Loading...
20040712.pdf9 DATE RECEIVEO� 2 PERMIT EXPIRES T USE PERMIT CITY OF EDMONDS ZONE N U M B E R 71,_�2- CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS 21 �?� � M A.� 0 NER NAME/NAME OF BUSINESS PLAT NAME/SUBDIVISI LOT NO. LID NO ON NO. M CA\141 r �e W MAILING ADDRESS 1-4 z 5 LID FEE S IESCP Approved PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP AW Permit Required 2a2c-a- ( -() 2— 1 Use Permit Roq'd 13 CITY stroo ZIP TELEPHONE EXISTING — PROPOSED Inspection A q ired Sidealk Relolu:'Iod REQUIRED DEDICATION FI underground 22-11 wiring roquired [3 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED NO Lu hW 4 1 1 Lu M ADDRESS z REMARKS z OWNER/CONTRAcroR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 2P z cc —3qL] zi ;r CITY ZIP ELEPHONE )(24= cs ei� c r Ii r) Cs) elr('071 NAME CBL# F& Ak L LAIJ GINEERING REVIEWED BY DATE ADDRESS 0 tA_ 0 717- FIRE REVIEWED BY DATE ul FE CITY ZIP TELEPHONE Ir 0 1 ­7-7�0-2;2jj ic VARIANCE OR CU SHORELINE OR ADB# INSPECTION BOND STATE LICENSE NOMBER ERPIRATION DATE CHECKED BY REOV/ POSTED r _� a - ' ES PQ S — 1"`�t I (+t 5 _t) I F)�� A 4.lrl SEPA REVIEW SIGN AREA Ely HEIGHT PROPERTY TAX ACCOUNT PARCEL NO COMPLETE EX ED EMPT ALLOWED PROPOSED ALLOWED PROPOS C-A _­ 1 '2 L "I .. 11, Z.A EXPW/031 F =4 LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBA(;I(S (F-1 vj NEW RESIDENTIAL PLUMBING / MECH ) r A ALLOWED. PROPOSED /VFF!qWS qfl;�E67 �tzi�RSARIA El ADDITION COMMERCIAL COMPLIANCE OR 3 q a/v 5 /" r x z CHANGE OF USE 15. 57. 15 � 5- , i 5 , I I z PARKING LOT AREA PLAMNIN6 RjEMVIEWY DATE REMODEL MULTIFAMILY SIGN REO'D I PROVIDED REPAIR G CYDS FENCE �k _)", I X Fn REMARKS OTHER DEMOLISH 13 TANK E] GARAGE RETAINING WALL FIRE SPRINKLER z yCA CARPORT ROCKERY FIRE ALARM 0 (TYPE OF UaE. BUSINESS OR ACTIVITY) EXPLAIN: CHECKED BY 7P SYUICTION C�OZZ OCCUP T S L) NO U I E5 ef-\-0 \ t ��( GRO NUMBER OF CRITICA-L im Lu NUMBER C W1 OF OWELLIN AREAS SPECIAL INSPECTIO� AREA OCCUPANt 0 STORIES UNITS NUMBER :z- I REQUIRED YES LOAD DESCRIBE WORK TO BE DONE REMARKS 0 z PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 5 1\ �A 1, \ /'A 1 1 A­!5 . r5' & h /,-\k M - - — I =! At-:306 ' - I A A L,, 2 i—T-rt-l" h 1 -1 J^= Vl\/1-3 0114­'V!:� F r--tr f VALUATION $ L j?l Description FEE Description FEE Plan Check State Surcharge 7 HEAT %)URCE GLAZII`jG LOT SLOPE % 4�;AA/ Building Permit City Surcharge "ECK NO: VESTED DATE/ ('2 Plumbing Base Fee v4rn Mechanical 701 M cc Ld 0. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK To BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Grading Engr. Review PERMIT APPLICATION: 180DAYS PERMIT LIMIT., I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection cn 'APPLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INI­ERE�T, AGREES rO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENI"S FROM ANY AND Fire Inspection Receipt # ALL CLAIMS FOR DAMAGES OFWHATEVER NATURE. ARISING DIRECTLYOR INDIRECILY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF 1HIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due NOR LIMIT IN ANY WAY THE Cl rYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- T his application is not a permit until signed by the TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASIIINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided WORKMEN'S COMPENSATION INSL?4A�CE AND RCW 18.27. 1 QFFI 'IGW 1�f DATE (OWNER OR DArE SIGNED (425) Lmmi :-'V7111z - I S?r 0 771-0220 REI JSF BY D E A "rf 4VN EXT 1333 E14 //J) 1w IT IS UN LA FU L TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL AVLILE - YELLO�_ A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- OR'IGIN vFINSPECTron I N CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 PINK - NER COLD - ASSESSOR 09;03 PRESS HARD -YOU ARE MAKING 4 COPIES z 0 M —11 -n 0 M C M 0 0 0 C —i K M M M Z .0 C 0 -n n M M 0 0 0 M C C/) MCI) M 0 Z z z 0 I 0 171 I Gi 0- 0- I W '�—E�R& S INSPECTIONS 0 ' N "blUu. y- R=20.00, o'0' 7 0 .001 No FIT�i N -77 AVE. GRADE 160.45' B.271-00, C. 2 13' D - —r-) - 8 (y 0 .14 = 26-5.25' 290.25' H01 ACTUAl- HEIGHT: 1-90-17' OT--2 F(-)(-)TliNC,= 25(-.,.00' 260-00' ISTFI-. =270.00' IPERVIOUS AREA -------- I I N c BUILDING: 2,631.50 SQ. FT. DRIVEWAY: 1,62933 SQ. FT. PATIO: 32.00 SQ. FT. L DECK: 71.21) SQ. FT. 