Loading...
20040710.pdfI 7 [7PERMIT EXPIRES (2 RECEIVED USE PERMIT ZONF NUMBER CITY OF EDMONDS )2�) CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDHESS OWNER NAME/NAME OF BUSINESS PLAT NAMEISUBDIVISION NO. LOT NO. LID NO. La: MAILING ADDRESS R—AkTILKI i W­-I' Cj :7 - I—) LID FEE $ z '2U fESCP Approyed PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP F.W 1`011nit R0qL11f0d 0 A)F 1 13 Street Use Permit Raq [3 ully HONE EXISTING PROPOSED Inspection Roquired In ZIP TELEP Sidewalk Floquired E3 HFQUIRED DEDICATION— FT Undotground 0 Wiring reqwfed [3 NAME METER SIZE LINE SIZE NO. OF FIXTURES P V PEOUIRED L I A- 1 0 ES NO 13 F L 3 cc W Y z t: ADDRESS REMARKS z OWNER1CONlRAClOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE z oz'_ LU CITY ZIP T�LEPHONE E'E C-7-1 0 /--C C- Z, C L .;? f-4 CC , s NAME CBL is ERING REVIEWED By �DATE Cr ADDRESS 0 2'r)IL, 4- FIRE REVIEWED BY DATE W IM CITY ZIP TELEPHONE U. -7-70 22A1 VARIANCE OR CU SHORELINE OR ADB# INSPECTION BOND STATE LICENSE NUMBER EXPIRATION DATE Y REQ'D POSTED I I I — - I [:]YES M�1171 IS — — 0 iPo �_ SEPA REVIEW SIGN AREA HEIGHT PROPERTY TAX ACCOUNT PARCEL NO. COMPLETE EXEMPT ALLOWED PROPOSED ALL05ED PROP ,0QSED LU _j N7) 15�ESIDENTIAL PLUMBING MECH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (Fr.) _R Z ALLOWED pROP0,7 FRONT SID� REAR FROOT UP SID.P REAR/ COMPLIANCE OR _1> 7 z ADDITION COMMERCIAL 0 �_o 1 5; .5 F CHANGE OF USE 35 1 1 z PARKING 1�01* AREA P� �NING R IE oD Y DATE REMODEL MULTIFAMILY SIGN FIEQ'D PROVIDEC 1m, 1 0 REPAIR GRADING FENCE )" 6-�_ — �y _� ?_ I CYDS ( X FT) REMARKS h DEMOLISH TANK m OTHER GARAGE RETAININGWALL FIRE SPRINKLER z CARPORT ROCKERY FIRE ALARM [TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: �CHECKEDBY ITYP ST UCTION OCCUPA Up QkL C--- �A r)al-- �y 1�, GRO P Gi NUM13ER NUMBER OF CRIfICA 117 L 0 OF DWELLING AREAS SPECIAL INSPECTION JAREA OCCUPANT" M z I NU REQUIREDV YES LOAD cr STORIES UNITS MBER DESCRIBE WORK TO BE DONE REMARKS z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D S -M 4 1%,�al t� -X. -VALUATION h' .3612 3 IP7) qqq Description FEE Description FEE 0— StateSur Plan Check charge HEAT SOURCE GI�AZING % OT SLOPE % Building Permit City Surcharge ) e72 PLAN CHECK NOL i V E MTD f Plumbing Base Fee jj)E TO L 4 Mechanical C, THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS40R' T)O BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading 21v SEPARATE PERMISSION. Engr. Review -7f-2i PERMIT APPLICATION: 180DAYS Uj PERMIT LIMIT. I YEAR I PROVIDED WORK IS STARTED WITHIN 160 DAYS Engr. Inspection 2 Ae— SEE 13ACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit U) W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF -1 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # �/Z/ ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY Oil INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT 13E DEEMED TO MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due , I I J f 5 1:; 0 NOR LIMI I IN ANY WAY THE CIIYS ABILITYTO ENFORCE ANY ORDINANCE PROVISION." xi Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY Willi CITY AND STATE LAWS REGULATING CONSTRUC- I his application is not a permit until signed by the TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building 011icial or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION icceipt is acknowledged in space provided. WORKMEN'S �RMFE�NSATION INSURANCE AND RCW 18.27. 1 91 DATE S NA)U F W r 0 T) DATE SIGNED (425) 77, A Lh1r)N6 :i,�- 31,11 771-0220 - FIELE�SE`D ll!!� ATE' WiTENfib'N' E)ff 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL L A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIG L F E - YELLOW INSPECTOR OW CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PIN N R GOLD-ASSEsson 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES z 0 Il 0 M --i -n M C M 0 0 --1 0 0 C: M M Z ID —i _z o -n n ;d —4 > x 9 M M 0 0 0 M C M 0 Z z Cn z 0 M r�JXP n- '1 1 'Utl ry N11 t&U o /E DC: UUVr-rlCLJ VVIMIN f- UnOW ce S -'k yl z 4- CC SCALE:.. TWIWE A ',.I ta C. p FOOTING DRAINS NOT SDR 35 MATEFOL TO BE TIED IINTO SCH 40 DETENTION SYSTEM N-12 'r-810 HmcoR WATER METER LOGATEP AT 15.00' THE 5w CORNE K OF LOT 1 FAp,.