Loading...
20040581.pdfN DATE RECEIVED 0 USE CITY OF EDMONDS ZONE JOB CONSTRUCTION PERMIT APPLICATION JAD DR E S S OWNER NAMENAME OF BUSINESS P P T _e� . . - � ��, . I - — LAT NAME/SUBDIVISION NO. PERMIT EXPIRES PERMIT NUMBER LOT NO. MAILING ADDRESS I - PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP CITY ZIP 1 TELEPHONE EXISTING — PROPOSED 4S& REQUIRED DEDICATION— FT NAME METER SIZE I LINE SIZE NO. OF FIXTURES ADDRESS SUITE/APT# LID NO. LID FEE $ TESCP Approved RW Permit Required Street Use Permit Roq*d Inspection Required Sidewalk Required Underground Wiring required PRV REQUIRED YES 13 NO 13 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 110 0 Z z z LU CITY ZIP TELEPHONE NAME CB1_# - rAll 2 0. Ta ENGINEERING REVIEWED BY ,Rr, H AL DATE Cr ADEtRfSS 0 FIRE REVIE ED BY BE cc ZIP TELEPHONE 11: 0 ry _07 -0 VARIANCE OR CU SHORELINE OR AD1111 INSPECTION BOND STATE LICENSE NUMBER EXPIRATIO1 DATE C ­ 13Y REO'D POSTED -I (f) M 6 L t I SEPA REVIEW OYES ONO S r-k Eill (P� I SIGN AREA HEIGHT -j PROPERTY TAX ACCOUNT PARCEL NO. COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED , PROPOSED -7 W ;3 EXP LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT) NEW 0­131�SIDENTIAL PLUMBING MECH ALLOWED PROPOSED FRONT SIDE REAR FRONT LIR SIDE REAR 0 COMPLIANCE OR ADDITION El COMMERCIAL CHANGE OF USE z PARKING AREA PLANNING REVIEWED BY DATE REMODEL MULTIFAMILY E] SIGN REO'D I PROV E] REPAIR GRADING FENCE CYDS ( X FT) REMARKS DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER z El CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTWI EVi.AIN: CHECKED BY TYPE7ffO I OCCUPANT GROUP 0 UK - - - n U) I / ul NUMBER NUMBER OF CRITICAL a OF DWELLING AREAS SPECIAL INSPECTION JAREA OCCUPANT M UNITS NUMBER REQUIRED [] LOAD 0 STORIES M1 I YES DESCRIBE WORK TO BE DONE REMARKS z N PROGRESS INSPECTIONS PER UBC 108/IBC109/lRC109 FINAL INSPECTION REO'D ::�W 11N fA, '1�, VALUATION 2� ol ou i -ei $ j� ik)/ J, Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE GLAZING % LOT SLOPE % Building Permit j\� City Surcharge PLAN CHECK NO: VESTED DATE Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading E DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE j SEPARATE PERMISSION. Engr. Review PERMIT APPLICATION: 180 DAYS A CL PERMIT LIMIT:11 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION V) 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt ALI. CLAIMS FOR DAMAGES OF WHATEVER NAVURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT, ISSUANCE OF 1 HIS PERMIT SHALL NOT HE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapeinsp. Total Amt. Due _j 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION X1 Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THAT THE INFORMATION PROVAL GIVEN IS CORRECT, AND THAT I AM LE OWNER, OR THE DU& AUTHORIZED AGENT OF APPLICATION AP THE OWNER. I AGREE TO COMPLY.MeTTF1 I CITY AND STATE LAWS REGULATING CONSTRUC- This application is note permit until signed by the TION; AND I IN4TI1,E WORK ITEHORIZED THEREBY. NO PERSON WILL BE EMPLOYED CALL Building Official or his/her Deputy: and Fees are paid, and N Do' LE LA D receipt is acknowledged in space provided. IN VIOLATION OF OF THE STATE OF WASIJINGTON RELATING TO FOR INSPECTION S WORKMEN'S COMP SA N URANCE AND RCW 18.27. OFFICIALS )SIGNATURE D E VN� RIF IN" DATE SIGN SIGNATURE ED (425) �9A k 771-0220 4, tE=,, s, E /DATV ATTENflOW/�­­_" EXT 1333 ITISUNLAWFUL SE OR��CUP DING OR STRUCTURE UNTILAFINAL INSPECTION HATBEEN MADE AN APPROVALOR ACERTIFICATE OF OCCU- ORIGINAL - FILE YELLOW - INSPECTOR PANCY HAS BEEN GRANTED. UBC109/]BC110/IRC110. PINK - OWNER GOLD - ASSESSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES z 0 1 0 M --i -n Cn M M 0 —10 0 C: M M Z 0 --1 C _z cn o -n n MM 0 0 0 M C: (n 9 Cn M Z z --A X Cn z 0 i 0 1711 1� FUEL TANK INSTALLATION CO. INC. PO Box 46412 Seattle, WA 98146 206-244-8020/ FAX 206-243-3477 Underground Storage Tank Cleaning Certificate Date: � C" 'I j Owner: P V-L Job site: bvi City: Tank size: 3L5C�� gallons This letter is to certify that the underground heating oil tank being decommissioned has been pumped and rinsed and all effluents legally and properly disposed of in the city of Seattle. The above referenced tank is now ready to be excavated and removed or decommissioned in place with inert material. Thomas H. Anderson <1.6BO 059581-U2 WA St. Cont. license FUELTIC08OB8 ILM Z 0 M Cn C M 0 0 0 0 C p!.:' 3: M M Z C -Z 0 -n -n M M 0 0 0 M 0) 0) M 0 Z 71 > Z Z 0 i M r FINAL PaWEQ1 AkDROVAL FORM t< r %." ?, d 1, �( 1, TO: J'� D A T E: 0 JUL 27 21010" [)EVELOPMEN't r s E cJTY OF EM4�:*�*'�;�)'-'� MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION _a7-, FIRE DEPARTMENT DATE4&��/O �f GN ENGINEERING DIVISION DATE PLEASESIGN FROM: PROJECT SITE ADDRESS— PERMIT#_s2-224� -PLANNING DIVISION DATE PLEASESIGN ,57 f ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERF ORMANCE BONDS and the granting of: ,11--k GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED Copy of CONDITIONS given to owner/contractor by inspector 1 . FAILED FINAL INSPECTION - OUTSTANDING ISSUES Copy of CORRECTION NOTICE given to owner/contractor by inpector 1 . 2. 0 RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbrms:ocaprv1 3/25/04 z 0 M =-n 0 M C M 0 0 --I (-) 0 C: --I R: = M M Z IC) ­4 C: 3: 0 -n n ;d __4 > r 9 M M 0 0 0 M C: (n K Cf) Q 0 Z r- M z --i X (n z 0 i 0 M I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 156e 200 v4w OSF/ z 0 1 0 M ­11 -n 55 --j 0 ITI C M 0 0 0 C M ITI Z 0 -n n M M 065 0 r- 0 M C (1) 9 C0 Q 0 Z > z z 0 1 0 ITI