'Q I-OT covE-RAGE: 2,064.00 / (-,,001.02 = 34-4'.';� -107-3250-0217-701) PTA. FILTER FENCE IMICHEL CONSTRUCTION, INC 94- 8TH AV E 'c- E Z' I -CA) at S' t �J�ATE lvdn- 6"J 5dats-�" ad Other BY ENI INEERING ,Z— WOOD FENCE 26(2 0 265bate- ,n ulTY COPY p F- 0 Aru EXCEPTION t im RECEIVEr J U N 3 It' 2,c'(1,4 BUILDING il' CITY OF 'o u L TJG A G PLAN- N 0- -R -D-IN LE: V = 20'-O!l z 0 i 0 m --i -n M c M 0 0 0 c: M M Z 1c) --I . I c 'cn' o -n n MITI 0 —cn 0 r- 0 m c (n k cn M 0 Z M > z cn z 0 i 0 m K, Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical/ Civil Engineer July 2, 2004 RECEIVED z JUL - 6 2004 M Mr. Rob Michel PERMIT COUNTER Michel Construction, Inc. 7907 - 212th Street S.W. #102 M C Edmonds, Washington 98026 rT, 0 0 Subject: Geotechnical Evaluation "Soils Report" 0 0 C Prop osed (2) 4 Lot S.F.R. Development M M z 811 Ave. S & Pine Street, Edmonds, Washington C z > Cn This engineering report presents the results of a geotechnical evaluation 0 -n of the property at the N.E. corner of 8h Ave. S. and Pine Street Edmonds, n Washington, with respect to the proposed 8 lot development. This evaluation M M was required due to owner developer concerns, as well as City of Edmonds 0 requirements. o M C (1) 9 C/) M 0 Z REFERENCES: Survey by L.S.A. > z Location map Site plan CD Project drainage plan by Donna Breske, PE 101% Py z CITY CU.- 0 Photographs M BACKGROUND: The proposed eight lot project, to be constructed by Michel Construction, Inc., will occupy the majority of the overall property, with access drive to 7 lots off 81h Ave S. SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 I Michel Construction, inc. 8 Ih Ave. S & Pine Street Pagetwo CHARACTERISTICS: A survey of the subject property was conducted on June 12, 2004 by Z 0 L.S.A. The property is rectangular, and consists of approximately 62,510 -4 frontag e feet along the east side of 8" Ave. S and 179.26 frontage feet along the 0 M north side of Pine Street. The adjoining properties, as well as the neighborhood, consist of single family residences on similar size lots. M The subject property contains mature trees, shrubs, and lowland grassy MO. 0 0 0 areas. The property is moderately sloped (less than 14%), and drains C southwesterly to the existing wetland. M M Z C Z > EVALUATION: r CD Visual assessments of the property at the N.E. corner of 8 Ih Ave. S and 0 n -n Pine Street revealed no evidence of any geotechnical distress. No slides, no M M settlements, no creep, nor any significant erosional degradation were observed. 0 0 This engineer has considerable experience in the immediate vicinity and 0 M C Cn understands the foundation subgrade conditions. 9 (D M 0 Z Experience has proven that the subgrade soils are fully capable of properly supporting the proposed 8 new single family residences. > This engineer evaluated the 81h Ave. S & Pine Street property on July 1, Z 2004. Significant clearing, grading, and drainage work had already occurred. (see photographs). Z 0 q The S.W. corner of the property is understood to be designated a W.Z., in 0 M accordance with drainage plans by Donna Breske, P.E. The utility work has exposed a large number of "soil test trenches" throughout the property. Subgrade conditions were uniform. 0 -8" "Former" grasses, roots, organic silt (removed as of July 1, 2004) 8"-16" Sandy loam, medium dense 16"-4' Dense to very dense slightly sandy SILT. - I 1h Michel Construction, Inc. 8 Ave. S & Pine Street Page three Ground water was present in the southern portion of the property. See photographs. Z 0 This engineer has reviewed drainage plans by Donna Breske, P.E. and -4 concurs with the system of drains and detention for geotechnical integrity. 