Loading...
20040833.pdfDATE RECEI PERMIT EXPIRES 4/_ L USE P ERMIT I ZONE '/P e3 �1_ CITY OF EDMONDS NUMBERO*e JOB SUITE/APT# CONSTRUCTION PERMIT APPLICATION ADDRESS OWNER NAMEINAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT NO. NO. Rr JL V -0 (�' 0 C L LID FEE S MAILING ADDRESS W IESCP Approved 13 z PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Required 13 _:9 �j Y'r, vjc�� Street Use permit Roq'd 0 0 ZIP - f ITEL EXISTING — PROPOSED inspection Required E3 CITY EPHONE Sidewalk Required underground REQUIRED DEDICATION— FT Winng required V) U) METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED NAME z YES 0 NO 13 rr tu z ADDRESS REMARKS z OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE E5 z a: CITY ZIP TELEPHONE NAME CBL# LC1 1) Sao- A s5 u L� i ?J t� t] ENGINEERING REVIEWED BY 47 DATE cc ADDRESS f// 3;4;�! 0 13 i) Ave, ��),V)lk FIRE REVIEWED BY DATE UJI CITY TELEPHONE 2 ..... U. ZIP F—J-mcn(ts 9 W-0 I VARIANCE OR CU SHORELINEORADBO INSfECTION BOND STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY HEO'D POSTED I WYES ONO IS LAN DA AI,03qA1H SEPA REVIEW SIGN AREA HEIGHT ALLOWED -j PROPERTY TAX ACCOUNT PARCEL NO, COMPLETE EXEMPT PROPOSED ALLOWED PROPOSED W r A 1) EXP X, LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT) NEW RESIDENTIAL PLUMBING / MECH ALLOWED PROPOSED FRONT SIDE REAR FRONT L/R SIDE REAR COMPLIANCE OR ADDITION �dCOMMERCIAL El CHANGE OF USE z PARKING LOT AREA PRNING RE WE B DATE REMODEL MULTIFAMILY ED SIGN REO'D j PROVIDED GRADING FENCE N i4 ql�&l El REPAIR CYDS El X Fr) REMARKS )THE DEMOLISH TANK VFC—AiRt A GARAGE RETAINING WALL FIRE SPR14KLER z CARPORT ROCKERY FIRE ALARM CrYPE OF USE, BUSIPgSS OR ACTiVrrN) EXPLAIN: CHECKED BY ITY OF CONSTR CTIO. CODE OCCUPANT AIA&K4 (V67 GROUP CRITICAL w NUMBER NUMBER OF / /. SPECIAL INSPECTION JAREA OCCUPANT '3 OF DWELLING NIP AREAS Cl� , I LOAD M UNITS NUMBER YES 0 STORIES REQUIRED DESCRIBE Woptie 'rn R;: nr)mc REMARKS PROGRESSINSPECTIONS PER UBC108/IBC109/IRC109 FINALINSPECTION REO'D *_7 7) VALUATION 15n /A J�j $ 17) 6zo Description FEE Description FEE .,-It) Plan Check State Surcharge HEAT SOURCE GLAZING % LOT SLOPE % Building Permit City Surcharge PLAN CHEC� VESTED DATE Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY AIE WORK NOTED. THIS PERMIT COVERS WORK TO — BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review r PERMIT APPLICATION: 180 DAYS u L PERMIT LIMIT.'11 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION *APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS THE CITY OF c pt# M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND Fire Inspection Receipt # x RE, ARISING DIRECTLY OR INDIRECTLY ALL CLAIMS FOR DAMAGES OF WHATEVER NATU FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOr HE Landscapelnsp. Total Amt. Due to DEEMED TO MODIF'� WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION." X1 Recording Fee -Receipt# I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN is CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF This application is not a permit until signed by the THE OWNEYRA'REE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Official or his/her Deputy: and Fees are paid, and TION; AND DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED receipt is acknowledged in space provided. 10 E FOR IN IN VIOUy ION, OF THE LABOR CODE OF THE STAT� OF WASHINGTON RELATING TO SPECTION WORKMEN�!�,COMPENSATIO��,JNP?RANCE AND 18.27. qj�f�ICIALS SIG� RE DATE A �.r-z 11111 "AGE (425) SIOATE DAT� SIGNED ,,UfiE (0 q 7�/ DATE Z'// '�a 771-0220 IREL ED BY A17ENTION EXT 1333 ITIS UNLAWFULTO USEOR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL at INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU- ORIGINAL - FILE YELLOW - IN ECTOR PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. PINK -OWNER GOLD -ASSESSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES I z 0 M =i =5 M C M 0 0 0 C: M M z Cl) o -n n M M q �5 0 r- 0 M C (1) r. (n M 0 Z z C0 z 0 1 0 M ORT �OF E D M 0 N D S 336 Admiral Way Edmonds, WA 98020-7214 (425) 774-0549 (425) 774-7837 FAX April 7) 2005 RECEIVED APR 112005 Mr. J aime Hawkins ENGINEERING DIVISION z 0 -4 City Engineering Inspector m City of Edmonds 121 5th Avenue North Edmonds, WA 98020 —C am C RE: CLOSURE OF CITY OF EDMONDS PERMITS ma oe GRADING PERMIT# 2004 -6678 AND PARKING LOT RESTORATION PERMIT# 2004-0833 0, Dear Mr. Hawkins: m mz Tl-�s correspondence has been prepared per your request regarding the Harbor Square C > z r- Remediation Project. Landau Associates (on behalf of the