�J'-�N bTH &&r (V Flag A/ $#PMED AS ED �etbacks Recilfired ACtUal BY ENGINEERING a' Front A Sides -712 'e ^ther Lq—vLLV EXLIL-q- L' - PLA-Nw JUN 2 8 2004 PFRMIT COUNTER APPR(),V�D BY PLANNING CITY COPY K � Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical/ Civil Engineer July 2, 2004 RECEIVED JUL 6 2004 z 0 0 M Mr. Rob Michel PERMIT COUNTER Michel Construction, Inc. =n- 7907 - 212th Street S.W. #102 C M Edmonds, Washington 98026 ma 0 Subject: Geotechnical Evaluation "Soils Report" 0 Proposed (2) 4 Lot S.F.R. Development M M z 81h Ave. S & Pine Street, Edmonds, Washington Z > r This engineering report presents the results of a geotechnical evaluation o -n -n of the property at the N.E. corner of 8h Ave. S. and Pine Street, Edmonds, Washington, with respect to the proposed 8 lot development. This evaluation rn M was required due to owner developer concerns, as well as City of Edmonds 0 55 0 requirements. 0 M C: CD 9 Cn Z REFERENCES: X Survey by L.S.A. z Location map X Site plan Cn r- roi eUL U1 Ci HCtgt:: P Ct" y L)""Ct "W 7 Photographs Jr CITY COw"A BACKGROUND: The proposed eight lot project, to be constructed by Michel Construction, Inc., will occupy the majority of the overall property, with access drive to 7 lots off 81h Ave S. SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 Michel Construction, Inc. 8 1h Ave. S & Pine Street Pagetwo CHARACTERISTICS: Z 0 A survey of the subject property was conducted on June 12, 2004 by L.S.A. The property is rectangular, and consists of approximately 62,510 0 frontage feet along the east side of 8" Ave. S and 179.26 frontage feet along the north side of Pine Street. The adjoining properties, as well as the neighborhood, consist of single family residences on similar size lots. 0 M M 0, 0 0 C: The subject property contains mature trees, shrubs, and lowland grassy -49 M areas. The property is moderately sloped (less than 14%), and drains M Z southwesterly to the existing wetland. C 2 X C0 -n EVALUATION: Visual assessments of the property at the N.E. corner of 8 1h Ave. S and Pine Street revealed no evidence of any geotechnical distress. No slides, no settlements, no creep, nor any significant erosional degradation were observed. This engineer has considerable experience in the immediate vicinity and understands the foundation subgrade conditions. Experience has proven that the subgrade soils are fully capable of properly supporting the proposed 8 new single family residences. This engineer evaluated the 8" Ave. S & Pine Street property on July 1, 2004. Significant clearing, grading, and drainage work had already occurred. (see photographs). The S.W. corner of the property is understood to be designated a W-Z., in accordance with drainage plans by Donna Breske, P.E. The utility work has exposed a large number of "soil test trenches" throughout the property. Subgrade conditions were uniform. 0 -8" "Former" grasses, roots, organic silt (removed as of July 1, 2004) 8"-16" Sandy loam, medium dense 16"-4' Dense to very dense slightly sandy SILT.- M M —0 0 0 M Cn (1) Q 0 Z 71 Z X Z 0 0 M Michel Construction, Inc. / 81n Ave. S & Pine Street Page three Ground water was present in the southern portion of the property. See photographs. This engineer has reviewed drainage plans by Donna Breske, P.E. and concurs with the system of drains and detention for geotechnical integrity. The very dense subgrade soils will provide excellent foundation bearing with proper drainage controls. CONCLUSIONS / RECOMMENDATIONS: Based on the findings of this investigation, and experience with similar sites in the area, the property at 8 1h Ave. S and Pine Street is geotechnically approved for the proposed Michel Construction 8 lot S.F.R. development, subject to the following: Standard reinforcing continuous and spread footings. Allowable bearing pressure: 2,000 p.s.f. Equivalent fluid pressure of 35 p.c.f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. Geotechnical inspection by this engineer prior to any foundation concrete placement. The proposed structures can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of Z 0 q 0 M —i -n r1i C M 0 0 O-C M M Z 10-4 > Z C/) 0 -n n M M 0 @) 0 r- 0 M C Cl) C 0) M 0 Z 7-1 X X Z --I Z 0 1 0 M Michel Construction, Inc. / 8 Ih Ave. S & Pine Street Page four eighteen (18) and twenty-four (24) inches, respectively, and should be bottomed rf at least eighteen (18) inches below the lower adjacent finish ground su ace. Depending on the final site grades, some overexcavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over excavated hole, the width of the overexcavation at the bottom must be at least as wide as the sum of two times the depth of the overexcavation and two feet below the the footing width. For example, an overexcavation extending bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of two thousand (2,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above -construction settlement of footings design criteria, it is anticipated that total post founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Design Value Coefficient of Friction 0.55 Passive Earth Pressure 350 p.c.f. Where: (1) p.c.