0 The very dense subgrade soils will provide excellent foundation bearing rn with proper drainage controls. 0 M C M 0 0 0 C CONCLUSIONS RECOMMENDATIONS: M M Z Based on the findings of this investigation, and experience with similar C Z sites in the area, the property at 8" Ave. S and Pine Street is geotechnically approved for the proposed Michel Construction 8 lot S.F.R. development, q -n n subject to the following: M M Standard reinforcing continuous and spread footings. Allowable bearing 0 pressure: 2,000 p.s.f. 0 M C Cn 9 CD "ixinlpnt fl"iri nrPQzure of 35 n c f is recommended for anv retainina Q 0 Z wall design provided drainage zone is inspected and verified by this engineer. For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. Geotechnical inspection by this engineer prior to any foundation concrete placement. The proposed structures can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of W t ;U Z X V) Z 0 i 0 M I a Michel Construction Inc. 8" Ave. S & Pine Street Page four eighteen (18) and twenty-four (24) inches, respectively, and should be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. Depending on the final site grades, some overexcavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over excavated hole, the width of the overexcavation at the bottom must be at least as wide as the sum of two times the depth of the overexcavation and the footing width. For example, an overexcavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of two thousand (2,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in -half inch, with differential settlements on the order of thickness) will be about one one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Desjg��.. Coefficient of Friction 0.55 Passive Earth Pressure 350 p.c.f. Where: (1) p.c.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. z 0 A 0 M 1h Michel Construction, Inc. 8 Ave. S & Pine Street Page five A safety factor of at least 1.5 is recommended for design of the foundation's resistance to lateral loading. z SLABS -ON -GRADE: 0 M Slab -on -grade floors may be supported on undisturbed, competent native CD soils or on structural fill. The slabs may be supported on the existing soils 0 M C provided these soils can be recompacted prior to placement of the free -draining M 0 sand or gravel underneath the slab. This sand and gravel layer should be a 0 0 0 minimum of four (4) inches thick. We also recommend using a vapor barrier C such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 M M z inches for sealing purposes. C z > PERMANENT FOUNDATION AND RETAINING WALLS: 0 _n Retaining walls backfilled on one side only should be designed to resist M M lateral earth pressures imposed by the soils retained by these structures. The CD 0 following recommended design parameters are for walls less than twelve (12) 0 M C CD feet in height which restrain level backfill: 9 CD M 0 Z Parameter Design Value X Active Earth Pressure* 35 p.c.f. z Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. z 0 Where: 0 M (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot deflect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). 11 Michel Construction, Inc. 8 th Ave. S & Pine Street Page six The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do. not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy co.nstruction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. the purpose of these backfill requirements is to assure that the design criteria for the retaining wall as not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. z 0 A 0 M =n- M M 10 0 0 0 C M M Z '() --I C _Z 0 -n n M M 0 0 0 M (J) Cf) Q 0 Z z C/) z 0 i 0 M Michel Construction, Inc. 81h Ave. S & Pine Street Page seven EXCAVATION AND SLOPES: In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a Z height of four (4) feet deep in unsaturated soils may be vertical. For temporary 