Port) supervised a remedial action at the Harbor Square complex during the period from August 2004 to March 2005. The goal of the 0 -nl remedial action was to excavate as much petroleum -impacted materials as possible while maintaining n public and commercial access to the complex. In preparation for soil removal activities, Landau mm Associates obtained the above referenced pern-.tits from the City of Edmonds (City). The permits 0 co reference the Removal Action Plan (RAP) which states that, upon co mpletion of excavation 0 r- 0 rn activities, the remediation areas will be backfilled and then finished with a 4-inch thick lift of asphalt. C Cn 9 Cn Two areas were excavated at the Harbor Square complex. One of the three excavated areas MO was finished with a 4-inch lift of asphalt. The scope of the remedial action has increased and.more Z excavation is scheduled for summer 2005. At the request of the building owner, the Port agreed to ;0 install a 2-inch lift of asphalt in the second excavated area in anticipation of the additional -4 excavation activities. Upon completion of the additional excavation activities, the Port plans to > z install another 2-inch lift (for a total of 4-inches) in the remaining area. Small tempo rary asphalt ramps were in-talled to alln,,Nr for a more smooth transition from die undisturbed surrounding area to the 2-inch asphalt layer. z 0 In March 2005, David Nelson of Landau Associates contacted the City of Edmonds i . ... m Engineering, Building, and Planning Departments to inspect the excavation areas and review the permits. City inspections were conducted on March 4, 2005. Mr. Nelson was contacted by you via telephone on Nfarch 10, 2005 regarding the inspections and permits. A summary of my understanding of the contents of that conversation is as follows: • Due to the lack of a total of 4-inches of asphalt cover in one excavation area, the restoration requirements of the permits were not met. • 'rhe ternp I oran- asphalt ramps currently at the site will need to be removed. M! Page Two • One of the handicap -capable parking stalls adjacent to the 180 W. Dayton Street building was too wide and did not meet City standards. • The City Engineering and Building Departments have signed off on the grading and asphalt permits with the understanding that 1) the Port plans remove the ramps and install a total of 4 inches of asphalt in the entire area excavated after additional excavation activities are completed and 2) the width of the aforementioned handicap - capable parking stall will be corrected once final asphalting is completed. • The Port will need to obtain a new combination grading and site restoration permit prior to additional excavation activities (scheduled for summer 2005). I hope that the information provided herein will be sufficient for your records. We will continue to keep the City informed as to the progress of the Harbor Square Phase I Remedial Action. If you should require additional details regarding our plans for additional excavation activities, please respond to this letter at your earliest convenience. Sincerely yours, Christopher W. IKeu a\um Executive Director cc: Janine Graff, City of Edmonds Building Inspector Steve Bullock, City of Edmonds Planning Department z 0 M 0 . . . . . . . . . . . . . . . ........... OTIC N TO PERMITTEE AND/OR OWNER Q3 DONOTREMOVE PARTIAL APPROVAL CORRECTON REQUIRED ENFORCEME,?� 1:1 TZIOLATION Pill 4 ,-�ES.To �-, /,�.rl C,/ Owner /)oy;Z'T- r,":- A1--,R3r:Ljz PermitNumber 21,61 7,c UA 44C JobAddress 11-1-1-112N -:ST- Site Contact v I r) WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED APPROVED PLANS AND JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE CORRE CTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED RECALL FOR INSPECTION U $50 REINSPECTION FEE MUST BE PAID PRIOR TO INSPECTION REQUEST STOP WORK -UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR L3 NO PERMIT -STOP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY WITH ALL APPLICABLE CITY CODES 7- A/ T-- 7-0 -T-n t,) C", 4� L /r' 7-- ZE ),D- 77-) 0 7-1 F C) k(At N(,C. 19 ri -r i-k F- ,'-I T- I C -7) 17 7 I A -r- pj A 4- R F -1r­li f-2, /A 711/ 1r-, -/\(/ -> N THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED TO BE CORRECTED WITHIN CALENDAR DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTION CALL 425-771-0220 Building El Planning El' -Engineering Fire Public Works Date Inspecto White: Permit File Pink: Enforcement Buff: Applicant z 0 1 0 M --I -n M 0 0 0 C M M Z J0 co o -n n M M 0 0 0 M