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. z 0 A 0 M -4 -n 0 M C M 0 0 --I (-) 0 M M z V) o -n n M M 0 �5 0 r- 0 M Cn M 0 Z z C/) z 0 1 0 M 1h Michel Construction, Inc. 8 Ave. S & Pine Street Page five A safety factor of at least 1 .5 is recommended for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE: Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided these soils can be recompacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height which restrain level backfill: Parameter Design Value Active Earth Pressure* 35 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. Where: (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot deflect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). z 0 M Michel Construction, Inc. 8 1h Ave. S & Pine Street Page six The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at z 0 least 1.5 for overturning and sliding. __4 0 M The above design values do- not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be 0 M C placed *above the walls. If these conditions exist, then those pressures should be M 0 added to the above lateral pressures. Also, if sloping backfill is desired behind 0 0 the walls, then we will need to be given the wall dimensions and slope of the C: backfill in order to provide the appropriate design earth pressures. M M Z 10--i Heavy construction equipment should not be operated behind retaining C and I foundation walls within a distance equal to the height of the wall, unless the 9; Cn walls are designed for the additional lateral pressures resulting from the be 0 -n n equipment. Placement and compaction of retaining wall backfill should - X accomplished with hand -operated equipment. rn M 0 0 Retaining Wall Backfill 0 M C: Cn Backfill placed within eighteen (18) inches of any retaining or foundation Cn M 0 Z walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles X > z passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the z 0 retaining walls. The drainage composites should be hydraulically connected to i the foundation drain system. the purpose of these backfill requirements is to 0 M assure that the design criteria for the retaining wall as not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. Michel Construction, Inc. 8" Ave. S & Pine Street rcty� Oqvvu" EXCAVATION AND SLOPES: In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavatio.;. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 1:1 (H:V). It is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch - minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. Z 0 0 M Cl) Om C M 0 0 0 0 C MM M Z r'.) -i I I C _Z F— -4 0 M -4 rn M 0) 0 r- 0 M C 0) 9 Cf) Q 0 Z Z Z 0 0 M E, Michel Construction, Inc. 8" Ave. S & Pine Street Page eight GENERAL EARTHWORK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and Z cleared of all surface vegetation, all organic matter, and other deleterious 0 4 material. The stripped or removed materials should not be mixed with any 0 materials to be used as structural fill. Structural fill is defined as any fill placed under the building, behind 0 permanent retaining or foundation walls, or in other areas where the underlying M C 0 soils needs to support loads. This engineer should observe site conditions M 0 -10 during and after excavation prior to placement of any structural fill. 0 C M All structural fill should be placed in horizontal lifts with a moisture content M Z JO at or near the optimum moisture content. The optimum moisture content is that Z moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled ca o -n during the filling and compaction process. -n The allowable thickness of the fill lift will depend on the material type, M M Cn compaction equipment, and the number of passes made to compact the lift. In 0 0 M no case should the lifts exceed twelve (12) inches in loose thickness. The C Cn 9 Cn following table presents recommended relative compaction for structural fill: Q 0 Z Location of Fill Placement Minimum RelativeCompaction Beneath footings, slabs or walkways 95% Z Behind retaining walls 90% CD Z Beneath pavements 95% for upper 12 0 i 0 inches of subgrade, 90% below that level M Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site Soils If grading activities take place during wet weather, or when on -site