0 cuts having a height greater than four (4) feet, the cut should have an inclination 0 no steeper than 1:1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnicall engineer, excavation cuts may be modified for site conditions. All permanent U5 -i cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes M C: M should not exceed 1:1 (H:V).'It is important to note that sands do cave suddenly, 0 -40 0 and without warning. The contractors should be made aware of this potential C --I K : W�, hazard. M M Z Water should not be allowed to flow uncontrolled over the top of any C _Z > temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve 0 n stability of the surficial layer of soil. A - M M DRAINAGE CONSIDERATIONS: 0 0 M C CD Footing drains are recommended at the base of all footings and retaining 9 Cn Q 0 walls. These drains should be surrounded by at least six (6) inches of one -inch- minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert' > should be at least as low as the bottom of the footing and it should be sloped for Z drainage. All roof and surface water drains must be kept separate from the Cn foundation drain system. Z 0 The excavation and site should be graded so that surface water is directed 0 off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. Michel Construction, Inc. 8 th Ave. S & Pine Street Page eight )RK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and cleared of all surface vegetation, all organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation prior to placement of any structural fill. All structural fill should be placed in horizontal lifts with a moisture content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: Location of Fill Placement Minimum RelativeCompaction Beneath footings, slabs or walkways 95% Behind retaining walls 90% Beneath pavements 95% for upper 12 inches of subgrade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site Soils If grading activities take place during wet weather, or when on -site soils are wet, site preparation costs may be higher because of delays due to rains and Z 0 i 0 M --i -n 0 M M 0 0 -40 0 C M M Z ,C) -4 C o -n M M 0 C-1) 0 0 M C C/) M 0 Z 7-1 Z --i W Z 0 --i 0 M Michel Construction, Inc. / 8 1h Ave. S & Pine Street Page nine the potential need to import granular fill. The on -site soils are generally silty and thus are moisture sensitive. Grading operations will be difficult when the moisture content of these soils exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill which is to be placed in wet weather should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials is segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: The overall property at 8" & Pine contains upslope seepage. The road (8 1h Ave. S.) has created a long term historical "dam". Thus, the S.W. corner of the property has become a man-made "moisture -zone". Drainage plans by Donna Breske, P.E. have incorporated intercept drains, tightlines and detention/ orifice mitigations. Geotechnically, this engineer will provide onsite inspections to verify proper foundation subgrade conditions exist prior to any concrete placement. CONC-RETE.' All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. INSPECTION: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: Z 0 i 0 M :; 9 M C MO 0 -1 0 0 C —1 K X M M Z g) --i Cn 0 -n n M M 0 0 M cl) Cn M 0 Z X Z Z 0 i 0 M I W, 81h Michel Construction, Inc. Ave. S & Pine Street Page ten Soil cuts Foundation subgrade verification Retaining wall, or rockery placement z 0 Any fill placement Subsurface drainage installation 0 M Temporary and final erosion control measures. C/) M SUMMARY: 0 0 The proposed Michel Construction 8 lot SFR project at 8" & Pine Oc Edmonds, is geotechnically viable when constructed in accordance with the XM Mz recommendations herein, compliance with City of Edmonds approved plans and C: -Z requirements, and key geotechnical inspection during construction. > 