Loading...
20040769.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS MAILINU At)UKtbb CIT3" ZIP TELEPHONE NAME ADDRESS CITY ZIP ITELEPHONE NAME USE ZONE JOB ADDRESS ef "//-- PLAT NAME/SUBDIVISION NO. PERMIT EXPIRES PERMIT NUMBEI`3�t�/v LOT NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRED DEDICATION— FT METER SIZE I LINE SIZE I NO. OF FIXTURES SJITEIAPT# E110N1111111111 LID NO, LID FEE S IESCP Approved C3 C3 RW permit Required 13 Street Use permit Rori'd inspection Required Q S,dewjjj� Required [3 Underground E3 Wiring required PRV REQUIRED YES E3 NO 13 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE CBL 4 MI S U 'T BE PRESEN " FOB— NGINEERIN9'AqyVEFfffI , - M 1. 26�� 1 � _L. RE WAI�, OR C ADDRESS CITY Z ZtL TELEPHONE N U I STATE LICENSE NUMBER FXPIKATIUN UAT E ONECK I BY C) 0!5 N � PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL PLUMBING / MECH ADDITION COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR GRADING CYDS 0 FENCE X FT DEMOLISH TANK OTHER GARAGE RETAIN ING WALL FIRE SPRINKLER FIRE ALARM CARPORT ROCKERY (TYPE OF USE, BUSINESS,04j ACTIVITY) EXPLAIN: NUMBER OF NUMBER OF DWEL , LING CRITICAL AREAS STORIES UNITS NUMBER DESCRIBEI WORK TO BE DONE HEAT SOURCE I GLAZING % I LOT SLOPE % PLAN CHECK NO: i VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180DAYS PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEFS, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY 10 ENFORCE ANY ORDINANCE PROVISION I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTIIORIZED THEREBY. NO PERSON WILL. BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNATURE (OWNER OFAGENT) (& I DATE SIG7/ FIRE REVIEWED BY DATE BOND VARIANCE OR CU SHORELINE OR ADBN NSREO ON POSTED T" 6D 0 YES INU S HEIGHT cc W z z E5 z W ul cc rL SEPA REVIEW COMPLETE EXEMPT SIGN AREA ALLOWED PROPOSED ALLOWED I PROPOSED EXP , I LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR REAR FRONT LJR SIDE 0 z --j PARKING LOT AREA I PLANNING REVIEWED BY DATE CL REO'D I PROVIDED REMARKS CHECKED BY ITYLE—OF OCCUPANT GROUP 4 kl� SPECIAL INSPECTION I AREA uuuur^ REQUIRED[] L��AD ................. REMARKS z PROGRESS INSPECTIONS PER UBC 108/IBC1091IRC109 FINAL INSPECTION REO'D M VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire inspection LandscapeInsp. Recording Fee FEE Description FEE State Surcharge City Surcharge Base Fee CALL FOR INSPECTION (425) 771-0220 cv�r -102firl Plan Chk. Deposit Receipt Total Amt. Due 1�5 Receipt # APPLICATION APPROVAL This application is not a perrT it until signed by the Building Otlicial or his/her Deputy and Fees are paid, and receipt is acknowledged in space provided. IC SIG JA RE DATE OATE ATTENTION I IT IS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVALOR A CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/iRC110. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR z 0 1 0 M --i -n 0 M C M 0 0 C) 0 C: M M Z JO C/) o -n n M M Q —(/) 0 r- 0 M C (n 9 Cn M C-) Z z Cl) z 0 A 0 M TO: DATE: N4EMO TO: PE OORDIN BUILDING DIVISION FROM: FIRE DEPARTMENT DATE_L�) -7 PLEASE WN ENGINEERING DIVISION DATE Pj.F,%_,;l! SIGN PLANNING DIVISION DATE PLEASr SIGN hnpr PROJECT J SITE ADDRESS- 04 7 ADB# DATE INSPECTED PERMIT # DESCRIPTION OF WORK TO BE INSPECTED—U C-- A field inspection Nvas conducted to determine compliance. with -approved plans. Final approval e above signed Department to the release of denotes that there are no objections from th PERFORMANCE BONDS and the granting of: 04,1-)GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by hipector 2. 9A RE -INSPECTED OUTSTAN-DING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature I:teilip:blcig:fornis:ocal)i-\,I 3125/04 z 0 M -1 -n (j) M 0 M C M 0 0 --in 0 C M M Z 10-1 c:: cl) 0 -n n 7d __j > t K M M 0 Fn 0 r- 0 M C U) F. Cn M C) Z r z C/) z 0 i 0 M I � RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION. Footing .......................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 000- z 0 0 ITI