soils are wet, site preparation costs may be higher because of delays due to rains and Michel Construction, Inc. / 8" Ave. S & Pine Street Page nine the potential need to import granular fill. The on -site soils are generally silty and thus are moisture sensitive. Grading operations will be difficult when the moisture content of these soils exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and 19pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill which is to be placed in wet weather should consistof a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials is segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: The overall property at 8 1h & Pine contains upslope seepage. The road (8'h Ave. S.) has created a long term historical "dam". Thus, the SW corner of the property has become a man-made "moisture -zone". Drainage plans by Donna Breske, P.E. have incorporated intercept drains, tightlines and detention/ orifice mitigations. Geotechnically, this engineer will provide onsite inspections to verify proper foundation subgrade conditions exist prior to any concrete placement. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. INSPECTION: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: Z 0 A 0 M --I -n M 0 0 0 0 M M Z o -n n MM a 0 0 M C cl) 9 CO) M 0 Z X --I 3: Z --I 3: 55 Z 0 1 0 M 9 Michel Construction, Inc. 8" Ave. S & Pine Street Page ten Soil cuts Foundation subgrade verification Retaining wall, or rockery placement Any fill placement z 0 Subsurface drainage installation 0 Tempora[y and final erosion control measures. SUMMARY: The proposed Michel Construction 8 lot SFR project at 8 1h & Pine Edmonds, is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspection during construction. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. r Geotechnical /Civil Engineer --- I - I IN-- - M = Dennis M. Bruce, RE. M. S. C. M� B. A. Geotechnical /Civil Engineer December 30, 2004 City of Edmonds 121 5 1h Ave. N. Edmonds, WA 98020 Subject: Field Reports / Geotechnical 11n1pections; Michel Construction Project 8 th and Pine 8 New Residences RECEIVED JAN G 120-95 ENG1NEEP,1t1(,j- [)ly1,cJ%l01q This engineering report presents the results of ongoing geotechnical inspections for the 8 new homes constructed by Michel Construction at 8 th and Pine. REFERENCES: 0 City of Edmonds approved project plans 0 Geotechnical reports by D. Bruce, P.E. July 2, 2004 0 Previous inspection reports 0 Photographs INSPECTIONS: This engineer has provided and continues to provide onsite geotechnical inspections as required by City of Edmonds authorization. Fine St. (2004-0697): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly. placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 959 8"' Ave. S. (2004-0709): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approve through this date (December 30, 2004). SOILS - FOUNDA RONS - SITE DEVELOPMENr - INSPECTION - DRAINAGE - DESIGN & PERMIr - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 9 0 M -i -n Cn --i 3: M C M 0 0 --10 0 C --4 K 3: rn rn z Cn 0 -n n --I M M 0 U; r- M Cn Cn Q 0 Z 3: Z --I 3: W Z 0 i 0 M I City of Edmonds December 30, 2004 Page 2 of 3 953 Qt' Ave. S. (2004-071 U Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). 945 81h Ave. S. (2004-0712): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 933 8" Ave. S. (2004-0710): Subsurface soil bearing previously verified a nd approved. Foundation installation, subsurface drains, and site grading appro Ih through this date (December 30, 2004). 925 8 Ave. S. (2004-0698): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 921 8 Ih Ave. S. (2004-0713): This engineer verified proper placement of structural fill material atop the dense native soils. As previously verified, the dense native soils easily provide a minimum of 2,000 p.s.f. bearing capacity. Contractor chose to place rock as an improved sub -grade material. Placement of structural fill and compaction were inspected and are geotechnically approved. This engineer verified proper placement of subsurface drainage in accordance with approved plans and good practices. Z 0 1 0 M C M 0 0 0 C M M Z 10--i CD 0 n M M 0 C-0 0 r- 0 M C/) C/) M 0 Z M Z Z 0 i 0 M Ll City of Edmonds December 30, 2004 Page 3 of 3 915 8" Ave. S. (2004-0714): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading gppLo_ved through this date (December 30, 2004). SUMMARY: z 0 Ongoing geotechnical inspections verified proper foundation, drainage, 0 M and rockery work through this date (December 30, 2004). d to this site or neighboring CO --I No adverse geotechnical impacts have occurre properties as a result of the construction activities. 