0 CLOSURE: -n The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer MM 0 C-1) 0 0 M C C/) M 0 Z z C/) z 0 0 M Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical/ Civil Engineer September 29, 2004 Ft C JAN City of Edmonds 121 5 1h Ave. N. DI\fIS1014 Edmonds, WA 98020 Subject: Field Reports Geotechnical 1psp—ections Michel Construction Project 48in and Pine-) 8 New Single Family Residences This report presents the ongoing results of geotechnical inspections for the 8 new residences at 8 th and Pine (by Michel Construction Inc.). REFERENCES: 0 Geotechnical report by D. Bruce, P.E. July 2, 2004 * City of Edmonds approved project plans for 8 new residences * Inspection authorization by City of Edmonds 0 Construction photographs BACKGROUND: Michel Construction has received permits for the construction of 8 new residences at the northeast intersection of 8 �h Ave. and Pine St. This engineer prepared a geotechnical report dated July 2, 2004 with criteria for foundation work, excavation, and rockeries. Excavation for the project began in August of 2004 (see photographs). This engineer provided gp�ila onsite inspections during periods of active excavation and foundation work. 915 81h Ave. S. (2004-0714): All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SOILS - FOUNDA rIONS - SITE DEVELOPMENT - INSPECrION - DRAINAGE - DESIGN& PERMIT - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 0 M City of Edmonds September 29, 2004 Page 2 of 3 921 811 Ave. S. (2004-07131: All excavation stable and approved. Soil bearing of 2,000 p-s-f- verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds a I pproved plans. 925 8" Ave. S. (2004-QQ981: All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 933 81h Ave. S. (2004-07101: All excavation stable and approved. Soil bearing of 2,000 p-s-f- verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 945 81h Ave.. S. (2004-Q712 proved. Soil 1: All excavation stable and ap bearing of 2,000 p-s-f- vedfied. "OK to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 953 8 Ih Ave. S. (2004-QZ1 11: All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 959 8th Ave. S. (2004-07091: All excavation stable and approved. Soil bearing of 2,000 p.s.f. verified. "OK' to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. 821 Pine St. (2004-0697): All excavation stable and approved. Soil bearing of , 2,000 p.s.f. verified. "OK'to proceed with foundation formwork, reinforcing steel, and concrete placement per City of Edmonds approved plans. SUMMARY: Geotechnical inspections verifi proper work through this date September 29, 2004. 0 The excavations for all 8 lots are stable and pppio—ved. z 0 i 0 M -1 71 Fn -4 X 0 M C M 0 -10 0 C M M z ID --I —z 0) o -n M M 0 —C1) 0 r- 0 M C Cn 9 (n M 0 Z z 0) z 0 1 0 M Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical /Civil Engineer RECEIVED December 30, 2004 JAN G 2005 ENGINEEPUIG DIVIS10m City of Edmonds 121 5 1h Ave. N. Z Edmonds, WA 98020 0 Subject: Field Reports Geotechnical Inspections 0 Michel Construction Project(iF_an_dP_-ine`-) 8 New Residences Vi M This engineering report presents the results of ongoing ge otechnical 0 M 0 at 8th inspections for the 8 new homes constructed by Michel Construction and 0 0 C: Pine. X M M Z REFERENCES: * City of Edmonds approved project plans ch 0 Geotechnical reports by D. Bruce, P.E. July 2, 2004 0 n n� 0 Previous inspection reports - i i 0 Photographs mm 0 INSPECTIONS: 0 OM C: cn This engineer has provided and continues to provide onsite geotechnical MO Z inspections as required by City of Edmonds authorization. Pine St. (2004-06971: This engineer verified proper placement of > compacted structural fill (crushed rock) to improve constructability on sub- Z grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively Z placed as a construction expedient and is geotechnically approved. 