Loading...
20040786.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/N7M7E OF 13USINESS , � 5 0 1,"1 Ir MAILING ADDRESS W z 0 ZIP TELEPHONE tz-l� Atu 1,V b 73 '1 NAME U Lu ADDRESS U x CITY ZIP TELEPHONE NAME CBL P I Z, 1A tA Y'q L _z/ ADDRESS CITY ZIP ELEPHONE 9A JT F tv J 61 C �q U L - [CHECKED BY STATE LICENSE NUMBER EXPIRATION DATE 1) i,�q K 0/"L, PROPERTY TAX ACCOUNT PARCEL NO NEW RESIDENTIAL AfFLUMBING / MECH ADDITION COM _IeMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL 1:1 MULTIFAMILY El SIGN REPAIR GRADING 13 CYDS FENCE 17 ( X FT) DEMOLISH 1:1 TANK 1:1 OTHER GARAGE Ei RETAINING WALL FIRE SPRINKLER 11 z CARPORT ROCKERY FIRE ALARM (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: iFc A j 'L 5 Irr%_1 IS tg a NUMBER NUMBER OF CRITICAL M OF DWELLING AREAS or STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE f\`JM1?(yV6- IN A IN i-L V' &A -IL- NeA,(EfKl�, yvA 1) 161 piii_�q 1) -,,)Q V I r& R-fijTj?�6,01'11 S HEAT SOURCE I GLAZING % I LOT SLOPE % PLAN CHECK NQ . , I , I , _� I VESTED DATE I ( /I/ - _/ / f J, I THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS wonK TO t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180DAYS IL PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 100 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMiESs rHE CITY OF 2 EDMONDS, WASHINGTON, 11 S OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND a: ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIREC IIY OR INDIRECT LY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF 1 HIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT. AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITT I CITY AND STATE LAWS REGULATING CONSTRUC TION; AND IN DOING THE WORK AUTHORIZED 1IIEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASIIINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNATURE (OWNER ioR�NT) DATE IGNED Y 7 1 USE ZONE JOB ADDRESS PLAT NAME/SUBDIVISION NO I PERMIT EXPIRES PERMIT N U M B E R 4121,441- SUITE/APT# LOT NO, LID NO. LID FEE $ IESCP -- roved 11-11 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit p Required 13 Street use Permit Roq'd 13 EXISTING - PROPOSED inspection Required 13 Sidewalk Required E3 REQUIRED DEDICATION- FT underground Witing required METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED 1 13 0 z YES NO X cc REMARKS z z OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE a 11 W ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DATE ul cc I [z VARIANCE OR CU HORELINE OR ADBN INSPECTION I BOND REO'D I POSTED OYES ONO IS SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED EXP I I I LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LIR SIDE REAR z PARKING LOT AREA PLANNING REVIEWED BY DATE REO'D I PROVIDED I IL REMARKS CHECKED BY ITYPE OF CONSTRUCTION CODE OCCUPAN GRO� 1 �6 90 Zz SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] YES LOAD REMARKS PROGRESS INSPECTIONS PER UBC 108/ IBC109/ IRC109 FINAL INSPECTION REO'D z M VALUATION Description FEE Description FEE Plan Check State Surcharge Building Permit City Surcharge Plumbing Base Fee t Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # LandscapeInsp. Total Amt. Due Recording Fee Receipt # CALL FOR INSPECTION (425) 771-0220 APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy:and Fees are paid, and receipt is acknowledged in space provided OFFICIALS SIGNATURE DATE ED-T DATE ATTENTION E)ff 1333 IT IS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE ANDAPPROVALOR A CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES ORIGINAL-FILE YELLO#-INSPECIC PINK -OWNER GOLD-ASSESSOFf z 0 1 0 M --i ­T1 0 M C M 0 0 0 0 C: --I ?, X M M Z r') --i C _z W 0 ­T1 ri M M 0 0 0 M Cn M 0 Z r— z Cn z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -in ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial, Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z 0 i 0 M —11 -n M C M 0 0 C M M Z r'.) -i . . C C/) 0 _n M ITI 0 0 M C cl) 9 C/) Q 0 Z > z z 0 i 0 M