0 M C M 0 0 --10 All geotechnical aspects are approved through this date (December 30, 0 2004). x M M z Geotechnical inspections ongoing as required by City of Edmonds. C z If there are any questions, do, not hesitate to call. 0 -n n M M M V WAS$,." 0 -0) 0 0 M C/) co, M 0 Z X Dennis M. Bruce, P.E. > Geotechnical Civil Engineer z JUMES 12123/ co C.C. Michel Construction Inc. z th St. SW 0 7907 212 #102 Edmonds, WA 98026 M DMB:jpb Dennis M. Bruce, P.E. Ge t hnical/Civil Engineer M. S. C. E., M. B. A. City of Edmonds 121 5 1h Ave. N. Edmonds, WA 98020 September 29, 2004 INS DIVISIO" Subject: Field Reports / Geotechnical Insme—ctions �-81h ---- Michel Construction Project and Pine-) 8 New Single Family Residen�-es This report presents the ongoing results of geotechnical inspections for the 8 new residences at 8�h and Pine (by Michel Construction Inc.). REFERENCES: 0 Geotechnical report by D. Bruce, P.E. July 2, 2004 0 City of Edmonds approved project plans for 8 new residences 0 Inspection authorization by City of Edmonds 0 Construction photographs BACKG_ROUND: Michel Construction has received permits for the construction of 8 new residences at the northeast intersection of 8 th Ave. and Pine St. This engineer prepared a geotechnical report dated July 2, 2004 with criteria for foundation work, excavation, and rockeries. Excavation for the project began in August of 2004 (see photographs). This engineer provided daily onsite inspections during periods of active excavation and foundation work. .0714): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SOILS . FOUNDArIONS - SlrEDEVELORMENr , INSPEcrloN - DRAINAGE - DESIGN & PERml r , L EGA L P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 0 1 0 M --I -n C M -40 0 0 im M M Z 3: En o -n -n 4 3:9 M M 5) 0 r- 0 M C C/) 9 Cn M 0, Z X Z X Z 0 0 M City of Edmonds September 29, 2004 Page 2 of 3 921 8" Ave. S. (2QQ4-0_7131: All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approvari plans. 925 81h Ave. S. (2004-0698): All excavation stable and approved. Soil bearing of 2,000 p-s-f. verified. "OK to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approvari plans. 933 8�h Ave. S. (2004-0710):�All excavation stable and approved. Soil rified. "OK' to proceed with foundation formwork, bearing of 2,000 p.s.f. ve ement per City of Edmonds approvari reinforcing steel, and concrete plac plans. 81h 0 945 Ave. S. (?004-0712): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 0 953 81h Ave. S. (2004-07111: All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 959 81h Ave. S. (2004-0709): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 821 Pine St. ( 004-0697): All excavation stable and approved. Soil bearing of 2,000 p-s-f- verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SUMMARY: Geotechnical inspections verified proper work through this date September 29, 2004. 0 The excavations for all 8 lots are stable and approved. z 0 4 0 M --I -n in- M M 0 --10 0 C M M Z C -Z C) 0 n M M U) 0 r- 0 M C CI) 9 C/) M 0 Z r- > z --I M C/) z 0 0 M 0 City of Edmonds September 29, 2004 Page 3 of 3 0 Foundation bearing for all 8 residences was verified and approved for foundation placement. 0 Geotechnical inspections ongoing as required by City of Edmonds. z IT! If there are any questions, do not hesitate to call. WAS 0 M z S C > Dennis M. Bruce, P.E. ONA1. Geotechnical Civil Engineer 0 -n M M C.C. Michel Construction Inc. 7907 212" St. SW #102 0 M C COI Edmonds, WA 98026 C ly M 0 DMB:jpb X z 0 IT! I Dennis M. Bruce, RE. M. S. C. M. B. A. Geotechnical /Civil Engineer September 29, 2004 City of Edmonds 121 51h Ave. N. Edmonds, WA 98020 I I ections Subject: Field Reports Geotechnica pkp-,�Q—t Ct 4 8th and Pine) Michel Construction Proje 8 New Single Family Residences This report presents the ongoing results of geotechnical inspections for the 8 new residences at 8 �h and Pine (by Michel Construction Inc.). REFERENCES: 0 Geotechnical report by D. Bruce, P.E. July 2, 2004 0 City of Edmonds approved project plans for 8 new residences 0 Inspection authorization by City of Edmonds 0 Construction photographs BACKG_ROUND: Michel Construction has received permits for the construction of 8 new residences at the northeast intersection of 8 th Ave. and Pine St. This engineer prepared a geotechnical report dated July 2, 2004 With criteria for foundation work, excavation, and rockeries. Excavation for the project began in