0 Subsurface drainage was properly placed in accordance with approved 0 plans and normal practices. M The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 959 8" Ave. S. (2004-0709): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). SOIL S - FOUNDA rIONS - S1 rE DE VEL OPMEN T - INSPEC TION - DRA INA GE - DESIGN & PERAW 7' - L EGA L P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 1 1 11. City of Edmonds December 30, 2004 Page 2 of 3 953 81h Ave. S. (2004-071-11: Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading gpploved through this date (December 30, 2004). 945 81h Ave. S. (2004-071 : This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnicaily approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 933 8 th Ave. S. (2004-0710): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading gppfoved through this date (December 30, 2004). 925 8 Ih Ave. S. (2004-0698): This engineer verified proper placement of compacted structural fill (crushed rock) to improve constructability on sub - grade soils. This engineer previously verified dense native sub -grade soils providing 2,000 p.s.f. bearing capacity. The structural fill was effectively placed as a construction expedient and is geotechnically approved. Subsurface drainage was properly placed in accordance with approved plans and normal practices. The rear soil cut required erosion stabilization and this engineer verified proper placement of the rockery. Base rocks were properly founded in dense native sub -grade soil. Rock size, rock linkage, and batter were properly installed. 921 8 Ih Ave. S. (2004-07131: This engineer verified proper placement of structural fill material atop the dense native soils. As previously verified, the dense native soils easily provide a minimum of 2,000 p.s.f. bearing capacity. Contractor chose to place rock as an improved sub -grade material. Placement of structural fill and compaction were inspected and are geotechnicallIV approved. This engineer verified proper placement of subsurface drainage in accordance with approved plans and good practices. Z 0 4 0 M :i 9 Cl) --i 0 M C M 0 0 0 C M M Z 10 C Cn 0 _n n —4 M M M q 0 0 M C C/) 9 Cn M 0 Z 3: Z CI) Z 0 A 0 M City of Edmonds December 30, 2004 Page 3 of 3 915 8" Ave. S. (2004-0714): Subsurface soil bearing previously verified and approved. Foundation installation, subsurface drains, and site grading approved through this date (December 30, 2004). SUMMARY: 0 Ongoing geotechnical inspections verified proper foundation, drainage, and rockery work through this date (December 30, 2004). 9 No adverse geotechnical impacts have occurred to this site or neighboring properties as a result of the construction activities. 0 Ali geotechnical aspects are approved through this date (December 30, 2004). 0 Geotechnical inspections ongoing as required by City of Edmonds. If there are any questions, do, not hesitate to call. I V'F' Dennis M. Bruce, P.E. j — Geotechnical / ivil Engineer I EUMES 12123/ C.C. Michel Construction Inc. 7907 212 th St. SW #102 Edmonds, WA 98026 DMB:jpb z 9 0 M --i -n M C M 0 0 0 C IT! IT! z C z 65 o -n M M M 0 C—/) 0 0 IT! Cn Cn M 0 Z z --I z 0 q 0 M M, � Height Calculation Worksheet Address: C1 Fk V, Date: Inspector(s): 1. Datum Point: ?.,IVN Q- 2. Datum Point Elevation: tA -f z 0 3. Average Grade: M .4..Max um Elevation Allowed:)-(iverag6 giade)-+ 25 U5 M C 5. Reference Point Elevation Shot to House: M 0 0 -40 0 (datum elevation)+ j7 g%j (grade to transit level line 9,q:l 'shot to house) C M MZ 6. Measurements from line shot onto house to r6of ridge: C Cn L 0 -n -n C1. M M W 0 0 M C W K 0) M 0 Z z Total: I k W z M 7. Actual Elevation::L'Sq �A8 (reference point elevation) + 0,*:,I I (measurements from #6) 9 .5q Conclusion: (actual) is greater /Qgj&han 9-9O.9LS (allowed); therefore the house b/ is not over the height requirement per ECDC 16.20-30 requirements GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH EDMON DS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building Engineering