Loading...
20040630.pdfECEIVL, PERMIT EXPIRES el i7A DATE R Lila USE PERMIT CITY OF EDMONDS ZONE (4 NUMBER L /. CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS,,) OWNER NAME/NAME OF BUSINESS �?4' , 4A.1A.1EL PLAT NAMEISUBDIVISION NO. L T NO., Llb NO� LM MAILING ADDRESS u LID FEE $ z B. OW i F-7t PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP JESGP Approved 0 0 Fivv Porrinit Required 13 (t t ti Speot Use Permit Roq'd 0 CITY ZIP TEIEPHONE EXISTING — PROPOSED inspection Acquired 13 Sidowalk Requited 13 =? REQUIRED DEDICATION— ET Undergrocind I winno,equim, [3 NAME METER SIZE LINE SIZE NO 01 FIXTURES PRV REQUIRED A-1cc-14- YES NO 11 M ADDRESS REMARKS z 0 OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROWDRAINAGE E5 1��ek-� 'OV41"lj z ol W CITY ZIP ITELEPHONE NAME CBL# ENGINEERING REVIEWED BY cc ADDRESS 0 W2 7 [4 FIRE REVIEWED BY DATE uj rz CITY TELEPHONE cc 0 ZIP i(- All')5 I-/- "b- STATE LICENSE NUMBER EXPIRATION DATE VARIANCE OR CU SHORELINE OR ADB# INSPECTION BOND CHECKED TAY REO'D POSTED f YES ONO S 114 SEPA REVIEW SIGN AREA HEIGHT PROPERTY PARCEL NO.) COMPLETE , EXEMPT ALLOWED , PROPOSED ALLOWED , PROPOSED Lu EXP NEW RESIDENTIAL PLUMBING / MECH LOT COVERAGE REQUIRED SETBACKS (171) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJRSIDE REAR COMPLIANCE OR z ADDITION OMMERCIAL E O—C CHANGE OF USE z PARKING LOT AREA PLANNING REVIEWED BY DATE :5 REMODEL MULTIFAMILY SIGN REO'D I PROVIDED a. FENCE El REPAIR GRADING CYDS ( X FT) REMARKS E] DEMOLISH TANK OTHER L.4:2 o GARAGE RETAINING WALL FIRE SPRINKLER z CARPORT E] ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: LZ;,7- CHECKED BY TYPE OF CONSTRUCTION COD OCCUPANT U) GROUP uj NUMBER NUMBER OF dRITICAL N27 a OF DWELLING AREAS S ECIALINSPECTION JAKEA OCCUPANT to 211 to STORIES NITS NUMBER REQUIRED LOAD DESCRIBE WORK TO BE DONE _] YES REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D M VALUATION Description FEE Description FEE Plan Check State Surcharge HEAT SOURqE GLAZING % LOT SLOPE % Building Permit City Surcharge PLAN CHECK NO: VESTED DATE Plumbing Base Fee In 111�/_ z2K�_:_ THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading SEPARATE PERMISSION. Engr. Review W PERMIT APPLICATION: 180 DAYS PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS Plan Chk. Deposit U) Fire Review W IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMI ESS THE Cl rY Or i :E EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Receip ALL CLAIMS FOR DAMAGES OF WHATEVER NAT URE, ARISING DIRECTLY 0 Fire Inspectio # R INDIREC I IY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF 1111S PERMIT SHALL NO] LIF DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMEN r OF ANY CITY LandscapeInsp. Total Amt. Due _j ORDINANCE x 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY 10 ENFORCE ANY ORDINANCE PROVISION Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THAT THE INFORMATION �W/71 . GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DU& AUT110FIlZED AGE-N1 OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application is not a permit until signed by the 1:ON; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED CALL Building 011icial or his/tier Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S COMPENSATIiQ�� �URANC,E.AND RCW 18,27. 0) /F /[IAI.S SIGNATURE DATE OWNER 01 AIE I SIGNATURE A E 11) DATE SIGNED (425) y c � " Y I / / / - -_ __9 W 771-0220 'RFi EASED 13Y /DATE ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY 'A' BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - OWNER GOLD - ASSESSOIj 09,103 PRESS HARD -YOU ARE MAKING 4 COPIES z 0 M Zi 95 Cn --j X 0 M C: M 0 0 —1 0 0 C: M Mz JO -4 C co 0 `71 n ;d > M M 055 0 r- 0 M C cf) 9 U) M 0 Z :C z Cn z 0 M FIN. PR03ECT APPROVAL. )RNI TO: DATE: MEMO TO: PE 0 .0- ILDING DIVISION FROM: 71LEMrSIGN #/ FIRE DEPARTMENT DATE Pl.r.,%SUSIGN ENGINEERING DIVISION DATE —PLANNING DIVISION DATE PLEASESIGN PROJECT SITE ADDRESS PERMIT # —ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with - approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 11 Copy of CORRECTION NOTICE given to owner/contractor by inpector 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tei1ip:b1dg:forn1s:ocaprN,1 3/25/04 z 0 i 0 M —i -n M M 0 0 -10 0 C --j K a: M M Z 0 --1 C 0 -n n;u > M M 055 0 r- 0 M C: Cn 9 U) M 0 Z r- M X z --I M C/) z 0 1 0 M FINi�w_ju PROJECT APPROVAL tORM TO: DATE: MEMO TO: PERMIT COORDfNATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE -PLEA-SESIGN ENGINEERING DIVISION DATE- PLEASESIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT E SITE ADDRESS- C( PERMIT ADB# DATE INSPECTEDq---(3--o_S DESCRIPTION OF WORK TO BE INSPECTED F A field inspection was con i ducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. R-E-INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date SignatUre 1:teMp:b1dg'f6rn1s:ocaprv1 3/25/04 z 0 M q =55 M M 0 0 __10 0 C M M Z 0-4 C 0 -n n;u > M M 0 0 0 M C Cn 9 co Q 0 Z ;u --i r z En z 0 M DATE APPROVED INSPECTOR S ETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. --------------- Retaining Wall ........ Slab Insulation .......... --------------- PLUMBING, Underground ............. --------------- Rough-In ................... commercial Final ...... HEATING, -------------- Gas Test .................... Gas Piping ................. Equipment .................. commercial Final ....... EXTERIOR SHEATHING NAILING.......................... ------------ FRAMING........................ FIRST FLOOR FRAMING ... ------- I ------------- INSULATION ................... Floor insulation ......... -------------- Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... ------------- MISCELLANEOUS .......... FINAL APPROVAL FOR ­64 OCCUPANCY .................. A z 0 4 0 M —1 -n Cn 0 ITI C: M 0 0 0 0 C M M Z _Z C/) 0 -n -n M M 0 0 M C C/) F. Cn M 0 Z z 0) z 0 0 M