C Cn Q C) Z X z Cn z 0 i 0 M IPMffIn fonnation ib"BuildOn U J z Februgry 24, 2005 File No. 712-80271 M Attn: Jeannine Graf, Building Official -1 -n CITY OF EDMONDS 0 M 121 e Avenue NoM C M Edmonds, wA 9w2o 0 0 0 X M M z SubjeLt Project Name Removal Action Plan Harbor Square Complex j) -4 PfDj@d Addr0w JSOJWWast Dayton C — > z Pem* No. 2004-M78 F- 19 C/) We. have compleW Me wquepsted spacWl Inspe(,Adons on ft subjeU 0�qji�fd All Work requiring 0 -n n .special Inspection was, to the beat of this agencYs kncrMedge, inspected and reported as spWW on permit documents. MM 0 WORK REQUIRED WORK INSPECTED 0 M Soll Compaction. Testing Soll Compaction Testing) 90 M 0 Z Sincerely, ;U PROFESSIONAL SERVICE INDUSTRIES, INC. z Z' 0 Gordon LIC) 0 Prqed M, M Seattle Construction Serview Department W: Anderson Environmental, Ed Clark Pmtft� aeroce 1n*AvW, I= 241 A 5ft Avwoa wow m%xwwm 7briace, WA SBD43 Mwe: 42SMA&24M - Fax dM48-24DI -.m LANDAU ASSOCIATES February 15, 2005 RECEIVED City of Edmonds FEB 14 2005 Development Services 121 5'hAvenue North PERMIT COUNTER Edmonds, Washington 98020 Attn: Jeannine Graf RE: GRADING PERMIT EXTENSION REQUEST HARBOR SQUARE GRADING PERMIT No. 2004-0678 Dear Ms. Graff - As you discussed with David Nelson of Landau Associates on February 14, 2005, the Port of Edmonds is conducting a soil removal action at the Harbor Square complex located at 180 West Dayton Street. Landau Associates is providing oversight for the soil removal and site restoration activities and has been issued Grading Permit No. 2004-0678 by the City of Edmonds for the project. The project duration was originally estimated to be approximately 6 to 8 weeks, beginning at the end of August 2004. Several unforeseen circumstances contributed to the extended duration of the project. The key factors are as follows: • The overall areal extent of the excavation areas has increased by approximately 200 percent. The additional excavation area is warranted based on the observations of petroleum impacts beyond the anticipated excavation boundaries. • There are numerous active underground utilities in the area. In order to ensure that none of the utilities was interrupted and to maintain site worker safety, excavation around or under these utilities has been a slow process. Some excavation around utilities was expected; however, the presence of previously unidentified utilities and the need to excavate a larger area has required additional excavation around or under utilities. • The excavation of soil in Remediation Area I extended to the east and under a water main. In order to excavate impacted materials, a section of water main was removed and replaced. All activities related to the removal and replacement of the water main have been conducted in conjunction with the City of Edmonds permit requirements. • Our original timeline for this project anticipated completion by late surnmer/early fall, when the groundwater elevations and precipitation volumes would be at their lowest. The project timeline has extended into the winter. Tile "wet season" has caused excavation delays as the contractor has managed water issues in the excavation areas The latest schedule from the contractor estimates the project will be completed, with the exception of the final placement of asphalt, by February 18, 2005. The final asphalt paving work is scheduled to be completed by February 25, 2005. Grading Permit No. 2004-0678 expires on February 16, ENVIRONMENTAL I GEOTECHNICAL I NATURAL RESOURCES 130 2nd Avenue South - Edmonds, WA 98020 - (425) 778-0907 - fax (425) 778-6409 - www.landauinc.com SEATTLE - SPOKANE - TACOMA - PORTLAND z 0 1 0 M --I -n Ui M 0 0 --10 0 C M M Z r'.) --I C 0 -n n M M C) 0 0 M C (J) C 0) M 0 Z M z C/) z 0 i 0 M 2005. We are requesting that the pennit expiration date be extended to February 25, 2005 to accommodate the project schedule. Please contact me at your earliest convenience by telephon e or e-mail (nipowers(GDlandauinc.com) to indicate if the City of Edmonds can accommodate this request, or contact me if additional permit fees or submittals will be required. LANDAU ASSOCIATES, INC. Z� 0:' M, Martin T. Powers, P.E. Project Manager �cn 0'M C! MTP/ccy 0 No. 173025.010.012 0� 0 r M Z' 1 -4 0 C z > 0-11 -n Co. 0 0 M 0; > 0 0 M LANDAu AsSOCIATES 02115105 SAWPROMIM025\012kGrading Pernt Exlension Request—hr.doc RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR .................. C -y—Pe. 1�1�61Y6� ? ; /omw z 0 11 0 M --I -n C M -40 0 0 M M z K) C _Z Cl) o -n n M M 0 0 rn C M 0 Z z 0) z 0 M