June 8, 2005 0 Michel Construction M 7907 212"' St. SW # 102 Edmonds, WA 98026 3: M Re: Building Permit: 2004-0712 M 0 0 Site Address: 945 8"' Ave S. 0 C Expiration Date: 08/26/05 M M Z Dear Micliel Construction, C _Z The purpose of this letter is to inform you that the last remaining inspection Oil YOLir X project is a final inspection(s). The final inspection(s) determines that there are no 0 -n -n outstanding life -safety issues and approval allows tile City to close your pennit File. M M The City considers the final inspection to be one of tile most important inspections 0 Ui 0 conducted on a project. In order to grant final approval tile following must be complete: 0 M C W smoke detectors, hou se numbers, guardrails, handrails, self -close doors between garage K W M 0 and residence, egress from sleeping rooms, safety glazing, weather-stripping, any Z r— Engineering department rcquirein ents etc. Of course not all of these things may X specifically apply to your project but it does give you an idea about tile kinds orthings that mus t be complete as well as some items that do not need to be installed such as: > Yom paint, cat -pet, moldings, wallpaper, etc. Please be advised permits expire one year f Z the date of issuance. if you will need more tirne to corriplete the work, permits call be 3: renewed prior to expiration for one half fees. If the permit expires without a final 55 Z approval granted by the Building Inspector, full. fees are required in order to renew tile 0 -4 permit. This can be very costly to you and we strongly encourage you to check your 0 permit expiration date and call for the required final inspcction(s). Note: If more than M one department is required to final your project, this is noted on your Job Card. Please feel free to contact tile at 425-771-0220 if you have any questions. Sincerely, JoAnne Zulauf Permit Specialist I Xre nip\I)SI" s\M aster 1.etters\,SRwaaniL1rSFR Incorporated August 11, 1890 Sister City - Hekli nan,Japan ff � Mar 28 06 09:31a D. Bruce, P.E. 206-546-8442 P.1 Dennis M. Bruce. RE. M. S. C. M. B. A. otechnical /Civil Engineer March 25, 2006 City of Edmonds 121 5" Ave. N Edmonds, WA 98020 Subject: FINAL Report - Geotechnical Inspections Michel Construction, Inc. 8 Now Homes 8th and Pine, Edmonds, Washington 915 8th Ave. S I Permit No. 2004-0714 945 8th Ave. S I Permit No. 2004-0712 921 8th Ave. S I Permit No. 2004-0713 953 8th Ave. S I Permit No. 2004-0711 925 8th Ave. S I Permit No. 2004-0698 959 8th Ave. S I Permit No. 2004-0709 933 8th Ave. S I Permit No. 2004-0710 821 Pine St / Permit No. 2004-0213 (final report submitted June 14, 2005) This engineering report presents the final resufts of ongoing geotechnical inspections for the 8 new homes constructed by Michel Construction at 8th and Pine in 4, 2005 completed inspections Edmonds, Washington. NOTE: Final report dated June 1 at 821 Pine St. REFERENCES: 0 City of Edmonds approved Project Plans RECERVED a Geotechnical and inspection reports by D. Bruce, P.E. 0 Site photographs MAR 2 8 2006 DEVELOPMENT SERVICES CTR. INSPECTIONS: CITY OF EDMONDS This engineer provided on -site geotechnical inspections as required by City of Edmonds in accordance with special inspection agreements. Geotechnical inspections occurred Agj!.y during key aspects of excavation, foundation preparation, fill placement, subsurface drainage, rockery construction and grading activities. The following summaries refer to all 7 homes listed above (821 Pine St. already completed). Excavations: The excavation for all 8 homes encountered dense native sub - grade soils as anticipated by the geotechnical investigation and report. SOILS * FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN a PERMIT - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 z 0 i 0 M --i -n U5 M 0 0 -40 0 M M Z r') -1 C 3: U5 0 -Ti n M M 0 0 0 M C cl) 9 co Q 0 Z 3: z -4 :C Cl) z 0 A 0 M 0 Mar 28 06 09:31a D. Bruce, P.E. 206-546-8442 p.2 City of Edmonds Re: Michel Construction, Inc., March 25, 2006 Page 2 All excavations were stable and are approved. a Soil Beadng: This engineer verified dense native sub -grade soils easily providing 2,000 p.s.f. bearing capacity. Subsequent foundation formwork reinforcing steel and concrete placement occurred in accordance with City of Edmonds approved Plans and good practices. Approved. 