August of 2004 (see photographs). This engineer provided daily onsite inspections during periods of active excavation and foundation work. 915 Rth Ave. S. (2004-0714): All excavation stable and approved. Soil bearing of 2,000 p-s-f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SOILS - FOUNDA7-10NS . SITED I EVELOPMENT - INSPECTION - DRAINAGE , DESIGN& PERA417- - LEGAL P.O. Box 55502 a Shoreline, WA 98155 * (206) 546-9217 * FAX (206) 546-8442 Z 0 i 0 M --I -n M M 0 --10 0 C: --i M M M M Z JO -4 C 3: Cn 0 -n n M M 0 0 0 M C: cl) 9 Cn Q 0 Z Z 0 Z 0 i 0 M 9 City of Edmonds September 29, 2004 Page 2 of 3 921 8" Ave. S. (2004-0713): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 925 81h Ave. S. (2004-0698): All excavation stable and approved. Soil bearing of 2,000 p-s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 0 933 8 th Ave. S. (2004-0710): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 0 945 8" Ave. S. (2004-0712): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 0 * 953 8 Ih Ave. S. (2004-0711 All excavation stable and approved. Soil bearing of 2,000 p-s-f- verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans, 959 81h Ave. S. (2004-0709): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 821 Pine St. (2004-0697): All excavation stable and approved. Soil bearing of 2,000 p-s-f. verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SUMMARY: Geotechnical inspections verified proper work through this date September 29, 2004. 0 The excavations for all 8 lots are stable and approved. z 0 1 0 M --i -n 0 M C M 0 0 0 M M Z JD --I C —Z 0 -n n 0 0 M Cn M 0 Z .A� ;U --I M z CI) z 0 1 0 M City of Edmonds September 29, 2004 Page 3 of 3 Foundation bearing for all 8 residences was verified and approved for foundation placement. Geotechnical inspections ongoing as required by City of Edmonds. z 0 0 M If there are any questions, do not hesitate to call. M. 0 M I WAY11 C M 0 0 3: M M Z -CIM C= Dennis M. Bruce, P.E. > ONA E: al Civil Engineer Geotechnic CD 0 -n M M C.0 Michel Construction Inc. 0 7907 212 th St. SW #102 0 0 M Edmonds, WA 98026 C (n 9 Cn M Z DMB:jpb z 3: CO z 0 0 M Dennis M. Bruce, RE. M. S. C. E., M. B. A. Geotechnical /Civil Engineer December 30 2004 f" i" ')nn ENGMIEEPftlo City of Edmonds 121 5t' Ave. N. Edmonds, WA 98020 Subject: Field Reports Geotechnical I isDections 78h Michel Construction Project �an:d P =in5e 8 New Residences This engineering report presents the results of ongoing geotechnical inspections for the 8 new homes constructed by Michel Construction at 8 th and Pine. REFERENCES: City of Edmonds approved project plans Geotechnical reports by D. Bruce, P.E. July 2, 2004 Previous inspection reports Photographs INSPECTIONS: This engineer has provided and continues to provide onsite geotechnical inspections as required by City of Edmonds authorization. Pine St. (2004-0697): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 959 8" Ave. S. (2004-0709): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). SOIL S - FOUNDA TIONS - S1 TE DE VEL OPMEN T' - INSPEC TION - DRA INA GE - DES16N & PERW T' - L EGA L P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 0 A 0 M -n M ma 0 0 C: M M Z _Z o -n n� M M 055 0 r- 0 M C cl) 90) Q 0 Z 71 Z --I a: W Z 0 i 3 M City of Edmonds December 30, 2004 Page 2 of 3 * 953 8" Ave. S. (2004-0711): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). * 945 8 Ih Ave. S. (2004-0712): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 0 933 8 Ih Ave. S. (2004-0710): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). th 0 925 8 Ave. S. (2004-0698): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 921 8" Ave. S. (2004-0713): This engineer verified proper placement of structural fill material atop the dense native soils. As previously verified, the dense native soils easily provide a minimum of 2,000 p.s.f. bearing capacity. Contractor chose to place rock as an improved sub -grade material. Placement of structural fill and compaction were inspected and are geotechnically approved. This engineer verified proper placement of subsurface drainage in accordance with approved plans and good practices. Z 0 1 0 1� 0 M C M 0 0 0 0 C --j K M M M Z jo --I C _Z CO o -n n M M 0 V5 0 r- 0 M C C/) 9 co M C.) Z M Z Z 0 i 0 M City of Edmonds December 30, 2004 Page 3 of 3 915 8" Ave. S. (2004-0714): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). SUMMARY: • Ongoing geotechnical inspections verified proper foundation, drainage, and rockery work through this date (December 30, 2004). • No