . . . . . I ..*. 0 0 . I . . I I . . . . . . . . . . . I I . I . . I I 1 0 . . . . 0 . . . . . . oLlo . I . I I I I a . I . a . ft . . . . . . . . I . . . . . . . . 1 0 0 6 1% . . . . . . . . . 1 4 0. 1 . . . . . . . . . . . . ., % a otw', I I ell 0 1 0 0 1 to . ,m o,' I a I ft 1 0 so,l %os' . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . I I . . . . . . . . . . . . . . .......... , , 6 . . . . . . . . .. . . . . . . . . . . . . I . . . . . . . . . . . . . . "o .... no. ....... &..** . . . . . . . ... .......... I I .1toll low M 0 4 0 0 ........ 0.1 & 0 too ... I I ............ I I .......... I ...... *.&.* ...... . ....... ............. to to to ............. I ........... I to ............... 11 ...... I . . . . . . . . . . I I I . . . . . . 0 . . . . . . . . . . too, . . . I . . . . . . I . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . ...... ...... Poll ........ I.,.. to to "o *0.0.0 . . . . . . . . . . . . . . . . I I . 1 . . . . . . . . . . . . . . . . I I . . :.0 & * 1 .0. %�� . . . . . . . . . . . . I I I . . . . . . . . . . . I . . . . . . . . . . . . . . . .... . . . . . . . . . . . . * 0 A 9 . o . 0 . . . . . . . t�: 1 4 5 low loo, ol EAM oo,�Noio, 50T. SET = At �oo­ott000000'=I OEXIST. �v!ATCH REINF. too:� ol lot, loll I EPDXY EA. END 0 ',00m L = : : f 4 $ , tool . . I ", q(5) 3" 0*1 FILES EQUALLY SPACED, lWa" EXIST. COURTYAtke SLAB AND CMU WALL TO REMAIN 4L PROPOSE FLOOR Df CONC. TO A d z 0 0 m m c m 0 0 WIMM-1 0 0 c m m z 10 z > rool@ C/) 0 lon 4110, m 9 1 1 1 MITI Cl) 0 r""* . . 0 m c Cl) rm C/) MO Z ;u > z C/) z 0 WEEMI I 0 m TiP6 �o :j "k, I v IFile: P Location: Embedment Below Comments on Pnntinci comments 7-1 YJ ei� 7-C' 21 PIN PILE INSTALLATION RECORD File: I LE Location: Pro'ect: Embedment Below Comments on Footing comments starvStop Start/stop Pile Ddvinq (feet) Driving Resistance Dat Chipping !0 ` " 1 11 Number -7 4 0 A-,f 0( ------------ "T Wngineers G c o % Dsn Load Gg Pr Hold Gauge I Gauge 2 Act Disr Load (kip) (psi) (min) (in) (in) __,(in) -- ILC v" n 0 CM t4c /00 V2, �36 '7,� q 0 too I I .�i I I I I A, -1'7n ,�. A� 'r M 1/1 PIN PILE LOAD TEST RECORD I Job No.: Ram Tyee7 C- 4� 8 C4 0I U') 10 M U') 0 C4 _j C 0 M Lr) In C11 04 P" .5 016 1 0.1 PA 0 Total Displacement (in) �1 n - L2 comments It) TO 0 C PILE -r,6 t i q;.- A �J A Fi; T r M 17'o Build On, Engineering C013SUIting Testing Cexti-ficate of Calibration PS1 Cerfific"('Ite NUmber 7127-30137 Calibl'ated li-quipment Info; Z' 0 Client Tril'orniation: Pacific Piling and Underpining RAM: Manufacturer: Simplex Atm. Howard Clark Model: 100 toil hollow, M double PO Box 2080 SIN: Model 001 C/) -4 Woodinville, WA 98072 G A G E: N/lanufficturer Enerpac 0- 10,000 psi 3: OM C (425)-185-8869 Nlodcl� SIN. A MO 0 Fax: (it'-5)-4189-4025 0 02 PROFESSION AL S14CIZVICE INDus'rRIES hereby cei-tifies that... X M M Z The above-clescribed instrument III CL or exceeded all published Spec ifications at tile time ot, 'fied below The instrument has been calibrated Lising standards whose Calibration specl C z > accuracies ai*e traceable to 1 lie National Inst*tLite of Standards and'Feclinology ts,r) within the or F- -4 3: calibration services, or have been deri ved froin accepted values limitations oi'the InstiWW'S I physical conslants, or have been derived by ratio ol. self calibi-lation techniques. All ca librat,1011 Z540 0 -n -n activities performed are in compliance w, th NIIL-STD-45662A and ANSI/NCSL 3: C M M —0) I Calibration %tatistics 0 r- 0 M C V) Cal Date & Tirne '7130103 'rernperatui-e 23"C Pass M 0 Next Cal Due 7/3 W04 1111111idity 50% Seals OK Z Results: Left aS found, no adjustments made M Standards used for certification > z Asset Model Description Cal Date Due Date 712-IC lUjlejc/�knietek- RA- Cornpression'Test i"dachine 6/16/03 6110104 z 0 -4 44 "1 7") 10 NIST NOS U.0 C 64 171-)- 1, U C C 64 179-2. S-C C 8455 M Pape 1 of�2 Build 0/7 Eng Its -N,'ICE I.NDUSTRIES- IIN(:- a nu t�lactu Stillplex 100 toll I lollow Nlodel Nlodel 00 1 S /.NI Enerpac G A G F,: N-1 a n u faCtL1 rCr 0-10,000 psi z imodel A m CD M C m 0 (Jage Pressure Verified Actual 0 (psi) Averaoc Load 00 C m m I C)OO 2501 z 1? 41 000 C —Z > 1000 4887b 4000 1125 j. 0 -n 5000 74250 �6000 --i I 3: r. I / �1- 5 m M 7000 99375 8000 M 0 C)OOO T2006 0 m C 1250 CO r. 0) m 0, Z 17- M 3: > Calibrated by: Gordon I..,Iovd Z, M CD z Reviewed by:ZLL 0 Gordon I.,loyd, Project SI)ecialist m Se.lffle Construction Se[Niccs Mir I lallon 7 Build 01.1 Engineering - Consulting - Testing (D u LLI �e cz 0� C: 0 V, CN C5 C, 0 cj 0 co vi CD 0 C� (D C) NV C) C, z 0 i 0 m --I -n 55 m c m 0 0 0 c M M z o -n n —1 :E m M 0 0 m c (D ?. U) M 0 Z ;u > z M U) z 0 q 0 m I FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLCASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE 1G1!z1bq- PIE&AGN PROJECT -C'b� T'Y SITE ADDRESS- 7, PERMIT Z,!5o 4- - o is- z ._ADB#__________�DATE INSPECTED 710 DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: V-_�GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED [I Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRE CTION NOTICE given to owner/contractor by inpector 2. 3. RE-INSPECTEI) OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fomis:ocaprv1 3/25/04 z 0 M --i -n M M 0 0 —10 0 C: ­4 K M M M Z 0­1 C Cn 0 _n n;U > M M 0 0 0 M C: Cn F. Cn Q 0 Z z Cn z 0 M I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... wv� Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ........ ........ Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 700 0 5z IS z 0 1 0 M ­11 -n rj) —4 0 M C M 0 0 __10 0 C M M Z C —Z 3: 0) 0 -n n —4 M M 0 0 0 M C Cj) 9 0) Q 0 Z > z Q) z 0 11 0 M