Loading...
20040773.pdfM USE ZONE ;ERMIT CITY OF EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION SUITE APT OWNER NAME OF BUSINESS TADORESS,,� q-1 / (109 40e� L D)ger-4- Me- Cor wl6e, LEGAL DESCRIPTION CHEC�.j SueDi�lblc-, -,o u .4 0 MAII, ING ADDRESS 0 PL PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING REQUIRED DEDfCA`TION TESCP Approved 0 RW Permit Rertijited 0 Street Use Pprmil Req d 0 CI I y ZIP MaICK05 01 R,70;0% TELEPHONE NUMBER ML9 020b.510 PROPOSED Inspection Required 0 Sidewalk Required 0 a: t: x U cc NAME LINE SIZE R E—MAHSHAL NO OF FIXTURES PRV REQUIRED YESD NO 0 Uj 1­ < 0 ADDRESS REMARKS IW`.i F BE HHESENT REMQVAIL, FOH OR G4 Z Fr Uj Uj CITY TELEPHONE NUMBER 4a IVA Z NAME enwirorweri&l *Fatfl� c5e- ADDRESS J co, 0 Z 0 ENGINEERING MEMO DATED REVIEWFD BY CIIY ZIP 9y oo 1 192, TELEPHONE NUMBER V3,3 A3-i 5 FIRE MEMO DATED REVIEWED BY Uj (r LICENSE NUMBER riON -PjV1,k,T-5 -1/31 AT SIGN AREA SEPA REVIEW ADB NO lESTATE ALLOWED PROPOSED COMPLETE EXEMPT Legal Description of Property - includd ail —easferne—n—Vs SHORELINE Z P Q_ cc L) (n EXP VARIANCE OR CU PLANNING REVIEW BY DATE SETBACKS —FEET FRONT SIDE REAR HEIGHT ]LOT COVERAG E LD Z Z Property Tix Account 0 REMARKS Q. Parcel NO. C-2 ElNEVV NQ RESIDENTIAL PLUMBING 1:1 ADDI FION 1:1 COMMERCIAL El MECHANICAL EIREMODEL 1:1 APT BLDG. SIGN CHECKED BY TYPE OF CONSTRUC TION [CODE OCCUPAN1 GROUL( GRADING FENCE F7 REPAIR E] — CYDS. x _FT) Q cc 0 cn Uj 0 C) DEMOLISH WOODSTOVE SWIM POOL 0 INSERT El HOT TUB/SPA 1 GARAGE RETAINING WALL/ 1 CARPORT E] ROCKERY RENEWAL SPECIAL INSPECTOR REQUIRED AREA' OCCUPANT LOAD REMARKS PROGRESS INSPECTIONS PER UBC 305 Z .0 ACT ITY) EXPLAIN: (TYPE OF USE. BUT -71) fqcid� D to NUMBER OF STORIES NUMBER OF CRITICAL. N1 AS DWELLING A UNITS U .EF1 DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) Deeompnf5st #1 �t k!"A"lo FINAL INSPECTION REQUIRED wash VALUATION FIE E FEE PLAN CHECK FEE BUILDING HEAT SOURCE GLAZING I % PLUMBING Plan Check No. MECHANICAL GRADINGIFILL This Permit covers work to be done on private property ONLY. Any construction on the public domain (curbs, sidewelks, driveways, marquees, etc.) will require separate permission. U9VIRCHARGE A-) SMX��GE FEE Permit Application: 180 Days Permit Limit: 1 Year - Provided Work is Started Within 180 Days NSPECTION FEE L.n Cr < 1: "Applicant. on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify. defend and hold harmless the City of Edmonds, Washington, its officials, employees. and agents from any and all claims for damages of whatever nature. arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT 0 o ' mo d,iify, waive or reduce any requirement of any city ordinance nor mit in any way the City's ability to enforce any ordinance provision." TOTAL AMOUNT DUe 1 11 71-?` 1 1k h mcknnwled n that I have read this annlication; that the viv 7 ti information given is correct; and that I am the owner, or the duly ATTENTION APPLIGAIIUN APPROVAL authorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until state laws regulating construction; and in doing the work authoriz- AUTHORIZES THE signed by the Building Official or his/her ed thereby, no person will be employed in violation of the Labor ONLY WORK NOTED Deputy; and fees are paid, and receipt is Code of the State of Washington relating to Workmen's Compensa. tion Insurance and RCW-J.8.27. INSPECTIC'. acknowledged in space provided. SIGNATUR NER 0 DA T E NED DE PA R T Y E *4 7 rh 0 P I L S SIGNAT E ATE L L e? 71 /,9 CITY OF EDMONDS D A—, CALL FOR EL- D dAfE 29� ATTENTION INSPECTIO N m'o IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE BEEN MADE AND APPROVAL OR 771-0220 _�/,�//z/ ORIGINAL LOV) —47nsp/clor UNTIL A FINAL INSPECTION HAS A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3 PINK — 0.-. - r- GOLD -- Assessor 102.67 Z 0 i 0 M -i -n 3: M C M 0 0 0 C: --I K 3: M M Z 1c) --I C 3: 0 -n n M M 0 C/) 0 r- 0 M C Cn 90) M 0 Z 3: Z Z 0 1 0 M FINAL PROJECT APPROVAL FORM, lo30 TO - DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: t,;z FIRE DEPARTMENT DATE 7"SH SIGN ENGINEERING DIVISION DATE z PLEASESIGN 0 A 0 PLANNING DIVISION DATE M PLFASE SIGN PROJECT 7- Z5 M 0 SITE ADDRESS M 0 0 C 0'7 ADB# DATE INSPECTED --i K PERMIT 2: M M Z DESCRIPTION OF WORK TO BE INSPECTED (2-1"�'SrZ > r -4 A field inspection was conducted to determine compliance with -approved plans. Final approval 'cn 0 _n denotes that there are no objections from the above signed Department to the release of n;U ORMANCE BONDS and the granting of > PERF 9 11� M M U5 0 M GRANT FINAL PROJECT APPROVAL K Cn M z X GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z 0 Copy of CONDITIONS given to owner/contractor by inspector Cn z 0 FAILED FINAL INSPECTION - OUTSTANDING ISSUES M Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fonns:ocaprv1 3/25/04