adverse geotechnical impacts have occurred to this site or neighboring properties as a result of the construction activities. • All geotechnical aspects are approved through this date (December 30, 2004). • Geotechnical inspections ongoing as required by City of Edmonds. If there are any questions, do riot hesitate to call. I �F. sot Dennis M. Bruce, P.E. - - I - Geotechnical / Givil Engineer LetPWS 12/23/ 6 oai�j C.C. Michel Construction Inc. 7907 212 1h St. SW #102 Edmonds, WA 98026 mmo-ol z 0 0 M C M 0 --I (-) 0 C M MZ C z 0 -n M M 0 —U) 0 r- 0 M C C0 C C/) Q 0 Z 71 > z --i x 0) z 0 4 0 M =I Height Calculation Worksheet V33 -9` Address: C Date: InVector(s): 1. Datum Point: S E 2. Datum Point Elevation: 3. Avera'geGrade: 4. Maximum Elevation Aflowed: )L(,, 4,!5 veragib &ade)41 25 5. Reference Point Elevation Shot to House: X411. (datum elevation) + RA (grade to transit level line shot to house) 6. Measurements from line shot onto house to i-dof ridge:' T,3 -1.5 I TOW 7. Actual Elevation: 2 r-jq,89, (reference point elevation) +;11,ils (measurements from #6) 0 Ct!S Conclusion: ej it,- Ocjs_ (actual) is gjreaterlfe—slsthan;�,I 1, 5 (allowed); therefore the house is/ is not over the height requirement per ECDC 16.20-30 requirements 0 0 M Mar 28 06 09:31a D. Bruce, P.E. 206-546-8442 P.1 Dennis M. Bruce, P.E. M. S. C. M. B. A. Geotechnical /Civil Engineer March 25, 2006 City of Edmonds 1h 121 5 Ave. N Edmonds, WA 98020 FINAL Report - Geotechnical Inspections Subject: Michel Construction, Inc. 8 Now Homes 8th and Pine, Edmonds, Washington 915 8th Ave. S I Permit No. 2004-0714 945 8th Ave. S I Permit No. 2004-0712 953 8"Ave. S / Permit No. 2004-0711 921 8th Ave. S I Permit No- 2004-0713 -0709 th 959 e Ave. S / Permit No. 2004 925 8 Ave. S I Permit No- 2004-0698 933 81h Ave. S / Permit No. 2004-0710 -0213 (final report submitted June U, 2005) E121 Pine St I Permit No. 2004 This engineering report presents the final results of ongoing geotechnical th and Pine in inspections for the 8 new homes constructed by Michel Construction at 8 Edmonds, Washington. NOTE: Final report dated June 14, 2005 completed inspections at 821 Pine St. REFERENCES: a City of Edmonds approved Project Plans ion reports by D. Bruce, P.E. * Geotechnical and inspect 0 Site photographs INSPECTIONS: This engineer provided on -site geotechnical inspections as required by City of Edmonds in accordance with special inspection agreements. Geotechnical inspections occurred gggy during key aspects of excavation, foundation preparation, fill placement, and grading activities. subsurface drainage, rockery construction The following summaries refer to all 7 homes listed above (821 Pine St. already completed). Excavations: The excavation for all 8 homes encountered dense native sub - grade soils as anticipated by the geotechnical investigation and report. RECEIVED SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN A PERZIT - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FA I)EVELOPMENT SERVICES CTF;. CITY OF EDMONDS z 0 A 0 M W Mar 28 06 09:31a D. Bruce, P.E. 206-546-8442 p.2 City of Edmonds Re: Michel Construction, Inc., March 25, 2006 Page 2 All excavations were stable and are approved. a Soil Bggn �ng: This engineer verified dense native sub -grade soils easily providing 2,000 p.s.f. bearing capacity. Subsequent foundation formwork reinforcing steel and concrete placement occurred in accordance with City of Edmonds approved Plans and good practices. Approved. 0 Fill Material: No significant quantities of fill material were required for geotechnical purposes. Contractor brought in localized amounts (less than 10 cubic yards per lot) and placed as a sub -base in order to optimize foundation formwork procedures. All placement of fill material is in accordance with this -- engineer's geotechnical inspections. Approved. Rpf keiy Construction: This project required a number of rockeries both between lots and at the up -slope east portion of the project (see Project Plans and photographs). -grade This engineer _vedfied the following: Base rock embeddment in dense sub soil, rock linkage, rock size, rock chinking, drainage zone, face batter, and final "blending in" with existing grades. All project rockeries comply with approved Project Plans, this engineer's on -site recommendations and normal good practices. All rockeries are approved as constructed. Subsurface Drainage: This engineer inspected and verified placement of subsurface drains in accordance with City of Edmonds approved Plans and good practices. All