0 Fill Material: No significant quantities of fill material were required for geotechnical purposes. Contractor brought in localized amounts (less than 10 cubic yards per lot) and placed as a sub -base in order to optimize foundation - formwork procedures. All placement of fill material is in accordance with this engineer's geotechnical inspections. Approved. Rockery Construction: This project required a number of rockeries both between lots and at the up -slope east portion of the project (see Project Plans and photographs). -grade This engineer verified the following: Base rock embeddment in dense sub soil, rock linkage, rock size, rock chinking, drainage zone, face batter, and final 'blending in" with existing grades. All project rockeries comply with approved Project Plans, this engineer's on -site recommendations and normal good practices. All rockeries are gppLoved as constructed. Subsurface Drainage: This engineer inspected and verified placement of subsurface drains in accordance with City of Edmonds approved Plans and good practices. All subsurface drainage is all a roved. Erosion Control: Contractor properly established temporary erosion control measures consisting of: Rocked construction entrance, siltation fencing, straw bales as required, inlet catch basin filter socks, and diligent. cleanup. All temporary erosion control measures were properly maintained throughout the project. Permanent Erosion Control Measures: Permanent erosion control measures have been properly established for the entire 8-home project: Final surficial grading has been completed, all dfiveways have been paved, rockedes completed, landscaping consisting of lawn, shrubbery and small trees have been properly installed. Additionally, the native growth zone at the southwest portion of the overall property appears to comply with City of Edmonds approved Plans. Z 0 i 0 M D. Bruce, P.E. 20G-54G-8442 P.3 Mar 28 OG 09:31a City of Edmonds Re: Michel Construction, Inc. March 25, 2006 Page 3 ol measures have been installed. There are no All permanent erosion contr exposed earth surfaces on the project- Approved. geotechnical instabilities or z SUMMARY: pection items have been properly completed All special geotechnical ins 0 including permanent erosion control measures. pletes the geotechnical inspections by D. Bruce, P.E. This report com Cn M C If there are any questions, do not hesitate to call. M 0 0 C M M z Tw C z > 0 -n. -n ONA1161 M M F Dennis M. Bruce, P.E. W �O EXPIRES Geotechnical Civil Engineer r, .:i. 0 M, C 0) cn, DMB:abj MO Z truction, Inc. cc: Michel Cons z 0) z (ZEagle Eye Consulting Engineers PO BOX 523 MICRJFILM Olalla WA 98359 C:206 356-7790 P:253 857-4939 August 18, 2004 z 0 To: Michel Construction M 7907 212 SW # 102 Edmonds, WA 98027 C0 Re: Michel Single Family Home M C th M0 959 8 Ave 0 0 Edmonds, Washington 98026 0 C. M Client's Reference Number # 04-303 EECE # ED04-23 M z C This project is approved for " Architectural, Structural, Plumbing, Mechanical, VIAQC and Energy " Pen -nit only. The drawing review has been completed and accepted for permit with the Approved Stamped drawings returned to the City of Ethylonds on August 18,2004. This plan has been redlined on A5 Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review, when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please Hoyt Jeter at (253) 857-4151 between 8:00 am and 5:00 pm. City of Edmonds Bv: Hoyt Jeter, PE President \\Ugleoye\eagIe eye consulting engineers\ Plan Review\ Udrnonds\2flGI\ED0-1-23\ ED-0 1-23 approval.doc