20040573 (2).pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
PLEASE SIGN
—ENGINEERING DIVISION DATE 5
'-'Mwe SIGN
PLANNING DIVISION DATE
PLEASE SIGN
PROJECT
SITE ADDRESS— .&ad
PERMIT# (J5�)AD134 DATE INSPECTED S__ "0-
DESCRIPTION OF WORK TO BE INSPECTED
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
f
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by, inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
I .
2.
RE-TNSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:tcmp:b1dg:romis:ocaprv1 3/25/04
z
0
i
0
M
--I -n
M
C
M 0
0
0
0 C
rn
M Z
0 --1
C
C/)
o -n
n ;d
>
M M
05
0 r-
0 rT1
Cn
Cn
M
Z
M
r
z
z
0
M
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SEtBACKS .....................
FOUNDATION:
Footing ......................
Wall..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -In ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING..........................
FRAMING........................
FIRST FLOOR FRAMING...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
-7
MISCELLANEOUS ..........
FINAL APPROVAL FOR �YQ
OCCUPANCY ..................
z
0
1
0
ITI
-i -n
M
C
M
0
-10
0
M
M Z
g:) -1
C
o -n
n
M M
a
0
0 M
C C/)
M 0
Z
z
C/)
z
0
1711