subsurface drainage is geotechnicallyap _ pEoved. Erosion Control: Contractor properly established temporary erosion control measures consisting of: Rocked construction entrance, siltation fencing, straw bales as required, inlet catch basin filter socks, and diligent. cleanup. All temporary erosion control measures were properly maintained throughout the project. Permanent Erosion Control Measures: Perm'anent erosion control measures have been properly established for the entire 8-home project: Final surficial grading has been completed, all driveways have been paved, rockedes completed, landscaping consisting of lawn, shrubbery and small trees have been properly installed. Additionally, the native growth zone at the southwest portion of the overall property appears to comply with City of Edmonds approved Plans. Z 0 1 0 M P.E. 206-546-8442 P.3 Mar 28 06 09:31a D. Bruce, City of Edmonds Re: Michel Construction, Inc. March 25, 2006 Page 3 installed. There are no All permanent erosion control measures have been rth surfaces on the project. Approved. geotechnical instabilities or exposed ea SUMMARY: z 0 s have been properly completed, a All special geotechnical inspection item 01 M including permanent erosion control measures. by D. Bruce, P.E. 0 This report completes the geotechnicai inspections 0 If there are any questions, do not hesitate to call. M C rn 0 0 00 C rn M Z C z C/) 0 17405 -n -n ONA16 Dennis M. Bruce, P.E. M M Geotechnical Civil Engineer 0 0 M C 0) DMB:abj C ch M 0: cc: Michel Construction, Inc. Z 3: z CO z 0 0 M QEagle Eye Consulting Engineers PO BOX 523 Olalla WA 98359 C:206 356-7790 P:253 857-4939 MICROFILM August 18, 2004 0 To: Michel Construction 0 7907 212 SW 9102 M, Edmonds, WA 98027 Re: Michel Single Family Home M C 959 8" Ave M a 0 to Edmonds, Washington 98026 -40 0 C -4 C :3: M, M z EECE # ED04-08 C —z -261 > Client's Reference Nurnber# 04 IAQC This project is approved for " Architectural, Structural, Plumbing, Mechanical, V co, 0 -n and Energy " Permit only. The drawing review has been completed and accepted for n permit with the Approved Stamped drawings returned to the City of Edmonds on August m rn 18,2004. Cn 0 0M t, Fire C CD Your plans are being reviewed concurrently with the Building Departmen co Department, Zoning Department and Public Works Engineering. Changes, clarifications M 0 :�zr nt plan or additional corrections may be required subsequent to the Building Departme review, when comments are received from the other concerned departments. z Should you have any inquiries regarding this letter, please Hoyt Jeter at (253) 857-4151 Cn between 8:00 am and 5:00 pm. z 0 _4 M City of Edmonds By: fiooyt J(Aer, PJ/ President FINNL'' ORM PROJECT. A' PP TO: DATE. `.`-��MEMO To:,,.�:.PERMIT C OORDINATOR: BU ILDING DIVISION FIRE DEP rmrz T DATE M: AW _N MX&SE SIGN z 14, NGINEERJNG DIVISION,PAT—E ?LrA.Sr SIGP PLANNING' DIVISIO N'DATE -n OLE.Asli Cm .Sl rn M TI: 0 m C) 0 c: 7777= 8 INSPECTED M M Z .;�DATE c: —Z D E S RIP` ION. 017� WORKTO BE, INSPECTE C T D _n �A, field i fion -was -,conducte �'to., etermine,complialled wit ��app �P,!! nspec I' -n;u S 10 t .,uw,��vibj t' Ar.Onl.,J t6 aboVe sig ed - Department to!.,thc e, f hat, theee are A 10US.., n M M 40C PERF ORMANCE BONDS. -and th'. egraptifig o cl) m c: c/) 9 cn m RANTTINALTROJE CYAPPROVAL z m m z `i'­:GRAW��jkoj8dt APPROV,AL WIT-11CONDITIONSN6TED U) .;::C6p Of CON DITJ[ONS:�'­0!; p ctor: P'l t z m INSPECTION JSSM1 S:�. Aiy�bf'CQRREi CTIONIN z.'.' E.7given to�owiierl�'c'oiitr*al"b"t*"o"t,b.y''.,i", A!_ -3 D,OUTSTtANDING� ISSUE 6kA -INAL PR0JEC-T'APPR( At SPPICITTE S 8ignature N r4 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED -04( SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... 77 J Pier/Porch ................. Retaining Wall ........... Slab insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... _MT Gas Piping ................. MT Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... fv\'S FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... T_ SPECIAL INSPECTION ... VA MISCELLANEOUS .......... - 6(4" FINAL APPROVAL FOR I�T OCCUPANCY .................. Side Sewer q V00-- AmoutPaid$ Receipt t5q3ce DateLsSued-<27119105- r,.xpires 001(JCA- U WaterMeterSize Amount Pafd-)Y-0-�_ Receipt fka"2�& Date Purchased ROW 'I'lic iiiiti,,ils NTF zire Miltoil m o u n It Pa! d $ t 1; 'I'llollipsoll"I tellipon'll'), coiitl*,Ict illspector .1,01- tile City. I Daie z 0 11 0 M ­4 -n M M 0 —40 0 C --i K 2: M M Z JO -4 C Cn 0 -n n MM 0 0 0 M C cl) 9 Cn Q 0 Z z Cn z 0 1 0 171